Loading...
HomeMy WebLinkAboutPacket for HO 07-22-24 3. The Filing Fee, as well as a digital copy of the BZA Info Packet, must be delivered to BZA Meeting Coordinator Bric Butler no later than Noon, Fri., July 12. A check can be mailed or hand-delivered to Bric, (please make check out to City of Carmel) or the fee can be paid online here via credit card (with a small processing fee). Failure to submit the Fee and Informational Packets by this time will result in the automatic tabling of the petition. Please include the following in your BZA Info Packet: a) Short memo/letter introducing the project New construction full service hotel to be built, Courtyard by Marriott, 102 rooms, 4 story building b) Statement of Variance request (short paragraph explaining what you are asking for) Meridian Corridor Massing - UDO Article 5.07.D.2. Moderate Width Lot (75% Coverage required, 62.4% proposed) The parcel is irregular shape with majority of the area covered by retention pond. Once hotel is placed with landscaping and sidewalks, we have a dumpster area which covers remaining of the site leaving no space for building to be extended. c) Statement of Support (short paragraph explaining reasons supporting the requests, including analysis and comparison of what is allowed vs. what is proposed) Same as above d) Location Map e) Reductions of all plans ((site plan, aerial photo of site, floor plans, exterior architecture, etc. on 8.5”x11” or 11”x17” paper). f) Page 8 of handout/application – Findings of Fact sheets (question sheet filled out for each variance request, statements completed) FINDINGS OF FACT SHEET - DEVELOPMENT STANDARDS VARIANCE CARMEL ADVISORY BOARD OF ZONING APPEALS (Petitioner to fill out 1-3 + first two blanks) Docket No.: Docket No. PZ-2024-00110 V Petitioner: Saamrajya LLC. 1. The approval of this variance will not be injurious to the public health, safety, morals and general welfare of the community because: This project will meet all other local and state requirements for health and safety. 2. The use and value of the area adjacent to the property included in the variance will not be affected in a substantially adver se manner because: This project will complement the area, because development of a beautiful hotel will increase/appreciate values of the surrounding properties. 3. The strict application of the terms of the Unified Development to the property will result in practical difficulties in the use of the property because: The hotel will not fit and will encroach into the setbacks. DECISION IT IS THEREFORE the decision of the Carmel Board of Zoning Appeals that Development Standards Variance Docket No. ___________________________ is granted, subject to any conditions stated in the minutes of this Board, which are incorporated herein by reference and made a part hereof. Adopted this _______________ day of __________________________________, 20 _______. _____________________________________________ _____________________________________________ HEARING OFFICER, Carmel Board of Zoning Appeals _____________________________________________ _____________________________________________ SECRETARY, Carmel Board of Zoning Appeals Conditions of approval of the Board, if any, are listed on the Letter of Grant. g) Any other pertinent information for the Board to explain this request (such as letters/emails of support, photos of site, HOA approval if applicable, etc.).