HomeMy WebLinkAboutA2103 - OVERALL THIRD FLOOR PLANUP
NE
A
NE
B
NE
C
NE
D
NE
E
NE
F
NE
G
NE
H
NE
J
NE
01
NE
02
NE
03
NE
04
NE
05
A1
1201
A1
1303
B6
1304
A1
1306
Stair E1-3STE1-3B6
1302
B8
1305
A3A
1307
A1
1309
Elec
E308
A8
1313
A1
1316
B1
1318
S1
1320
S1
1321
B8
1324
A5
1328
S1
1330
A5
1332
A5
1331
Stair E3-3
STE2-3
Mech
E314
A5
1329
S1
1327
A5
1326
B7
1325
A3
1323
S1
1322
A3
1319
B6
1317
A3
1315
B10
1314
C3
1312
A1
1311
A1
1310
A1
1308
Elevator E2-3
ELVE2-3
Elevator E1-3
ELV1-2
MEP
E309
Data
E313
NE
06
NE
07
NE
08
NE
09
NE
10
28' - 6"19' - 6"28' - 6"28' - 6"27' - 9"14' - 2 3/4"147' - 11 3/4"15' - 5 1/2" 31' - 6" 27' - 0" 31' - 6" 15' - 0" 16' - 2" 19' - 5" 27' - 0" 27' - 0" 15' - 1" 19' - 7" 17' - 3" 11 1/2"
262' - 11"
15' - 5 1/2" 31' - 6" 20' - 11"
67' - 10 1/2"8' - 3" 28' - 6" 19' - 6" 28' - 6"85' - 3 1/8"1' - 3" 19' - 6" 28' - 6"8' - 3" 28' - 6" 3' - 9"41' - 6 1/4"15' - 5 1/2" 27' - 9" 28' - 6" 28' - 6" 19' - 6" 28' - 6"107' - 4 1/2"167' - 11 1/2"31' - 6"15' - 0"16' - 2"19' - 5"27' - 0"
126' - 1 3/8"
64' - 8"69' - 0"19' - 9"Storage
E310
18' - 8"
27' - 0" 27' - 0" 30' - 11" 2' - 10 1/2"
General Notes
1. The General Contractor shall verify
all conditions at the jobsite. Notify
Architect of any deviations from
those conditions as they are noted
on the drawings.
2. The General Contractor shall
coordinate and schedule all work
with the Owner.
3. The General Contractor is
responsible for compliance with all
state and local building codes and
government regulatory agencies.
4. The General Contractor is to
submit shop drawings, project data,
and samples to Owner/Architect for
approval prior to fabrication of all
millwork and wall finishes.
5. Do not scale any drawings. Any
dimensions are to be obtained from
the Architect if not noted on the
drawings. Refer all questions to the
Architect or Engineer on Record.
6. All dimensions are to C.L. of
demising wall of units and face of
framing.
7. The General Contractor shall keep
one set of plans at the jobsite for
the specific purpose of recording
actual construction conditions. Such
project record documents shall be
provided to the Owner upon
completion of the project.
8. The General Contractor shall verify
size, location, and characteristics
of all works and equipment supplied
by the Owner or others with the
manufacturer or supplier prior to
the start of the work.
9. The General Contractor shall see
that all Subcontractors receive
complete working drawings and
assume full responsibility for
coordination of work.
10. See Enlarged Area Plans for
Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010
8.1.2023
Permit Set
A2103Overall Third FloorPlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A2103
1 NE Overall Third Floor