HomeMy WebLinkAboutC010.0.38 - Spill Prevention Plan Monthly Tank Inspection FormATTACHMENT 4 – MONTHLY TANK/CONTAINER INSPECTION FORM
Location Location Location
OK Repairs
Required
OK Repairs
Required
OK Repairs
Required
Tank Exterior
Deterioration
Leaks
Accumulation of
Liquid
Liquid Level
Vent Capped
Tank Seams
Tank Gaskets
Tank Rivets &
Bolts
Tank Supports &
Foundations
Deterioration
Pooled Liquid
Tank emergency
Shut-off Valve
Ground Surrounding
and Under Tank
Pooled Liquid
Pipe Supports
Pipe Valves
In closed Position
Pipelines
Pump Started
Controls Locked
Repairs Completed: __________________________
Date: Signature: _____
**Return Original to Assigned Contractor**
Attachment F