Loading...
HomeMy WebLinkAboutC010.0.17 - Erosion Control DetailsP.C. Sta. 18+67.07 Line "PR-A-3"Northing: 1709556.52 Easting: 214528.84 P.C. Sta. 21+51.10 Line "PR-A-3"Northing: 1709582.35 Easting: 214808.95 P.T. Sta. 19+84.33 Line "PR-A-3"Northing: 1709582.45 Easting: 214642.18 P.T. Sta. 21+83.15 Line "PR-A-3"Northing: 1709568.99 Easting: 214836.92 Line "PR-A-3"Line "PR-A-3"S 38°58'00" E S 89°58'00" EN 64°11'34" EP.I. Sta. 21+68.27 "PR-A-3" Δ = 51°00'00" Rt. Northing: 1709582.34 Easting: 214826.12 End Construction Sta. 27+52.98 Line "PR-A-3" Northing: 1709125.94 Easting: 215195.27 Section 9, T17N, R4E Clay Township Hamilton County, IN Section 4, T17N, R4E Clay Township Hamilton County, IN P.C. Sta. 10+28.29 Line "PR-A-4"Northing: 1709069.65 Easting: 215265.29 P.C. Sta. 11+53.43 Line "PR-A-4"Northing: 1709176.90 Easting: 215206.87 P.T. Sta. 10+95.64 Line "PR-A-4" Northing: 1709131.91 Easting: 215243.14 P.T. Sta. 12+59.41 Line "PR-A-4"Northing: 1709267.70 Easting: 215225.73 10 + 0 0 11+00 12 + 0 013+00P.I. Sta. 12+26.48 "PR-A-4" Δ = 101°12'32" Rt. Northing: 1709233.77 Easting: 215161.02 P.I. Sta. 10+63.30 "PR-A-4"Δ = 38°35'07" Lt. P.I. Sta. 19+26.72 "PR-A-3" Δ = 25°50'26" Rt. Northing: 1709582.48 Easting: 214582.53 Line "PR-A-4" N 38°52'30" WN 62°20'01" EN 0 ° 1 7 ' 2 3 " W Const. Limits 15+0020+00735730730730730730730730725720720725730730 7 3 0730730 7307307307157157257307207 3 5 7 3 5 735 Section 10, T17N, R4E Clay Township Hamilton County, IN N38°52'30"WWhite River+85.00 "PR-A-3", Str. No. 134 x 77' of 4.5' x 3' Box Culverts1.40%0.64%2.01%Sod-LinedChannelWater FlowOver Trail+25.00High PointSod-LinedChannel+09.87High Point1.47%Sod-LinedChannel27+53 16+0017+0018+0019+0020+0021+0022+00 23+00 24+00 25+00 26+00 27+00 Line "PR-A-3"0.99%Line "PR-A-4"Lin e " P R - A - 4 " Line "PR-A-3" & Line "PR-B"Line "PR-A-3"SPSump PitDewatering PumpSheet PileCofferdamS P Sump Pit Dewatering PumpSheet Pile CofferdamMatchline - Sta. 24+75File Name: P:\RD\C3D\22-409 106th St Trail over White River\Road\Dwg\Plans\Erosion Control Details.dwg Plot Date: 2/13/2023 Plotted By: Andrew Wolka8440 Allison Pointe Boulevard, Suite 200 Indianapolis, IN 46250 Phone 317-895-2585 www.ucindy.comConsultingUNITED DESIGNED: CHECKED: DRAWN: CHECKED: RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE SHEETS of VERTICAL SCALE HORIZONTAL SCALE CONTRACT BRIDGE FILE PROJECT DESIGNATION SURVEY BOOKATWMAC BJP BJP 1 = 50' N/A - - - - 14 30 - EROSION CONTROL DETAILS LINE "PR-A-3" & "PR-A-4" CLAY TOWNSHIP 1. Silt fence shall be installed prior to any land disturbing activities. Temporary Filter Tube/Filter Sock shall be installed as ditch grading is completed. 2. Temporary seeding shall be placed on disturbed areas that are expected to be undisturbed for over 7 days. 3. Temporary erosion control measures shall be removed as permanent erosion control measures are installed. 4. Refer to Plan & Profile sheets for permanent erosion control measures. 5. The entire project is within the floodplain. 6. Tree removal shall be minimized and limited to trees within the construction limits. 7. Q100 velocities from culverts do not require riprap at the culvert ends. TEMPORARY EROSION CONTROL NOTES TEMPORARY EROSION CONTROL LEGEND Temporary Pipe Inlet Protection Erosion Control Blanket Temporary Silt Fence Mulched Seeding, Type U Temporary Filter Tube/Filter Sock 8 in. COFFERDAM & DEWATERING NOTES 1. Cofferdams and dewatering will be required to dry working areas so substructures can be installed in dry conditions. 2. Cofferdams shown are part of documentation included for permit approval. 3. Temporary dewatering measures are expected to be in place less than 3 months. 4. Contractor shall verify existing flowline elevation to set the appropriate pump depth prior to construction. 5. Dewatering hose positioned so intake does not rest on stream bed. Attachment A