Loading...
HomeMy WebLinkAboutDink House Layout & Specs1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 DRAWING REVISIONS COMMISSION NO. : DATE : CHECK BY : CERTIFIED BY: DRAWN BY : (1)(2)(3)(4)(5)(6)(7)(8)(9)(10)(11)(12)A B C D E F G H I J K L M N O P Q R S T U V W LAYOUT PLAN & SPECIFICATIONS AHG AHGADDED NEW ENTRY DOOR FRAMING DETAIL 2-2-24REV DOOR DETAIL & EXTERIOR IMPROVEMENTS 2-5-24ADDED END PLATE REINFORCING 2-6-24ESTEP PICKLEBALL FACILITY201 WEST CARMEL DRIVECARMEL, INDIANAS2.0 12-6-2023 PP1 PF1 Column: Extend to Foundation. W 14 X 109 . Base Plat 24"x24"x1/2" Grade 60 Steel, Bolt to Foundation w/ four 5/8" Epoxy A36 Bolts , Field Verify Column Height. Attach Column to Building Frame at each location per detail, Bolt to Building Frame with A325 Bolts to Frame Bottom Flange per detail. Footing: 6'x6'x2' 4000 psi concrete w/ #6 bars @ 12" O.C. Each Way, Top of Footing 1' Below Floor Slab. Test Subgrade Before Footing Pour. Repair Subgrade as Required. Using these documents, the Owner indemnifies and holds harmless Gerdom Engineering & its employees against any and all loss and litigation from the use of these plans beyond the fees paid for this project. D1 New Double Glass Entry Door. Owner's architect to specify. See Structural Detail for reinforcing. Adjust Layout to match specified door.