Loading...
HomeMy WebLinkAboutA1104 - OVERALL FOURTH FLOOR PLANUPUP NW A NW B NW C NW D NW E NW F NW G NW H NW I NW J NW K NW L NW M NW N NW 1 NW 2 NW 3 NW 5 NW 6 NW 7 NW 8 NW 9 NW 10 NW 12 NW 13 C1 2401 B1 2403 B1 2404 A1 2405 B1 2407 A1 2409 B1 2411 A1 2412 B4 2413 A4 2414 B3 2415 B3 2418 B3 2420 B3 2423 S2 2424 B4 2425 A1 2426 B1 2427 A1 2429 B1 2431 A1 2433 B1 2440 A1 2441 B1 2443 A1 2444 B9 2445 A7 2446 A2A 2447 A2 2448 A2A 2450 A2A 2451 A2A 2453 A2 2454 A2A 2456 A2 2458 B2 2402 A1 2406 A1 2408 A6 2410 B3 2416 A1 2417 B3 2419 A1 2421 B3 2422 B2 2428 A1 2430 A1 2432 B5 2434 A1 2436 A1 2438 A1 2439 A1 2437 B5 2435 B2 2442 B3 2449 A1 2452 B3 2455 A1 2457 B3 2459 2ARCHIVE - A1104E Elevator W1-4 ELVW1-4 Stair W2-4 STW2-4 Elevator W2-4 ELVW2-4 Stair W3-4 STW3-4 Elevator W3-4 ELVW3-4 Mech W405 1ARCHIVE - A1104E Services W416 Services W417 MEP W419 Area AArea BArea B Area D Area DArea CArea C Area A15' - 0"30' - 0"15' - 3"15' - 3"30' - 0"30' - 0"30' - 0"30' - 0"35' - 0"10' - 0 7/8"10' - 5 1/2" 35' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 3" 15' - 3" 30' - 0" 15' - 0" 15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"342' - 3"287' - 9" 5' - 1 1/2" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 1 1/2"342' - 0 3/4"Courtyard Storage W435 Courtyard Storage W436 Stair W1-4 STW1-4 Clubroom W428 Coworking W424 Fitness W429 Private Fitness/ Yoga W430 Storage W431 MEP W432 Restroom W434 Restroom W433 Restroom W422 Restroom W423 Mech W420 4' - 10 3/4" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0"27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 7 3/4" 288' - 0" 193' - 4 1/2"31' - 0 1/2"63' - 4 1/2" - --- - --- General Notes 1. The General Contractor shall verify all conditions at the jobsite. Notify Architect of any deviations from those conditions as they are noted on the drawings. 2. The General Contractor shall coordinate and schedule all work with the Owner. 3. The General Contractor is responsible for compliance with all state and local building codes and government regulatory agencies. 4. The General Contractor is to submit shop drawings, project data, and samples to Owner/Architect for approval prior to fabrication of all millwork and wall finishes. 5. Do not scale any drawings. Any dimensions are to be obtained from the Architect if not noted on the drawings. Refer all questions to the Architect or Engineer on Record. 6. All dimensions are to C.L. of demising wall of units and face of framing. 7. The General Contractor shall keep one set of plans at the jobsite for the specific purpose of recording actual construction conditions. Such project record documents shall be provided to the Owner upon completion of the project. 8. The General Contractor shall verify size, location, and characteristics of all works and equipment supplied by the Owner or others with the manufacturer or supplier prior to the start of the work. 9. The General Contractor shall see that all Subcontractors receive complete working drawings and assume full responsibility for coordination of work. 10. See Enlarged Area Plans for Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010 8.1.2023 Permit Set A1104Overall FourthFloor PlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A1104 1 NW Fourth Floor