Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2024-00100 Sign Package Security Federal Credit Union Workflow Started: 6/24/2024 10:23:11 AM Report Generated: 07/02/2024 10:42 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Sign Permits Aliza Shalit 6/28/24 10:24 AM Comment All Signs require a separate and individual sign permit application and review process. Approval of ADLS Amend is not approval of sign permit. Info Only 2 1 Sign Permits Aliza Shalit 6/28/24 10:25 AM Changemark Reversed lighting/mounting schematic The reverse channel letter mounting/lighting schematic seems to be wrong. If this sign is to be reversed lighted the backing should be specified as translucent, not precoated white aluminum as shown on the schematic. Please update Sign Criteria.pdf Responded by: Samantha Milburn - 6/28/24 1:09 PM You are correct and the corrected versions of the Sign Criteria & Rendering - Channel Letters have been uploaded. Resolved 3 1 Sign Permits Aliza Shalit 6/28/24 10:25 AM Changemark Spandrel panel Please provide sign spandrel panel height and width as outlined in green. Sign Criteria.pdf Responded by: Samantha Milburn - 6/28/24 1:14 PM Thank you, please see updated version. Resolved 4 1 Sign Permits Aliza Shalit 6/28/24 10:28 AM Changemark tenant panels Will you need a panel for your tenant like you have facing Redd? Rendering - Michigan Monument.pdf Responded by: Samantha Milburn - 6/28/24 1:22 PM The owner of Security Federal has confirmed that this sign will be for Security Federal only and will not include a tenant panel. Resolved 5 1 Sign Permits Aliza Shalit 6/28/24 10:28 AM Changemark Landscape plan A landscape plan is required for both ground signs. The UDO Sign Standards requires that all ground signs have a landscaped area at their base with an area at least equal to the total sign area on the monument. Rock or ground cover is not considered landscape. Please include plantings, decorative grasses, bushes, etc. Rendering - Michigan Monument.pdf Responded by: Samantha Milburn - 6/28/24 1:22 PM Thank you, please see updated version. Resolved 6 1 Sign Permits Aliza Shalit 6/28/24 10:28 AM Changemark Ground sign Will ground signs be lighted internally or externally. Please include this information on both proposed ground sign schematics. Rendering - Redd Rd. Monument.pdf Responded by: Samantha Milburn - 6/28/24 1:22 PM Thank you, please see updated version. Resolved REVIEW COMMENTS