Loading...
HomeMy WebLinkAboutL100 - ADLS Planting Plan-L100DNUPUPSGDNUPUPUPUP4'-10"2'-6"2'-0"4'-0"4'-6"To PlazaDNUPUPSGDNUPUPUPUP4'-10"2'-6"2'-0"4'-0"4'-6"To PlazaNorth015'30'60'Scale 1" = 30'-0"L100Planting Plan ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFO REVISIONS210108.11.2023Permit SetMONON SQUARE Monon Square Associates, LLC GENERAL LANDSCAPE & PLANTING NOTES1.Contractor responsible for locating all utilities in field prior to beginning work. Contractor responsiblefor repairing any damage to utilities to the satisfaction of the owner, utility owner, and operatingauthority at no additional cost.2.Contractor to stake all tree locations prior to planting. Final placement of plant materials shall beapproved by Landscape Architect. Contractor responsible for relocation of incorrectly placed plantmaterial at no additional cost.3.All plants to meet or exceed size standards as set forth by the 'Standards for Nursery Stock'.4.Contractor to seed all disturbed areas not indicated as planting bed or hardscape on the plans.5.Plan documents indicate minimum plant material required. Contractor responsible for calculating plantquantities based on plans, details, and field conditions.6.Contractor to install plant material in accordance with all local codes and ordinances. See LandscapeOrdinance Chart below.7.If plant quantities indicated on plan are not available, contractor shall notify Landscape Architect prior tobidding. Otherwise, substitution of plant material will not be permitted.8.All planting beds shall have a minimum of 24" uncompacted soil, free from weeds or deleterious materialslarger than 1".9.All planting beds to receive a minimum of 3" shredded hardwood back mulch, except as noted in theplanting details.LANDSCAPE ORDINANCE CHARTZONING: C-2From the City of Carmel Unified Development Ordinance as of 2023-07-14:Section 5.19-LS-01 - Commercial Landscaping StandardsZoned C-2, not applicable.Section 5.20-LS-02 - %ufferyard StandardsZoned C-2, not applicable.Section 5.21-LS-03B% - Street TreesRequirements: 1 Tree  50 l.f. (25 ft. min. distance between trees) Note: Shade trees shall be planted along all streets within the rights-of-ways, parallel to the street.Species, size, and installation shall be per the standards of the City of Carmel.Northwest ParcelWest Side (Monon Trail)Separate Trail and Streetscape Project. Not Applicable.Walnut Street: 290 l.f.Required: 6 Street TreesProvided: 6 Street TreesVeteran's Way:Separate Trail and Streetscape Project. Not Applicable.South Side:Separate Trail and Streetscape Project. Not Applicable.Northeast ParcelRangeline Road & Walnut Street: 472 l.f.Required: 10 Street TreesProvided: 10 Street Trees note: (4) street trees relocated within plaza due to site constraintsVeteran's WaySeparate Trail and Streetscape Project. Not Applicable.South SideSeparate Trail and Streetscape Project. Not Applicable.Section 5.21-LS-03BC - %ufferyardsNo adjacent single-family residences, Not ApplicableAreas to receive seeded lawnWalnut StreetWalnut StreetRangeline Road Project LimitsProject LimitsProject Limits Project LimitsProject LimitsProject LimitsProject LimitsProject LimitsProject LimitsProject LimitsProject LimitsProject LimitsProject LimitsProject LimitsVeteran's Way Veteran's Way Pet Waste Station7/10/2024