HomeMy WebLinkAboutA1105 - OVERALL FIFTH FLOOR PLANDN
DN
UP
UPUP
NW
A
NW
B
NW
C
NW
D
NW
E
NW
F
NW
G
NW
H
NW
I
NW
J
NW
K
NW
L
NW
M
NW
N
NW
1
NW
2
NW
3
NW
5
NW
6
NW
7
NW
8
NW
9
NW
10
NW
12
NW
13
C1
2501
B1
2503
B1
2504
A1
2508
B1
2510
A1
2512
B1
2514
A1
2515
B4
2516
B3
2518
B3
2521
B3
2523
B3
2526
S2
2527
B4
2528
A1
2529
B1
2530
A1
2532
B1
2534
A1
2536
B1
2540
A1
2541
B1
2543
A1
2544
B9
2545
A7
2546
A2A
2547
A2
2548
A2A
2550
A2A
2551
A2A
2553
A2
2554
A2A
2556
A2
2558
B2
2502
B5
2505
B5
2507
C2
2506
B3
2559
A1
2557
B3
2555
A1
2552
B3
2549
B2
2542
B5
2539
C2
2538
B5
2537
A1
2509
A1
2511
B2
2513
B3
2519
A1
2520
B3
2522
A1
2524
B3
2525
B2
2531
A1
2533
A1
2535
A4
2517
Stair W1-5
STW1-5
Elevator W1-5
ELVW1-5
Stair W2-5
STW2-5
Elevator W2-5
ELVW2-5
Trash
W505
Stair W3-5
STW3-5 Elevator W3-5
ELVW3-5
Mech
W515 Area AArea BArea B
Area D
Area DArea CArea C
Area A15' - 0"30' - 0"15' - 3"15' - 3"30' - 0"30' - 0"30' - 0"30' - 0"35' - 0"10' - 0 7/8"4' - 10 3/4" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0"27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 7 3/4"10' - 5 1/2" 35' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 3" 15' - 3" 30' - 0" 15' - 0" 15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"342' - 3"287' - 9"
5' - 1 1/2" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 1 1/2"342' - 0 3/4"288' - 2 3/4"
193' - 4 1/2"31' - 0 1/2"63' - 4 1/2"
-
---
-
---
General Notes
1. The General Contractor shall verify
all conditions at the jobsite. Notify
Architect of any deviations from
those conditions as they are noted
on the drawings.
2. The General Contractor shall
coordinate and schedule all work
with the Owner.
3. The General Contractor is
responsible for compliance with all
state and local building codes and
government regulatory agencies.
4. The General Contractor is to
submit shop drawings, project data,
and samples to Owner/Architect for
approval prior to fabrication of all
millwork and wall finishes.
5. Do not scale any drawings. Any
dimensions are to be obtained from
the Architect if not noted on the
drawings. Refer all questions to the
Architect or Engineer on Record.
6. All dimensions are to C.L. of
demising wall of units and face of
framing.
7. The General Contractor shall keep
one set of plans at the jobsite for
the specific purpose of recording
actual construction conditions. Such
project record documents shall be
provided to the Owner upon
completion of the project.
8. The General Contractor shall verify
size, location, and characteristics
of all works and equipment supplied
by the Owner or others with the
manufacturer or supplier prior to
the start of the work.
9. The General Contractor shall see
that all Subcontractors receive
complete working drawings and
assume full responsibility for
coordination of work.
10. See Enlarged Area Plans for
Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010
8.1.2023
Permit Set
A1105Overall Fifth FloorPlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A1105
1 NW Fifth Floor