Loading...
HomeMy WebLinkAboutA2104 - OVERALL FOURTH FLOOR PLANNE A NE B NE C NE D NE E NE F NE G NE H NE J NE 01 NE 02 NE 03 NE 04 NE 05 Stair E3-4STE2-4Mech E414 Data E411 Elec E408 MEP E409 Stair E2-4STE1-428' - 6"19' - 6"28' - 6"28' - 6"27' - 9"14' - 2 3/4"147' - 11 3/4"15' - 5 1/2" 31' - 6" 27' - 0" 31' - 6" 15' - 0" 16' - 2" 19' - 5" 27' - 0" 27' - 0" 15' - 1" 19' - 7" 17' - 3" 11 1/2" 262' - 11" 15' - 5 1/2" 31' - 6" 20' - 11" 67' - 10 1/2"8' - 3" 28' - 6" 19' - 6" 28' - 6"84' - 9"1' - 3" 19' - 6" 28' - 6"8' - 3" 28' - 6" 3' - 9"40' - 6"15' - 5 1/2" 27' - 9" 28' - 6" 28' - 6" 19' - 6" 28' - 6"A1 1401 A1 1403 B6 1404 A1 1406 B6 1402 B8 1405 A3A 1407 A1 1409 A1 1408 A1 1410 A1 1411 A8 1413 A1 1416 B1 1418 S1 1430 A5 1432 A5 1431 B6 1417 A3 1415 B10 1414 C3 1412 Elevator E1-4 ELVE1-4 Elevator E2-4 ELVE2-4 S1 1420 S1 1421 B8 1424 A5 1428 A5 1429 S1 1427 A5 1426 B7 1425 A3 1423 S1 1422 A3 1419 NE 06 NE 07 NE 08 NE 09 NE 10 107' - 4 1/2"167' - 11 1/2"31' - 6"15' - 0"16' - 2"19' - 5"27' - 0" 125' - 4" 64' - 8"69' - 0"19' - 9"Storage E413 27' - 0" 27' - 0" 30' - 11" 2' - 10 1/2" 18' - 8" General Notes 1. The General Contractor shall verify all conditions at the jobsite. Notify Architect of any deviations from those conditions as they are noted on the drawings. 2. The General Contractor shall coordinate and schedule all work with the Owner. 3. The General Contractor is responsible for compliance with all state and local building codes and government regulatory agencies. 4. The General Contractor is to submit shop drawings, project data, and samples to Owner/Architect for approval prior to fabrication of all millwork and wall finishes. 5. Do not scale any drawings. Any dimensions are to be obtained from the Architect if not noted on the drawings. Refer all questions to the Architect or Engineer on Record. 6. All dimensions are to C.L. of demising wall of units and face of framing. 7. The General Contractor shall keep one set of plans at the jobsite for the specific purpose of recording actual construction conditions. Such project record documents shall be provided to the Owner upon completion of the project. 8. The General Contractor shall verify size, location, and characteristics of all works and equipment supplied by the Owner or others with the manufacturer or supplier prior to the start of the work. 9. The General Contractor shall see that all Subcontractors receive complete working drawings and assume full responsibility for coordination of work. 10. See Enlarged Area Plans for Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010 8.1.2023 Permit Set A2104Overall FourthFloor PlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A2104 1 NE Overall Fourth Floor