Loading...
HomeMy WebLinkAboutA2105 - OVERALL FIFTH FLOOR PLANNE A NE B NE C NE D NE E NE F NE G NE H NE J NE 01 NE 02 NE 03 NE 04 NE 05 A1 1501 A1 1503 B6 1504 A1 1506 B6 1502 B8 1505 A3A 1507 A1 1509 A1 1508 A1 1510 A1 1511 C3 1512 A8 1513 A1 1516 B1 1518 S1 1520 S1 1521 B8 1524 A5 1528 S1 1530 A5 1532 A5 1531 A5 1529 S1 1527 A5 1526 B7 1525 A3 1523 S1 1522 A3 1519 B6 1517 A3 1515 B10 1514 Stair E3-5 STE2-5 Elevator E2-5 ELVE2-5 Elevator E1-5 ELV1-5 Elec E508 MEP E509 Stair E1-5STE1-5Mech E513 NE 06 NE 07 NE 08 NE 09 NE 10 28' - 6"19' - 6"28' - 6"28' - 6"27' - 9"14' - 2 3/4"147' - 11 3/4"15' - 5 1/2" 31' - 6" 27' - 0" 31' - 6" 15' - 0" 16' - 2" 19' - 5" 27' - 0" 27' - 0" 15' - 1" 19' - 7" 17' - 3" 11 1/2" 262' - 11" 15' - 5 1/2" 31' - 6" 20' - 11" 67' - 10 1/2"8' - 3" 28' - 6" 19' - 6" 28' - 6"85' - 3 1/8"1' - 3" 19' - 6" 28' - 6"8' - 3" 28' - 6" 3' - 9"41' - 6 1/4"15' - 5 1/2" 27' - 9" 28' - 6" 28' - 6" 19' - 6" 28' - 6"107' - 4"167' - 11 1/2"31' - 6"15' - 0"16' - 2"19' - 5"27' - 0" 126' - 1 3/8" 64' - 8"69' - 0"19' - 9"27' - 0" 27' - 0" 30' - 11" 3' - 7" Storage E514 Data E511 General Notes 1. The General Contractor shall verify all conditions at the jobsite. Notify Architect of any deviations from those conditions as they are noted on the drawings. 2. The General Contractor shall coordinate and schedule all work with the Owner. 3. The General Contractor is responsible for compliance with all state and local building codes and government regulatory agencies. 4. The General Contractor is to submit shop drawings, project data, and samples to Owner/Architect for approval prior to fabrication of all millwork and wall finishes. 5. Do not scale any drawings. Any dimensions are to be obtained from the Architect if not noted on the drawings. Refer all questions to the Architect or Engineer on Record. 6. All dimensions are to C.L. of demising wall of units and face of framing. 7. The General Contractor shall keep one set of plans at the jobsite for the specific purpose of recording actual construction conditions. Such project record documents shall be provided to the Owner upon completion of the project. 8. The General Contractor shall verify size, location, and characteristics of all works and equipment supplied by the Owner or others with the manufacturer or supplier prior to the start of the work. 9. The General Contractor shall see that all Subcontractors receive complete working drawings and assume full responsibility for coordination of work. 10. See Enlarged Area Plans for Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010 8.1.2023 Permit Set A2105Overall Fifth FloorPlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A2105 1 NE Overall Fifth Floor