HomeMy WebLinkAboutC010.0.3 - Table of ContentsPage 3
15. Material handling and storage procedures associated with construction activity ………………………...14
C. Stormwater Pollution Prevention: Post Construction Component……............15
1. Description of pollutants and their sources associated with the proposed land use…………..............15
2. Description of proposed post-construction stormwater measures ………………………………………………..15
3. Plan details for each stormwater measures …………………………………………………………………………………..15
4. Sequence describing stormwater measure implementation. ………………………………………………………..15
5. Maintenance guidelines for proposed post-construction stormwater measures ………….……………….15
6. Entity that will be responsible for operation and maintenance of the post-construction stormwater
measures……………………………………………………………………………………………………………………………………….15