Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2024-00113 V to 115 V - 131 4th St NW Variances Workflow Started: 6/26/2024 4:09:11 PM Report Generated: 07/23/2024 12:51 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Planning & Zoning Angie Conn 7/1/24 3:35 PM Comment Please respond in writing to the preliminary review comments listed at the bottom of the 06/26 docket no. assignment email, and please do that before noon Friday, July 12. For your convenience, they are listed again, below: a) Please make checks payable to City of Carmel if you are paying via check. b) Provide a copy of the Official List of Adjacent Property Owners from the Hamilton County Auditors Office. (Make sure to check Carmel BZA on their form.) c) *The Current in Carmel only prints on Tuesdays, and their filing deadline is usually 14 days prior to their printing date. Please submit your Microsoft Word file of the legal ad to them before Noon, Fri., June 28 so that it prints on time. Their contact info is 317-489-4444 or legals@youarecurrent.com. (Please refer to the Handout for a template of wording to use for the legal ad and the mailings the Notice of Public Hearing.) d) The mailings/notices to the neighbors should be done by first class mail with Certificate of Mailing (not Certified Mail). (Please provide us with the certificate of mailings for the file on or before Noon, Wed., July 17) e) Please provide the filled out & notarized Placement of Public Notice Sign Placement Affidavit form (found in Handout) once the sign is placed. f) Please provide the filled out & notarized Petitioners Affidavit of Notice of Public Hearing form (found in Handout). g) Please provide the filled out Notice of the Public Hearing form/template (found in Handout). h) Please provide proof of notice, such as Publishers Affidavit from the newspaper, once you receive them. i) Please make sure to list out your practical difficulties and hardships associated with having to comply with the zoning ordinance. j) Additional review comments (if any) will be issued through ProjectDox, our online electronic plan review software. Responded by: Stanley Burrell - 7/10/24 4:11 PM The 06/26 docket no assignment email has been responded to in writing addressing all of the items listed. Check will be dropped off at office on 7/11. Resolved 2 1 Planning & Zoning Angie Conn 7/1/24 3:36 PM Comment Additional review comments were made under pending building permit B-2024-00607. Those will still need to be addressed as part of the Building Permits review process. Responded by: Stanley Burrell - 7/10/24 4:06 PM Please see updated responses on the building permit review. All open comments were addressed on 7/6 Resolved 3 1 Planning & Zoning Angie Conn 7/1/24 3:38 PM Comment Please provide an explanation as to where people who stay in the Accessory Dwelling will park on site. Responded by: Stanley Burrell - 7/10/24 4:06 PM There is no additional parking required. All parking is in the garage and driveway, and that is adequate enough parking for the design of the house. The accessory dwelling will not have additional people staying there. It is part of the main house and attached by the upstairs hallway, It contains one of the 5 bedrooms. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2024-00113 V to 115 V - 131 4th St NW Variances Workflow Started: 6/26/2024 4:09:11 PM Report Generated: 07/23/2024 12:51 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 4 1 Engineering Alex Jordan 7/5/24 10:01 AM Comment We are still reviewing the building permit for this lot. We will need to review the sidewalk contribution estimate as well as receive a response on the $6,000 contribution to the Thoroughfare fund in lieu of providing detention. Responded by: Stanley Burrell - 7/10/24 4:07 PM Please see updated responses on the building permit review. All open comments were addressed on 7/6 Info Only 5 2 Planning & Zoning Angie Conn 7/23/24 9:42 AM Comment The BZA approved the variances with the conditions of you gaining Engineering Dept. approvals, including Stormwater Fund and cost of sidewalk payments, as well as the flexibility to move the house/garage back an additional 5-ft from the street. Info Only