HomeMy WebLinkAboutA2101 - OVERALL FIRST FLOOR PLANDN
UP
UP
NE
A
NE
B
NE
C
NE
D
NE
E
NE
F
NE
G
NE
H
NE
J
NE
01
NE
02
NE
03
NE
04
NE
05
Stair C1-1
STC1-1
Water
E108
Parking Garage
E100
Trash
E107
Stair E3-1
STE3-1
City IT
E105
Bikes
E101
Bikes
E103
Mechanical
E102
Stair E1-1
STE1-1
Stair E2-1
STE2-1 Restaurant
E-R1
Elec
E109
18' - 8"
263' - 4 1/2"78' - 5 5/8"43' - 11"27' - 9"28' - 6"28' - 6"28' - 6"19' - 6"28' - 6"28' - 6"27' - 9"14' - 2 3/4"1' - 0 1/2"31' - 6" 27' - 0" 31' - 6" 15' - 0"
NE
06
NE
07
NE
08
NE
09
NE
10
15' - 5 1/2" 31' - 6" 27' - 0" 31' - 6" 15' - 0" 16' - 2" 19' - 5" 27' - 0" 27' - 0" 15' - 1" 19' - 7" 17' - 3"
11"15' - 3 1/4" 27' - 9" 28' - 6" 28' - 6" 19' - 6" 28' - 6"19' - 5"27' - 0"27' - 0"30' - 11"
107' - 4 1/2"167' - 9 1/4"68' - 9 1/2"248' - 9 1/4"120' - 11"180' - 6"72' - 9 1/2"35' - 6 1/8"59' - 8 1/4"
Elevator E1-1
ELVE1-1
Dog Wash
E106
Elevator E2-1
ELVE2-1 Stair C2-1STC2-1Elevator C1-1
ELVC1-1
-
---
-
---
-
---
General Notes
1. The General Contractor shall verify
all conditions at the jobsite. Notify
Architect of any deviations from
those conditions as they are noted
on the drawings.
2. The General Contractor shall
coordinate and schedule all work
with the Owner.
3. The General Contractor is
responsible for compliance with all
state and local building codes and
government regulatory agencies.
4. The General Contractor is to
submit shop drawings, project data,
and samples to Owner/Architect for
approval prior to fabrication of all
millwork and wall finishes.
5. Do not scale any drawings. Any
dimensions are to be obtained from
the Architect if not noted on the
drawings. Refer all questions to the
Architect or Engineer on Record.
6. All dimensions are to C.L. of
demising wall of units and face of
framing.
7. The General Contractor shall keep
one set of plans at the jobsite for
the specific purpose of recording
actual construction conditions. Such
project record documents shall be
provided to the Owner upon
completion of the project.
8. The General Contractor shall verify
size, location, and characteristics
of all works and equipment supplied
by the Owner or others with the
manufacturer or supplier prior to
the start of the work.
9. The General Contractor shall see
that all Subcontractors receive
complete working drawings and
assume full responsibility for
coordination of work.
10. See Enlarged Area Plans for
Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010
8.1.2023
Permit Set
A2101Overall First FloorPlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A2101
1 NE Overall First Floor