Loading...
HomeMy WebLinkAboutA2102 - OVERALL SECOND FLOOR PLANUP NE A NE B NE C NE D NE E NE F NE G NE H NE J NE 01 NE 02 NE 03 NE 04 NE 05 Stair E3-2 SE3-2 Elevator E2-2 ELVE2-2 Elevator E1-2 ELVE1-2 Stair E1-2 STE1-1 Stair E2-2STE2-2NE 06 NE 07 NE 08 NE 09 NE 10 A3B 1207 A1 1208A1 1209 B6 1210 S1 1212 B10 1214 A3 1215 B6 1217 A3 1219 S1 1222 A3 1223 B7 1225 A5 1226 S1 1227 A5 1229 A5 1231 A5 1232 A5 1228 B8 1224 S1 1220 S1 1221 B1 1218 A1 1216 A8 121328' - 6"19' - 6"28' - 6"28' - 6"27' - 9"14' - 2 3/4"147' - 11 3/4"15' - 5 1/2" 31' - 6" 27' - 0" 31' - 6" 15' - 0" 16' - 2" 19' - 5" 27' - 0" 27' - 0" 15' - 1" 19' - 7" 17' - 3" 11 1/2" 262' - 11" 15' - 5 1/2" 31' - 6" 20' - 11" 67' - 10 1/2"8' - 3" 28' - 6" 19' - 6" 28' - 6"85' - 3 1/8"1' - 3" 19' - 6" 28' - 6"8' - 3" 28' - 6" 3' - 9"41' - 0 1/8"15' - 5 1/2" 27' - 9" 28' - 6" 28' - 6" 19' - 6" 28' - 6"107' - 4 1/2"167' - 11 1/2"31' - 6"15' - 0"16' - 2"19' - 5"27' - 0" 125' - 7 1/4" 64' - 8"68' - 9"19' - 6"19' - 3 7/8" 27' - 0" 27' - 0" 30' - 11" 3' - 1 1/2" Mech E215 Storage E216 Double Height Elec E207 Tenent Entry E208 Mail CenterE209Data E213 General Notes 1. The General Contractor shall verify all conditions at the jobsite. Notify Architect of any deviations from those conditions as they are noted on the drawings. 2. The General Contractor shall coordinate and schedule all work with the Owner. 3. The General Contractor is responsible for compliance with all state and local building codes and government regulatory agencies. 4. The General Contractor is to submit shop drawings, project data, and samples to Owner/Architect for approval prior to fabrication of all millwork and wall finishes. 5. Do not scale any drawings. Any dimensions are to be obtained from the Architect if not noted on the drawings. Refer all questions to the Architect or Engineer on Record. 6. All dimensions are to C.L. of demising wall of units and face of framing. 7. The General Contractor shall keep one set of plans at the jobsite for the specific purpose of recording actual construction conditions. Such project record documents shall be provided to the Owner upon completion of the project. 8. The General Contractor shall verify size, location, and characteristics of all works and equipment supplied by the Owner or others with the manufacturer or supplier prior to the start of the work. 9. The General Contractor shall see that all Subcontractors receive complete working drawings and assume full responsibility for coordination of work. 10. See Enlarged Area Plans for Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010 8.1.2023 Permit Set A2102Overall SecondFloor PlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A2102 1 NE Overall Second Floor