Section B
1. Description of the potential pollutant generating sources and pollutants, including all potential
non-stormwater discharges
The primary potential pollutant sources associated with the proposed bridge replacement and roadway
construction are sediment associated with disturbed soil, leaking construction equipment, fuel spills
during refueling operations, garbage/litter, and concrete from truck washouts. The concrete will be
designed by the contractor in accordance with the Indiana Stormwater Quality Manual Section 710.03.
The contractor will install appropriate erosion and sediment control measures to prevent sediment from
migrating off-site. Leaking equipment, refueling spills, and garbage/litter issues will be prevented by
implementing an effective material handling and spill prevention plan.
2. Stable Construction Entrance Locations and Specifications
There will be one stable construction entrance utilized to provide temporary access during project
construction. The stable construction entrance will be located between Station 19+00 and 22+00 Line "PR-
A-3. The stable construction entrance will be no more than 30 feet in width. The stable construction
entrance will be installed per INDOT Standard Drawing E 205-TECP-12 (Attachment E).
3. Specifications for temporary and permanent stabilization
Temporary pipe inlet protection will be used for the inlets of existing and proposed pipes within the
project limits. See erosion control details in the construction plan set (Appendix A) and INDOT
Specifications and Standard Drawings (Appendix E).
4. Sediment Control Measures for Concentrated Flow Areas
Concentrated flow is anticipated at the culvert under the parking lot approach, Station 10+50 “PR-A-3”,
Station 15+0 “PR-A-3, 15+15 “PR-A-3”, 17+87 “PR-A-3”, and Station 18+0 “PR-A-3”. Temporary Pipe inlet
protection will be installed in the areas of concentrated rated flow. A temporary silt fence and filter sock
installed around the perimeter of the project area will ensure sediment stays within the project area. The
locations of these measures are shown in the erosion control plan sheets (Attachment A). The temporary
filter sock, temporary pipe inlet protection and temporary silt fence will be installed and maintained in
accordance with Section 205 of the 2022 Standard Specifications and the INDOT standard drawings
(Attachment E).
5. Sediment Control Measures for Sheet Flow Areas
Prior to any grading and/or excavation, the contractor will install a temporary silt fence along the
perimeter of the construction limits. Filter sock will be placed along the perimeter in the vicinity White
River and Bluewoods Creek.