HomeMy WebLinkAboutA2104 - OVERALL FOURTH FLOOR PLANNE
A
NE
B
NE
C
NE
D
NE
E
NE
F
NE
G
NE
H
NE
J
NE
01
NE
02
NE
03
NE
04
NE
05
Stair E3-4STE2-4Mech
E414
Data
E411
Elec
E408
MEP
E409
Stair E2-4STE1-428' - 6"19' - 6"28' - 6"28' - 6"27' - 9"14' - 2 3/4"147' - 11 3/4"15' - 5 1/2" 31' - 6" 27' - 0" 31' - 6" 15' - 0" 16' - 2" 19' - 5" 27' - 0" 27' - 0" 15' - 1" 19' - 7" 17' - 3" 11 1/2"
262' - 11"
15' - 5 1/2" 31' - 6" 20' - 11"
67' - 10 1/2"8' - 3" 28' - 6" 19' - 6" 28' - 6"84' - 9"1' - 3" 19' - 6" 28' - 6"8' - 3" 28' - 6" 3' - 9"40' - 6"15' - 5 1/2" 27' - 9" 28' - 6" 28' - 6" 19' - 6" 28' - 6"A1
1401
A1
1403
B6
1404
A1
1406
B6
1402
B8
1405
A3A
1407
A1
1409
A1
1408
A1
1410
A1
1411
A8
1413
A1
1416
B1
1418
S1
1430
A5
1432
A5
1431
B6
1417
A3
1415
B10
1414 C3
1412
Elevator E1-4
ELVE1-4
Elevator E2-4
ELVE2-4
S1
1420
S1
1421
B8
1424
A5
1428
A5
1429
S1
1427
A5
1426
B7
1425
A3
1423
S1
1422
A3
1419
NE
06
NE
07
NE
08
NE
09
NE
10
107' - 4 1/2"167' - 11 1/2"31' - 6"15' - 0"16' - 2"19' - 5"27' - 0"
125' - 4"
64' - 8"69' - 0"19' - 9"Storage
E413
27' - 0" 27' - 0" 30' - 11"
2' - 10 1/2"
18' - 8"
General Notes
1. The General Contractor shall verify
all conditions at the jobsite. Notify
Architect of any deviations from
those conditions as they are noted
on the drawings.
2. The General Contractor shall
coordinate and schedule all work
with the Owner.
3. The General Contractor is
responsible for compliance with all
state and local building codes and
government regulatory agencies.
4. The General Contractor is to
submit shop drawings, project data,
and samples to Owner/Architect for
approval prior to fabrication of all
millwork and wall finishes.
5. Do not scale any drawings. Any
dimensions are to be obtained from
the Architect if not noted on the
drawings. Refer all questions to the
Architect or Engineer on Record.
6. All dimensions are to C.L. of
demising wall of units and face of
framing.
7. The General Contractor shall keep
one set of plans at the jobsite for
the specific purpose of recording
actual construction conditions. Such
project record documents shall be
provided to the Owner upon
completion of the project.
8. The General Contractor shall verify
size, location, and characteristics
of all works and equipment supplied
by the Owner or others with the
manufacturer or supplier prior to
the start of the work.
9. The General Contractor shall see
that all Subcontractors receive
complete working drawings and
assume full responsibility for
coordination of work.
10. See Enlarged Area Plans for
Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010
8.1.2023
Permit Set
A2104Overall FourthFloor PlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A2104
1 NE Overall Fourth Floor