HomeMy WebLinkAboutA1103 - OVERALL THIRD FLOOR PLANUPUP
NW
A
NW
B
NW
C
NW
D
NW
E
NW
F
NW
G
NW
H
NW
I
NW
J
NW
K
NW
L
NW
M
NW
N
NW
1
NW
2
NW
3
NW
5
NW
6
NW
7
NW
8
NW
9
NW
10
NW
12
NW
13
C1
2301
B1
2303
B1
2304
A1
2305
B1
2307
A1
2309
B1
2311
A1
2312
B4
2313
B3
2315
B3
2318
B3
2320
B3
2323
S2
2324
B4
2325
A1
2326
B1
2327
A1
2329
B1
2331
A1
2333
B1
2340
A1
2341
B1
2343
A1
2344
B9
2345
A7
2346
A2A
2347
A2
2348
A2A
2350
A2A
2351
A2A
2353
A2
2354
A2A
2356
A2
2358
Stair W1-3
STW1-3
Elevator W1-3
ELVW1-3
Stair W2-3
STW2-3
Elevator W2-3
ELVW2-3
Mech
W303
Trash
W305
Stair W3-3
STW3-3
Elevator W3-3
ELVW3-3
Mech
W311
Mech
W313
A4
2314Area AArea BArea B
Area D
Area DArea CArea C
Area A15' - 0"30' - 0"15' - 3"15' - 3"30' - 0"30' - 0"30' - 0"30' - 0"35' - 0"10' - 0 7/8"4' - 10 3/4" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0"27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 7 3/4"10' - 8 1/2" 34' - 9" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 3" 15' - 3" 30' - 0" 15' - 0" 15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"
Roof Top Deck
W314
Bike Storage
W315
Pool Equipment
W316
Garage
W300
Utilities
W307
City IT
W308
342' - 3"287' - 9"
5' - 1 1/2" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 1 1/2"342' - 0 3/4"288' - 2 3/4"
225' - 5 3/8"31' - 3 5/8"31' - 0 1/2"
-
---
-
---
General Notes
1. The General Contractor shall verify
all conditions at the jobsite. Notify
Architect of any deviations from
those conditions as they are noted
on the drawings.
2. The General Contractor shall
coordinate and schedule all work
with the Owner.
3. The General Contractor is
responsible for compliance with all
state and local building codes and
government regulatory agencies.
4. The General Contractor is to
submit shop drawings, project data,
and samples to Owner/Architect for
approval prior to fabrication of all
millwork and wall finishes.
5. Do not scale any drawings. Any
dimensions are to be obtained from
the Architect if not noted on the
drawings. Refer all questions to the
Architect or Engineer on Record.
6. All dimensions are to C.L. of
demising wall of units and face of
framing.
7. The General Contractor shall keep
one set of plans at the jobsite for
the specific purpose of recording
actual construction conditions. Such
project record documents shall be
provided to the Owner upon
completion of the project.
8. The General Contractor shall verify
size, location, and characteristics
of all works and equipment supplied
by the Owner or others with the
manufacturer or supplier prior to
the start of the work.
9. The General Contractor shall see
that all Subcontractors receive
complete working drawings and
assume full responsibility for
coordination of work.
10. See Enlarged Area Plans for
Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010
8.1.2023
Permit Set
A1103Overall Third FloorPlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A1103
1 NW Third Floor
See sheet A1092 for Garage Plan and
Details