HomeMy WebLinkAboutA2105 - OVERALL FIFTH FLOOR PLANNE
A
NE
B
NE
C
NE
D
NE
E
NE
F
NE
G
NE
H
NE
J
NE
01
NE
02
NE
03
NE
04
NE
05
A1
1501
A1
1503
B6
1504
A1
1506
B6
1502
B8
1505
A3A
1507
A1
1509
A1
1508
A1
1510
A1
1511
C3
1512
A8
1513
A1
1516
B1
1518
S1
1520
S1
1521
B8
1524
A5
1528
S1
1530
A5
1532
A5
1531
A5
1529
S1
1527
A5
1526
B7
1525
A3
1523
S1
1522
A3
1519
B6
1517
A3
1515 B10
1514
Stair E3-5
STE2-5
Elevator E2-5
ELVE2-5
Elevator E1-5
ELV1-5
Elec
E508
MEP
E509
Stair E1-5STE1-5Mech
E513
NE
06
NE
07
NE
08
NE
09
NE
10
28' - 6"19' - 6"28' - 6"28' - 6"27' - 9"14' - 2 3/4"147' - 11 3/4"15' - 5 1/2" 31' - 6" 27' - 0" 31' - 6" 15' - 0" 16' - 2" 19' - 5" 27' - 0" 27' - 0" 15' - 1" 19' - 7" 17' - 3" 11 1/2"
262' - 11"
15' - 5 1/2" 31' - 6" 20' - 11"
67' - 10 1/2"8' - 3" 28' - 6" 19' - 6" 28' - 6"85' - 3 1/8"1' - 3" 19' - 6" 28' - 6"8' - 3" 28' - 6" 3' - 9"41' - 6 1/4"15' - 5 1/2" 27' - 9" 28' - 6" 28' - 6" 19' - 6" 28' - 6"107' - 4"167' - 11 1/2"31' - 6"15' - 0"16' - 2"19' - 5"27' - 0"
126' - 1 3/8"
64' - 8"69' - 0"19' - 9"27' - 0" 27' - 0" 30' - 11" 3' - 7"
Storage
E514
Data
E511
General Notes
1. The General Contractor shall verify
all conditions at the jobsite. Notify
Architect of any deviations from
those conditions as they are noted
on the drawings.
2. The General Contractor shall
coordinate and schedule all work
with the Owner.
3. The General Contractor is
responsible for compliance with all
state and local building codes and
government regulatory agencies.
4. The General Contractor is to
submit shop drawings, project data,
and samples to Owner/Architect for
approval prior to fabrication of all
millwork and wall finishes.
5. Do not scale any drawings. Any
dimensions are to be obtained from
the Architect if not noted on the
drawings. Refer all questions to the
Architect or Engineer on Record.
6. All dimensions are to C.L. of
demising wall of units and face of
framing.
7. The General Contractor shall keep
one set of plans at the jobsite for
the specific purpose of recording
actual construction conditions. Such
project record documents shall be
provided to the Owner upon
completion of the project.
8. The General Contractor shall verify
size, location, and characteristics
of all works and equipment supplied
by the Owner or others with the
manufacturer or supplier prior to
the start of the work.
9. The General Contractor shall see
that all Subcontractors receive
complete working drawings and
assume full responsibility for
coordination of work.
10. See Enlarged Area Plans for
Additional Information. ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS21010
8.1.2023
Permit Set
A2105Overall Fifth FloorPlanMONONSQUARE620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCSCALE: 1/16" = 1'-0"A2105
1 NE Overall Fifth Floor