A Storm Water Quality Control Plan (SWQCP) shall be submitted to the Engineer for and a pre-disturbance
meeting shall be held not more than 30 days prior to the start of land-disturbing activities. See Appendix
E for more details.
13. Provisions for erosion and sediment control on individual residential building lots regulated
under the proposed project
This section does not apply to this construction contract.
14. Material handling and spill prevention and spill response plan meeting the requirements in 327
IAC 2-6.1
A material handling and spill prevention plan is provided in Attachment F. Notification to IDEM will occur
immediately following the discovery of a discharge via the twenty-four (24) hour emergency spill response
number (1-888-233-7745).
15. Material handling and storage procedures associated with construction activity
A material handling and spill prevention plan is provided in Attachment F. Notification to IDEM will occur
immediately following the discovery of a discharge via the twenty-four (24) hour emergency spill response
number (1-888-233-774