HomeMy WebLinkAboutA1102 - OVERALL SECOND FLOOR PLANUPUP
NW
A
NW
B
NW
C
NW
D
NW
E
NW
F
NW
G
NW
H
NW
I
NW
J
NW
K
NW
L
NW
M
NW
N
NW
1
NW
2
NW
3
NW
5
NW
6
NW
7
NW
8
NW
9
NW
10
NW
12
NW
13
342' - 3"287' - 9"
5' - 1 1/2" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 1 1/2"
C1 *
2201
B1 *
2203
B1 *
2204
A1 *
2205
B1 *
2207
A1 *
2209
B1 *
2211
A1 *
2212
B4 *
2213
B3 *
2215
B3 *
2218
B3 *
2220
B3 *
2223
S2 *
2224
B4 *
2225
A1 *
2226
B1 *
2227
A1 *
2229
B1 *
2231
A1 *
2233
B1 *
2240
A1 *
2241
B1 *
2243
A1 *
2244
Elevator W2-2
ELVW2-2
Mech
W203
Trash
W205
Mech.
W212 Mech.
W213
Stair W1-2
STW1-2
Stair W2-2
STW2-2
A4 *
2214Area AArea BArea B
Area D
Area DArea CArea C
Area A
342' - 1"Retail
R-9
Retail
R-8Retail
R-715' - 0"30' - 0"15' - 3"15' - 3"30' - 0"30' - 0"30' - 0"30' - 0"35' - 0"8' - 2 3/8"5' - 2" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 7 3/4"9' - 10 3/8" 34' - 9" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 3" 15' - 3" 30' - 0" 15' - 0" 15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"
288' - 2 3/4"
Stair W3-2
STW3-2
Elevator W3-2
ELVW3-2 Elevator W1-2
ELVW1-2
City IT
W208
Garage
W200
225' - 3"62' - 11 3/4"
BIKE STORAGE
W207
-
---
-
---
General Notes
1. The General Contractor shall verify
all conditions at the jobsite. Notify
Architect of any deviations from
those conditions as they are noted
on the drawings.
2. The General Contractor shall
coordinate and schedule all work
with the Owner.
3. The General Contractor is
responsible for compliance with all
state and local building codes and
government regulatory agencies.
4. The General Contractor is to
submit shop drawings, project data,
and samples to Owner/Architect for
approval prior to fabrication of all
millwork and wall finishes.
5. Do not scale any drawings. Any
dimensions are to be obtained from
the Architect if not noted on the
drawings. Refer all questions to the
Architect or Engineer on Record.
6. All dimensions are to C.L. of
demising wall of units and face of
framing.
7. The General Contractor shall keep
one set of plans at the jobsite for
the specific purpose of recording
actual construction conditions. Such
project record documents shall be
provided to the Owner upon
completion of the project.
8. The General Contractor shall verify
size, location, and characteristics
of all works and equipment supplied
by the Owner or others with the
manufacturer or supplier prior to
the start of the work.
9. The General Contractor shall see
that all Subcontractors receive
complete working drawings and
assume full responsibility for
coordination of work.
10. See Enlarged Area Plans for
Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010
8.1.2023
Permit Set
A1102Overall SecondFloor PlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A1102
1 NW Second Floor
See sheet A1091 for Garage Plan and
Details