Loading...
HomeMy WebLinkAboutL100 - PLANTING PLANDN UP UP SG DN UP DN UP UP SG DN UP North 0 15' 30'60' Scale 1" = 30'-0" L100Planting Plan ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS 21010 8.1.2023 Permit SetMONONSQUARE 620 S. Rangeline RoadCarmel, IN 46032Monon SquareAssociates, LLCGENERAL LANDSCAPE & PLANTING NOTES 1. Contractor responsible for locating all utilities in field prior to beginning work. Contractor responsible for repairing any damage to utilities to the satisfaction of the owner, utility owner, and operating authority at no additional cost. 2. Contractor to stake all tree locations prior to planting. Final placement of plant materials shall be approved by Landscape Architect. Contractor responsible for relocation of incorrectly placed plant material at no additional cost. 3. All plants to meet or exceed size standards as set forth by the 'Standards for Nursery Stock'. 4. Contractor to seed all disturbed areas not indicated as planting bed or hardscape on the plans. 5. Plan documents indicate minimum plant material required. Contractor responsible for calculating plant quantities based on plans, details, and field conditions. 6. Contractor to install plant material in accordance with all local codes and ordinances. See Landscape Ordinance Chart below. 7. If plant quantities indicated on plan are not available, contractor shall notify Landscape Architect prior to bidding. Otherwise, substitution of plant material will not be permitted. 8. All planting beds shall have a minimum of 24" uncompacted soil, free from weeds or deleterious materials larger than 1". 9. All planting beds to receive a minimum of 3" shredded hardwood back mulch, except as noted in the planting details. LANDSCAPE ORDINANCE CHART ZONING: C-2 From the City of Carmel Unified Development Ordinance as of 2023-07-14: Section 5.19-LS-01 - Commercial Landscaping Standards Zoned C-2, not applicable. Section 5.20-LS-02 - %ufferyard Standards Zoned C-2, not applicable. Section 5.21-LS-03 % - Street Trees Requirements: 1 Tree 50 l.f. (25 ft. min. distance between trees) Note: Shade trees shall be planted along all streets within the rights-of-ways, parallel to the street. Species, size, and installation shall be per the standards of the City of Carmel. Northwest Parcel West Side (Monon Trail) Separate Trail and Streetscape Project. Not Applicable. Walnut Street: 290 l.f. Required: 6 Street Trees Provided: 6 Street Trees Veteran's Way: Separate Trail and Streetscape Project. Not Applicable. South Side: Separate Trail and Streetscape Project. Not Applicable. Northeast Parcel Rangeline Road & Walnut Street: 472 l.f. Required: 10 Street Trees Provided: 10 Street Trees note: (4) street trees relocated within plaza due to site constraints Veteran's Way Separate Trail and Streetscape Project. Not Applicable. South Side Separate Trail and Streetscape Project. Not Applicable. Section 5.21-LS-03 C - %ufferyards No adjacent single-family residences, Not Applicable Areas to receive seeded lawn Walnut Street Wal n u t S t r e e t Rangeline RoadProject Limits Project LimitsProject LimitsProject LimitsProject LimitsProject LimitsProject Limits Project Limits Proj ect L i mi tsProject Limits Project LimitsProject LimitsProject Limits Project LimitsVeteran's WayVeteran's Way7/10/2024