HomeMy WebLinkAboutA1101 - OVERALL FIRST FLOOR PLANDN
UP
UP
UP
UP
UP
NW
A
NW
B
NW
C
NW
D
NW
E
NW
F
NW
G
NW
H
NW
I
NW
J
NW
K
NW
L
NW
M
NW
N
NW
1
NW
2
NW
3
NW
5
NW
6
NW
7
NW
8
NW
9
NW
10
NW
12
NW
13
15' - 0"30' - 0"15' - 3"15' - 3"30' - 0"30' - 0"30' - 0"30' - 0"35' - 0"8' - 9"15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"
5' - 2" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3"10' - 8 1/2" 34' - 9" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 3" 15' - 3" 30' - 0" 15' - 0" 15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"
287' - 9"342' - 3"5' - 1 1/2" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 32' - 6"25' - 3" 5' - 1 1/2"340' - 7"B1 *
2104
A1 *
2105
A1 *
2109
B1 *
2111
A1 *
2112
B4 *
2113
B3 *
2114
B3 *
2118
B3 *
2120
Stair W1-1
STW1-1
Elevator W1-1
ELVW1-1
Stair W2
STW2-1
Elevator W2
ELVW2-1
Stair W3-1
STW3-1
Elevator W3-1
ELVW3-1
A9 *
2103Area AArea BArea B
Area D
Area DArea CArea C
Area A
193' - 4 1/2"4' - 0 1/2"27' - 10"31' - 6"13' - 2 1/4"
Retail
R-8
Retail
R-7 Retail 9
R-9
Retail 6
R-6
Retail 4
R-4
Retail 3
R-3
Retail 2
R-2
Retail 1
R1
Trash Room
W118
Garage
W100
Maintenance Room
W124
Bike Storage
W123
Mailroom
W122
Elevator Lobby
W101
Leasing Lobby
W102
Leasing
W108
Closing
W107
Work Room
W106
P.O.
W103
P.O.
W104
Package Room
W110
Lobby
W121
Water
W116
Electric
W114
17' - 8 7/8"
288' - 2 3/4"
Utilities
W119
Retail 5
R-5
-
---
-
---
General Notes
1. The General Contractor shall verify
all conditions at the jobsite. Notify
Architect of any deviations from
those conditions as they are noted
on the drawings.
2. The General Contractor shall
coordinate and schedule all work
with the Owner.
3. The General Contractor is
responsible for compliance with all
state and local building codes and
government regulatory agencies.
4. The General Contractor is to
submit shop drawings, project data,
and samples to Owner/Architect for
approval prior to fabrication of all
millwork and wall finishes.
5. Do not scale any drawings. Any
dimensions are to be obtained from
the Architect if not noted on the
drawings. Refer all questions to the
Architect or Engineer on Record.
6. All dimensions are to C.L. of
demising wall of units and face of
framing.
7. The General Contractor shall keep
one set of plans at the jobsite for
the specific purpose of recording
actual construction conditions. Such
project record documents shall be
provided to the Owner upon
completion of the project.
8. The General Contractor shall verify
size, location, and characteristics
of all works and equipment supplied
by the Owner or others with the
manufacturer or supplier prior to
the start of the work.
9. The General Contractor shall see
that all Subcontractors receive
complete working drawings and
assume full responsibility for
coordination of work.
10. See Enlarged Area Plans for
Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010
8.1.2023
Permit Set
A1101Overall First FloorPlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A1101
1 NW First Floor
See sheet A1091 for Garage Plan and
Details