Loading...
HomeMy WebLinkAboutC010.0.16 - Eroson Control DetailsP.C. Sta. 11+50.99 Line "PR-A-3"Northing: 1709273.10 Easting: 213875.69 P.C. Sta. 18+67.07 Line "PR-A-3"Northing: 1709556.52 Easting: 214528.84 P.C. Sta. 21+51.10 Line "PR-A-3"Northing: 1709582.35 Easting: 214808.95 P.T. Sta. 12+75.38 Line "PR-A-3"Northing: 1709298.93 Easting: 213996.16 P.T. Sta. 19+84.33 Line "PR-A-3"Northing: 1709582.45 Easting: 214642.18 P.T. Sta. 21+83.15 Line "PR-A-3"Northing: 1709568.99 Easting: 214836.92 P.I. Sta. 12+14.40 "PR-A-3" Δ = 27°24'41" Lt. Northing: 1709271.32 Easting: 213939.07 Line "PR-A-3" Line "PR- A- 3" Line "PR-A-3" S 3 8 ° 5 8 ' 0 0 " E S 89°58'00" E S 88°23'44" E N 64°11' 3 4 " E P.I. Sta. 21+68.27 "PR-A-3" Δ = 51°00'00" Rt. Northing: 1709582.34 Easting: 214826.12 Begin Construction Sta. 9+62.38 Line "PR-A-3" Northing: 1709278.38 Easting: 213687.16 End Construction Sta. 27+52.98 Line "PR-A-3" Northing: 1709125.94 Easting: 215195.27 Section 9, T17N, R4E Clay Township Hamilton County, IN Section 9, T17N, R4E Clay Township Hamilton County, IN Section 4, T17N, R4E Clay Township Hamilton County, IN 12+00P.I. Sta. 12+26.48 "PR-A-4" Δ = 101°12'32" Rt. Northing: 1709233.77 Easting: 215161.02 P.I. Sta. 19+26.72 "PR-A-3" Δ = 25°50'26" Rt. Northing: 1709582.48 Easting: 214582.53 Str. No. 10 106' of 36" Type 1 Pipe Req'd. +50.0 "PR-A-3", Str. No. 11 47' of 18" Type 1 Pipe Req'd. +15.0 "PR-A-3", Str. No. 12 40' of 24" Type 1 Pipe Req'd. +87.0 "PR-A-3", C o n s t . L im i t s N: 1709279.4756E: 213647.950910+0015+0020+0025+0073 5 735735 730 730 735740735740735730730 730730 730 7307257207207257307 3 0 730730730730715 715 725730720735Section 10, T17N, R4E Clay Township Hamilton County, IN N 3 8 ° 5 2 ' 3 0 "W 106th St.Hazel Dell Pkwy.White River Concrete Washout Area Temporary Construction Ingress/Egress Pad +85.00 "PR-A-3", Str. No. 13 4 x 77' of 4.5' x 3' Box Culverts1.40% 0.64%2.01% 125'125' 2.90% Sod-Lined Channel Sod-Lined Channel Water Flow Over Trail +25.00High Point Sod-Lined Channel +09.87High Point 1.47% Sod-Lined Channel 9+23 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 2 2 + 0 0 2 3 + 0 0 2 4 + 0 0 2 5 + 0 0 2 6 + 0 0 2 7 + 0 0 Line "PR- A- 3" 0.56% 0.99% Slope Drain & Splashpad Slope Drain & Splashpad Li n e " P R - A - 3 " & Li n e " P R - B " Li n e " P R - A - 3 " SP Sump Pit Dewatering Pump Sheet Pile Cofferdam(Constructed by Others)S P S um p P i t D e w a t e r i n g P um p S h e e t P i l e C o f f e r d am Matchline - Sta. 24 +75 Sod-Lined Channel File Name: P:\RD\C3D\22-409 106th St Trail over White River\Road\Dwg\Plans\Erosion Control Details.dwg Plot Date: 2/13/2023 Plotted By: Andrew Wolka8440 Allison Pointe Boulevard, Suite 200 Indianapolis, IN 46250 Phone 317-895-2585 www.ucindy.comConsultingUNITED DESIGNED: CHECKED: DRAWN: CHECKED: RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE SHEETS of VERTICAL SCALE HORIZONTAL SCALE CONTRACT BRIDGE FILE PROJECT DESIGNATION SURVEY BOOKATWMAC BJP BJP 1 = 50' N/A - - - - 13 30 - EROSION CONTROL DETAILS LINE "PR-A-3" CLAY TOWNSHIP1.0'4.0' 4:1 Sod 4:1 Sod-Lined Channel Detail 0.28% 3' Flat-Bottom Ditch 0.53% 3' Flat-Bottom Ditch 1. Silt fence shall be installed prior to any land disturbing activities. Temporary Filter Tube/Filter Sock shall be installed as ditch grading is completed. 2. Temporary seeding shall be placed on disturbed areas that are expected to be undisturbed for over 7 days. 3. Temporary erosion control measures shall be removed as permanent erosion control measures are installed. 4. Refer to Plan & Profile sheets for permanent erosion control measures. 5. The entire project is within the floodplain. 6. Tree removal shall be minimized and limited to trees within the construction limits. 7. Q100 velocities from culverts do not require riprap at the culvert ends. TEMPORARY EROSION CONTROL NOTES TEMPORARY EROSION CONTROL LEGEND Temporary Pipe Inlet Protection Erosion Control Blanket Temporary Silt Fence Mulched Seeding, Type U Temporary Filter Tube/Filter Sock 8 in. COFFERDAM & DEWATERING NOTES 1. Cofferdams and dewatering will be required to dry working areas so substructures can be installed in dry conditions. 2. Cofferdams shown are part of documentation included for permit approval. 3. Temporary dewatering measures are expected to be in place less than 3 months. 4. Contractor shall verify existing flowline elevation to set the appropriate pump depth prior to construction. 5. Dewatering hose positioned so intake does not rest on stream bed. Attachment A