HomeMy WebLinkAboutC010.0.1- Table of ContentsPage 1
TABLE OF CONTENTS
Section Page
A. Construction Plan – General Plan Components (Section A)………………...............................................5
1. Index of the location of required plan elements in the construction plan………………………………………..5
2. Vicinity Map…………………………………………………………………………………………………………………………………….5
3. Narrative Describing Project Nature and Purpose………………………………………………...............................5
4. Latitude and longitude to the nearest fifteen (15) seconds…………………………………………………..............5
5. Legal Description of the Project Site…………………………………………………………...……………………………………6
6. 11 X 17-inch plat showing building lot numbers/boundaries and road layout/names…......................6
7. Boundaries of the one hundred (100) year floodplains, floodway fringes, and floodways …………......6
8. Land use of all adjacent properties. …………………………………………………………………………………………………6
9. Identification of a U.S. EPA approved or established TMDL. ……….…………………………………………...........6
10. Name(s) of the receiving water(s)………………………………………………………………………………………….…………6
11. Identification of discharges to a water on the current 303(d) list of impaired waters and the
pollutant(s) for which it is impaired….……………………………………………………………………………………………..7
12. Soils map of the predominate soil types…………………..……………………………………………………………………..7
13. Identification and location of all known wetlands, lakes, and water courses on or adjacent to the
project site (construction plan, existing site layout) ………………………………………..................................7
14. Identification of any other state or federal water quality permits or authorizations that are required
for construction activities…….……………………………………………………………..……………………………………………7
15. Identification and delineation of existing cover, including natural buffers…………………………………….…8
16. Existing site topography at an interval appropriate to indicate drainage pattern.…...…......................8
17. Location(s) where run-off enters the project site………………………………………………………………..……………8
18. Location(s) where run-off discharges from the project site prior to land disturbance……………………..8
19. Location of all existing structures on the project site……………………....………………………………………………8
20. Existing permanent retention or detention facilities, including manmade wetlands, designed for the
purpose of stormwater management..…………………………………………………………………………………………...8
21. Locations where stormwater may be directly discharged into ground water, such as abandoned wells,
sinkholes, or karst features …………………………………………………………………….…………………..………………….8
22. Size of the project area expressed in acres …………………………………………………………………….………………8
23. Total expected land disturbance expressed in acres ………………………………………………….……………….....9
24. Proposed Final topography…………………………………….…………………………………………………………………….…9