Loading...
HomeMy WebLinkAboutA1105 - OVERALL FIFTH FLOOR PLANDN DN UP UPUP NW A NW B NW C NW D NW E NW F NW G NW H NW I NW J NW K NW L NW M NW N NW 1 NW 2 NW 3 NW 5 NW 6 NW 7 NW 8 NW 9 NW 10 NW 12 NW 13 C1 2501 B1 2503 B1 2504 A1 2508 B1 2510 A1 2512 B1 2514 A1 2515 B4 2516 B3 2518 B3 2521 B3 2523 B3 2526 S2 2527 B4 2528 A1 2529 B1 2530 A1 2532 B1 2534 A1 2536 B1 2540 A1 2541 B1 2543 A1 2544 B9 2545 A7 2546 A2A 2547 A2 2548 A2A 2550 A2A 2551 A2A 2553 A2 2554 A2A 2556 A2 2558 B2 2502 B5 2505 B5 2507 C2 2506 B3 2559 A1 2557 B3 2555 A1 2552 B3 2549 B2 2542 B5 2539 C2 2538 B5 2537 A1 2509 A1 2511 B2 2513 B3 2519 A1 2520 B3 2522 A1 2524 B3 2525 B2 2531 A1 2533 A1 2535 A4 2517 Stair W1-5 STW1-5 Elevator W1-5 ELVW1-5 Stair W2-5 STW2-5 Elevator W2-5 ELVW2-5 Trash W505 Stair W3-5 STW3-5 Elevator W3-5 ELVW3-5 Mech W515 Area AArea BArea B Area D Area DArea CArea C Area A15' - 0"30' - 0"15' - 3"15' - 3"30' - 0"30' - 0"30' - 0"30' - 0"35' - 0"10' - 0 7/8"4' - 10 3/4" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0"27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 7 3/4"10' - 5 1/2" 35' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 15' - 3" 15' - 3" 30' - 0" 15' - 0" 15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"15' - 0" 30' - 0" 24' - 0" 24' - 8" 7' - 8"342' - 3"287' - 9" 5' - 1 1/2" 25' - 3" 7' - 0" 52' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 32' - 6" 25' - 3" 5' - 1 1/2"342' - 0 3/4"288' - 2 3/4" 193' - 4 1/2"31' - 0 1/2"63' - 4 1/2" - --- - --- General Notes 1. The General Contractor shall verify all conditions at the jobsite. Notify Architect of any deviations from those conditions as they are noted on the drawings. 2. The General Contractor shall coordinate and schedule all work with the Owner. 3. The General Contractor is responsible for compliance with all state and local building codes and government regulatory agencies. 4. The General Contractor is to submit shop drawings, project data, and samples to Owner/Architect for approval prior to fabrication of all millwork and wall finishes. 5. Do not scale any drawings. Any dimensions are to be obtained from the Architect if not noted on the drawings. Refer all questions to the Architect or Engineer on Record. 6. All dimensions are to C.L. of demising wall of units and face of framing. 7. The General Contractor shall keep one set of plans at the jobsite for the specific purpose of recording actual construction conditions. Such project record documents shall be provided to the Owner upon completion of the project. 8. The General Contractor shall verify size, location, and characteristics of all works and equipment supplied by the Owner or others with the manufacturer or supplier prior to the start of the work. 9. The General Contractor shall see that all Subcontractors receive complete working drawings and assume full responsibility for coordination of work. 10. See Enlarged Area Plans for Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010 8.1.2023 Permit Set A1105Overall Fifth FloorPlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A1105 1 NW Fifth Floor