Loading...
HomeMy WebLinkAboutC010.0.2 - Table of ContentsPage 2 25. Locations and approximate boundaries of all disturbed areas…………………………………………..…………….9 26. Locations, size, and dimensions of all stormwater drainage system such as culverts, stormwater sewer, and conveyance channels……………………………………………………………………………………….……………9 27. Locations of specific points where stormwater and non-stormwater discharges will leave the project site………………………………………………………………………………………………………………………………………..…………9 28. Location of all proposed site improvements, including roads, utilities, lot delineation and identification, proposed structures, and common areas………………………………………………………………….9 29. Location of all on-site and off-site soil stockpiles and borrow areas……………………………………………….10 30. Construction support activities that are expected to be part of the project…………………………………………………………………………………………………………………….…………………….10 31. Location of any in-stream activities that are planned for the project including, but not limited to stream crossings and pump arounds………………………………………………………………………………………………10 B. Stormwater Pollution Prevention – Construction Components (Section B)........................................................................................................................................................1 1 1. Description of the potential pollutant generating sources and pollutants, including all potential non- stormwater discharges ………………………………………………………………………………………………………….…..…11 2. Stable construction entrance locations and specifications…………………………………………………………….11 3. Specifications for temporary and permanent stabilization................................................................11 4. Sediment control measures for concentrated flow area….…..………………………………………………………..11 5. Sediment control measures for sheet flow areas…………………………………………...................................11 6. Run-off control measures ……………………………………………………………………………………………………..………12 7. Stormwater outlet protection location and specification……………………………………………………………….12 8. Grade stabilization structure locations and specifications…...............................................................12 9. Dewatering applications and management methods..……………………….…………………………………………..12 10. Measures utilized for work within waterbodies……………………….…………………………………………………...12 11. Maintenance guidelines for each proposed stormwater quality measure ………………………………….…13 12. Planned construction sequence that describes the implementation of stormwater quality measures in relation to land disturbance..…………………………………………………......................................................13 13. Provisions for erosion and sediment control on individual residential building lots regulated under the proposed project …………………………………………………………………………………………………………….………14 14. Material handling and spill prevention and spill response plan meeting the requirements in 327 IAC 2-6.1..…………………………………………………………………………………………………………………………………………… 14