HomeMy WebLinkAboutDrainage ReportSPRING MILL SHOPS
DRAINAGE REPORT
PREPARED FOR:
Republic Development LLC
Contact Person: Douglas B. Wagner
13578 E. 131st Street, Suite 200
Fishers, IN 46037
Contact Phone Number: (317) 770-1818
Contact Email: dwagner@republicdev.com
PREPARED BY:
Stoeppelwerth & Associates, Inc.
Contact Person: Nicole Stambro, E.I.
7965 East 106th Street
Fishers, Indiana 46038
Contact Phone Number: (317) 570-4773
Contact Email Address: nstambro@stoeppelwerth.com
DATE PREPARED:
June 14, 2024
DRAINAGE REPORT
SPRING MILL SHOPS
JOB # 60160JGV
TABLE OF CONTENTS
ENGINEERING CERTIFICATION
CERTIFICATE OF INSURANCE
DRAINAGE NARRATIVE
EXHIBITS
LOCATION MAP
FLOODPLAIN MAP
SOILS MAP
RAINFALL DATA
APPENDIX A - PIPE SIZING CALCULATIONS
APPENDIX B - JACKSONS GRANT VILLAGE MASTER PLAN DRAINAGE REPORT
APPENDIX C - BASIN MAPS
06/14/2024
1
ENGINEERING CERTIFICATION
SPRING MILL SHOPS
DRAINAGE REPORT AND ANALYSIS
Brian M. Brown, PE, CFM
Indiana Registration No. 11200386
I, Brian M Brown, certify that this drainage report and supporting calculations are in compliance with the
requirements set forth by the Hamilton County Drainage Board and/or Hamilton County Surveyor in the
Hamilton County, Indiana Stormwater Management Ordinance.
06/14/2024
2
DRAINAGE NARRATIVE
SPRING MILL SHOPS
JOB #60160JGV
INTRODUCTION
Republic Development LLC is proposing the development of a mixed-use subdivision in Hamilton County to
be known as Jacksons Grant Village. Spring Mill Shops is a commercial development and is the last section in
the Jacksons Grant Village Master Plan. The site is located northwest of the intersection of 116th St and
Spring Mill Rd. The site is more specifically located in a part of the Southeast Quarter of Section 34,
Township 18 North, Range 3 East of Clay Township, Hamilton County, Indiana.
EXISTING SITE CONDITIONS
Jackson’s Grant Village will be located south of the Jackson’s Grant Development. The existing site is split
into three drainage basins, with one draining to the north and west into William’s Creek, and the two
southerly basins draining south through existing culverts into a developed area that then drain into Williams
Creek. Based on existing topography, it appears that there will be no offsite drainage onto the site. According
to FEMA FIRM panel 18057C0208G the site lies within Zone X, Area of Minimal Flood Hazard. The site is
made up of type B, Brookston soils, as well as type C, Crosby and Miami soils. Surrounding land uses are
large single family homes to the west, residential to the north and residential to the south.
PROPOSED SITE CONDITIONS
In order to determine the pre-developed allowable release rates the entire site has been delineated minus any
areas that drain offsite. In early discussions with the Hamilton County Surveyors Office (HCSO), it was
requested that the whole development be allowed to drain to the northern portion of the site that drains into
Williams Creek as the southern outlets appear to be too shallow to take the onsite water. Since that initial
discussion, the property to the south has developed and provided an outlet. Therefore, the whole site acreage
was then applied to the 0.1 cfs per acre and the 0.3 cfs per acre to obtain the allowable release rates. The
entire site acreage is 24.18 but 2 basins, that account for 3.28 acres, continue to drain directly offsite and are
not accounted for in the detention calculations. There is 7.05 acres, that in the existing condition drains
Southeast towards the roundabout at Springmill and 116th Street. This area is not factored into the allowable
release rate since the area drains to a separate outlet. There will be two outlets. One to the north that drains
the majority of the site through Lake 1. The second outlet will be to the southwest of the site and will drain
the detention basin, this outlet drains the remainder of the site . The release rate will not be limited to the
specific outlet but an overall release rate. Additional discussions with the HCSO, they requested that we
provided detention for the existing residential property when it develops in the future.
06/14/2024
3
Table 1: Proposed Site Conditions – Onsite Release Rates
Storm Event 10-Year 100-Year
Unit Allowable Release Rate 0.1 cfs/acre 0.3 cfs/acre
Onsite Acreage 17.13 = acres 17.13 = acres
Calculation 0.1 cfs/acre x acres 0.3 cfs/acre x acres
Onsite Allowable Release Rates 1.71 cfs 5.14 cfs
Dry Basin Discharge 1.17 cfs 1.55 cfs
NorthWest Pond Discharge 1.58 cfs 3.59 cfs
Total Release Rate for the Site 2.75 cfs 5.14 cfs
Jacksons Grant Village will develop in two sections. Section 1 will be the residential and major streets.
Section 2 will be the Townhomes and commercial portions. The detention system is designed such that the
existing residence when it develops will be covered by the detention system and will drain north. This report
assumes Section 1 has already been built, which is Scenario 1. Scenario 2 build outs most of the remainder of
the site except the 436A basin. The full build out scenario is Scenario 2 and the 436A basin being fully
developed. A final analysis is included that was made to show what size orifice it would take to meet the 10-
year release rate. This scenario is provided after the Scenario 3 tables.
The second scenario would be the full build out of Section 2. This would include any of the commercial
buildings towards the right hand of the sit and anything else that wasn’t built during Section 1. For this
scenario, the 463A basin will continue draining to the 457A structure.
The proposed peak discharges are based on TR-55 methodology. A detention analysis was performed using
the 2, 10 and 100-year storm events and their corresponding 24-hour rainfall depths. The NRCS Type II
rainfall distribution was used to generate the hydrographs.
The minimum orifice size for the Carmel Stormwater Technical Standards is 6 inches. When a 6” orifice is
placed on both outlet control structures, the 10-year allowable release rate is not met, this mainly affects the
Northwest basin. Another scenario was completed to see what orifice it would take to hit the 10-year
allowable release rate and it was a 4.5” orifice. With this minimum orifice size and a different weir at the 100-
year elevation, the pond is staying in the top of bank.
Table 8: Proposed Site Conditions – Proposed Conditions – Scenario 3 (Full Build Out – Small Orifice)
Storm Event 2-Year 10-Year 100-Year
Proposed Overall Release Rates - SW 0.34 cfs 0.43 cfs 1.59 cfs
Proposed Overall Release Rates – NW 0.54 cfs 0.75 cfs 2.39 cfs
Total for the Site 0.88 cfs 1.18 cfs 3.98 cfs
Table 9: Proposed Site Conditions – Lake Elevations (Full Build Out – Small Orifice)
Lake 2-Year 10-Year 100-Year
Lake 1 849.40 ft 850.94 ft 853.42 ft
Top Of Bank 855.5 ft
Normal Pool 847 ft
06/14/2024
4
STORM SEWER DESIGN
The use of Manning’s equation was used for determination of storm drain pipe sizes for non-submerged
conditions. The storm drain system is capable of passing the 10-year storm event with free water surface
elevations below the crown of pipe. Minimum storm drain flowing velocity for full pipe flow shall be 2.5 fps
and maximum storm drain flowing velocity for full pipe flow is 10 fps.
The inlet grate castings are designed such that the 10-year storm event shall be sufficiently conveyed into the
storm sewer system at 50% efficiency. The inlets are spaced to allow one lane of traffic to remain open
during the 10-year storm event. Appendix C provides the detailed calculations.
WATER QUALITY
Water quality for the site will be handled via wet detention pond, Lake 1. Lake 1 will have an outlet control
structure with orifices that have been sized to meet the allowable release rates while ensuring the sediment
settles to the bottom before being released.
EMERGENCY SPILLWAY
The emergency spillway for Lake 1 was sized for the runoff from all the upstream contributing watersheds. In
lieu of providing a spillway for the day basin, a back-to-back 100 year storm was ran. The results from this
analysis showed that the back to back flow in the pond stayed within the top of bank. Those calculations can
be found in Appendix E. Emergency flood routes can be seen on sheet C201 in the plans.
CULVERT SIZING
Towards the southwestern portion of the site, there is a culvert that goes under the walking path that
ultimately drains to Outlet 2. Per the Carmel Stormwater Technical Standards Manual, culverts need to be
sized to not overtop for the 100-year storm. The design flow for the culvert was grabbed from the ICPR4
report then placed in HY-8. The culvert 460/461 was sized to be a 24” RCP. All culvert calculations can be
found in Appendix G.
REFERENCES
Design and data methods are based on the following references:
1. Hamilton County Stormwater Technical Standards Manual
2. City of Carmel Stormwater Technical Standards
3. HERPICC Stormwater Drainage Manual
Table 10: Proposed Site Conditions – Dry Basin Elevations (Full Build Out– Small Orifice)
Lake 2-Year 10-Year 100-Year
Dry Basin 849.47 ft 850.10 ft 851.25 ft
Top Of Bank 852.5 ft
06/14/2024
5
4. USDA – Urban Hydrology for Small Watersheds
5. USDA – Soil Conservation Service
06/14/2024
6
EXHIBITS
1 LOCATION MAP
2 FLOODPLAIN MAP
3 SOILS MAP AND REPORT
4 HAMLTON COUNTY RAINFALL DATA
06/14/2024
7
Imagery ©2020 IndianaMap Framework Data, Maxar Technologies, USDA Farm Service Agency, Map data ©2020 100 ft
Jackson's Grant Village Location Map
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.06/14/2024 8
USGS The National Map: Orthoimagery. Data refreshed April 2020
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or DepthZone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mileZone X
Future Conditions 1% Annual
Chance Flood HazardZone X
Area with Reduced Flood Risk due to
Levee. See Notes.Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood HazardZone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 9/14/2020 at 10:18 AM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
86°10'19"W 39°57'42"N
86°9'41"W 39°57'14"N06/14/2024 9
Hydrologic Soil Group—Hamilton County, Indiana
(Overall Existing_line)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/14/2020
Page 1 of 4442321044232704423330442339044234504423510442321044232704423330442339044234504423510570920570980571040571100571160571220571280571340571400571460
570920 570980 571040 571100 571160 571220 571280 571340 571400 571460
39° 57' 32'' N 86° 10' 11'' W39° 57' 32'' N86° 9' 47'' W39° 57' 20'' N
86° 10' 11'' W39° 57' 20'' N
86° 9' 47'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 100 200 400 600
Feet
0 35 70 140 210
Meters
Map Scale: 1:2,550 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.06/14/2024 10
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Hamilton County, Indiana
Survey Area Data: Version 21, Jun 4, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 1, 2018—Sep
30, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Hamilton County, Indiana
(Overall Existing_line)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/14/2020
Page 2 of 406/14/2024 11
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
Br Brookston silty clay
loam, 0 to 2 percent
slopes
B/D 6.5 26.8%
CrA Crosby silt loam, fine-
loamy subsoil, 0 to 2
percent slopes
C/D 13.2 54.5%
MmD2 Miami silt loam, 12 to 18
percent slopes,
eroded
C 0.4 1.4%
UbaA Urban land-Brookston
complex, 0 to 2
percent slopes
0.2 0.7%
YbvA Brookston silty clay
loam-Urban land
complex, 0 to 2
percent slopes
B/D 0.1 0.4%
YclA Crosby silt loam, fine-
loamy subsoil-Urban
land complex, 0 to 2
percent slopes
C/D 3.9 16.1%
Totals for Area of Interest 24.2 100.0%
Hydrologic Soil Group—Hamilton County, Indiana Overall Existing_line
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/14/2020
Page 3 of 4
06/14/2024
12
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Hamilton County, Indiana Overall Existing_line
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/14/2020
Page 4 of 4
06/14/2024
13
06/14/2024
14
06/14/2024
15
APPENDIX A
PIPE SIZING CALCULATIONS
06/14/2024
16
Jackson's Grant VillageRunoff Coefficients &Job #60160JGVWeighted Curve NumbersTotal Drainage AreaTotal Impervious Area AimpTotal Impervious Area AimpTotal Pervious Area AperTotal Agricultural Area AagSub-Basin Weighted C-FactorSub-Basin Weighted CN(ac)(sq. ft.)(ac)(ac)(ac)CwCNw4030.18 1185 0.03 0.16 0.00 0.26 82.74050.9226060 0.60 0.32 0.00 0.61 91.74060.1522200.05 0.10 0.00 0.39 86.04070.1722200.05 0.12 0.00 0.37 85.54080.3722200.05 0.32 0.00 0.26 82.54090.3644400.10 0.26 0.00 0.35 85.04110.4166600.15 0.26 0.00 0.41 86.64130.2512550.03 0.22 0.00 0.24 82.14140.4167040.15 0.26 0.00 0.42 86.74150.4914723 0.34 0.15 0.00 0.64 92.54170.5912267 0.28 0.31 0.00 0.49 88.64180.2883600.19 0.09 0.00 0.63 92.34210.1936600.08 0.11 0.00 0.47 88.04220.1650000.11 0.05 0.00 0.64 92.54230.4913880 0.32 0.17 0.00 0.61 91.74240.6066600.15 0.45 0.00 0.33 84.64280.0500.00 0.05 0.00 0.16 80.04290.1845800.11 0.08 0.00 0.56 90.44300.5189570.21 0.31 0.00 0.44 87.24320.1315600.04 0.10 0.00 0.35 84.94340.2550600.12 0.14 0.00 0.48 88.34350.4111752 0.27 0.14 0.00 0.62 91.94360.3010420 0.24 0.06 0.00 0.71 94.34380.4611940 0.27 0.18 0.00 0.58 90.84390.4213533 0.31 0.11 0.00 0.66 93.24400.2459990.14 0.10 0.00 0.55 90.24410.4116775 0.39 0.02 0.00 0.81 97.14420.4513165 0.30 0.14 0.00 0.63 92.24430.2879160.18 0.10 0.00 0.61 91.7Post Developed SiteCw = 0.85Aimp+ 0.16Aper+ 0.5AagTotal Drainage AreaStructure #06/14/2024
17
Total Drainage AreaTotal Impervious Area AimpTotal Impervious Area AimpTotal Pervious Area AperTotal Agricultural Area AagSub-Basin Weighted C-FactorSub-Basin Weighted CN(ac)(sq. ft.)(ac)(ac)(ac)CwCNwStructure #4440.75 22294 0.51 0.24 0.00 0.63 92.34450.6324173 0.55 0.07 0.00 0.77 95.94460.4812669 0.29 0.19 0.00 0.58 91.04470.3474590.17 0.17 0.00 0.51 89.0447A0.2142990.10 0.11 0.00 0.49 88.54480.4215255 0.35 0.07 0.00 0.74 95.14500.3189760.21 0.10 0.00 0.62 92.04510.2585610.20 0.06 0.00 0.69 93.9451A0.4014314 0.33 0.07 0.00 0.73 95.04520.114130.01 0.10 0.00 0.22 81.64700.0715590.04 0.03 0.00 0.52 0.04710.0713530.03 0.04 0.00 0.47 0.04720.1210920.03 0.09 0.00 0.31 83.94730.3172670.17 0.14 0.00 0.54 0.04740.0700.00 0.07 0.00 0.16 0.04750.1537520.09 0.06 0.00 0.56 0.04540.3074050.17 0.13 0.00 0.55 90.14560.1634400.08 0.08 0.00 0.49 88.74570.4617500.04 0.42 0.00 0.22 81.64580.2125770.06 0.15 0.00 0.36 85.24620.1434290.08 0.06 0.00 0.55 90.24630.2056650.13 0.07 0.00 0.60 91.64640.1227870.06 0.06 0.00 0.52 89.3DRY BASIN1.2746800.11 1.17 0.00 0.22 81.5Lake11.9162400.14 1.77 0.00 0.21 81.3436A1.8544138 1.01 0.84 0.00 0.54 89.9436A Right0.9366750.79 0.14 0.00 0.75 95.3436A Left0.9267150.15 0.77 0.00 0.28 83.0Full Build Out of Pond 20.36387186 8.89 11.47 0.00 0.46 87.86457A Combined Basin 3.2952360 1.20 2.09 0.00 0.41 86.58Interim Pond S217.46339911 7.80 9.66 0.00 0.47 89.50Basin Onsite S23.7452360 1.20 2.53 0.00 0.38 85.79Basin Offsite S20.9267150.15 0.77 0.00 0.28 83.02Calculated Values NOT Runoff Coefficients for an individual structuresInterim Conditions- Scenario 2Full Build Out - Scenario 306/14/2024
18
Total Drainage AreaTotal Impervious Area AimpTotal Impervious Area AimpTotal Pervious Area AperTotal Agricultural Area AagSub-Basin Weighted C-FactorSub-Basin Weighted CN(ac)(sq. ft.)(ac)(ac)(ac)CwCNwStructure #OFFSITE TO THE WEST - SOUTH3.13 22216 0.51 2.62 0.00 0.27 82.9OFFSITE TO THE EAST - WEST ( Culvert )0.5291750.21 0.31 0.00 0.44 87.3ROAD OFFSITE TO THE EAST0.9423887 0.55 0.39 0.00 0.56 90.5DS10.174829.80 0.11 0.06 0.00 0.60 0.0DS20.205655.92 0.13 0.07 0.00 0.60 0.0DS30.05459.71 0.01 0.04 0.00 0.31 0.0436 new1.8569546.17 1.60 0.25 0.00 0.76 0.04470.3869546.17 1.60 -1.22 0.00 3.06 0.0447a0.2169546.17 1.60 -1.39 0.00 5.41 0.04450.5969546.17 1.60 -1.01 0.00 2.03 0.04460.5769546.17 1.60 -1.03 0.00 2.09 0.0Inlets that drain to the dry basin06/14/2024
19
Time of ConcentrationsJob #60160JGVStormCADPost-Developed SiteDescriptionn = L =P2 =s =Tt = .007(nL)0.8/(P20.5s0.4)Description s= V = L = Tt = L/VTc (total)Tc (total)(ft) (in) (ft/ft)(hrs)Paved/Unpaved (ft/ft) (ft/s) (ft) (hrs) (hrs)(min)403Dense Grasses 0.24 100 2.66 0.004 0.4966Unpaved 0.004892 1.13 20.44 0.0050 0.501630.1405Pavement 0.011 100 2.66 0.006 0.0359Paved 0.006858 1.683422 160.4 0.0265 0.06235.0406Dense Grasses 0.24 100 2.66 0.010.3442Paved 0.004621 1.38188 21.6 0.0043 0.348620.9407Dense Grasses 0.24 100 2.66 0.012 0.3200Unpaved 1 16.1345 0 0.0000 0.320019.2408Dense Grasses 0.24 100 2.66 0.012 0.3200Paved 1 20.3282 0 0.0000 0.320019.2409Dense Grasses 0.24 100 2.66 0.015 0.2927Unpaved 0.011142 1.703093 770 0.1256 0.418325.1411Dense Grasses 0.24 100 2.66 0.010.3442Paved 0.016194 2.586905 25 0.0027 0.346920.8413Pavement 0.011 100 2.66 0.012 0.0272Paved 0.004894 1.422097 61.3 0.0120 0.03915.0414Pavement 0.011 100 2.66 0.012 0.0272Paved 0.004894 1.422097 61.3 0.0120 0.03915.0415Dense Grasses 0.24 78 2.66 0.011538 0.2665Paved 0.009461 1.977249 105.7 0.0148 0.281316.9417Dense Grasses 0.24 100 2.66 0.019 0.2663Paved 0.025918 3.272646 46.3 0.0039 0.270216.2418Dense Grasses 0.24 86 2.66 0.001157 0.7228Paved 1 20.3282 0 0.0000 0.722843.4421Dense Grasses 0.24 96.5 2.66 0.020725 0.2499Paved 1 20.3282 0 0.0000 0.249915.0422Dense Grasses 0.24 24.3 2.66 0.065844 0.0522Paved 0.005348 1.486545 74.8 0.0140 0.06625.0423Dense Grasses 0.24 36.4 2.66 0.021978 0.1119Paved 0.00565 1.527961 178 0.0324 0.14438.7424Dense Grasses 0.24 100 2.66 0.014 0.3009Unpaved 0.007112 1.360701 140.6 0.0287 0.329619.8428Dense Grasses 0.24 72.97 2.66 0.028779 0.1753Unpaved 1 16.1345 0 0.0000 0.175310.5429Dense Grasses 0.24 92 2.66 0.017708 0.2562Unpaved 0.00597 1.24666 67 0.0149 0.271116.3430Dense Grasses 0.24 100 2.66 0.013 0.3099Unpaved 0.008162 1.457623 257.3 0.0490 0.359021.5432Dense Grasses 0.24 100 2.66 0.010.3442Unpaved 0.014085 1.914813 21.3 0.0031 0.347320.8434Pavement 0.011 100 2.66 0.013 0.0263Paved 0.005333 1.484562 37.5 0.0070 0.03335.0435Dense Grasses 0.24 100 2.66 0.011 0.3313Paved 0.006036 1.579361 99.4 0.0175 0.348820.9436Pavement 0.011 100 2.66 0.022 0.0213Unpaved 1 16.1345 0 0.0000 0.02135.0438Dense Grasses 0.24 100 2.66 0.017 0.2784Paved 0.004716 1.395949 106.03 0.0211 0.299518.0439Pavement 0.011 100 2.66 0.004 0.0422Paved 0.004292 1.331745 23.3 0.0049 0.04705.0440Pavement 0.011 100 2.66 0.019 0.0226Paved 0.00289 1.092851 118.6 0.0301 0.05285.0441Pavement 0.011 100 2.66 0.017 0.0236Paved 0.004739 1.399451 42.2 0.0084 0.03205.0442Dense Grasses 0.24 100 2.66 0.020997 0.2558Paved 0.012821 2.301715 118.6 0.0143 0.270116.2443Pavement 0.011 100 2.66 0.017 0.0236Paved 0.003968 1.280556 75.6 0.0164 0.04005.0444Dense Grasses 0.24 100 2.66 0.004 0.4966Paved 0.005425 1.497242 147.47 0.0274 0.524031.4445Pavement 0.011 100 2.66 0.015 0.0249Paved 0.004753 1.401445 105.2 0.0209 0.04575.0446Dense Grasses 0.24 100 2.66 0.008 0.3763Unpaved 0.026263 2.614716 49.5 0.0053 0.381622.9447Dense Grasses 0.24 105 2.66 0.014286 0.3103Unpaved 1 16.1345 0 0.0000 0.310318.6447APavement 0.011 100 2.66 0.010.0292Paved 0.008929 1.920834 22.4 0.0032 0.03255.0448Dense Grasses 0.24 100 2.66 0.004 0.4966Paved 0.008432 1.866623 118.60.01760.514230.9450Dense Grasses 0.24 67 2.66 0.037313 0.1476Unpaved 1 16.1345 0 0.0000 0.14768.9451Pavement 0.011 100 2.66 0.005 0.0386Paved 0.017857 2.71647 162.6 0.0166 0.05525.0451APavement 0.011 100 2.66 0.005 0.0386Paved 0.017857 2.71647 163.6 0.0167 0.05535.0452Dense Grasses 0.24 83.9 2.66 0.034565 0.1821Unpaved 1 16.1345 0 0.0000 0.182110.9470Dense Grasses 0.24 62.07 2.66 0.030611 0.1502Unpaved 0 1 0 0.0000 0.15029.0471Dense Grasses 0.24 51.61 2.66 0.013563 0.1795Unpaved 0 1 0 0.0000 0.179510.8472Dense Grasses 0.24 100 2.66 0.008 0.3763Unpaved 0 1 0 0.0000 0.376322.6473Dense Grasses 0.24 100 2.66 0.005 0.4542Unpaved 0.007242 1.373025 110.47 0.0223 0.476528.6474Dense Grasses 0.24 62.53 2.66 0.012794 0.2142Unpaved 0 1 0 0.0000 0.214212.9475Dense Grasses 0.24 65.63 2.66 0.009142 0.2547Unpaved 0 1 0 0.0000 0.254715.3Jackson's Grant VillageSheet FlowManual (L/V)Basin06/14/2024
20
Descriptionn = L =P2 =s =Tt = .007(nL)0.8/(P20.5s0.4)Description s= V = L = Tt = L/VTc (total)Tc (total)(ft) (in) (ft/ft)(hrs)Paved/Unpaved (ft/ft) (ft/s) (ft) (hrs) (hrs)(min)Sheet FlowManual (L/V)BasinEX-2Dense Grasses 0.24 83.9 2.66 0.034565 0.1821Unpaved 8 45.63526 7 0.0000 0.182210.9454Pavement 0.011 100 2.66 0.002206 0.0535Paved 0.002203 0.95405 136.2 0.0397 0.09325.6456Dense Grasses 0.24 100 2.66 0.018 0.2721Paved 0.007491 1.759374 26.7 0.0042 0.276316.6457Dense Grasses 0.24 100 2.66 0.019 0.2663Unpaved 0.004891 1.128385 224.9 0.0554 0.321619.3458Dense Grasses 0.24 100 2.66 0.050.1808Unpaved 0.009615 1.582118 26 0.0046 0.185411.1462Pavement 0.011 100 2.66 0.050.01545.0463Pavement 0.011 100 2.66 0.050.01545.0464DRY BASINDense Grasses 0.24 100 2.66 0.018 0.2721Unpaved 0.004673 1.102932 65.2 0.0164 0.288517.3436ADense Grasses 0.24 100 2.66 0.018 0.2721Unpaved 0.004673 1.102932 67.2 0.0169 0.289010.0436A LeftDense Grasses 0.24 100 2.66 0.017 0.2784Unpaved 0.005421 1.187933 313.6 0.0733 0.351721.1Full Build Out of Pond Dense Grasses 0.24 100 2.66 0.018 0.2721Unpaved 0.004673 1.102932 66.2 0.0167 0.288817.3457A Combined Basin Dense Grasses 0.24 100 2.66 0.019 0.2663Paved 0.025918 3.272646 46.3 0.0039 0.270216.2Interim Pond S2Dense Grasses 0.24 100 2.66 0.018 0.2721Unpaved 0.004673 1.102932 66.2 0.0167 0.288817.3Basin Onsite S2Dense Grasses 0.24 100 2.66 0.019 0.2663Paved 0.025918 3.272646 46.3 0.0039 0.270216.2Basin Offsite S2Dense Grasses 0.24 100 2.66 0.017 0.2784Unpaved 0.005421 1.187933 313.6 0.0733 0.351721.1INTERIM POND - S1Dense Grasses 0.24 100 2.66 0.007 0.3970Unpaved 0.007163 1.365535 208.42 0.0424 0.467728.1415 - INTERIMDense Grasses 0.24 100 2.66 0.007 0.3970Unpaved 0.007163 1.365501 209.42 0.0426 0.439626.4Basin Onsite S1Dense Grasses 0.24 100 2.66 0.019 0.2663Paved 0.025918 3.272646 46.3 0.0039 0.270216.2Basin Offsite S1Dense Grasses 0.24 100 2.66 0.017 0.2784Unpaved 0.005421 1.187933 313.6 0.0733 0.351721.1OFFSITE TO THE EAST - NORTH ( Culvert )Dense Grasses 0.24 100 2.66 0.030.2218Unpaved 0.011278 1.713465 266 0.0431 0.264915.9OFFSITE TO THE EAST - SOUTHDense Grasses 0.24 100 2.66 0.017 0.2784Unpaved 0.01035 1.641444 425 0.0719 0.350321.0Road to the EastPavement 0.011 100 2.66 0.030.0188Unpaved 0.003896 1.007096 385 0.1062 0.12507.5Interim Conditions- Scenario 1Interim Conditions- Scenario 2Full Build Out - Scenario 3Inlets that drain to the dry basin06/14/2024
21
Project Description
Jacksons Grant Village 02-02-2024.SPF
Project Options
CFS
Elevation
Rational
User-Defined
Steady Flow
YES
NO
Analysis Options
Apr 19, 2021 00:00:00
Apr 20, 2021 00:00:00
Apr 19, 2021 00:00:00
0 days
0 01:00:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
30 seconds
Number of Elements
Qty
0
57
69
63
2
0
0
4
70
1
64
0
5
0
0
0
0
Rainfall Details
10 year(s)
Outlets ..........................................................................
Pollutants ..............................................................................
Land Uses ............................................................................
Return Period........................................................................
Links......................................................................................
Channels ......................................................................
Pipes ............................................................................
Pumps ..........................................................................
Orifices .........................................................................
Weirs ............................................................................
Nodes....................................................................................
Junctions ......................................................................
Outfalls .........................................................................
Flow Diversions ...........................................................
Inlets ............................................................................
Storage Nodes .............................................................
Runoff (Dry Weather) Time Step ..........................................
Runoff (Wet Weather) Time Step ........................................
Reporting Time Step ............................................................
Routing Time Step ................................................................
Rain Gages ...........................................................................
Subbasins..............................................................................
Enable Overflow Ponding at Nodes ......................................
Skip Steady State Analysis Time Periods ............................
Start Analysis On ..................................................................
End Analysis On ...................................................................
Start Reporting On ................................................................
Antecedent Dry Days ............................................................
File Name .............................................................................
Flow Units .............................................................................
Elevation Type ......................................................................
Hydrology Method .................................................................
Time of Concentration (TOC) Method ..................................
Link Routing Method .............................................................
06/14/2024
22
Subbasin Summary
SN Subbasin Area Weighted Total Total Total Peak Time of
ID Runoff Rainfall Runoff Runoff Runoff Concentration
Coefficient Volume
(ac)(in) (in) (ac-in) (cfs) (days hh:mm:ss)
1 Sub-403 0.18 0.2600 1.63 0.42 0.08 0.15 0 00:30:06
2 Sub-405 0.92 0.6100 1.14 0.69 0.64 2.55 0 00:15:00
3 Sub-406 0.15 0.3900 1.36 0.53 0.08 0.23 0 00:20:54
4 Sub-407 0.17 0.3700 1.31 0.48 0.08 0.26 0 00:19:12
5 Sub-408 0.37 0.2600 1.31 0.34 0.13 0.39 0 00:19:12
6 Sub-409 0.36 0.3500 1.50 0.52 0.19 0.45 0 00:25:06
7 Sub-411 0.41 0.4100 1.37 0.56 0.23 0.66 0 00:20:48
8 Sub-413 0.25 0.2400 1.05 0.25 0.06 0.28 0 00:13:18
9 Sub-414 0.41 0.4200 1.04 0.44 0.18 0.82 0 00:13:00
10 Sub-415 0.49 0.6400 1.21 0.78 0.38 1.36 0 00:16:53
11 Sub-417 0.59 0.4900 1.19 0.58 0.34 1.27 0 00:16:12
12 Sub-417A 0.09 0.1600 0.51 0.08 0.01 0.09 0 00:05:00
13 Sub-418 0.28 0.6300 1.16 0.73 0.20 0.79 0 00:15:30
14 Sub-421 0.19 0.4700 1.14 0.54 0.10 0.41 0 00:15:00
15 Sub-422 0.16 0.6400 0.51 0.33 0.05 0.63 0 00:05:00
16 Sub-423 0.49 0.6100 0.78 0.48 0.23 1.61 0 00:08:42
17 Sub-424 0.60 0.3300 1.34 0.44 0.26 0.80 0 00:19:48
18 Sub-428 0.05 0.1600 0.90 0.14 0.01 0.04 0 00:10:30
19 Sub-429 0.18 0.5600 1.20 0.67 0.12 0.44 0 00:16:18
20 Sub-430 0.51 0.5900 1.39 0.82 0.42 1.17 0 00:21:30
21 Sub-432 0.13 0.3500 1.37 0.48 0.06 0.18 0 00:20:48
22 Sub-434 0.25 0.4800 0.51 0.25 0.06 0.73 0 00:05:00
23 Sub-435 0.41 0.6200 1.36 0.85 0.35 1.00 0 00:20:54
24 Sub-436 0.30 0.6000 0.51 0.31 0.09 1.10 0 00:05:00
25 Sub-436A 1.77 0.7500 0.87 0.65 1.15 6.93 0 00:10:00
26 Sub-436A( Interim)1.38 0.5300 1.37 0.73 1.00 2.87 0 00:21:00
27 Sub-438 0.46 0.5800 1.26 0.73 0.34 1.12 0 00:18:00
28 Sub-439 0.42 0.6600 0.51 0.34 0.14 1.70 0 00:05:00
29 Sub-440 0.24 0.5500 0.51 0.28 0.07 0.81 0 00:05:00
30 Sub-441 0.41 0.8100 0.51 0.41 0.17 2.03 0 00:05:00
31 Sub-442 0.45 0.6300 1.19 0.75 0.34 1.25 0 00:16:12
32 Sub-443 0.28 0.6100 0.51 0.31 0.09 1.05 0 00:05:00
33 Sub-444 0.75 0.6300 1.65 1.04 0.78 1.49 0 00:31:24
34 Sub-445 0.63 0.7700 0.51 0.39 0.25 2.97 0 00:05:00
35 Sub-446 0.48 0.5800 1.43 0.83 0.40 1.04 0 00:22:54
36 Sub-447 0.34 0.5100 1.29 0.66 0.22 0.72 0 00:18:36
37 Sub-447A 0.21 0.4900 0.51 0.25 0.05 0.63 0 00:05:00
38 Sub-448 0.42 0.7400 1.64 1.21 0.51 0.99 0 00:30:54
39 Sub-450 0.31 0.6200 0.79 0.49 0.15 1.03 0 00:08:54
40 Sub-451 0.25 0.6900 0.51 0.35 0.09 1.06 0 00:05:00
41 Sub-451a 0.40 0.7300 0.51 0.37 0.15 1.79 0 00:05:00
42 Sub-452 0.11 0.2200 0.92 0.20 0.02 0.12 0 00:10:54
43 Sub-454 0.30 0.4300 1.21 0.52 0.16 0.56 0 00:16:36
44 Sub-456 0.16 0.4900 1.32 0.65 0.10 0.32 0 00:19:18
45 Sub-457 0.37 0.2300 1.24 0.28 0.11 0.36 0 00:17:18
46 Sub-458 0.21 0.3600 0.94 0.34 0.07 0.38 0 00:11:06
47 Sub-458EW 0.52 0.4400 1.37 0.60 0.31 0.90 0 00:21:00
48 Sub-458offWS 3.13 0.2700 1.17 0.32 0.99 3.75 0 00:15:54
49 Sub-462 0.05 0.3100 0.51 0.16 0.01 0.10 0 00:05:00
50 Sub-463 0.20 0.6000 0.51 0.31 0.06 0.73 0 00:05:00
51 Sub-464 0.17 0.6000 0.51 0.31 0.05 0.62 0 00:05:00
52 Sub-470 0.07 0.3200 0.80 0.26 0.02 0.12 0 00:09:00
53 Sub-471 0.07 0.4700 0.92 0.43 0.03 0.17 0 00:10:48
54 Sub-472 0.12 0.4200 1.42 0.60 0.07 0.19 0 00:22:36
55 Sub-473 0.31 0.5300 1.59 0.84 0.26 0.55 0 00:28:36
56 Sub-474 0.07 0.1600 1.02 0.16 0.01 0.05 0 00:12:54
57 Sub-475 0.15 0.5600 1.15 0.65 0.10 0.38 0 00:15:18
06/14/2024
23
Node Summary
SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time
ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded
Elevation Elevation Attained Depth Attained Flooding Volume
Attained Occurrence
(ft) (ft) (ft) (ft) (ft²) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min)
1 401 Junction 847.00 848.17 847.00 848.17 0.00 0.98 847.38 0.00 3.60 0 00:00 0.00 0.00
2 403 Junction 847.15 853.80 847.15 853.80 0.00 3.57 848.01 0.00 5.79 0 00:00 0.00 0.00
3 404 Junction 850.44 854.37 850.44 854.37 0.00 2.55 851.32 0.00 3.05 0 00:00 0.00 0.00
4 405 Junction 850.58 854.20 850.58 854.20 0.00 2.55 851.37 0.00 2.83 0 00:00 0.00 0.00
5 406 Junction 848.84 853.80 848.84 853.80 0.00 1.20 849.44 0.00 4.36 0 00:00 0.00 0.00
6 407 Junction 849.38 853.80 849.38 853.80 0.00 0.99 849.90 0.00 3.90 0 00:00 0.00 0.00
7 408 Junction 849.89 853.80 849.89 853.80 0.00 0.74 850.32 0.00 3.48 0 00:00 0.00 0.00
8 409 Junction 850.40 853.60 850.40 853.60 0.00 0.45 850.73 0.00 2.87 0 00:00 0.00 0.00
9 411 Junction 847.19 853.80 847.19 853.80 0.00 4.24 848.18 0.00 5.61 0 00:00 0.00 0.00
10 412 Junction 847.53 854.61 847.53 854.61 0.00 3.83 848.52 0.00 6.08 0 00:00 0.00 0.00
11 413 Junction 847.68 854.39 847.68 854.39 0.00 3.83 848.75 0.00 5.64 0 00:00 0.00 0.00
12 414 Junction 847.85 854.39 847.85 854.39 0.00 3.61 849.57 0.00 4.82 0 00:00 0.00 0.00
13 415 Junction 848.88 854.38 848.88 854.38 0.00 3.06 849.96 0.00 4.42 0 00:00 0.00 0.00
14 417 Junction 849.77 853.67 849.77 853.67 0.00 1.27 850.29 0.00 3.38 0 00:00 0.00 0.00
15 417A Junction 851.49 855.68 851.49 855.68 0.00 0.09 851.58 0.00 4.10 0 00:00 0.00 0.00
16 418 Junction 849.58 853.67 849.58 853.67 0.00 2.03 850.20 0.00 3.47 0 00:00 0.00 0.00
17 421 Junction 849.36 854.06 849.36 854.38 0.00 2.36 850.24 0.00 3.82 0 00:00 0.00 0.00
18 422 Junction 849.54 854.79 849.54 854.79 0.00 2.13 850.57 0.00 4.22 0 00:00 0.00 0.00
19 423 Junction 849.89 854.76 849.89 854.76 0.00 1.96 850.67 0.00 4.09 0 00:00 0.00 0.00
20 424 Junction 850.41 853.51 850.41 853.51 0.00 0.80 850.86 0.00 2.66 0 00:00 0.00 0.00
21 428 Junction 849.03 853.80 849.03 853.80 0.00 1.88 849.72 0.00 4.08 0 00:00 0.00 0.00
22 428A Junction 849.87 854.48 849.87 854.48 0.00 1.86 850.56 0.00 3.92 0 00:00 0.00 0.00
23 429 Junction 850.07 854.22 850.07 854.22 0.00 1.86 850.90 0.00 3.32 0 00:00 0.00 0.00
24 430 Junction 850.26 854.22 850.26 854.22 0.00 1.72 850.99 0.00 3.23 0 00:00 0.00 0.00
25 432 Junction 847.15 853.60 847.15 853.60 0.00 20.19 849.02 0.00 4.58 0 00:00 0.00 0.00
26 433 Junction 847.90 854.64 847.90 854.64 0.00 7.41 849.35 0.00 5.29 0 00:00 0.00 0.00
27 434 Junction 848.20 854.37 848.20 854.37 0.00 7.41 849.57 0.00 4.80 0 00:00 0.00 0.00
28 435 Junction 848.38 854.08 848.38 854.08 0.00 7.41 849.68 0.00 4.40 0 00:00 0.00 0.00
29 436 Junction 848.87 854.08 848.87 854.08 0.00 6.93 850.07 0.00 4.01 0 00:00 0.00 0.00
30 437 Junction 847.45 854.18 847.45 854.18 0.00 14.61 849.27 0.00 4.91 0 00:00 0.00 0.00
31 438 Junction 847.60 854.04 847.60 854.04 0.00 14.61 849.36 0.00 4.68 0 00:00 0.00 0.00
32 439 Junction 847.75 854.04 847.75 854.04 0.00 14.29 849.58 0.00 4.46 0 00:00 0.00 0.00
33 440 Junction 848.03 853.77 848.03 853.77 0.00 12.60 849.81 0.00 3.96 0 00:00 0.00 0.00
34 441 Junction 848.35 853.98 848.35 853.98 0.00 8.89 851.08 0.00 2.90 0 00:00 0.00 0.00
35 442 Junction 848.88 854.10 848.88 854.10 0.00 6.28 849.99 0.00 4.11 0 00:00 0.00 0.00
36 443 Junction 849.07 854.10 849.07 854.10 0.00 5.89 850.12 0.00 3.98 0 00:00 0.00 0.00
37 444 Junction 849.51 853.90 849.51 853.90 0.00 4.84 850.70 0.00 3.21 0 00:00 0.00 0.00
38 445 Junction 849.88 853.99 849.88 853.99 0.00 4.46 850.97 0.00 3.02 0 00:00 0.00 0.00
39 446 Junction 850.53 854.19 850.53 854.19 0.00 1.23 851.02 0.00 3.17 0 00:00 0.00 0.00
40 447 Junction 850.46 854.22 850.46 854.22 0.00 0.82 850.95 0.00 3.27 0 00:00 0.00 0.00
41 447A Junction 851.05 854.75 851.05 854.75 0.00 0.63 851.44 0.00 3.31 0 00:00 0.00 0.00
42 448 Junction 850.38 854.19 850.38 854.19 0.00 1.50 850.89 0.00 3.29 0 00:00 0.00 0.00
43 450 Junction 851.08 854.77 851.08 854.77 0.00 1.03 851.60 0.00 3.17 0 00:00 0.00 0.00
44 451 Junction 849.82 853.62 849.82 853.62 0.00 2.90 850.63 0.00 2.99 0 00:00 0.00 0.00
45 451A Junction 850.35 854.20 850.35 854.20 0.00 1.84 850.92 0.00 3.28 0 00:00 0.00 0.00
46 452 Junction 851.07 854.61 851.07 854.77 0.00 0.12 851.21 0.00 3.40 0 00:00 0.00 0.00
47 453 Junction 847.93 851.92 847.93 851.92 0.00 2.27 848.72 0.00 3.21 0 00:00 0.00 0.00
48 454 Junction 847.98 851.37 847.98 851.37 0.00 1.35 848.55 0.00 2.83 0 00:00 0.00 0.00
49 455B Junction 848.42 851.89 848.42 851.89 0.00 4.90 849.62 0.00 2.27 0 00:00 0.00 0.00
50 456 Junction 848.68 852.14 848.68 852.14 0.00 3.45 849.79 0.00 2.36 0 00:00 0.00 0.00
51 457 Junction 848.90 852.16 848.90 852.16 0.00 3.15 850.10 0.00 2.05 0 00:00 0.00 0.00
52 457A Junction 850.48 850.48 850.48 850.48 0.00 2.87 850.92 0.00 0.56 0 00:00 0.00 0.00
53 462 Junction 850.85 854.50 850.85 854.50 0.00 1.45 851.50 0.00 3.00 0 00:00 0.00 0.00
54 463 Junction 851.42 855.10 851.42 855.10 0.00 1.36 851.97 0.00 3.13 0 00:00 0.00 0.00
55 464 Junction 851.95 855.50 851.95 855.50 0.00 0.62 852.29 0.00 3.21 0 00:00 0.00 0.00
56 470 Junction 850.99 854.23 850.99 854.23 0.00 0.55 851.38 0.00 2.84 0 00:00 0.00 0.00
57 471 Junction 851.30 855.00 851.30 855.00 0.00 0.17 851.49 0.00 3.51 0 00:00 0.00 0.00
58 472 Junction 851.44 855.41 851.44 855.41 0.00 0.19 851.60 0.00 3.81 0 00:00 0.00 0.00
59 473 Junction 851.52 854.95 851.52 854.95 0.00 0.55 851.81 0.00 3.14 0 00:00 0.00 0.00
60 474 Junction 851.02 855.41 851.02 855.41 0.00 0.05 851.10 0.00 4.31 0 00:00 0.00 0.00
61 475 Junction 851.12 855.10 851.12 855.10 0.00 0.38 851.36 0.00 3.74 0 00:00 0.00 0.00
62 476 Junction 850.03 855.58 850.03 855.58 0.00 0.42 850.77 0.00 4.80 0 00:00 0.00 0.00
63 Jun-04 Junction 851.03 852.50 851.03 852.50 0.00 0.17 851.34 0.00 1.16 0 00:00 0.00 0.00
64 Out-1400-401 Outfall 846.60 0.98 846.98
65 Out-1EX-453 Outfall 847.86 2.27 848.62
66 458 Storage Node 848.95 851.00 848.95 0.00 1.01 849.24 0.00 0.00
67 DryBasin Storage Node 848.04 851.00 848.04 0.00 4.90 849.38 0.00 0.00
68 Jun-03 Storage Node 851.32 854.00 851.32 0.00 3.75 851.78 0.00 0.00
69 Lake1 Storage Node 847.00 853.00 847.00 0.00 26.14 848.27 0.00 0.00
06/14/2024
24
Link Summary
SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported
ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition
Node Elevation Elevation Ratio Total Depth
Ratio
(ft) (ft) (ft) (%) (in)(cfs) (cfs)(ft/sec) (ft)(min)
1 17 Pipe 472 446 88.49 851.44 850.73 0.8000 12.000 0.0120 0.19 3.45 0.06 2.36 0.16 0.16 0.00 Calculated
2 19 Pipe 474 476 88.74 851.02 850.13 1.0000 12.000 0.0120 0.05 3.86 0.01 1.74 0.08 0.08 0.00 Calculated
3 22 Pipe 475 476 98.06 851.12 850.53 0.6000 12.000 0.0120 0.38 2.99 0.13 2.61 0.24 0.24 0.00 Calculated
4 23 Pipe 476 444 41.55 850.03 849.61 1.0000 12.000 0.0120 0.42 3.86 0.11 3.22 0.22 0.22 0.00 Calculated
5 400-401 Pipe 401 Out-1400-401 111.10 847.00 846.60 0.3600 18.000 0.0120 0.98 6.83 0.14 2.74 0.38 0.26 0.00 Calculated
6 402-403 Pipe 403 Lake1 51.54 847.15 847.00 0.2900 18.000 0.0130 3.57 5.75 0.62 3.43 0.86 0.57 0.00 Calculated
7 403-404 Pipe 404 403 115.43 850.44 847.40 2.6300 15.000 0.0130 2.55 10.48 0.24 7.04 0.42 0.34 0.00 Calculated
8 403-406 Pipe 406 403 68.44 848.84 847.65 1.7400 12.000 0.0130 1.20 4.70 0.26 5.01 0.35 0.35 0.00 Calculated
9 404-405 Pipe 405 404 15.00 850.58 850.54 0.3000 15.000 0.0130 2.55 3.54 0.72 3.14 0.79 0.63 0.00 Calculated
10 406-407 Pipe 407 406 146.97 849.38 848.94 0.3000 12.000 0.0130 0.99 1.95 0.51 2.50 0.51 0.51 0.00 Calculated
11 407-408 Pipe 408 407 137.70 849.89 849.48 0.3000 12.000 0.0130 0.74 1.95 0.38 2.31 0.43 0.43 0.00 Calculated
12 408-409 Pipe 409 408 137.18 850.40 849.99 0.3000 12.000 0.0130 0.45 1.95 0.23 2.02 0.33 0.33 0.00 Calculated
13 410-411 Pipe 411 Lake1 61.96 847.19 847.00 0.3000 18.000 0.0130 4.24 5.75 0.74 3.56 0.96 0.64 0.00 Calculated
14 411-412 Pipe 412 411 80.83 847.53 847.29 0.3000 18.000 0.0130 3.83 5.75 0.67 3.48 0.89 0.60 0.00 Calculated
15 412-413 Pipe 413 412 15.00 847.68 847.63 0.3000 18.000 0.0130 3.83 5.75 0.67 3.48 0.89 0.60 0.00 Calculated
16 413-414 Pipe 414 413 33.01 847.85 847.78 0.2100 18.000 0.0130 3.61 4.84 0.75 3.00 0.97 0.64 0.00 Calculated
17 414-415 Pipe 415 414 119.95 848.88 848.66 0.1800 18.000 0.0130 3.06 4.50 0.68 2.74 0.91 0.61 0.00 Calculated
18 415-421 Pipe 421 415 104.69 849.36 849.13 0.2200 15.000 0.0130 2.36 3.03 0.78 2.73 0.83 0.66 0.00 Calculated
19 417-417A Pipe 417A 417 117.69 851.49 849.87 1.3800 15.000 0.0130 0.09 7.58 0.01 2.07 0.09 0.08 0.00 Calculated
20 417-418 Pipe 417 418 30.41 849.77 849.68 0.3000 15.000 0.0130 1.27 3.51 0.36 2.63 0.52 0.42 0.00 Calculated
21 418-455B Pipe 418 455B 136.11 849.58 848.52 0.7800 15.000 0.0130 2.03 5.70 0.36 4.25 0.52 0.41 0.00 Calculated
22 421-422 Pipe 422 421 37.02 849.54 849.46 0.2200 15.000 0.0130 2.13 3.00 0.71 2.65 0.78 0.62 0.00 Calculated
23 422-423 Pipe 423 422 30.00 849.89 849.79 0.3300 12.000 0.0130 1.96 2.06 0.95 2.98 0.78 0.78 0.00 Calculated
24 423-424 Pipe 424 423 140.05 850.41 849.99 0.3000 12.000 0.0130 0.80 1.95 0.41 2.36 0.45 0.45 0.00 Calculated
25 427-428 Pipe 428 Lake1 67.82 849.03 847.00 3.0000 12.000 0.0130 1.88 6.17 0.30 6.89 0.38 0.38 0.00 Calculated
26 428-428A Pipe 428A 428 115.00 849.87 849.13 0.6400 12.000 0.0130 1.86 2.85 0.65 3.86 0.59 0.59 0.00 Calculated
27 428-429 Pipe 429 428A 15.00 850.07 849.97 0.6400 12.000 0.0130 1.86 2.85 0.65 3.86 0.59 0.59 0.00 Calculated
28 429-430 Pipe 430 429 30.00 850.26 850.17 0.3000 12.000 0.0130 1.72 1.95 0.88 2.80 0.73 0.73 0.00 Calculated
29 431-432 Pipe 432 Lake1 49.00 847.16 847.00 0.3300 30.000 0.0130 20.19 23.44 0.86 5.37 1.79 0.72 0.00 Calculated
30 432-433 Pipe 433 432 136.91 847.90 847.65 0.1800 24.000 0.0130 7.41 9.72 0.76 3.41 1.31 0.65 0.00 Calculated
31 432-437 Pipe 437 432 106.00 847.45 847.26 0.1800 30.000 0.0130 14.61 17.37 0.84 3.96 1.76 0.70 0.00 Calculated
32 433-434 Pipe 434 433 15.00 848.20 848.15 0.3300 21.000 0.0130 7.41 9.15 0.81 4.23 1.20 0.68 0.00 Calculated
33 434-435 Pipe 435 434 28.00 848.38 848.30 0.2900 21.000 0.0130 7.41 8.47 0.87 3.97 1.27 0.72 0.00 Calculated
34 435-436 Pipe 436 435 135.74 848.87 848.48 0.2900 21.000 0.0130 6.93 8.49 0.82 3.94 1.20 0.69 0.00 Calculated
35 437-438 Pipe 438 437 26.52 847.60 847.55 0.1900 30.000 0.0130 14.61 17.81 0.82 4.05 1.72 0.69 0.00 Calculated
36 438-439 Pipe 439 438 30.00 847.76 847.70 0.2000 30.000 0.0130 14.29 18.34 0.78 4.13 1.66 0.66 0.00 Calculated
37 439-440 Pipe 440 439 120.65 848.03 847.86 0.1400 30.000 0.0130 12.60 15.40 0.82 3.50 1.72 0.69 0.00 Calculated
38 440-441 Pipe 441 440 34.00 848.35 848.24 0.3200 24.000 0.0130 8.89 12.87 0.69 4.42 1.22 0.61 0.00 Calculated
39 440-451 Pipe 451 440 122.00 849.82 849.00 0.6700 12.000 0.0130 2.90 2.92 0.99 4.24 0.81 0.81 0.00 Calculated
40 441-442 Pipe 442 441 121.00 848.88 848.45 0.3600 21.000 0.0130 6.28 9.45 0.66 4.20 1.04 0.60 0.00 Calculated
41 441-450 Pipe 450 441 173.00 851.08 850.56 0.3000 12.000 0.0130 1.03 1.95 0.53 2.52 0.52 0.52 0.00 Calculated
42 442-443 Pipe 443 442 26.14 849.07 848.98 0.3400 21.000 0.0130 5.89 9.30 0.63 4.09 1.01 0.58 0.00 Calculated
43 443-444 Pipe 444 443 119.06 849.48 849.17 0.2600 21.000 0.0130 4.84 8.46 0.57 3.63 0.95 0.54 0.00 Calculated
44 444-445 Pipe 445 444 134.76 849.88 849.61 0.2000 18.000 0.0120 4.46 5.09 0.88 3.25 1.09 0.73 0.00 Calculated
45 445 STUB W Pipe 448 445 70.45 850.38 849.98 0.5700 12.000 0.0120 1.50 2.92 0.51 3.74 0.51 0.51 0.00 Calculated
46 445-446 Pipe 446 445 123.81 850.53 849.98 0.4400 12.000 0.0120 1.23 2.57 0.48 3.24 0.49 0.49 0.00 Calculated
47 445-447 Pipe 447 445 165.00 850.46 849.98 0.2900 12.000 0.0130 0.82 1.93 0.43 2.36 0.46 0.46 0.00 Calculated
48 447-447A Pipe 447A 447 162.00 851.05 850.56 0.3000 12.000 0.0130 0.63 1.95 0.32 2.21 0.39 0.39 0.00 Calculated
49 448-470 Pipe 470 448 113.87 850.99 850.48 0.4500 12.000 0.0120 0.55 2.58 0.21 2.61 0.31 0.31 0.00 Calculated
50 451-452 Pipe 452 451A 108.00 851.07 850.45 0.5700 12.000 0.0130 0.12 2.70 0.05 1.75 0.14 0.14 0.00 Calculated
51 453-454 Pipe 454 453 29.35 847.98 847.93 0.1800 18.000 0.0130 1.35 4.46 0.30 2.21 0.57 0.38 0.00 Calculated
52 453-458 Pipe 458 453 23.00 848.95 848.43 2.2600 12.000 0.0130 0.96 5.36 0.18 5.15 0.29 0.29 0.00 Calculated
53 455A-455B Pipe 455B DryBasin 69.73 848.42 848.26 0.2300 18.000 0.0130 4.90 5.03 0.97 3.24 1.20 0.80 0.00 Calculated
54 455B-456 Pipe 456 455B 84.13 848.68 848.52 0.1900 18.000 0.0130 3.45 4.58 0.75 2.85 0.97 0.65 0.00 Calculated
55 456-457 Pipe 457 456 68.80 848.95 848.78 0.2500 15.000 0.0130 3.15 3.21 0.98 2.98 1.01 0.80 0.00 Calculated
56 457-457A Pipe 457A 457 21.00 850.48 849.66 3.9000 12.000 0.0130 2.87 7.04 0.41 8.50 0.44 0.44 0.00 Calculated
57 470-471 Pipe 471 470 71.54 851.30 851.09 0.3000 12.000 0.0120 0.17 2.11 0.08 1.61 0.19 0.19 0.00 Calculated
58 470-472 Pipe 473 470 71.31 851.52 851.09 0.6000 12.000 0.0120 0.55 2.99 0.18 2.89 0.29 0.29 0.00 Calculated06/14/2024 25
Link Summary
SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported
ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition
Node Elevation Elevation Ratio Total Depth
Ratio
(ft) (ft) (ft) (%) (in)(cfs) (cfs)(ft/sec) (ft)(min)
59 6inch Pipe Jun-03 Jun-04 18.00 851.64 851.03 3.3900 6.000 0.0130 0.17 1.03 0.17 3.89 0.14 0.28 0.00 Calculated
60 EX-453 Pipe 453 Out-1EX-453 37.64 847.93 847.86 0.1800 18.000 0.0130 2.27 4.46 0.51 2.53 0.76 0.51 0.00 Calculated
61 Link-07 Pipe 451A 451 62.30 850.35 849.92 0.6900 12.000 0.0130 1.84 2.96 0.62 3.97 0.57 0.57 0.00 Calculated
62 Link-09 Pipe 464 463 85.04 851.95 851.52 0.5100 12.000 0.0130 0.62 2.53 0.25 2.67 0.34 0.34 0.00 Calculated
63 Link-10 Pipe 463 462 108.60 851.42 850.95 0.4300 12.000 0.0130 1.36 2.34 0.58 3.09 0.55 0.55 0.00 Calculated
64 Link-11 Pipe 462 430 103.12 850.85 850.36 0.4800 12.000 0.0130 1.45 2.46 0.59 3.26 0.55 0.55 0.00 Calculated
65 swale Channel Jun-04 458 196.00 851.03 848.95 1.0600 12.000 0.0320 0.17 4.00 0.04 1.21 0.31 0.31 0.00
66 Lake1OCS2 Orifice Lake1 401 847.00 847.00 6.000 0.00
67 Lake1OCSTC Orifice Lake1 401 847.00 847.00 36.000 0.00
68 Lake1OCSWQ Orifice Lake1 401 847.00 847.00 6.000 0.98
69 Orifice-04 Orifice DryBasin 454 848.04 847.98 6.000 1.01
70 Orifice-05 Orifice DryBasin 454 848.04 847.98 36.000 0.00
06/14/2024 26
Subbasin Hydrology
Subbasin : Sub-403
Input Data
Area (ac) ....................................................... 0.18
Weighted Runoff Coefficient ........................ 0.2600
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-0.18 - 0.26
Composite Area & Weighted Runoff Coeff. 0.18 0.26
Subbasin Runoff Results
Total Rainfall (in) .......................................... 1.63
Total Runoff (in) ............................................ 0.42
Peak Runoff (cfs) ......................................... 0.15
Rainfall Intensity ........................................... 3.243
Weighted Runoff Coefficient ........................ 0.2600
Time of Concentration (days hh:mm:ss) ...... 0 00:30:06
06/14/2024
27
Junction Input
SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum
ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe
Elevation Offset Elevation Depth Cover
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft²) (in)
1 401 847.00 848.17 1.17 847.00 0.00 848.17 0.00 0.00 0.00
2 403 847.15 853.80 6.64 847.15 0.00 853.80 0.00 0.00 0.00
3 404 850.44 854.37 3.93 850.44 0.00 854.37 0.00 0.00 0.00
4 405 850.58 854.20 3.62 850.58 0.00 854.20 0.00 0.00 0.00
5 406 848.84 853.80 4.96 848.84 0.00 853.80 0.00 0.00 0.00
6 407 849.38 853.80 4.42 849.38 0.00 853.80 0.00 0.00 0.00
7 408 849.89 853.80 3.91 849.89 0.00 853.80 0.00 0.00 0.00
8 409 850.40 853.60 3.20 850.40 0.00 853.60 0.00 0.00 0.00
9 411 847.19 853.80 6.61 847.19 0.00 853.80 0.00 0.00 0.00
10 412 847.53 854.61 7.07 847.53 0.00 854.61 0.00 0.00 0.00
11 413 847.68 854.39 6.71 847.68 0.00 854.39 0.00 0.00 0.00
12 414 847.85 854.39 6.54 847.85 0.00 854.39 0.00 0.00 0.00
13 415 848.88 854.38 5.50 848.88 0.00 854.38 0.00 0.00 0.00
14 417 849.77 853.67 3.90 849.77 0.00 853.67 0.00 0.00 0.00
15 417A 851.49 855.68 4.19 851.49 0.00 855.68 0.00 0.00 0.00
16 418 849.58 853.67 4.09 849.58 0.00 853.67 0.00 0.00 0.00
17 421 849.36 854.06 4.70 849.36 0.00 854.38 0.32 0.00 0.00
18 422 849.54 854.79 5.25 849.54 0.00 854.79 0.00 0.00 0.00
19 423 849.89 854.76 4.87 849.89 0.00 854.76 0.00 0.00 0.00
20 424 850.41 853.51 3.10 850.41 0.00 853.51 0.00 0.00 0.00
21 428 849.03 853.80 4.77 849.03 0.00 853.80 0.00 0.00 0.00
22 428A 849.87 854.48 4.61 849.87 0.00 854.48 0.00 0.00 0.00
23 429 850.07 854.22 4.15 850.07 0.00 854.22 0.00 0.00 0.00
24 430 850.26 854.22 3.96 850.26 0.00 854.22 0.00 0.00 0.00
25 432 847.15 853.60 6.45 847.15 0.00 853.60 0.00 0.00 0.00
26 433 847.90 854.64 6.74 847.90 0.00 854.64 0.00 0.00 0.00
27 434 848.20 854.37 6.17 848.20 0.00 854.37 0.00 0.00 0.00
28 435 848.38 854.08 5.70 848.38 0.00 854.08 0.00 0.00 0.00
29 436 848.87 854.08 5.21 848.87 0.00 854.08 0.00 0.00 0.00
30 437 847.45 854.18 6.73 847.45 0.00 854.18 0.00 0.00 0.00
31 438 847.60 854.04 6.44 847.60 0.00 854.04 0.00 0.00 0.00
32 439 847.75 854.04 6.29 847.75 0.00 854.04 0.00 0.00 0.00
33 440 848.03 853.77 5.74 848.03 0.00 853.77 0.00 0.00 0.00
34 441 848.35 853.98 5.63 848.35 0.00 853.98 0.00 0.00 0.00
35 442 848.88 854.10 5.22 848.88 0.00 854.10 0.00 0.00 0.00
36 443 849.07 854.10 5.03 849.07 0.00 854.10 0.00 0.00 0.00
37 444 849.51 853.90 4.39 849.51 0.00 853.90 0.00 0.00 0.00
38 445 849.88 853.99 4.11 849.88 0.00 853.99 0.00 0.00 0.00
39 446 850.53 854.19 3.66 850.53 0.00 854.19 0.00 0.00 0.00
40 447 850.46 854.22 3.76 850.46 0.00 854.22 0.00 0.00 0.00
41 447A 851.05 854.75 3.70 851.05 0.00 854.75 0.00 0.00 0.00
42 448 850.38 854.19 3.80 850.38 0.00 854.19 0.00 0.00 0.00
43 450 851.08 854.77 3.69 851.08 0.00 854.77 0.00 0.00 0.00
44 451 849.82 853.62 3.80 849.82 0.00 853.62 0.00 0.00 0.00
45 451A 850.35 854.20 3.85 850.35 0.00 854.20 0.00 0.00 0.00
46 452 851.07 854.61 3.54 851.07 0.00 854.77 0.16 0.00 0.00
47 453 847.93 851.92 4.00 847.93 0.00 851.92 0.00 0.00 0.00
48 454 847.98 851.37 3.39 847.98 0.00 851.37 0.00 0.00 0.00
49 455B 848.42 851.89 3.47 848.42 0.00 851.89 0.00 0.00 0.00
50 456 848.68 852.14 3.46 848.68 0.00 852.14 0.00 0.00 0.00
51 457 848.90 852.16 3.26 848.90 0.00 852.16 0.00 0.00 0.00
52 457A 850.48 850.48 0.00 850.48 0.00 850.48 0.00 0.00 0.00
53 462 850.85 854.50 3.65 850.85 0.00 854.50 0.00 0.00 0.00
54 463 851.42 855.10 3.68 851.42 0.00 855.10 0.00 0.00 0.00
55 464 851.95 855.50 3.55 851.95 0.00 855.50 0.00 0.00 0.00
56 470 850.99 854.23 3.24 850.99 0.00 854.23 0.00 0.00 0.00
57 471 851.30 855.00 3.70 851.30 0.00 855.00 0.00 0.00 0.00
58 472 851.44 855.41 3.97 851.44 0.00 855.41 0.00 0.00 0.00
59 473 851.52 854.95 3.43 851.52 0.00 854.95 0.00 0.00 0.00
60 474 851.02 855.41 4.39 851.02 0.00 855.41 0.00 0.00 0.00
61 475 851.12 855.10 3.98 851.12 0.00 855.10 0.00 0.00 0.00
62 476 850.03 855.58 5.55 850.03 0.00 855.58 0.00 0.00 0.00
63 Jun-04 851.03 852.50 1.47 851.03 0.00 852.50 0.00 0.00 0.00
06/14/2024
28
Junction Results
SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time
ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded
Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume
Attained Occurrence
(cfs) (cfs) (ft) (ft) (ft) (ft)(ft)(ft) (days hh:mm) (days hh:mm) (ac-in) (min)
1 401 0.98 0.00 847.38 0.38 0.00 3.60 847.21 0.21 0 00:52 0 00:00 0.00 0.00
2 403 3.57 0.15 848.01 0.86 0.00 5.79 847.66 0.51 0 00:15 0 00:00 0.00 0.00
3 404 2.55 0.00 851.32 0.88 0.00 3.05 850.55 0.11 0 00:15 0 00:00 0.00 0.00
4 405 2.55 2.55 851.37 0.79 0.00 2.83 850.59 0.01 0 00:15 0 00:00 0.00 0.00
5 406 1.20 0.23 849.44 0.60 0.00 4.36 848.95 0.11 0 00:19 0 00:00 0.00 0.00
6 407 0.99 0.26 849.90 0.52 0.00 3.90 849.49 0.11 0 00:19 0 00:00 0.00 0.00
7 408 0.74 0.39 850.32 0.43 0.00 3.48 850.00 0.11 0 00:19 0 00:00 0.00 0.00
8 409 0.45 0.45 850.73 0.33 0.00 2.87 850.41 0.01 0 00:25 0 00:00 0.00 0.00
9 411 4.24 0.66 848.18 0.99 0.00 5.61 847.31 0.12 0 00:13 0 00:00 0.00 0.00
10 412 3.83 0.00 848.52 0.99 0.00 6.08 847.65 0.12 0 00:13 0 00:00 0.00 0.00
11 413 3.83 0.28 848.75 1.08 0.00 5.64 847.80 0.13 0 00:08 0 00:00 0.00 0.00
12 414 3.61 0.82 849.57 1.72 0.00 4.82 848.68 0.83 0 00:08 0 00:00 0.00 0.00
13 415 3.06 1.36 849.96 1.08 0.00 4.42 849.14 0.26 0 00:08 0 00:00 0.00 0.00
14 417 1.27 1.27 850.29 0.52 0.00 3.38 849.88 0.11 0 00:16 0 00:00 0.00 0.00
15 417A 0.09 0.09 851.58 0.09 0.00 4.10 851.49 0.00 0 00:05 0 00:00 0.00 0.00
16 418 2.03 0.79 850.20 0.62 0.00 3.47 849.69 0.11 0 00:16 0 00:00 0.00 0.00
17 421 2.36 0.41 850.24 0.88 0.00 3.82 849.47 0.11 0 00:08 0 00:00 0.00 0.00
18 422 2.13 0.63 850.57 1.03 0.00 4.22 849.80 0.26 0 00:08 0 00:00 0.00 0.00
19 423 1.96 1.61 850.67 0.78 0.00 4.09 850.00 0.11 0 00:08 0 00:00 0.00 0.00
20 424 0.80 0.80 850.86 0.45 0.00 2.66 850.42 0.01 0 00:20 0 00:00 0.00 0.00
21 428 1.88 0.04 849.72 0.69 0.00 4.08 849.15 0.12 0 00:05 0 00:00 0.00 0.00
22 428A 1.86 0.00 850.56 0.69 0.00 3.92 849.99 0.12 0 00:05 0 00:00 0.00 0.00
23 429 1.86 0.44 850.90 0.83 0.00 3.32 850.18 0.11 0 00:05 0 00:00 0.00 0.00
24 430 1.72 1.16 850.99 0.73 0.00 3.23 850.37 0.11 0 00:05 0 00:00 0.00 0.00
25 432 20.19 0.18 849.02 1.87 0.00 4.58 847.67 0.52 0 00:05 0 00:00 0.00 0.00
26 433 7.41 0.00 849.35 1.45 0.00 5.29 848.17 0.27 0 00:10 0 00:00 0.00 0.00
27 434 7.41 0.73 849.57 1.37 0.00 4.80 848.32 0.12 0 00:10 0 00:00 0.00 0.00
28 435 7.41 1.00 849.68 1.30 0.00 4.40 848.49 0.11 0 00:10 0 00:00 0.00 0.00
29 436 6.93 6.93 850.07 1.20 0.00 4.01 848.88 0.01 0 00:10 0 00:00 0.00 0.00
30 437 14.61 0.00 849.27 1.82 0.00 4.91 847.58 0.13 0 00:05 0 00:00 0.00 0.00
31 438 14.61 1.12 849.36 1.76 0.00 4.68 847.73 0.13 0 00:05 0 00:00 0.00 0.00
32 439 14.29 1.70 849.58 1.83 0.00 4.46 847.89 0.14 0 00:05 0 00:00 0.00 0.00
33 440 12.60 0.81 849.81 1.78 0.00 3.96 849.00 0.97 0 00:05 0 00:00 0.00 0.00
34 441 8.89 2.03 851.08 2.73 0.00 2.90 850.56 2.21 0 00:09 0 00:00 0.00 0.00
35 442 6.28 1.25 849.99 1.11 0.00 4.11 849.01 0.13 0 00:05 0 00:00 0.00 0.00
36 443 5.89 1.05 850.12 1.05 0.00 3.98 849.20 0.13 0 00:05 0 00:00 0.00 0.00
37 444 4.84 1.49 850.70 1.19 0.00 3.21 849.63 0.12 0 00:05 0 00:00 0.00 0.00
38 445 4.46 2.97 850.97 1.09 0.00 3.02 850.00 0.12 0 00:05 0 00:00 0.00 0.00
39 446 1.23 1.04 851.02 0.49 0.00 3.17 850.73 0.20 0 00:23 0 00:00 0.00 0.00
40 447 0.82 0.72 850.95 0.49 0.00 3.27 850.57 0.11 0 00:05 0 00:00 0.00 0.00
41 447A 0.63 0.63 851.44 0.39 0.00 3.31 851.05 0.00 0 00:05 0 00:00 0.00 0.00
42 448 1.50 0.99 850.89 0.51 0.00 3.29 850.49 0.11 0 00:31 0 00:00 0.00 0.00
43 450 1.03 1.03 851.60 0.52 0.00 3.17 851.08 0.00 0 00:09 0 00:00 0.00 0.00
44 451 2.90 1.06 850.63 0.81 0.00 2.99 849.92 0.10 0 00:05 0 00:00 0.00 0.00
45 451A 1.84 1.79 850.92 0.57 0.00 3.28 850.45 0.10 0 00:05 0 00:00 0.00 0.00
46 452 0.12 0.12 851.21 0.14 0.00 3.40 851.07 0.00 0 00:11 0 00:00 0.00 0.00
47 453 2.27 0.00 848.72 0.79 0.00 3.21 848.47 0.54 0 00:21 0 00:00 0.00 0.00
48 454 1.35 0.56 848.55 0.57 0.00 2.83 848.03 0.05 0 00:16 0 00:00 0.00 0.00
49 455B 4.90 0.00 849.62 1.20 0.00 2.27 848.54 0.12 0 00:19 0 00:00 0.00 0.00
50 456 3.45 0.32 849.79 1.11 0.00 2.36 848.80 0.12 0 00:21 0 00:00 0.00 0.00
51 457 3.15 0.36 850.10 1.20 0.00 2.05 849.67 0.77 0 00:21 0 00:00 0.00 0.00
52 457A 2.87 2.87 850.92 0.44 0.00 0.56 850.49 0.01 0 00:21 0 00:00 0.00 0.00
53 462 1.45 0.09 851.50 0.65 0.00 3.00 850.95 0.10 0 00:05 0 00:00 0.00 0.00
54 463 1.36 0.73 851.97 0.55 0.00 3.13 851.52 0.10 0 00:05 0 00:00 0.00 0.00
55 464 0.62 0.62 852.29 0.34 0.00 3.21 851.95 0.00 0 00:05 0 00:00 0.00 0.00
56 470 0.55 0.12 851.38 0.39 0.00 2.84 851.10 0.11 0 00:28 0 00:00 0.00 0.00
57 471 0.17 0.17 851.49 0.19 0.00 3.51 851.31 0.01 0 00:11 0 00:00 0.00 0.00
58 472 0.19 0.19 851.60 0.16 0.00 3.81 851.44 0.00 0 00:22 0 00:00 0.00 0.00
59 473 0.55 0.55 851.81 0.29 0.00 3.14 851.53 0.01 0 00:28 0 00:00 0.00 0.00
60 474 0.05 0.05 851.10 0.08 0.00 4.31 851.02 0.00 0 00:13 0 00:00 0.00 0.00
61 475 0.38 0.38 851.36 0.24 0.00 3.74 851.12 0.00 0 00:15 0 00:00 0.00 0.00
62 476 0.42 0.00 850.77 0.74 0.00 4.80 850.53 0.50 0 00:15 0 00:00 0.00 0.00
63 Jun-04 0.17 0.00 851.34 0.31 0.00 1.16 851.14 0.11 0 00:31 0 00:00 0.00 0.00
06/14/2024
29
Channel Input
SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap
ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate
Elevation Offset Elevation Offset
(ft) (ft) (ft) (ft) (ft) (ft) (%)(ft) (ft)(cfs)
1 swale 196.00 851.03 0.00 848.95 0.00 2.08 1.0600 Triangular 1.000 3.000 0.0320 0.5000 0.5000 0.0000 0.00 No
06/14/2024
30
Channel Results
SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported
ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition
Occurrence Ratio Total Depth
Ratio
(cfs) (days hh:mm) (cfs)(ft/sec) (min) (ft)(min)
1 swale 0.17 0 00:31 4.00 0.04 1.21 2.70 0.31 0.31 0.00
06/14/2024
31
Pipe Input
SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. of
ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels
Elevation Offset Elevation Offset Height
(ft) (ft) (ft) (ft) (ft) (ft) (%)(in) (in)(cfs)
1 17 88.49 851.44 0.00 850.73 0.20 0.71 0.8000 CIRCULAR 12.000 12.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
2 19 88.74 851.02 0.00 850.13 0.10 0.89 1.0000 CIRCULAR 12.000 12.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
3 22 98.06 851.12 0.00 850.53 0.50 0.59 0.6000 CIRCULAR 12.000 12.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
4 23 41.55 850.03 0.00 849.61 0.10 0.42 1.0000 CIRCULAR 12.000 12.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
5 400-401 111.10 847.00 0.00 846.60 0.00 0.40 0.3600 CIRCULAR 18.000 18.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
6 402-403 51.54 847.15 0.00 847.00 0.00 0.15 0.2900 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
7 403-404 115.43 850.44 0.00 847.40 0.25 3.04 2.6300 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
8 403-406 68.44 848.84 0.00 847.65 0.50 1.19 1.7400 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
9 404-405 15.00 850.58 0.00 850.54 0.09 0.05 0.3000 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
10 406-407 146.97 849.38 0.00 848.94 0.10 0.44 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
11 407-408 137.70 849.89 0.00 849.48 0.10 0.41 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
12 408-409 137.18 850.40 0.00 849.99 0.10 0.41 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
13 410-411 61.96 847.19 0.00 847.00 0.00 0.19 0.3000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
14 411-412 80.83 847.53 0.00 847.29 0.10 0.24 0.3000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
15 412-413 15.00 847.68 0.00 847.63 0.10 0.04 0.3000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
16 413-414 33.01 847.85 0.00 847.78 0.11 0.07 0.2100 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
17 414-415 119.95 848.88 0.00 848.66 0.81 0.22 0.1800 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
18 415-421 104.69 849.36 0.00 849.13 0.25 0.23 0.2200 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
19 417-417A 117.69 851.49 0.00 849.87 0.10 1.62 1.3800 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
20 417-418 30.41 849.77 0.00 849.68 0.10 0.09 0.3000 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
21 418-455B 136.11 849.58 0.00 848.52 0.10 1.06 0.7800 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
22 421-422 37.02 849.54 0.00 849.46 0.10 0.08 0.2200 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
23 422-423 30.00 849.89 0.00 849.79 0.25 0.10 0.3300 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
24 423-424 140.05 850.41 0.00 849.99 0.10 0.42 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
25 427-428 67.82 849.03 0.00 847.00 0.00 2.03 3.0000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
26 428-428A 115.00 849.87 0.00 849.13 0.10 0.74 0.6400 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
27 428-429 15.00 850.07 0.00 849.97 0.10 0.10 0.6400 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
28 429-430 30.00 850.26 0.00 850.17 0.10 0.09 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
29 431-432 49.00 847.16 0.01 847.00 0.00 0.16 0.3300 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
30 432-433 136.91 847.90 0.00 847.65 0.50 0.25 0.1800 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
31 432-437 106.00 847.45 0.00 847.26 0.11 0.19 0.1800 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
32 433-434 15.00 848.20 0.00 848.15 0.25 0.05 0.3300 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
33 434-435 28.00 848.38 0.00 848.30 0.10 0.08 0.2900 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
34 435-436 135.74 848.87 0.00 848.48 0.10 0.39 0.2900 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
35 437-438 26.52 847.60 0.00 847.55 0.10 0.05 0.1900 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
36 438-439 30.00 847.76 0.01 847.70 0.10 0.06 0.2000 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
37 439-440 120.65 848.03 0.00 847.86 0.11 0.17 0.1400 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
38 440-441 34.00 848.35 0.00 848.24 0.21 0.11 0.3200 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
39 440-451 122.00 849.82 0.00 849.00 0.97 0.82 0.6700 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
40 441-442 121.00 848.88 0.00 848.45 0.10 0.43 0.3600 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
41 441-450 173.00 851.08 0.00 850.56 2.21 0.52 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
42 442-443 26.14 849.07 0.00 848.98 0.10 0.09 0.3400 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
43 443-444 119.06 849.48 -0.03 849.17 0.10 0.31 0.2600 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
44 444-445 134.76 849.88 0.00 849.61 0.10 0.27 0.2000 CIRCULAR 18.000 18.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
45 445 STUB W 70.45 850.38 0.00 849.98 0.10 0.40 0.5700 CIRCULAR 12.000 12.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
46 445-446 123.81 850.53 0.00 849.98 0.10 0.55 0.4400 CIRCULAR 12.000 12.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
47 445-447 165.00 850.46 0.00 849.98 0.10 0.49 0.2900 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
48 447-447A 162.00 851.05 0.00 850.56 0.10 0.49 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
49 448-470 113.87 850.99 0.00 850.48 0.10 0.51 0.4500 CIRCULAR 12.000 12.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
50 451-452 108.00 851.07 0.00 850.45 0.10 0.62 0.5700 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
51 453-454 29.35 847.98 0.00 847.93 0.00 0.05 0.1800 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
52 453-458 23.00 848.95 0.00 848.43 0.50 0.52 2.2600 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
53 455A-455B 69.73 848.42 0.00 848.26 0.22 0.16 0.2300 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
54 455B-456 84.13 848.68 0.00 848.52 0.10 0.16 0.1900 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
55 456-457 68.80 848.95 0.05 848.78 0.10 0.17 0.2500 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
56 457-457A 21.00 850.48 0.00 849.66 0.76 0.82 3.9000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
57 470-471 71.54 851.30 0.00 851.09 0.10 0.21 0.3000 CIRCULAR 12.000 12.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
58 470-472 71.31 851.52 0.00 851.09 0.10 0.43 0.6000 CIRCULAR 12.000 12.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
59 6inch 18.00 851.64 0.32 851.03 0.00 0.61 3.3900 CIRCULAR 6.000 6.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
60 EX-453 37.64 847.93 0.00 847.86 0.00 0.07 0.1800 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
61 Link-07 62.30 850.35 0.00 849.92 0.10 0.43 0.6900 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
62 Link-09 85.04 851.95 0.00 851.52 0.10 0.43 0.5100 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
63 Link-10 108.60 851.42 0.00 850.95 0.10 0.47 0.4300 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
64 Link-11 103.12 850.85 0.00 850.36 0.10 0.49 0.4800 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
06/14/2024
32
Pipe Results
SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported
ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition
Occurrence Ratio Total Depth
Ratio
(cfs) (days hh:mm) (cfs)(ft/sec) (min) (ft)(min)
1 17 0.19 0 00:22 3.45 0.06 2.36 0.62 0.16 0.16 0.00 Calculated
2 19 0.05 0 00:13 3.86 0.01 1.74 0.85 0.08 0.08 0.00 Calculated
3 22 0.38 0 00:15 2.99 0.13 2.61 0.63 0.24 0.24 0.00 Calculated
4 23 0.42 0 00:15 3.86 0.11 3.22 0.22 0.22 0.22 0.00 Calculated
5 400-401 0.98 0 00:52 6.83 0.14 2.74 0.68 0.38 0.26 0.00 Calculated
6 402-403 3.57 0 00:15 5.75 0.62 3.43 0.25 0.86 0.57 0.00 Calculated
7 403-404 2.55 0 00:15 10.48 0.24 7.04 0.27 0.42 0.34 0.00 Calculated
8 403-406 1.20 0 00:19 4.70 0.26 5.01 0.23 0.35 0.35 0.00 Calculated
9 404-405 2.55 0 00:15 3.54 0.72 3.14 0.08 0.79 0.63 0.00 Calculated
10 406-407 0.99 0 00:19 1.95 0.51 2.50 0.98 0.51 0.51 0.00 Calculated
11 407-408 0.74 0 00:19 1.95 0.38 2.31 0.99 0.43 0.43 0.00 Calculated
12 408-409 0.45 0 00:25 1.95 0.23 2.02 1.13 0.33 0.33 0.00 Calculated
13 410-411 4.24 0 00:13 5.75 0.74 3.56 0.29 0.96 0.64 0.00 Calculated
14 411-412 3.83 0 00:13 5.75 0.67 3.48 0.39 0.89 0.60 0.00 Calculated
15 412-413 3.83 0 00:13 5.75 0.67 3.48 0.07 0.89 0.60 0.00 Calculated
16 413-414 3.61 0 00:08 4.84 0.75 3.00 0.18 0.97 0.64 0.00 Calculated
17 414-415 3.06 0 00:08 4.50 0.68 2.74 0.73 0.91 0.61 0.00 Calculated
18 415-421 2.36 0 00:08 3.03 0.78 2.73 0.64 0.83 0.66 0.00 Calculated
19 417-417A 0.09 0 00:05 7.58 0.01 2.07 0.95 0.09 0.08 0.00 Calculated
20 417-418 1.27 0 00:16 3.51 0.36 2.63 0.19 0.52 0.42 0.00 Calculated
21 418-455B 2.03 0 00:16 5.70 0.36 4.25 0.53 0.52 0.41 0.00 Calculated
22 421-422 2.13 0 00:08 3.00 0.71 2.65 0.23 0.78 0.62 0.00 Calculated
23 422-423 1.96 0 00:08 2.06 0.95 2.98 0.17 0.78 0.78 0.00 Calculated
24 423-424 0.80 0 00:20 1.95 0.41 2.36 0.99 0.45 0.45 0.00 Calculated
25 427-428 1.88 0 00:05 6.17 0.30 6.89 0.16 0.38 0.38 0.00 Calculated
26 428-428A 1.86 0 00:05 2.85 0.65 3.86 0.50 0.59 0.59 0.00 Calculated
27 428-429 1.86 0 00:05 2.85 0.65 3.86 0.06 0.59 0.59 0.00 Calculated
28 429-430 1.72 0 00:05 1.95 0.88 2.80 0.18 0.73 0.73 0.00 Calculated
29 431-432 20.19 0 00:05 23.44 0.86 5.37 0.15 1.79 0.72 0.00 Calculated
30 432-433 7.41 0 00:10 9.72 0.76 3.41 0.67 1.31 0.65 0.00 Calculated
31 432-437 14.61 0 00:05 17.37 0.84 3.96 0.45 1.76 0.70 0.00 Calculated
32 433-434 7.41 0 00:10 9.15 0.81 4.23 0.06 1.20 0.68 0.00 Calculated
33 434-435 7.41 0 00:10 8.47 0.87 3.97 0.12 1.27 0.72 0.00 Calculated
34 435-436 6.93 0 00:10 8.49 0.82 3.94 0.57 1.20 0.69 0.00 Calculated
35 437-438 14.61 0 00:05 17.81 0.82 4.05 0.11 1.72 0.69 0.00 Calculated
36 438-439 14.29 0 00:05 18.34 0.78 4.13 0.12 1.66 0.66 0.00 Calculated
37 439-440 12.60 0 00:05 15.40 0.82 3.50 0.57 1.72 0.69 0.00 Calculated
38 440-441 8.89 0 00:05 12.87 0.69 4.42 0.13 1.22 0.61 0.00 Calculated
39 440-451 2.90 0 00:05 2.92 0.99 4.24 0.48 0.81 0.81 0.00 Calculated
40 441-442 6.28 0 00:05 9.45 0.66 4.20 0.48 1.04 0.60 0.00 Calculated
41 441-450 1.03 0 00:09 1.95 0.53 2.52 1.14 0.52 0.52 0.00 Calculated
42 442-443 5.89 0 00:05 9.30 0.63 4.09 0.11 1.01 0.58 0.00 Calculated
43 443-444 4.84 0 00:05 8.46 0.57 3.63 0.55 0.95 0.54 0.00 Calculated
44 444-445 4.46 0 00:05 5.09 0.88 3.25 0.69 1.09 0.73 0.00 Calculated
45 445 STUB W 1.50 0 00:31 2.92 0.51 3.74 0.31 0.51 0.51 0.00 Calculated
46 445-446 1.23 0 00:23 2.57 0.48 3.24 0.64 0.49 0.49 0.00 Calculated
47 445-447 0.82 0 00:05 1.93 0.43 2.36 1.17 0.46 0.46 0.00 Calculated
48 447-447A 0.63 0 00:05 1.95 0.32 2.21 1.22 0.39 0.39 0.00 Calculated
49 448-470 0.55 0 00:28 2.58 0.21 2.61 0.73 0.31 0.31 0.00 Calculated
50 451-452 0.12 0 00:11 2.70 0.05 1.75 1.03 0.14 0.14 0.00 Calculated
51 453-454 1.35 0 00:16 4.46 0.30 2.21 0.22 0.57 0.38 0.00 Calculated
52 453-458 0.96 0 00:21 5.36 0.18 5.15 0.07 0.29 0.29 0.00 Calculated
53 455A-455B 4.90 0 00:19 5.03 0.97 3.24 0.36 1.20 0.80 0.00 Calculated
54 455B-456 3.45 0 00:21 4.58 0.75 2.85 0.49 0.97 0.65 0.00 Calculated
55 456-457 3.15 0 00:21 3.21 0.98 2.98 0.38 1.01 0.80 0.00 Calculated
56 457-457A 2.87 0 00:21 7.04 0.41 8.50 0.04 0.44 0.44 0.00 Calculated
57 470-471 0.17 0 00:11 2.11 0.08 1.61 0.74 0.19 0.19 0.00 Calculated
58 470-472 0.55 0 00:28 2.99 0.18 2.89 0.41 0.29 0.29 0.00 Calculated
59 6inch 0.17 0 00:31 1.03 0.17 3.89 0.08 0.14 0.28 0.00 Calculated
60 EX-453 2.27 0 00:21 4.46 0.51 2.53 0.25 0.76 0.51 0.00 Calculated
61 Link-07 1.84 0 00:05 2.96 0.62 3.97 0.26 0.57 0.57 0.00 Calculated
62 Link-09 0.62 0 00:05 2.53 0.25 2.67 0.53 0.34 0.34 0.00 Calculated
63 Link-10 1.36 0 00:05 2.34 0.58 3.09 0.59 0.55 0.55 0.00 Calculated
64 Link-11 1.45 0 00:05 2.46 0.59 3.26 0.53 0.55 0.55 0.00 Calculated
06/14/2024
33
Storage Nodes
Storage Node : 458
Input Data
848.95
851.00
2.05
848.95
0.00
0.00
0.00
Storage Area Volume Curves
Storage Curve : 458 storage
Stage Storage Storage
Area Volume
(ft)(ft²) (ft³)
0 0 0.000
1.05 3500 1837.50
2.05 5200 6187.50
Evaporation Loss .....................................................................
Invert Elevation (ft) ...................................................................
Max (Rim) Elevation (ft) ...........................................................
Max (Rim) Offset (ft) ................................................................
Initial Water Elevation (ft) .........................................................
Initial Water Depth (ft) ..............................................................
Ponded Area (ft²) .....................................................................
06/14/2024
34
06/14/2024
35
Storage Node : 458 (continued)
Output Summary Results
1.01
0.94
0.96
0.00
849.24
0.29
848.99
0.04
0 00:21
0.000
0
0
0.00
Total Time Flooded (min) ........................................................
Total Retention Time (sec) ......................................................
Max HGL Depth Attained (ft) ...................................................
Average HGL Elevation Attained (ft) ........................................
Average HGL Depth Attained (ft) .............................................
Time of Max HGL Occurrence (days hh:mm) ..........................
Total Exfiltration Volume (1000-ft³) ..........................................
Total Flooded Volume (ac-in) ..................................................
Peak Inflow (cfs) ......................................................................
Peak Lateral Inflow (cfs) ..........................................................
Peak Outflow (cfs) ...................................................................
Peak Exfiltration Flow Rate (cfm) ............................................
Max HGL Elevation Attained (ft) ..............................................
06/14/2024
36
Storage Node : DryBasin
Input Data
848.04
851.00
2.96
848.04
0.00
0.00
0.00
Storage Area Volume Curves
Storage Curve : Storage-02 (DB)
Stage Storage Storage
Area Volume
(ft)(ft²) (ft³)
0 0 0.000
0.96 4993.92 2397.08
1.96 10199.03 9993.56
2.96 11623.25 20904.70
Initial Water Depth (ft) ..............................................................
Ponded Area (ft²) .....................................................................
Evaporation Loss .....................................................................
Invert Elevation (ft) ...................................................................
Max (Rim) Elevation (ft) ...........................................................
Max (Rim) Offset (ft) ................................................................
Initial Water Elevation (ft) .........................................................
06/14/2024
37
06/14/2024
38
Storage Node : DryBasin (continued)
Outflow Orifices
SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice
ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient
Diameter Height Width Elevation
(in) (in) (in) (ft)
1 Orifice-04 Side CIRCULAR No 6.00 848.04 0.61
2 Orifice-05 Bottom Rectangular No 36.00 36.00 851.16 0.63
Output Summary Results
4.90
0.00
1.01
0.00
849.38
1.34
848.13
0.09
0 00:35
0.000
0
0
0.00
Total Exfiltration Volume (1000-ft³) ..........................................
Total Flooded Volume (ac-in) ..................................................
Total Time Flooded (min) ........................................................
Total Retention Time (sec) ......................................................
Peak Exfiltration Flow Rate (cfm) ............................................
Max HGL Elevation Attained (ft) ..............................................
Max HGL Depth Attained (ft) ...................................................
Average HGL Elevation Attained (ft) ........................................
Average HGL Depth Attained (ft) .............................................
Time of Max HGL Occurrence (days hh:mm) ..........................
Peak Inflow (cfs) ......................................................................
Peak Lateral Inflow (cfs) ..........................................................
Peak Outflow (cfs) ...................................................................
06/14/2024
39
Storage Node : Jun-03
Input Data
851.32
854.00
2.68
851.32
0.00
0.00
0.00
Storage Area Volume Curves
Storage Curve : 6inch
Stage Storage Storage
Area Volume
(ft)(ft²) (ft³)
0 0 0.000
0.68 22518.21 7656.19
1.68 49019.08 43424.84
Max (Rim) Offset (ft) ................................................................
Initial Water Elevation (ft) .........................................................
Initial Water Depth (ft) ..............................................................
Ponded Area (ft²) .....................................................................
Evaporation Loss .....................................................................
Invert Elevation (ft) ...................................................................
Max (Rim) Elevation (ft) ...........................................................
06/14/2024
40
06/14/2024
41
Storage Node : Jun-03 (continued)
Output Summary Results
3.75
3.75
0.17
0.00
851.78
0.46
851.68
0.36
0 00:31
0.000
0
0
0.00
Average HGL Depth Attained (ft) .............................................
Time of Max HGL Occurrence (days hh:mm) ..........................
Total Exfiltration Volume (1000-ft³) ..........................................
Total Flooded Volume (ac-in) ..................................................
Total Time Flooded (min) ........................................................
Total Retention Time (sec) ......................................................
Peak Lateral Inflow (cfs) ..........................................................
Peak Outflow (cfs) ...................................................................
Peak Exfiltration Flow Rate (cfm) ............................................
Max HGL Elevation Attained (ft) ..............................................
Max HGL Depth Attained (ft) ...................................................
Average HGL Elevation Attained (ft) ........................................
Peak Inflow (cfs) ......................................................................
06/14/2024
42
Storage Node : Lake1
Input Data
847.00
853.00
6.00
847.00
0.00
0.00
0.00
Storage Area Volume Curves
Storage Curve : Storage-01
Stage Storage Storage
Area Volume
(ft)(ft²) (ft³)
0 22512.18 0.000
1 25490.48 24001.33
2 28569.17 51031.16
3 31748.08 81189.79
4 35027.2 114577.43
5 38406.58 151294.32
6 41886.61 191440.92
7 46467.5 235617.98
Evaporation Loss .....................................................................
Invert Elevation (ft) ...................................................................
Max (Rim) Elevation (ft) ...........................................................
Max (Rim) Offset (ft) ................................................................
Initial Water Elevation (ft) .........................................................
Initial Water Depth (ft) ..............................................................
Ponded Area (ft²) .....................................................................
06/14/2024
43
06/14/2024
44
Storage Node : Lake1 (continued)
Outflow Orifices
SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice
ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient
Diameter Height Width Elevation
(in) (in) (in) (ft)
1 Lake1OCS2 Side Rectangular No 6.00 9.00 850.48 0.63
2 Lake1OCSTC Bottom Rectangular No 36.00 36.00 853.50 0.63
3 Lake1OCSWQ Side CIRCULAR No 6.00 847.00 0.61
Output Summary Results
26.14
0.00
0.98
0.00
848.27
1.27
847.45
0.45
0 00:52
0.000
0
0
0.00
Total Time Flooded (min) ........................................................
Total Retention Time (sec) ......................................................
Max HGL Depth Attained (ft) ...................................................
Average HGL Elevation Attained (ft) ........................................
Average HGL Depth Attained (ft) .............................................
Time of Max HGL Occurrence (days hh:mm) ..........................
Total Exfiltration Volume (1000-ft³) ..........................................
Total Flooded Volume (ac-in) ..................................................
Peak Inflow (cfs) ......................................................................
Peak Lateral Inflow (cfs) ..........................................................
Peak Outflow (cfs) ...................................................................
Peak Exfiltration Flow Rate (cfm) ............................................
Max HGL Elevation Attained (ft) ..............................................
06/14/2024
45
Type: R-4342 Perimeter Area For yard inlets located in rear yards
Clogged 6.00 2.00
50% 4.50 1.00
0.6A(2gh)0.5
Inlet Rational Flow
Grate
Perimeter Grate Area Depth at Casting
(Weir)
Depth at Casting
(Orifice)
(#) (cfs) (ft)(ft2)(ft) (ft)
403 0.15 4.50 1.00 0.05 0.00
406 0.23 4.50 1.00 0.07 0.00
407 0.26 4.50 1.00 0.07 0.00
408 0.39 4.50 1.00 0.09 0.01
409 0.45 4.50 1.00 0.10 0.01
411 0.66 4.50 1.00 0.13 0.02
416 1.36 4.50 1.00 0.22 0.08
424 0.80 4.50 1.00 0.15 0.03
428 0.04 4.50 1.00 0.02 0.00
432 0.18 4.50 1.00 0.06 0.00
458 0.36 4.50 1.00 0.09 0.01
462 0.47 4.50 1.00 0.11 0.01
463 0.73 4.50 1.00 0.14 0.02
464 0.38 4.50 1.00 0.09 0.01
470 0.12 4.50 1.00 0.04 0.00
471 0.17 4.50 1.00 0.05 0.00
472 0.19 4.50 1.00 0.06 0.00
473 0.55 4.50 1.00 0.12 0.01
474 0.05 4.50 1.00 0.02 0.00
475 0.38 4.50 1.00 0.09 0.01
Ponding depth at casting can be no greater than 9
inches or 0.75 feet
Jackson's Grant Village Yard Inlet Capacities
Job #60160JGV
06/14/2024
46
Type: R-3402-E Perimeter Area For yard inlets located in rear yards
Unclogged 8.00 2.10
50% Clogged 6.00 1.05
0.6A(2gh)0.5
Inlet Rational Flow
Grate
Perimeter Grate Area Depth at Casting
(Weir)
Depth at Casting
(Orifice)
(#) (cfs) (ft)(ft2)(ft) (ft)
415 1.36 6.00 1.05 0.18 0.07
421 0.41 6.00 1.05 0.08 0.01
436 6.93 6.00 1.05 0.53 1.82
440 0.81 6.00 1.05 0.13 0.02
441 2.03 6.00 1.05 0.23 0.16
444 1.49 6.00 1.05 0.19 0.08
445 2.60 6.00 1.05 0.28 0.26
446 1.30 6.00 1.05 0.17 0.06
447 1.02 6.00 1.05 0.15 0.04
447A 0.85 6.00 1.05 0.13 0.03
448 1.61 6.00 1.05 0.20 0.10
450 1.03 6.00 1.05 0.15 0.04
451 2.26 6.00 1.05 0.25 0.19
452 0.77 6.00 1.05 0.12 0.02
Jackson's Grant Village Street Inlet Capacities
Job #60160JGV
Ponding depth at casting can be no greater than 9
inches or 0.75 feet
06/14/2024
47
APPENDIX B
JACKSONS GRANT VILLAGE
MASTER PLAN DRAINAGE REPORT
06/14/2024
48
JACKSON’S GRANT VILLAGE
DRAINAGE REPORT – SECTION 1
PREPARED FOR:
Republic Development LLC
Contact Person: Douglas B. Wagner
13578 E. 131st Street, Suite 200
Fishers, IN 46037
Contact Phone Number: (317) 770-1818
Contact Email: dwagner@republicdev.com
PREPARED BY:
Stoeppelwerth & Associates, Inc.
Contact Person: Brian M. Brown, P.E., CFM
7965 East 106th Street
Fishers, Indiana 46038
Contact Phone Number: (317) 570-4704
Contact Email Address: bbrown@stoeppelwerth.com
DATE PREPARED:
September 16, 2021
DATE REVISED:
March 18, 2022
06/14/2024
49
Summary of Revisions
Below is a summary of revisions pertaining to this drainage report as altered from the previously
approved analysis. This is not intended to be an exhaustive summary but a generalized list of the
major changes.
1)A spillway was added to the Dry Basin, located in the SW corner.
2)Structure 451A was also added to the pipe network. This was reflected in SSA.
03/18/2022
Page 2 of 209
06/14/2024
50
DRAINAGE REPORT
JACKSONS GRANT VILLAGE,OVERALL
JOB # 60160JGV
TABLE OF CONTENTS
ENGINEERING CERTIFICATION
CERTIFICATE OF INSURANCE
DRAINAGE NARRATIVE
EXHIBITS
LOCATION MAP
FLOODPLAIN MAP
SOILS MAP
RAINFALL DATA
APPENDIX A - EXISTING CONDITONS CALCULATIONS
APPENDIX B - *PROPOSED SITE CONDITIONS CALCULATIONS
*Includes Interim Conditions and Full Build Out Conditions
APPENDIX C - STORM SEWER DESIGN CALCULATIONS
APPENDIX D - WATER QUALITY CALCULATIONS
APPENDIX E - EMERGENCY SPILLWAY CALCULATIONS
APPENDIX F - SWALE CALCULATIONS
APPENDIX G - CULVERT CALCULATIONS
APPENDIX H - BASIN MAPS
03/18/2022
Page 3 of 209
06/14/2024
51
ENGINEERING CERTIFICATION
JACKSON’S GRANT VILLAGE
DRAINAGE REPORT AND ANALYSIS
Brian M. Brown, PE, CFM
Indiana Registration No. 11200386
I, Brian M Brown, certify that this drainage report and supporting calculations are in compliance with the
requirements set forth by the Hamilton County Drainage Board and/or Hamilton County Surveyor in the
Hamilton County, Indiana Stormwater Management Ordinance.
03/18/2022
Page 4 of 209
06/14/2024
52
$1<35235,(7253$571(5(;(&87,9(2)),&(50(0%(5(;&/8'('"
,165 $''/ 68%5/75 ,16' :9'
352'8&(5 &217$&71$0(
)$;3+21($&1R$&1R([W
(0$,/$''5(66
,1685(5$
,1685(',1685(5%
,1685(5&
,1685(5'
,1685(5(
,1685(5)
32/,&<180%(5 32/,&<()) 32/,&<(;37<3(2),1685$1&(/,0,7600''<<<< 00''<<<<
$87202%,/(/,$%,/,7<
80%5(//$/,$%
(;&(66/,$%
:25.(56&203(16$7,21$1'(03/2<(56
/,$%,/,7<
'(6&5,37,212)23(5$7,216/2&$7,2169(+,&/(6$&25'$GGLWLRQDO5HPDUNV6FKHGXOHPD\EHDWWDFKHGLIPRUHVSDFHLVUHTXLUHG
$87+25,=('5(35(6(17$7,9(
($&+2&&855(1&(
'$0$*(725(17('&/$,060$'( 2&&85 35(0,6(6(DRFFXUUHQFH
0('(;3$Q\RQHSHUVRQ
3(5621$/ $'9,1-85<
*(1
/$**5(*$7(/,0,7$33/,(63(5*(1(5$/$**5(*$7(
35232/,&< /2&352'8&76&20323$**-(&7
27+(5
&20%,1('6,1*/(/,0,7 (DDFFLGHQW
$1<$872 %2',/<,1-85<3HUSHUVRQ
2:1(' 6&+('8/('%2',/<,1-85<3HUDFFLGHQW $872621/< $8726
+,5(' 1212:1('
3523(57<'$0$*($872621/< $872621/<
3HUDFFLGHQW
2&&85 ($&+2&&855(1&(
&/$,060$'($**5(*$7(
'(' 5(7(17,21
3(5 27+67$787( (5
(/($&+$&&,'(17
(/',6($6(($(03/2<((
,I\HVGHVFULEHXQGHU
(/',6($6(32/,&</,0,7'(6&5,37,212)23(5$7,216EHORZ
,1685(56$))25',1*&29(5$*( 1$,&
&200(5&,$/*(1(5$//,$%,/,7<
<1
1$
0DQGDWRU\LQ1+
6+28/'$1<2)7+($%29('(6&5,%('32/,&,(6%(&$1&(//('%()25(
7+((;3,5$7,21'$7(7+(5(2)127,&(:,//%('(/,9(5(',1
$&&25'$1&(:,7+7+(32/,&<3529,6,216
7+,6,672&(57,)<7+$77+(32/,&,(62),1685$1&(/,67('%(/2:+$9(%((1,668('727+(,1685('1$0('$%29()257+(32/,&<3(5,2'
,1',&$7('127:,7+67$1',1*$1<5(48,5(0(177(5025&21',7,212)$1<&2175$&72527+(5'2&80(17:,7+5(63(&772:+,&+7+,6
&(57,),&$7(0$<%(,668('250$<3(57$,17+(,1685$1&($))25'('%<7+(32/,&,(6'(6&5,%('+(5(,1,668%-(&772$//7+(7(506
(;&/86,216$1'&21',7,2162)68&+32/,&,(6/,0,766+2:10$<+$9(%((15('8&('%<3$,'&/$,06
7+,6&(57,),&$7(,6,668('$6$0$77(52),1)250$7,2121/<$1'&21)(56125,*+7683217+(&(57,),&$7(+2/'(57+,6
&(57,),&$7('2(6127$)),50$7,9(/<251(*$7,9(/<$0(1'(;7(1'25$/7(57+(&29(5$*($))25'('%<7+(32/,&,(6
%(/2:7+,6&(57,),&$7(2),1685$1&('2(6127&2167,787($&2175$&7%(7:((17+(,668,1*,1685(56$87+25,=('
5(35(6(17$7,9(25352'8&(5$1'7+(&(57,),&$7(+2/'(5
,03257$17,IWKHFHUWLILFDWHKROGHULVDQ$'',7,21$/,1685('WKHSROLF\LHVPXVWKDYH$'',7,21$/,1685('SURYLVLRQVRUEHHQGRUVHG
,I68%52*$7,21,6:$,9('VXEMHFWWRWKHWHUPVDQGFRQGLWLRQVRIWKHSROLF\FHUWDLQSROLFLHVPD\UHTXLUHDQHQGRUVHPHQW$VWDWHPHQWRQ
WKLVFHUWLILFDWHGRHVQRWFRQIHUULJKWVWRWKHFHUWLILFDWHKROGHULQOLHXRIVXFKHQGRUVHPHQWV
&29(5$*(6 &(57,),&$7(180%(55(9,6,21180%(5
&(57,),&$7(+2/'(5 &$1&(//$7,21
$&25'&25325$7,21$OOULJKWVUHVHUYHG$&25'
&(57,),&$7(2)/,$%,/,7<,1685$1&('$7(00''<<<<
7KH$&25'QDPHDQGORJRDUHUHJLVWHUHGPDUNVRI$&25'
6WRHSSHOZHUWKDQG$VVRFLDWHV,QFDQG6DQG.H\3URSHUWLHV
(DVWWK6WUHHW
)LVKHUV,1
$
%
%8$
$
&8(
$
:& 1
$&RPPHUFLDO3URSHUW\%XLOGLQJV
$3URI/LDE$(+ DJJ
72:+20,70$<&21&(51
672($1'.($'$06
&RQQHU,QVXUDQFH,QF.H\VWRQH&URVVLQJ
6XLWH,QGLDQDSROLV,1
&RQWLQHQWDO&DVXDOW\&RPSDQ\
1DWLRQDO)LUH,QVXUDQFH&RPSDQ\RI+DUWIRUG
;
;
;
;
;
;;
;
;
;
03/18/2022
Page 5 of 209
06/14/2024
53
DRAINAGE NARRATIVE
JACKSON’S GRANT VILLAGE, SECTION 1
JOB #60160JGV
INTRODUCTION
Republic Development LLC is proposing the development of a mixed-use subdivision in Hamilton County to
be known as Jackson’s Grant Village. The site is located northwest of the intersection of 116th St and Spring
Mill Rd. The site is more specifically located in a part of the Southeast Quarter of Section 34, Township 18
North, Range 3 East of Clay Township, Hamilton County, Indiana.
EXISTING SITE CONDITIONS
Jackson’s Grant Village will be located south of the Jackson’s Grant Development. The existing site is split
into three drainage basins, with one draining to the north and west into William’s Creek, and the two
southerly basins draining south through existing culverts into a developed area that then drain into Williams
Creek. Based on existing topography, it appears that there will be no offsite drainage onto the site. According
to FEMA FIRM panel 18057C0208G the site lies within Zone X, Area of Minimal Flood Hazard. The site is
made up of type B, Brookston soils, as well as type C, Crosby and Miami soils. Surrounding land uses are
large single family homes to the west, residential to the north and residential to the south.
PROPOSED SITE CONDITIONS
In order to determine the pre-developed allowable release rates the entire site has been delineated minus any
areas that drain offsite. In early discussions with the Hamilton County Surveyors Office (HCSO), it was
requested that the whole development be allowed to drain to the northern portion of the site that drains into
Williams Creek as the southern outlets appear to be too shallow to take the onsite water. Since that initial
discussion, the property to the south has developed and provided an outlet. Therefore, the whole site acreage
was then applied to the 0.1 cfs per acre and the 0.3 cfs per acre to obtain the allowable release rates. The
entire site acreage is 24.18 but 2 basins, that account for 3.28 acres, continue to drain directly offsite and are
not accounted for in the detention calculations. There is 7.05 acres, that in the existing condition drains
Southeast towards the roundabout at Springmill and 116th Street. This area is not factored into the allowable
release rate since the area drains to a separate outlet. There will be two outlets. One to the north that drains
the majority of the site through Lake 1. The second outlet will be to the southwest of the site and will drain
the detention basin, this outlet drains the remainder of the site . The release rate will not be limited to the
specific outlet but an overall release rate. Additional discussions with the HCSO, they requested that we
provided detention for the existing residential property when it develops in the future.
03/18/2022
Page 6 of 209
06/14/2024
54
Table 1: Proposed Site Conditions – Onsite Release Rates
Storm Event 10-Year 100-Year
Unit Allowable Release Rate 0.1 cfs/acre 0.3 cfs/acre
Onsite Acreage 17.13 = acres 17.13 = acres
Calculation 0.1 cfs/acre x acres 0.3 cfs/acre x acres
Onsite Allowable Release Rates 1.71 cfs 5.14 cfs
Dry Basin Discharge 1.17 cfs 1.55 cfs
NorthWest Pond Discharge 1.58 cfs 3.59 cfs
Total Release Rate for the Site 2.75 cfs 5.14 cfs
It is anticipated that the site will develop in 2 sections. Section 1 will be the residential and major streets.
Section 2 will be the Townhomes and commercial portions. The detention system is designed such that the
existing residence when it develops will be covered by the detention system and will drain north. Each of
these interim conditions are expanded below.
Scenario 1
The first scenario will be the Section 1 build out. The western portion of the site and the pond will be built
during Section 1. This includes the residential portion of the site and all the main roads (Keaton Drive, Otto
Lane, and Village Creek Drive). During this time, the existing residence (436A basin, the southern basin
towards the middle of the site, also labeled on all maps), will drain according to existing drainage patterns.
The basin is split in half, the western half of the basin drains towards 457A and the eastern half will drain
towards the existing drainage system that west of the intersection of Springmill Road and W 116th Street and
drains under 116th Street. All pipes will be sized for the final conditions not the interim conditions.
Table 2: Interim Conditions – Scenario 1 – Release Rates
Storm Event 2-Year 10-Year 100-Year
Proposed Overall Release Rates - SW 0.94 cfs 1.19 cfs 1.60 cfs
Proposed Overall Release Rates – NW 0.68 cfs 1.10 cfs 1.75 cfs
Total for the Site 1.62 cfs 2.29 cfs 3.35 cfs
Table 3: Interim Conditions – Scenario 1 – Lake 1 Elevations
Lake 2-Year 10-Year 100-Year
Lake 1 848.30 ft 849.26 ft 851.45 ft
Top Of Bank 855.5 ft
Normal Pool 847 ft
Table 4: Interim Conditions – Scenario 1 – Dry Basin Elevations
Lake 2-Year 10-Year 100-Year
Dry Basin 849.50 ft 850.13 ft 851.51 ft
Top Of Bank 852.5 ft
03/18/2022
Page 7 of 209
06/14/2024
55
Scenario 2
The second scenario would be the full build out of Section 2. This would include any of the commercial
buildings towards the right hand of the sit and anything else that wasn’t built during Section 1. For this
scenario, the 463A basin will continue draining to the 457A structure.
Scenario 3
The Ultimate build out condition will be when the 436A basin develops. After the 436A basin develops it will
ultimately drain north towards structure 436. This is to ensure that the basin meets detention requirements by
ultimately out letting into Lake 1. During the interim conditions, this basin does not need to meet detention
requirements. There is one pond, identified as Lake 1, located on this site in the Northwest corner that will
take all proposed onsite and outlet into William’s Creek. There is no offsite draining to the proposed area.
Table 5: Interim Conditions – Scenario 2 – Release Rates
Storm Event 2-Year 10-Year 100-Year
Proposed Overall Release Rates - SW 0.93 cfs 1.18 cfs 1.61 cfs
Proposed Overall Release Rates – NW 1.05 cfs 1.48 cfs 3.17 cfs
Total for the Site 1.98 cfs 2.66 cfs 4.78 cfs
Table 6: Interim Conditions – Scenario 2 – Lake 1 Elevations
Lake 2-Year 10-Year 100-Year
Lake 1 849.12 ft 850.44 ft 852.92 ft
Top Of Bank 855.5 ft
Normal Pool 847 ft
Table 7: Interim Conditions – Scenario 2 – Dry Basin Elevations
Lake 2-Year 10-Year 100-Year
Dry Basin 849.45 ft 850.11 ft 851.54 ft
Top Of Bank 852.5 ft
Table 8: Proposed Site Conditions – Proposed Conditions – Scenario 3 (Full Build Out WITH Standard Sized Orifice)
Storm Event 2-Year 10-Year 100-Year
Proposed Overall Release Rates - SW 0.93 cfs 1.17 cfs 1.55 cfs
Proposed Overall Release Rates – NW 1.12 cfs 1.58 cfs 3.59 cfs
Total for the Site 2.05 cfs 2.75 cfs 5.14 cfs
03/18/2022
Page 8 of 209
06/14/2024
56
The proposed peak discharges are based on TR-55 methodology. A detention analysis was performed using
the 2, 10 and 100-year storm events and their corresponding 24-hour rainfall depths. The NRCS Type II
rainfall distribution was used to generate the hydrographs.
The minimum orifice size for Carmel Stormwater Technical Standards is 6 inches. When a 6” orifice is placed
on both outlet control structures, the 10-year allowable release rate is not met, this mainly affects the
Northwest basin. Another scenario was completed to see what size orifice it would take to hit the 10-year
allowable release rate and it was a 4.5” orifice. With this minimum orifice size and a different weir at the 100-
year elevation, the pond is still staying in the top of bank.
Table 11: Proposed Site Conditions – Proposed Conditions – Scenario 3 (with Small Orifice)
Storm Event 2-Year 10-Year 100-Year
Proposed Overall Release Rates - SW 0.34 cfs 0.43 cfs 1.59 cfs
Proposed Overall Release Rates – NW 0.54 cfs 0.75 cfs 2.39 cfs
Total for the Site 0.88 cfs 1.18 cfs 3.98 cfs
Table 9: Proposed Site Conditions – Lake Elevations
Lake 2-Year 10-Year 100-Year
Lake 1 849.29 ft 850.78 ft 853.50 ft
Top Of Bank 855.5 ft
Normal Pool 847 ft
Table 10: Proposed Site Conditions – Dry Basin Elevations
Lake 2-Year 10-Year 100-Year
Dry Basin 849.26 ft 849.83 ft 850.99 ft
Top Of Bank 852.5 ft
Table 12: Proposed Site Conditions – Lake 1 Elevations - Small Orifice
Lake 2-Year 10-Year 100-Year
Lake 1 849.40 ft 850.94 ft 853.42 ft
Top Of Bank 855.5 ft
Normal Pool 847 ft
Table 13: Proposed Site Conditions – Dry Basin Elevations – Small Orifice
Lake 2-Year 10-Year 100-Year
Dry Basin 849.47 ft 850.10 ft 851.25 ft
Top Of Bank 852.5 ft
03/18/2022
Page 9 of 209
06/14/2024
57
STORM SEWER DESIGN
The use of Manning’s equation was used for determination of storm drain pipe sizes for non-submerged
conditions. The storm drain system is capable of passing the 10-year storm event with free water surface
elevations below the crown of pipe. Minimum storm drain flowing velocity for full pipe flow shall be 2.5 fps
and maximum storm drain flowing velocity for full pipe flow is 10 fps.
The inlet grate castings are designed such that the 10-year storm event shall be sufficiently conveyed into the
storm sewer system at 50% efficiency. The inlets are spaced to allow one lane of traffic to remain open
during the 10-year storm event. Appendix C provides the detailed calculations.
WATER QUALITY
Water quality for the site will be handled via wet detention pond, Lake 1. Lake 1 will have an outlet control
structure with orifices that have been sized to meet the allowable release rates while ensuring the sediment
settles to the bottom before being released.
EMERGENCY SPILLWAY
The emergency spillway for Lake 1 was sized for the runoff from all the upstream contributing watersheds. In
lieu of providing a spillway for the day basin, a back-to-back 100 year storm was ran. The results from this
analysis showed that the back to back flow in the pond stayed within the top of bank. Those calculations can
be found in Appendix E. Emergency flood routes can be seen on sheet C201 in the plans.
CULVERT SIZING
Towards the southwestern portion of the site, there is a culvert that goes under the walking path that
ultimately drains to Outlet 2. Per the Carmel Stormwater Technical Standards Manual, culverts need to be
sized to not overtop for the 100-year storm. The design flow for the culvert was grabbed from the ICPR4
report then placed in HY-8. The culvert 460/461 was sized to be a 24” RCP. All culvert calculations can be
found in Appendix G.
REFERENCES
Design and data methods are based on the following references:
1.Hamilton County Stormwater Technical Standards Manual
2.City of Carmel Stormwater Technical Standards
3.HERPICC Stormwater Drainage Manual
4.USDA – Urban Hydrology for Small Watersheds
5.USDA – Soil Conservation Service
03/18/2022
Page 10 of 209
06/14/2024
58
EXHIBITS
1 LOCATION MAP
2 FLOODPLAIN MAP
3 SOILS MAP AND REPORT
4 HAMLTON COUNTY RAINFALL DATA
03/18/2022
Page 11 of 209
06/14/2024
59
Imagery ©2020 IndianaMap Framework Data, Maxar Technologies, USDA Farm Service Agency, Map data ©2020 100 ftJackson's Grant Village Location MapThis document was created by an application that isn’t licensed to use novaPDF.Purchase a license to generate PDF files without this notice.03/18/2022
Page 12 of 209
Site06/14/2024
60
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
VVWDQGDUGVIRUWKHXVHRIGLJLWDOIORRGPDSVLILWLVQRWYRLGDVGHVFULEHGEHORZ7KHEDVHPDSVKRZQFRPSOLHVZLWK)(0$
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
:
1
:
103/18/2022
Page 13 of 209
06/14/2024
61
+\GURORJLF6RLO*URXS²+DPLOWRQ&RXQW\,QGLDQD2YHUDOO([LVWLQJBOLQH1DWXUDO5HVRXUFHV&RQVHUYDWLRQ6HUYLFH:HE6RLO6XUYH\1DWLRQDO&RRSHUDWLYH6RLO6XUYH\3DJHRI
1
:
1
:
1
:
1
:10DSSURMHFWLRQ:HE0HUFDWRU&RUQHUFRRUGLQDWHV:*6(GJHWLFV870=RQH1:*6 )HHW 0HWHUV0DS6FDOHLISULQWHGRQ$ODQGVFDSH[VKHHW6RLO0DSPD\QRWEHYDOLGDWWKLVVFDOH03/18/2022
Page 14 of 209
06/14/2024
62
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²6HS7KHRUWKRSKRWRRURWKHUEDVHPDSRQZKLFKWKHVRLOOLQHVZHUHFRPSLOHGDQGGLJLWL]HGSUREDEO\GLIIHUVIURPWKHEDFNJURXQGLPDJHU\GLVSOD\HGRQWKHVHPDSV$VDUHVXOWVRPHPLQRUVKLIWLQJRIPDSXQLWERXQGDULHVPD\EHHYLGHQW+\GURORJLF6RLO*URXS²+DPLOWRQ&RXQW\,QGLDQD2YHUDOO([LVWLQJBOLQH1DWXUDO5HVRXUFHV&RQVHUYDWLRQ6HUYLFH:HE6RLO6XUYH\1DWLRQDO&RRSHUDWLYH6RLO6XUYH\3DJHRI03/18/2022
Page 15 of 209
06/14/2024
63
+\GURORJLF6RLO*URXS
0DSXQLWV\PERO 0DSXQLWQDPH 5DWLQJ $FUHVLQ$2,3HUFHQWRI$2,
%U %URRNVWRQVLOW\FOD\
ORDPWRSHUFHQW
VORSHV
%'
&U$&URVE\VLOWORDPILQH
ORDP\VXEVRLOWR
SHUFHQWVORSHV
&'
0P'0LDPLVLOWORDPWR
SHUFHQWVORSHV
HURGHG
&
8ED$8UEDQODQG%URRNVWRQ
FRPSOH[WR
SHUFHQWVORSHV
<EY$%URRNVWRQVLOW\FOD\
ORDP8UEDQODQG
FRPSOH[WR
SHUFHQWVORSHV
%'
<FO$&URVE\VLOWORDPILQH
ORDP\VXEVRLO8UEDQ
ODQGFRPSOH[WR
SHUFHQWVORSHV
&'
7RWDOVIRU$UHDRI,QWHUHVW
+\GURORJLF6RLO*URXS²+DPLOWRQ&RXQW\,QGLDQD 2YHUDOO([LVWLQJBOLQH
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
03/18/2022
Page 16 of 209
06/14/2024
64
'HVFULSWLRQ
+\GURORJLFVRLOJURXSVDUHEDVHGRQHVWLPDWHVRIUXQRIISRWHQWLDO6RLOVDUH
DVVLJQHGWRRQHRIIRXUJURXSVDFFRUGLQJWRWKHUDWHRIZDWHULQILOWUDWLRQZKHQWKH
VRLOVDUHQRWSURWHFWHGE\YHJHWDWLRQDUHWKRURXJKO\ZHWDQGUHFHLYH
SUHFLSLWDWLRQIURPORQJGXUDWLRQVWRUPV
7KHVRLOVLQWKH8QLWHG6WDWHVDUHDVVLJQHGWRIRXUJURXSV$%&DQG'DQG
WKUHHGXDOFODVVHV$'%'DQG&'7KHJURXSVDUHGHILQHGDVIROORZV
*URXS$6RLOVKDYLQJDKLJKLQILOWUDWLRQUDWHORZUXQRIISRWHQWLDOZKHQ
WKRURXJKO\ZHW7KHVHFRQVLVWPDLQO\RIGHHSZHOOGUDLQHGWRH[FHVVLYHO\
GUDLQHGVDQGVRUJUDYHOO\VDQGV7KHVHVRLOVKDYHDKLJKUDWHRIZDWHU
WUDQVPLVVLRQ
*URXS%6RLOVKDYLQJDPRGHUDWHLQILOWUDWLRQUDWHZKHQWKRURXJKO\ZHW7KHVH
FRQVLVWFKLHIO\RIPRGHUDWHO\GHHSRUGHHSPRGHUDWHO\ZHOOGUDLQHGRUZHOO
GUDLQHGVRLOVWKDWKDYHPRGHUDWHO\ILQHWH[WXUHWRPRGHUDWHO\FRDUVHWH[WXUH
7KHVHVRLOVKDYHDPRGHUDWHUDWHRIZDWHUWUDQVPLVVLRQ
*URXS&6RLOVKDYLQJDVORZLQILOWUDWLRQUDWHZKHQWKRURXJKO\ZHW7KHVHFRQVLVW
FKLHIO\RIVRLOVKDYLQJDOD\HUWKDWLPSHGHVWKHGRZQZDUGPRYHPHQWRIZDWHURU
VRLOVRIPRGHUDWHO\ILQHWH[WXUHRUILQHWH[WXUH7KHVHVRLOVKDYHDVORZUDWHRI
ZDWHUWUDQVPLVVLRQ
*URXS'6RLOVKDYLQJDYHU\VORZLQILOWUDWLRQUDWHKLJKUXQRIISRWHQWLDOZKHQ
WKRURXJKO\ZHW7KHVHFRQVLVWFKLHIO\RIFOD\VWKDWKDYHDKLJKVKULQNVZHOO
SRWHQWLDOVRLOVWKDWKDYHDKLJKZDWHUWDEOHVRLOVWKDWKDYHDFOD\SDQRUFOD\
OD\HUDWRUQHDUWKHVXUIDFHDQGVRLOVWKDWDUHVKDOORZRYHUQHDUO\LPSHUYLRXV
PDWHULDO7KHVHVRLOVKDYHDYHU\VORZUDWHRIZDWHUWUDQVPLVVLRQ
,IDVRLOLVDVVLJQHGWRDGXDOK\GURORJLFJURXS$'%'RU&'WKHILUVWOHWWHULV
IRUGUDLQHGDUHDVDQGWKHVHFRQGLVIRUXQGUDLQHGDUHDV2QO\WKHVRLOVWKDWLQ
WKHLUQDWXUDOFRQGLWLRQDUHLQJURXS'DUHDVVLJQHGWRGXDOFODVVHV
5DWLQJ2SWLRQV
$JJUHJDWLRQ0HWKRG'RPLQDQW&RQGLWLRQ
&RPSRQHQW3HUFHQW&XWRII1RQH6SHFLILHG
7LHEUHDN5XOH+LJKHU
+\GURORJLF6RLO*URXS²+DPLOWRQ&RXQW\,QGLDQD 2YHUDOO([LVWLQJBOLQH
1DWXUDO5HVRXUFHV
&RQVHUYDWLRQ6HUYLFH
:HE6RLO6XUYH\
1DWLRQDO&RRSHUDWLYH6RLO6XUYH\
3DJHRI
03/18/2022
Page 17 of 209
06/14/2024
65
03/18/2022
Page 18 of 209
06/14/2024
66
03/18/2022
Page 19 of 209
06/14/2024
67
APPENDIX A
EXISTING
CONDITIONS CALCULATIONS
03/18/2022
Page 20 of 209
06/14/2024
68
-RE-*9 3UH'HYHORSHG,&35
6RLO
*URXS
&RYHU'HVFULSWLRQ
FRYHUW\SHWUHDWPHQWDQG
K\GURORJLFFRQGLWLRQ&1 $UHD$F &1
$UHD
& 5RZ&URSV*RRG
& :RRGV*RRG
% 2SHQ6SDFH*RRG
& :RRGV*RRG
% ,PSHUYLRXV
7RWDO
6RLO
*URXS
&RYHU'HVFULSWLRQ
FRYHUW\SHWUHDWPHQWDQG
K\GURORJLFFRQGLWLRQ&1 $UHD$F &1
$UHD
% 5RZ&URSV*RRG
& 2SHQ6SDFH*RRG
& 5RZ&URSV*RRG
7RWDO
6RLO
*URXS
&RYHU'HVFULSWLRQ
FRYHUW\SHWUHDWPHQWDQG
K\GURORJLFFRQGLWLRQ&1 $UHD$F &1
$UHD
& :RRGV*RRG
& 5RZ&URSV*RRG
% :RRGV*RRG
% 5RZ&URSV*RRG
7RWDO
&1XPEHUV-DFNVRQ
V*UDQW9LOODJH
(;(DVWWR:LOOLDPV&UHHN &1
(;1RUWKWR:LOOLDPV&UHHN &1
(;:HVWWR:LOOLDPV&UHHN &1
2QVLWH&XUYH1XPEHUDGMXVWHGWRWKHQH[W
OHVVLQILOWUDWLQJFDSDFLW\FDWHJRU\SHURUGLQDQFH
03/18/2022
Page 21 of 209
06/14/2024
69
-RE-*9'HVFULSWLRQQ / 3 V 7W Q/3V'HVFULSWLRQV 9 / 7W /9 'HVFULSWLRQ 9 / 7W /97FWRWDO7FWRWDOIW LQ IWIWKUV3DYHG8QSDYHG IWIW IWV IW KUVKUVPLQ(;1RUWK6KRUW*UDVV3UDLUH 8QSDYHG &KDQQHO (;:HVW6KRUW*UDVV3UDLUH 8QSDYHG &KDQQHO (;(DVW6KRUW*UDVV3UDLUH 8QSDYHG &KDQQHO -DFNVRQ
V*UDQW9LOODJH%DVLQ7LPHRI&RQFHQWUDWLRQV3UH'HYHORSHG,&35&KDQQHO3LSH)ORZ7RWDO7R&6KHHW)ORZ6KDOORZ&RQFHQWUDWHG)ORZ03/18/2022
Page 22 of 209
06/14/2024
70
Jacksons Grant Village - Existing Conditions 1
C:\Users\nstambro\Desktop\Jacksons Grant Village\1/20/2022 11:14
Background Image: Existing Conditions
Simple Basin: EX East to Williams Creek
Scenario: Existing
Node: Southeast Outlet
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 19.2000 min
Max Allowable Q: 999999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 8.5800 ac
Curve Number: 75.0
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: EX North to Williams Creek
Scenario: Existing
Node: NW OUTLET
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 19.3000 min
03/18/2022
Page 23 of 209
06/14/2024
71
Jacksons Grant Village - Existing Conditions 2
C:\Users\nstambro\Desktop\Jacksons Grant Village\1/20/2022 11:14
Max Allowable Q: 999999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 6.1000 ac
Curve Number: 74.0
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: EX West to Williams Creek
Scenario: Existing
Node: Southwest Outlet
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 36.6000 min
Max Allowable Q: 999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: Uh484
Peaking Factor: 484.0
Area: 11.0300 ac
Curve Number: 78.0
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Node: NW OUTLET
Scenario: Existing
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 841.00 ft
Warning Stage: 853.00 ft
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 841.00
0 0 0 12.0000 853.00
0 0 0 30.0000 841.00
03/18/2022
Page 24 of 209
06/14/2024
72
Jacksons Grant Village - Existing Conditions 3
C:\Users\nstambro\Desktop\Jacksons Grant Village\1/20/2022 11:14
Comment:
Node: Southeast Outlet
Scenario: Existing
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 849.00 ft
Warning Stage: 852.00 ft
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 849.00
0 0 0 12.0000 852.00
0 0 0 30.0000 849.00
Comment:
Node: Southwest Outlet
Scenario: Existing
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 851.00 ft
Warning Stage: 855.00 ft
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 851.00
0 0 0 12.0000 855.00
0 0 0 30.0000 851.00
Comment:
Simulation: 002yr
Scenario: Existing
Run Date/Time: 1/20/2022 10:44:31 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
03/18/2022
Page 25 of 209
06/14/2024
73
Jacksons Grant Village - Existing Conditions 4
C:\Users\nstambro\Desktop\Jacksons Grant Village\1/20/2022 11:14
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
03/18/2022
Page 26 of 209
06/14/2024
74
Jacksons Grant Village - Existing Conditions 5
C:\Users\nstambro\Desktop\Jacksons Grant Village\1/20/2022 11:14
Comment:
Simulation: 010yr
Scenario: Existing
Run Date/Time: 1/20/2022 10:44:35 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
03/18/2022
Page 27 of 209
06/14/2024
75
Jacksons Grant Village - Existing Conditions 6
C:\Users\nstambro\Desktop\Jacksons Grant Village\1/20/2022 11:14
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Existing
Run Date/Time: 1/20/2022 10:44:40 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
03/18/2022
Page 28 of 209
06/14/2024
76
Jacksons Grant Village - Existing Conditions 7
C:\Users\nstambro\Desktop\Jacksons Grant Village\1/20/2022 11:14
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simple Basin Runoff Summary [Existing]
Basin
Name
Sim Name Max Flow
[cfs]
Time to
Max Flow
[hrs]
Total
Rainfall
[in]
Total
Runoff [in]
Area [ac] Equivalent
Curve
Number
% Imperv % DCIA
EX East to
Williams
Creek
002yr 6.47 12.1333 2.66 0.75 8.5800 75.0 0.00 0.00
EX East to
Williams
010yr 14.11 12.1167 3.83 1.54 8.5800 75.0 0.00 0.00
03/18/2022
Page 29 of 209
06/14/2024
77
Jacksons Grant Village - Existing Conditions 8
C:\Users\nstambro\Desktop\Jacksons Grant Village\1/20/2022 11:14
Basin
Name
Sim Name Max Flow
[cfs]
Time to
Max Flow
[hrs]
Total
Rainfall
[in]
Total
Runoff [in]
Area [ac] Equivalent
Curve
Number
% Imperv % DCIA
Creek
EX East to
Williams
Creek
100yr 33.99 12.1000 6.46 3.69 8.5800 75.0 0.00 0.00
EX North
to
Williams
Creek
002yr 4.24 12.1333 2.66 0.70 6.1000 74.0 0.00 0.00
EX North
to
Williams
Creek
010yr 9.53 12.1167 3.83 1.48 6.1000 74.0 0.00 0.00
EX North
to
Williams
Creek
100yr 23.45 12.1167 6.46 3.58 6.1000 74.0 0.00 0.00
EX West
to
Williams
Creek
002yr 6.91 12.3167 2.66 0.90 11.0300 78.0 0.00 0.00
EX West
to
Williams
Creek
010yr 14.20 12.3000 3.83 1.76 11.0300 78.0 0.00 0.00
EX West
to
Williams
Creek
100yr 32.71 12.2833 6.46 4.00 11.0300 78.0 0.00 0.00
Node Max Conditions w/ Times [Existing]
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
NW
OUTLET
002yr 853.00 852.99 0.0167 4.24 0.00 0 11.9938 1.4938 12.1271 0.0000
NW
OUTLET
010yr 853.00 852.99 0.0167 9.50 0.00 0 11.9938 1.4938 12.1105 0.0000
NW
OUTLET
100yr 853.00 852.99 0.0167 23.45 0.00 0 11.9938 1.4938 12.1105 0.0000
Southea
st Outlet
002yr 852.00 852.00 0.0042 6.46 0.00 0 11.9938 1.4605 12.1271 0.0000
Southea 010yr 852.00 852.00 0.0042 14.08 0.00 0 11.9938 1.4605 12.1105 0.0000
03/18/2022
Page 30 of 209
06/14/2024
78
Jacksons Grant Village - Existing Conditions 9
C:\Users\nstambro\Desktop\Jacksons Grant Village\1/20/2022 11:14
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
st Outlet
Southea
st Outlet
100yr 852.00 852.00 0.0042 33.97 0.00 0 11.9938 1.4605 12.1105 0.0000
Southwe
st Outlet
002yr 855.00 855.00 0.0056 6.91 0.00 0 11.9938 1.4605 12.3105 0.0000
Southwe
st Outlet
010yr 855.00 855.00 0.0056 14.19 0.00 0 11.9938 1.4605 12.2938 0.0000
Southwe
st Outlet
100yr 855.00 855.00 0.0056 32.68 0.00 0 11.9938 1.4605 12.2938 0.0000
03/18/2022
Page 31 of 209
06/14/2024
79
APPENDIX B
PROPOSED SITE
CONDITIONS CALCULATIONS
(includes both interim and full-build out conditions)
03/18/2022
Page 32 of 209
06/14/2024
80
-DFNVRQ
V*UDQW9LOODJH5XQRII&RHIILFLHQWV -RE-*9:HLJKWHG&XUYH1XPEHUV7RWDO'UDLQDJH$UHD7RWDO,PSHUYLRXV$UHD$LPS7RWDO,PSHUYLRXV$UHD$LPS7RWDO3HUYLRXV$UHD$SHU7RWDO$JULFXOWXUDO$UHD$DJ6XE%DVLQ:HLJKWHG&)DFWRU6XE%DVLQ:HLJKWHG&1DFVTIWDFDFDF&Z&1Z 3RVW'HYHORSHG6LWHCw = 0.85Aimp+ 0.16Aper+ 0.5AagTotal Drainage Area6WUXFWXUH03/18/2022
Page 33 of 209
06/14/2024
81
$ '5<%$6,1 /DNH $ $5LJKW $/HIW )XOO%XLOG2XWRI3RQG $&RPELQHG%DVLQ ,QWHULP3RQG6 %DVLQ2QVLWH6 %DVLQ2IIVLWH6 ,QWHULP3RQG6 6WUXFWXUH DQG$OWHUHG%DVLQ$UHDV $OWHUHG%DVLQ$UHDV %DVLQ2QVLWH6 5() %DVLQ2IIVLWH6 2))6,7(727+(:(676287+ 2))6,7(727+(($67:(67&XOYHUW 52$'2))6,7(727+(($67 ,QOHWVWKDWGUDLQWRWKHGU\EDVLQ,QWHULP&RQGLWLRQV6FHQDULR&DOFXODWHG9DOXHV1275XQRII&RHIILFLHQWVIRUDQLQGLYLGXDOVWUXFWXUHV,QWHULP&RQGLWLRQV6FHQDULR)XOO%XLOG2XW6FHQDULR03/18/2022
Page 34 of 209
06/14/2024
82
7LPHRI&RQFHQWUDWLRQV-RE-*96WRUP&$'3RVW'HYHORSHG6LWH'HVFULSWLRQQ / 3 V 7W Q/3V'HVFULSWLRQ V 9 / 7W /97FWRWDO7FWRWDOIW LQ IWIWKUV3DYHG8QSDYHG IWIW IWV IW KUV KUVPLQ'HQVH*UDVVHV 8QSDYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 3DYHPHQW 8QSDYHG 'HQVH*UDVVHV 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG $3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 8QSDYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG '5<%$6,1'HQVH*UDVVHV 8QSDYHG $'HQVH*UDVVHV 8QSDYHG $/HIW'HQVH*UDVVHV 8QSDYHG -DFNVRQ
V*UDQW9LOODJH%DVLQ6KHHW)ORZ0DQXDO/903/18/2022
Page 35 of 209
06/14/2024
83
'HVFULSWLRQQ / 3 V 7W Q/3V'HVFULSWLRQ V 9 / 7W /97FWRWDO7FWRWDO%DVLQ6KHHW)ORZ0DQXDO/9)XOO%XLOG2XWRI3RQG'HQVH*UDVVHV 8QSDYHG $&RPELQHG%DVLQ'HQVH*UDVVHV 3DYHG ,QWHULP3RQG6'HQVH*UDVVHV 8QSDYHG %DVLQ2QVLWH6'HQVH*UDVVHV 3DYHG %DVLQ2IIVLWH6'HQVH*UDVVHV 8QSDYHG ,17(5,0321'6'HQVH*UDVVHV 8QSDYHG ,17(5,0'HQVH*UDVVHV 8QSDYHG %DVLQ2QVLWH6'HQVH*UDVVHV 3DYHG %DVLQ2IIVLWH6'HQVH*UDVVHV 8QSDYHG 2))6,7(727+(($671257+&XOYHUW'HQVH*UDVVHV 8QSDYHG 2))6,7(727+(($676287+'HQVH*UDVVHV 8QSDYHG 5RDGWRWKH(DVW3DYHPHQW 8QSDYHG ,QWHULP&RQGLWLRQV6FHQDULR,QWHULP&RQGLWLRQV6FHQDULR)XOO%XLOG2XW6FHQDULR,QOHWVWKDWGUDLQWRWKHGU\EDVLQ03/18/2022
Page 36 of 209
06/14/2024
84
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)1
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Background Image: Interim S1 WITH OFFSITE
Simple Basin: Interim Pond S1
Scenario: Interim - S1 W OFFSITE
Node: LAKE 1
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 28.1000 min
Max Allowable Q: 999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: Uh484
Peaking Factor: 484.0
Area: 13.2600 ac
Curve Number: 85.0
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
03/18/2022
Page 37 of 209
06/14/2024
85
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)2
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simple Basin: Offsite S1
Scenario: Interim - S1 W OFFSITE
Node: DB
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 21.1000 min
Max Allowable Q: 99999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 0.9200 ac
Curve Number: 83.0
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: Onsite S1
Scenario: Interim - S1 W OFFSITE
Node: DB
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 16.2000 min
Max Allowable Q: 99999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 3.0800 ac
Curve Number: 86.9
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Drop Structure Link: DB - Out
Scenario: Interim - S1 W
OFFSITE
From Node: DB
To Node: SW Outlet 1
Link Count: 1
Flow Direction: Both
Upstream Pipe Downstream Pipe
Invert: 848.04 ft Invert: 847.98 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.00 ft Default: 0.00 ft
03/18/2022
Page 38 of 209
06/14/2024
86
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)3
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Solution: Combine
Increments: 0
Pipe Count: 1
Damping: 0.0000 ft
Length: 32.98 ft
FHWA Code: 0
Entr Loss Coef: 0.00
Exit Loss Coef: 0.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Pipe Comment:
Weir Component
Weir: 1
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Circular
Invert: 848.04 ft
Control Elevation: 848.04 ft
Max Depth: 0.50 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 2
Weir Count: 1
Weir Flow Direction: None
Damping: 0.0000 ft
Weir Type: Horizontal
Geometry Type: Rectangular
Invert: 851.16 ft
Control Elevation: 851.16 ft
Max Depth: 3.00 ft
Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Drop Structure Comment:
03/18/2022
Page 39 of 209
06/14/2024
87
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)4
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Drop Structure Link: L1 - OUT
Scenario: Interim - S1 W
OFFSITE
From Node: LAKE 1
To Node: NW OUTLET
Link Count: 1
Flow Direction: Both
Solution: Combine
Increments: 10
Pipe Count: 1
Damping: 0.0000 ft
Length: 111.00 ft
FHWA Code: 1
Entr Loss Coef: 0.00
Exit Loss Coef: 1.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Upstream Pipe Downstream Pipe
Invert: 847.00 ft Invert: 846.60 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.50 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0130 Manning's N: 0.0130
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0130 Manning's N: 0.0130
Pipe Comment:
Weir Component
Weir: 1
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Circular
Invert: 847.00 ft
Control Elevation: 847.00 ft
Max Depth: 0.50 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 2
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Rectangular
Invert: 851.75 ft
Control Elevation: 851.75 ft
Max Depth: 0.50 ft
Max Width: 0.50 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
03/18/2022
Page 40 of 209
06/14/2024
88
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)5
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Weir Comment:
Weir Component
Weir: 3
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Horizontal
Geometry Type: Rectangular
Invert: 853.50 ft
Control Elevation: 853.50 ft
Max Depth: 3.00 ft
Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Drop Structure Comment:
Weir Link: Lake 1 Spillway
Scenario: Interim - S1 W OFFSITE
From Node: LAKE 1
To Node: NW OUTLET
Link Count: 1
Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Broad Crested Vertical
Geometry Type: Trapezoidal
Invert: 853.50 ft
Control Elevation: 853.50 ft
Max Depth: 1.00 ft
Extrapolation Method: Normal Projection
Bottom Width: 40.00 ft
Left Slope: 4.000 (h:v)
Right Slope: 4.000 (h:v)
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 2.800
Weir Table:
Orifice Default: 0.600
Orifice Table:
Comment:
Node: DB
Scenario: Interim - S1 W OFFSITE
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 848.04 ft
Warning Stage: 851.50 ft
03/18/2022
Page 41 of 209
06/14/2024
89
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)6
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Stage [ft]Area [ac]Area [ft2]
848.04 0.0000 0
849.00 0.1786 7781
850.00 0.3121 13597
851.00 0.3479 15153
852.00 0.3849 16765
852.50 0.4036 17579
Comment:
Node: LAKE 1
Scenario: Interim - S1 W OFFSITE
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 847.00 ft
Warning Stage: 853.50 ft
Stage [ft]Area [ac]Area [ft2]
847.00 0.6900 30056
848.00 0.7600 33106
849.00 0.8400 36590
850.00 0.9200 40075
851.00 1.0000 43560
852.00 1.0800 47045
853.00 1.1700 50965
854.00 1.2600 54886
Comment:
Node: NW OUTLET
Scenario: Interim - S1 W OFFSITE
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 846.00 ft
Warning Stage: 847.50 ft
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 846.00
0 0 0 12.0000 847.50
0 0 0 30.0000 846.00
Comment:
03/18/2022
Page 42 of 209
06/14/2024
90
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)7
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Node: SW Outlet 1
Scenario: Interim - S1 W OFFSITE
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 847.36 ft
Warning Stage: 850.00 ft
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 847.36
0 0 0 48.0000 847.36
Comment:
Simulation: 002yr
Scenario: Existing
Run Date/Time: 9/16/2021 10:38:25 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 43 of 209
06/14/2024
91
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)8
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 010yr
Scenario: Existing
Run Date/Time: 9/16/2021 10:38:28 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 44 of 209
06/14/2024
92
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)9
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 45 of 209
06/14/2024
93
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)10
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 100yr
Scenario: Existing
Run Date/Time: 9/16/2021 10:38:32 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 46 of 209
06/14/2024
94
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)11
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 002yr
Scenario: Interim - S1 W OFFSITE
Run Date/Time: 9/16/2021 10:38:36 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 47 of 209
06/14/2024
95
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)12
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 010yr
Scenario: Interim - S1 W OFFSITE
Run Date/Time: 9/16/2021 10:38:40 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 48 of 209
06/14/2024
96
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)13
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 49 of 209
06/14/2024
97
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)14
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 100yr
Scenario: Interim - S1 W OFFSITE
Run Date/Time: 9/16/2021 10:38:45 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 50 of 209
06/14/2024
98
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)15
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Interim - S1 W OFFSITE B2B
Run Date/Time: 9/16/2021 10:38:50 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 51 of 209
06/14/2024
99
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)16
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 002yr
Scenario: Interim - S1- NO OFFSITE
Run Date/Time: 9/16/2021 10:38:56 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 52 of 209
06/14/2024
100
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)17
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 53 of 209
06/14/2024
101
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)18
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 010yr
Scenario: Interim - S1- NO OFFSITE
Run Date/Time: 9/16/2021 10:39:00 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 54 of 209
06/14/2024
102
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)19
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Interim - S1- NO OFFSITE
Run Date/Time: 9/16/2021 10:39:05 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 55 of 209
06/14/2024
103
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)20
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 002yr
Scenario: Interim - S2
Run Date/Time: 9/7/2021 1:00:29 PM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 56 of 209
06/14/2024
104
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)21
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 57 of 209
06/14/2024
105
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)22
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 010yr
Scenario: Interim - S2
Run Date/Time: 9/7/2021 1:00:34 PM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 58 of 209
06/14/2024
106
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)23
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Interim - S2
Run Date/Time: 9/7/2021 1:00:40 PM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 59 of 209
06/14/2024
107
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)24
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 002yr
Scenario: Interim - S2 -NO OFFSITE
Run Date/Time: 9/16/2021 10:39:10 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 60 of 209
06/14/2024
108
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)25
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 61 of 209
06/14/2024
109
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)26
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 010yr
Scenario: Interim - S2 -NO OFFSITE
Run Date/Time: 9/16/2021 10:39:15 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 62 of 209
06/14/2024
110
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)27
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Interim - S2 -NO OFFSITE
Run Date/Time: 9/16/2021 10:39:20 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 63 of 209
06/14/2024
111
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)28
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 002yr
Scenario: Interim - S2 W OFFSITE
Run Date/Time: 9/16/2021 10:39:26 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 64 of 209
06/14/2024
112
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)29
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 65 of 209
06/14/2024
113
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)30
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 010yr
Scenario: Interim - S2 W OFFSITE
Run Date/Time: 9/16/2021 10:39:30 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 66 of 209
06/14/2024
114
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)31
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Interim - S2 W OFFSITE
Run Date/Time: 9/16/2021 10:39:35 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 67 of 209
06/14/2024
115
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)32
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 002yr
Scenario: Proposed - S3 - FULL BUILD OUT
Run Date/Time: 9/16/2021 10:39:41 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 68 of 209
06/14/2024
116
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)33
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 69 of 209
06/14/2024
117
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)34
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 010yr
Scenario: Proposed - S3 - FULL BUILD OUT
Run Date/Time: 9/16/2021 10:39:45 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 70 of 209
06/14/2024
118
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)35
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Proposed - S3 - FULL BUILD OUT
Run Date/Time: 9/16/2021 10:39:50 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 71 of 209
06/14/2024
119
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)36
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Proposed - S3 - Full Build Out B2B
Run Date/Time: N/A
Program Version: N/A
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 72 of 209
06/14/2024
120
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)37
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 73 of 209
06/14/2024
121
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)38
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 002yr
Scenario: Proposed - S3 - Small Orifice
Run Date/Time: 9/16/2021 10:39:55 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 74 of 209
06/14/2024
122
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)39
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 010yr
Scenario: Proposed - S3 - Small Orifice
Run Date/Time: 9/16/2021 10:40:00 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 75 of 209
06/14/2024
123
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)40
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Proposed - S3 - Small Orifice
Run Date/Time: 9/16/2021 10:40:05 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 76 of 209
06/14/2024
124
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)41
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 77 of 209
06/14/2024
125
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)42
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 002yr
Scenario: Proposed -S3 - Full Build Out (no offsite)
Run Date/Time: 9/16/2021 10:40:09 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 78 of 209
06/14/2024
126
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)43
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 010yr
Scenario: Proposed -S3 - Full Build Out (no offsite)
Run Date/Time: 9/16/2021 10:40:14 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 79 of 209
06/14/2024
127
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)44
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Proposed -S3 - Full Build Out (no offsite)
Run Date/Time: 9/16/2021 10:40:19 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 80 of 209
06/14/2024
128
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)45
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 81 of 209
06/14/2024
129
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)46
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simulation: 002yr
Scenario: Proposed- S3
Run Date/Time: N/A
Program Version: N/A
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 82 of 209
06/14/2024
130
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)47
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 010yr
Scenario: Proposed- S3
Run Date/Time: N/A
Program Version: N/A
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 83 of 209
06/14/2024
131
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)48
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Proposed- S3
Run Date/Time: N/A
Program Version: N/A
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 84 of 209
06/14/2024
132
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)49
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 85 of 209
06/14/2024
133
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)50
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Simple Basin Runoff Summary [Interim - S1 W OFFSITE]
Basin
Name
Sim Name Max Flow
[cfs]
Time to
Max Flow
[hrs]
Total
Rainfall
[in]
Total
Runoff [in]
Area [ac] Equivalent
Curve
Number
% Imperv % DCIA
Interim
Pond S1
002yr 15.15 12.2000 2.66 1.31 13.2600 85.0 0.00 0.00
Interim
Pond S1
010yr 26.82 12.2000 3.83 2.31 13.2600 85.0 0.00 0.00
Interim
Pond S1
100yr 54.07 12.1833 6.46 4.75 13.2600 85.0 0.00 0.00
Offsite S1 002yr 1.11 12.1333 2.66 1.18 0.9200 83.0 0.00 0.00
Offsite S1 010yr 2.03 12.1333 3.83 2.14 0.9200 83.0 0.00 0.00
Offsite S1 100yr 4.21 12.1167 6.46 4.53 0.9200 83.0 0.00 0.00
Onsite S1 002yr 5.16 12.0833 2.66 1.44 3.0800 86.9 0.00 0.00
Onsite S1 010yr 8.75 12.0833 3.83 2.48 3.0800 86.9 0.00 0.00
Onsite S1 100yr 16.95 12.0667 6.46 4.96 3.0800 86.9 0.00 0.00
Link Min/Max Conditions with Times [Interim - S1 W OFFSITE]
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
DB -
Out -
Pipe
002yr 0.94 0.00 0.00 0.00 0.00 12.6951 0.0000 11.8135 0.0000 0.0000
DB -
Out -
Weir: 1
002yr 0.94 0.00 0.00 4.81 4.81 12.6572 0.0000 11.8127 12.6572 12.6572
DB -
Out -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
DB -
Out -
Pipe
010yr 1.19 0.00 0.00 0.00 0.00 12.8976 0.0000 11.4748 0.0000 0.0000
DB -
Out -
Weir: 1
010yr 1.19 0.00 0.00 6.05 6.05 12.8976 0.0000 20.8700 12.8976 12.8976
DB -
Out -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
DB -
Out -
Pipe
100yr 1.60 0.00 0.00 0.00 0.00 13.2981 0.0000 26.3248 0.0000 0.0000
DB -
Out -
Weir: 1
100yr 1.60 0.00 0.00 8.16 8.16 13.2567 0.0000 26.3512 13.2567 13.2567
03/18/2022
Page 86 of 209
06/14/2024
134
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)51
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
DB -
Out -
Weir: 2
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
002yr 0.68 0.00 0.02 0.00 0.00 15.8419 0.0000 35.2750 0.0000 0.0000
L1 -
OUT -
Weir: 1
002yr 0.68 0.00 0.04 3.46 3.46 15.8376 0.0000 35.2750 15.8376 15.8376
L1 -
OUT -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
010yr 1.10 0.00 0.02 0.00 0.00 15.6935 0.0000 45.7288 0.0000 0.0000
L1 -
OUT -
Weir: 1
010yr 1.10 0.00 0.04 5.63 5.63 15.6890 0.0000 45.7288 15.6890 15.6890
L1 -
OUT -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
100yr 1.75 0.00 -0.02 0.00 0.00 16.9957 0.0000 11.2634 0.0000 0.0000
L1 -
OUT -
Weir: 1
100yr 1.75 0.00 -0.04 8.89 8.89 16.9913 0.0000 11.2634 16.9913 16.9913
L1 -
OUT -
Weir: 2
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
03/18/2022
Page 87 of 209
06/14/2024
135
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)52
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Node Max Conditions w/ Times [Interim - S1 W OFFSITE]
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
DB 002yr 851.50 849.50 -0.0010 6.21 0.94 10669 12.6694 24.4230 12.0833 12.6572
DB 010yr 851.50 850.13 -0.0010 10.69 1.19 13798 12.9043 21.5809 12.0834 12.8976
DB 100yr 851.50 851.51 0.0010 21.01 1.60 15971 13.2616 11.8865 12.0833 13.2567
LAKE 1 002yr 853.50 848.30 0.0010 15.15 0.68 34141 15.8376 13.0934 12.1999 15.8376
LAKE 1 010yr 853.50 849.26 0.0010 26.82 1.10 37490 15.6844 12.6444 12.2000 15.6890
LAKE 1 100yr 853.50 851.45 -0.0010 54.07 1.75 45123 16.9913 31.4746 12.1835 16.9913
NW
OUTLET
002yr 847.50 847.50 0.0021 0.68 0.00 0 12.0001 1.4771 15.8419 0.0000
NW
OUTLET
010yr 847.50 847.50 0.0021 1.10 0.00 0 12.0001 1.4771 15.6935 0.0000
NW
OUTLET
100yr 847.50 847.50 0.0021 1.75 0.00 0 12.0001 1.4771 16.9957 0.0000
SW
Outlet 1
002yr 850.00 847.36 0.0000 0.94 0.00 0 0.0000 0.0000 12.6951 0.0000
SW
Outlet 1
010yr 850.00 847.36 0.0000 1.19 0.00 0 0.0000 0.0000 12.8976 0.0000
SW
Outlet 1
100yr 850.00 847.36 0.0000 1.60 0.00 0 0.0000 0.0000 13.2981 0.0000
03/18/2022
Page 88 of 209
0.94
1.19
1.60
0.68
1.10
1.75
849.50
850.13
851.51
848.30
849.26
851.45
06/14/2024
136
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)53
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Background Image: Interim S1
Simple Basin Runoff Summary [Interim - S1- NO OFFSITE]
Basin
Name
Sim Name Max Flow
[cfs]
Time to
Max Flow
[hrs]
Total
Rainfall
[in]
Total
Runoff [in]
Area [ac] Equivalent
Curve
Number
% Imperv % DCIA
Interim
Pond S1
002yr 15.15 12.2000 2.66 1.31 13.2600 85.0 0.00 0.00
Interim
Pond S1
010yr 26.82 12.2000 3.83 2.31 13.2600 85.0 0.00 0.00
Interim
Pond S1
100yr 54.07 12.1833 6.46 4.75 13.2600 85.0 0.00 0.00
Onsite S1 002yr 5.16 12.0833 2.66 1.44 3.0800 86.9 0.00 0.00
Onsite S1 010yr 8.75 12.0833 3.83 2.48 3.0800 86.9 0.00 0.00
Onsite S1 100yr 16.95 12.0667 6.46 4.96 3.0800 86.9 0.00 0.00
03/18/2022
Page 89 of 209
06/14/2024
137
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)54
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Link Min/Max Conditions with Times [Interim - S1- NO OFFSITE]
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
DB -
Out -
Pipe
002yr 0.87 0.00 0.00 0.00 0.00 12.5422 0.0000 11.8499 0.0000 0.0000
DB -
Out -
Weir: 1
002yr 0.87 0.00 0.00 4.41 4.41 12.5422 0.0000 11.8338 12.5422 12.5422
DB -
Out -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
DB -
Out -
Pipe
010yr 1.08 0.00 0.00 0.00 0.00 12.7025 0.0000 11.5922 0.0000 0.0000
DB -
Out -
Weir: 1
010yr 1.08 0.00 0.00 5.52 5.52 12.7025 0.0000 11.5903 12.7025 12.7025
DB -
Out -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
DB -
Out -
Pipe
100yr 1.44 0.00 0.00 0.00 0.00 12.9975 0.0000 24.4439 0.0000 0.0000
DB -
Out -
Weir: 1
100yr 1.44 0.00 0.00 7.34 7.34 12.9975 0.0000 24.2731 12.9975 12.9975
DB -
Out -
Weir: 2
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
002yr 0.68 0.00 0.02 0.00 0.00 15.8405 0.0000 35.2859 0.0000 0.0000
L1 -
OUT -
Weir: 1
002yr 0.68 0.00 0.04 3.46 3.46 15.8371 0.0000 35.2859 15.8371 15.8371
L1 -
OUT -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
010yr 1.10 0.00 0.02 0.00 0.00 15.6910 0.0000 45.7365 0.0000 0.0000
L1 -
OUT -
010yr 1.10 0.00 0.04 5.63 5.63 15.6871 0.0000 45.7365 15.6871 15.6871
03/18/2022
Page 90 of 209
06/14/2024
138
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)55
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
Weir: 1
L1 -
OUT -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
100yr 1.75 0.00 -0.02 0.00 0.00 16.9958 0.0000 11.2618 0.0000 0.0000
L1 -
OUT -
Weir: 1
100yr 1.75 0.00 -0.04 8.89 8.89 16.9918 0.0000 11.2618 16.9918 16.9918
L1 -
OUT -
Weir: 2
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Node Max Conditions w/ Times [Interim - S1- NO OFFSITE]
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
DB 002yr 851.50 849.32 0.0010 5.16 0.87 9626 12.5525 10.6835 12.0832 12.5422
DB 010yr 851.50 849.85 -0.0010 8.75 1.08 12702 12.7277 17.7821 12.0832 12.7025
DB 100yr 851.50 850.93 -0.0010 16.95 1.44 15042 13.0144 21.9063 12.0668 12.9975
LAKE 1 002yr 853.50 848.30 0.0010 15.15 0.68 34141 15.8371 13.2116 12.2001 15.8371
LAKE 1 010yr 853.50 849.26 -0.0010 26.82 1.10 37490 15.6871 25.4785 12.1999 15.6871
LAKE 1 100yr 853.50 851.45 0.0010 54.07 1.75 45123 16.9918 9.5978 12.1835 16.9918
NW
OUTLET
002yr 847.50 847.50 0.0021 0.68 0.00 0 11.9999 1.4771 15.8405 0.0000
NW
OUTLET
010yr 847.50 847.50 0.0021 1.10 0.00 0 12.0001 1.4771 15.6910 0.0000
03/18/2022
Page 91 of 209
06/14/2024
139
Jacksons Grant Interim Conditions - Scenario 1 (With and Without Offsite)56
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:03
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
NW
OUTLET
100yr 847.50 847.50 0.0021 1.75 0.00 0 12.0000 1.4771 16.9958 0.0000
SW
Outlet 1
002yr 850.00 847.36 0.0000 0.87 0.00 0 0.0000 0.0000 12.5422 0.0000
SW
Outlet 1
010yr 850.00 847.36 0.0000 1.08 0.00 0 0.0000 0.0000 12.7025 0.0000
SW
Outlet 1
100yr 850.00 847.36 0.0000 1.44 0.00 0 0.0000 0.0000 12.9975 0.0000
03/18/2022
Page 92 of 209
06/14/2024
140
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)1
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Background Image: Interim S2 WITH OFFSITE
Simple Basin: Interim Pond - S2
Scenario: Interim - S2 W OFFSITE
Node: LAKE 1
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 17.3000 min
Max Allowable Q: 999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: Uh484
Peaking Factor: 484.0
Area: 17.4600 ac
Curve Number: 89.5
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
03/18/2022
Page 93 of 209
06/14/2024
141
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)2
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Comment:
Simple Basin: Offsite - S2
Scenario: Interim - S2 W OFFSITE
Node: DB
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 21.1000 min
Max Allowable Q: 99999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 0.9200 ac
Curve Number: 83.0
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: Onsite - S2
Scenario: Interim - S2 W OFFSITE
Node: DB
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 16.2000 min
Max Allowable Q: 99999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 3.2700 ac
Curve Number: 84.8
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Drop Structure Link: DB - Out
Scenario: Interim - S2 W
Upstream Pipe Downstream Pipe
Invert: 848.04 ft Invert: 847.98 ft
03/18/2022
Page 94 of 209
06/14/2024
142
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)3
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
OFFSITE
From Node: DB
To Node: SW Outlet 1
Link Count: 1
Flow Direction: Both
Solution: Combine
Increments: 0
Pipe Count: 1
Damping: 0.0000 ft
Length: 32.98 ft
FHWA Code: 0
Entr Loss Coef: 0.00
Exit Loss Coef: 0.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Pipe Comment:
Weir Component
Weir: 1
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Circular
Invert: 848.04 ft
Control Elevation: 848.04 ft
Max Depth: 0.50 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 2
Weir Count: 1
Weir Flow Direction: None
Damping: 0.0000 ft
Weir Type: Horizontal
Geometry Type: Rectangular
Invert: 851.16 ft
Control Elevation: 851.16 ft
Max Depth: 3.00 ft
Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
03/18/2022
Page 95 of 209
06/14/2024
143
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)4
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Drop Structure Comment:
Drop Structure Link: L1 - OUT
Scenario: Interim - S2 W
OFFSITE
From Node: LAKE 1
To Node: NW OUTLET
Link Count: 1
Flow Direction: Both
Solution: Combine
Increments: 10
Pipe Count: 1
Damping: 0.0000 ft
Length: 111.00 ft
FHWA Code: 1
Entr Loss Coef: 0.00
Exit Loss Coef: 1.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Upstream Pipe Downstream Pipe
Invert: 847.00 ft Invert: 846.60 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.50 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0130 Manning's N: 0.0130
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0130 Manning's N: 0.0130
Pipe Comment:
Weir Component
Weir: 1
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Circular
Invert: 847.00 ft
Control Elevation: 847.00 ft
Max Depth: 0.50 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 2
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Rectangular
Invert: 851.75 ft
Control Elevation: 851.75 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
03/18/2022
Page 96 of 209
06/14/2024
144
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)5
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Max Depth: 0.50 ft
Max Width: 0.50 ft
Fillet: 0.00 ft
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 3
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Horizontal
Geometry Type: Rectangular
Invert: 853.50 ft
Control Elevation: 853.50 ft
Max Depth: 3.00 ft
Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Drop Structure Comment:
Weir Link: Lake 1 Spillway
Scenario: Interim - S2 W OFFSITE
From Node: LAKE 1
To Node: NW OUTLET
Link Count: 1
Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Broad Crested Vertical
Geometry Type: Trapezoidal
Invert: 853.50 ft
Control Elevation: 853.50 ft
Max Depth: 1.00 ft
Extrapolation Method: Normal Projection
Bottom Width: 40.00 ft
Left Slope: 4.000 (h:v)
Right Slope: 4.000 (h:v)
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 2.800
Weir Table:
Orifice Default: 0.600
Orifice Table:
Comment:
Node: DB
03/18/2022
Page 97 of 209
06/14/2024
145
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)6
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Scenario: Interim - S2 W OFFSITE
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 848.04 ft
Warning Stage: 851.50 ft
Stage [ft]Area [ac]Area [ft2]
848.04 0.0000 0
849.00 0.1786 7781
850.00 0.3121 13597
851.00 0.3479 15153
852.00 0.3849 16765
852.50 0.4036 17579
Comment:
Node: LAKE 1
Scenario: Interim - S2 W OFFSITE
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 847.00 ft
Warning Stage: 853.50 ft
Stage [ft]Area [ac]Area [ft2]
847.00 0.6900 30056
848.00 0.7600 33106
849.00 0.8400 36590
850.00 0.9200 40075
851.00 1.0000 43560
852.00 1.0800 47045
853.00 1.1700 50965
854.00 1.2600 54886
Comment:
Node: NW OUTLET
Scenario: Interim - S2 W OFFSITE
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 846.00 ft
Warning Stage: 847.50 ft
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 846.00
03/18/2022
Page 98 of 209
06/14/2024
146
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)7
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Year Month Day Hour Stage [ft]
0 0 0 12.0000 847.50
0 0 0 30.0000 846.00
Comment:
Node: SW Outlet 1
Scenario: Interim - S2 W OFFSITE
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 847.60 ft
Warning Stage: 850.00 ft
Stage [ft]Area [ac]Area [ft2]
0.00 847.3600 36911002
48.00 847.3600 36911002
Comment:
Simple Basin Runoff Summary [Interim - S2 W OFFSITE]
Basin
Name
Sim Name Max Flow
[cfs]
Time to
Max Flow
[hrs]
Total
Rainfall
[in]
Total
Runoff [in]
Area [ac] Equivalent
Curve
Number
% Imperv % DCIA
Interim
Pond - S2
002yr 32.09 12.0833 2.66 1.64 17.4600 89.5 0.00 0.00
Interim
Pond - S2
010yr 52.29 12.0833 3.83 2.72 17.4600 89.5 0.00 0.00
Interim
Pond - S2
100yr 97.61 12.0833 6.46 5.25 17.4600 89.5 0.00 0.00
Offsite -
S2
002yr 1.11 12.1333 2.66 1.18 0.9200 83.0 0.00 0.00
Offsite -
S2
010yr 2.03 12.1333 3.83 2.14 0.9200 83.0 0.00 0.00
Offsite -
S2
100yr 4.21 12.1167 6.46 4.53 0.9200 83.0 0.00 0.00
Onsite -
S2
002yr 4.93 12.0833 2.66 1.30 3.2700 84.8 0.00 0.00
Onsite -
S2
010yr 8.67 12.0833 3.83 2.29 3.2700 84.8 0.00 0.00
Onsite -
S2
100yr 17.35 12.0667 6.46 4.72 3.2700 84.8 0.00 0.00
03/18/2022
Page 99 of 209
06/14/2024
147
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)8
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Link Min/Max Conditions with Times [Interim - S2 W OFFSITE]
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
DB -
Out -
Pipe
002yr 0.93 0.00 0.00 0.00 0.00 12.6574 0.0000 11.8304 0.0000 0.0000
DB -
Out -
Weir: 1
002yr 0.93 0.00 0.00 4.72 4.72 12.6574 0.0000 11.8296 12.6574 12.6574
DB -
Out -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
DB -
Out -
Pipe
010yr 1.18 0.00 0.00 0.00 0.00 12.9486 0.0000 20.9406 0.0000 0.0000
DB -
Out -
Weir: 1
010yr 1.18 0.00 0.00 6.01 6.01 12.9486 0.0000 20.8830 12.9486 12.9486
DB -
Out -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
DB -
Out -
Pipe
100yr 1.61 0.00 0.00 0.00 0.00 13.2978 0.0000 26.5330 0.0000 0.0000
DB -
Out -
Weir: 1
100yr 1.61 0.00 0.00 8.20 8.20 13.2978 0.0000 26.5062 13.2978 13.2978
DB -
Out -
Weir: 2
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
002yr 1.05 0.00 0.02 0.00 0.00 15.4644 0.0000 44.1177 0.0000 0.0000
L1 -
OUT -
Weir: 1
002yr 1.05 0.00 0.04 5.37 5.37 15.4604 0.0000 44.1177 15.4604 15.4604
L1 -
OUT -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
010yr 1.48 0.00 -0.02 0.00 0.00 16.4735 0.0000 11.6137 0.0000 0.0000
L1 -
OUT -
010yr 1.48 0.00 -0.04 7.55 7.55 16.4689 0.0000 11.6137 16.4689 16.4689
03/18/2022
Page 100 of 209
06/14/2024
148
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)9
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
Weir: 1
L1 -
OUT -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
100yr 3.17 0.00 -0.02 0.00 0.00 14.7739 0.0000 9.6992 0.0000 0.0000
L1 -
OUT -
Weir: 1
100yr 2.01 0.00 -0.04 10.26 10.26 14.7689 0.0000 9.6992 14.7689 14.7689
L1 -
OUT -
Weir: 2
100yr 1.15 0.00 0.00 4.61 4.61 14.7689 0.0000 12.4632 14.7689 14.7689
L1 -
OUT -
Weir: 3
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Node Max Conditions w/ Times [Interim - S2 W OFFSITE]
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
DB 002yr 851.50 849.45 -0.0010 5.98 0.93 10426 12.6760 24.1949 12.0835 12.6574
DB 010yr 851.50 850.11 -0.0010 10.61 1.18 13767 12.9171 19.0846 12.0834 12.9486
DB 100yr 851.50 851.54 -0.0010 21.42 1.61 16023 13.3163 17.9352 12.0833 13.2978
LAKE 1 002yr 853.50 849.12 0.0010 32.09 1.05 37018 15.4604 12.0283 12.0835 15.4604
LAKE 1 010yr 853.50 850.44 0.0010 52.29 1.48 41607 16.4689 9.8233 12.0834 16.4689
LAKE 1 100yr 853.50 852.92 -0.0010 97.61 3.17 50648 14.7689 35.3401 12.0833 14.7689
NW
OUTLET
002yr 847.50 847.50 0.0021 1.05 0.00 0 12.0000 1.4771 15.4644 0.0000
NW
OUTLET
010yr 847.50 847.50 0.0021 1.48 0.00 0 11.9999 1.4771 16.4735 0.0000
03/18/2022
Page 101 of 209
0.93
1.18
1.61
1.05
1.48
3.17
849.45
850.11
851.54
849.12
850.44
852.92
06/14/2024
149
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)10
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
NW
OUTLET
100yr 847.50 847.50 0.0021 3.17 0.00 0 12.0000 1.4771 14.7739 0.0000
SW
Outlet 1
002yr 850.00 847.60 0.0000 0.93 0.00 3691100
0
48.0010 13.3959 12.6574 0.0000
SW
Outlet 1
010yr 850.00 847.60 0.0000 1.18 0.00 3691100
0
48.0082 13.8612 12.9486 0.0000
SW
Outlet 1
100yr 850.00 847.60 0.0000 1.61 0.00 3691100
0
48.0076 14.0459 13.2978 0.0000
Simulation: 002yr
Scenario: Interim - S2 W OFFSITE
Run Date/Time: 9/16/2021 10:39:26 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
03/18/2022
Page 102 of 209
06/14/2024
150
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)11
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 010yr
Scenario: Interim - S2 W OFFSITE
Run Date/Time: 9/16/2021 10:39:30 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
03/18/2022
Page 103 of 209
06/14/2024
151
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)12
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
03/18/2022
Page 104 of 209
06/14/2024
152
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)13
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Simulation: 100yr
Scenario: Interim - S2 W OFFSITE
Run Date/Time: 9/16/2021 10:39:35 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Global
03/18/2022
Page 105 of 209
06/14/2024
153
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)14
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Opt:
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Background Image: Interim S2
03/18/2022
Page 106 of 209
06/14/2024
154
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)15
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Simple Basin Runoff Summary [Interim - S2 -NO OFFSITE]
Basin
Name
Sim Name Max Flow
[cfs]
Time to
Max Flow
[hrs]
Total
Rainfall
[in]
Total
Runoff [in]
Area [ac] Equivalent
Curve
Number
% Imperv % DCIA
Interim
Pond - S2
002yr 32.09 12.0833 2.66 1.64 17.4600 89.5 0.00 0.00
Interim
Pond - S2
010yr 52.29 12.0833 3.83 2.72 17.4600 89.5 0.00 0.00
Interim
Pond - S2
100yr 97.61 12.0833 6.46 5.25 17.4600 89.5 0.00 0.00
Onsite -
S2
002yr 4.93 12.0833 2.66 1.30 3.2700 84.8 0.00 0.00
Onsite -
S2
010yr 8.67 12.0833 3.83 2.29 3.2700 84.8 0.00 0.00
Onsite -
S2
100yr 17.35 12.0667 6.46 4.72 3.2700 84.8 0.00 0.00
Link Min/Max Conditions with Times [Interim - S2 -NO OFFSITE]
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
DB -
Out -
Pipe
002yr 0.84 0.00 0.00 0.00 0.00 12.5830 0.0000 16.2747 0.0000 0.0000
DB -
Out -
Weir: 1
002yr 0.84 0.00 0.00 4.30 4.30 12.5392 0.0000 16.2205 12.5392 12.5392
DB -
Out -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
DB -
Out -
Pipe
010yr 1.08 0.00 0.00 0.00 0.00 12.7890 0.0000 18.8679 0.0000 0.0000
DB -
Out -
Weir: 1
010yr 1.08 0.00 0.00 5.48 5.48 12.7328 0.0000 19.1961 12.7328 12.7328
DB -
Out -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
DB -
Out -
Pipe
100yr 1.45 0.00 0.00 0.00 0.00 13.0319 0.0000 24.6612 0.0000 0.0000
DB -
Out -
Weir: 1
100yr 1.45 0.00 0.00 7.39 7.39 13.0319 0.0000 24.6310 13.0319 13.0319
03/18/2022
Page 107 of 209
06/14/2024
155
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)16
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
DB -
Out -
Weir: 2
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
002yr 1.05 0.00 0.02 0.00 0.00 15.4626 0.0000 44.1136 0.0000 0.0000
L1 -
OUT -
Weir: 1
002yr 1.05 0.00 0.04 5.37 5.37 15.4626 0.0000 44.1136 15.4626 15.4626
L1 -
OUT -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
010yr 1.48 0.00 -0.02 0.00 0.00 16.4764 0.0000 11.6132 0.0000 0.0000
L1 -
OUT -
Weir: 1
010yr 1.48 0.00 -0.04 7.55 7.55 16.4719 0.0000 11.6132 16.4719 16.4719
L1 -
OUT -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
100yr 3.17 0.00 -0.02 0.00 0.00 14.7744 0.0000 9.6981 0.0000 0.0000
L1 -
OUT -
Weir: 1
100yr 2.01 0.00 -0.04 10.26 10.26 14.7700 0.0000 9.6981 14.7700 14.7700
L1 -
OUT -
Weir: 2
100yr 1.15 0.00 0.00 4.61 4.61 14.7700 0.0000 12.4557 14.7700 14.7700
L1 -
OUT -
Weir: 3
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
03/18/2022
Page 108 of 209
06/14/2024
156
Jacksons Grant Interim Conditions - Scenario 2 (With and Without Offsite)17
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 11:15
Node Max Conditions w/ Times [Interim - S2 -NO OFFSITE]
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
DB 002yr 851.50 849.27 -0.0010 4.93 0.84 9362 12.5560 14.0798 12.0832 12.5392
DB 010yr 851.50 849.82 -0.0010 8.67 1.08 12571 12.7538 17.7921 12.0832 12.7328
DB 100yr 851.50 850.96 -0.0010 17.35 1.45 15092 13.0494 22.0213 12.0668 13.0319
LAKE 1 002yr 853.50 849.12 0.0010 32.09 1.05 37018 15.4592 12.0333 12.0835 15.4626
LAKE 1 010yr 853.50 850.44 -0.0010 52.29 1.48 41607 16.4719 35.7380 12.0834 16.4719
LAKE 1 100yr 853.50 852.92 0.0010 97.61 3.17 50648 14.7700 12.1351 12.0834 14.7700
NW
OUTLET
002yr 847.50 847.50 0.0021 1.05 0.00 0 12.0001 1.4771 15.4626 0.0000
NW
OUTLET
010yr 847.50 847.50 0.0021 1.48 0.00 0 11.9999 1.4771 16.4764 0.0000
NW
OUTLET
100yr 847.50 847.50 0.0021 3.17 0.00 0 12.0000 1.4771 14.7744 0.0000
SW
Outlet 1
002yr 850.00 847.36 0.0000 0.84 0.00 0 0.0000 0.0000 12.5830 0.0000
SW
Outlet 1
010yr 850.00 847.36 0.0000 1.08 0.00 0 0.0000 0.0000 12.7890 0.0000
SW
Outlet 1
100yr 850.00 847.36 0.0000 1.45 0.00 0 0.0000 0.0000 13.0319 0.0000
03/18/2022
Page 109 of 209
06/14/2024
157
Jacksons Grant FULL BUILD OUT - Scenario 3 1
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Simple Basin: 457A Combined
Scenario: Proposed - S3 - FULL BUILD OUT
Node: DB
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 16.2000 min
Max Allowable Q: 999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 3.2900 ac
Curve Number: 84.8
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: Full Build Out of Pond
Scenario: Proposed - S3 - FULL BUILD OUT
Node: LAKE 1
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 17.3000 min
Max Allowable Q: 999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: Uh484
Peaking Factor: 484.0
Area: 20.3600 ac
Curve Number: 88.2
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: Offsite to the West - North
Scenario: Proposed - S3 - FULL BUILD OUT
Node: 458
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 15.9000 min
Max Allowable Q: 0.00 cfs
03/18/2022
Page 110 of 209
06/14/2024
158
Jacksons Grant FULL BUILD OUT - Scenario 3 2
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 3.1300 ac
Curve Number: 82.9
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: Offsite to the West - South
Scenario: Proposed - S3 - FULL BUILD OUT
Node: 458
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 21.0000 min
Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 0.5200 ac
Curve Number: 87.3
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Drop Structure Link: 453 to Dry Basin
Scenario: Proposed - S3 -
FULL BUILD OUT
From Node: DB
To Node: 453
Link Count: 1
Flow Direction: Both
Solution: Combine
Increments: 0
Pipe Count: 1
Damping: 0.0000 ft
Length: 29.00 ft
FHWA Code: 0
Entr Loss Coef: 0.00
Upstream Pipe Downstream Pipe
Invert: 847.48 ft Invert: 847.43 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
03/18/2022
Page 111 of 209
06/14/2024
159
Jacksons Grant FULL BUILD OUT - Scenario 3 3
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Exit Loss Coef: 0.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Manning's N: 0.0000 Manning's N: 0.0000
Pipe Comment:
Weir Component
Weir: 1
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Circular
Invert: 848.04 ft
Control Elevation: 848.04 ft
Max Depth: 0.50 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 2
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Horizontal
Geometry Type: Rectangular
Invert: 851.16 ft
Control Elevation: 851.16 ft
Max Depth: 3.00 ft
Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Drop Structure Comment:
Pipe Link: 453-458
Scenario: Proposed - S3 -
FULL BUILD OUT
From Node: 458
To Node: 453
Link Count: 1
Flow Direction: Both
Upstream Downstream
Invert: 849.35 ft Invert: 848.43 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.00 ft Max Depth: 1.00 ft
Bottom Clip
Default: 0.00 ft Default: 0.00 ft
03/18/2022
Page 112 of 209
06/14/2024
160
Jacksons Grant FULL BUILD OUT - Scenario 3 4
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Damping: 0.0000 ft
Length: 23.00 ft
FHWA Code: 0
Entr Loss Coef: 0.00
Exit Loss Coef: 0.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Comment:
Drop Structure Link: L1 - OUT
Scenario: Proposed - S3 -
FULL BUILD OUT
From Node: LAKE 1
To Node: NW OUTLET
Link Count: 1
Flow Direction: Both
Solution: Combine
Increments: 10
Pipe Count: 1
Damping: 0.0000 ft
Length: 111.00 ft
FHWA Code: 1
Entr Loss Coef: 0.00
Exit Loss Coef: 1.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Upstream Pipe Downstream Pipe
Invert: 847.00 ft Invert: 846.60 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.50 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0130 Manning's N: 0.0130
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0130 Manning's N: 0.0130
Pipe Comment:
Weir Component
Weir: 1
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Circular
Invert: 847.00 ft
Control Elevation: 847.00 ft
Max Depth: 0.50 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
03/18/2022
Page 113 of 209
06/14/2024
161
Jacksons Grant FULL BUILD OUT - Scenario 3 5
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Weir: 2
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Rectangular
Invert: 851.75 ft
Control Elevation: 851.75 ft
Max Depth: 0.50 ft
Max Width: 0.50 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 3
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Horizontal
Geometry Type: Rectangular
Invert: 853.50 ft
Control Elevation: 853.50 ft
Max Depth: 3.00 ft
Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Drop Structure Comment:
Weir Link: Lake 1 Spillway
Scenario: Proposed - S3 - FULL BUILD
OUT
From Node: LAKE 1
To Node: NW OUTLET
Link Count: 1
Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Broad Crested Vertical
Geometry Type: Trapezoidal
Invert: 853.50 ft
Control Elevation: 853.50 ft
Max Depth: 1.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 2.800
Weir Table:
Orifice Default: 0.600
03/18/2022
Page 114 of 209
06/14/2024
162
Jacksons Grant FULL BUILD OUT - Scenario 3 6
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Extrapolation Method: Normal Projection
Bottom Width: 40.00 ft
Left Slope: 4.000 (h:v)
Right Slope: 4.000 (h:v)
Orifice Table:
Comment:
Pipe Link: SW Outlet 1 - 453
Scenario: Proposed - S3 -
FULL BUILD OUT
From Node: 453
To Node: SW Outlet 1
Link Count: 1
Flow Direction: Both
Damping: 0.0000 ft
Length: 38.00 ft
FHWA Code: 0
Entr Loss Coef: 0.00
Exit Loss Coef: 0.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Upstream Downstream
Invert: 847.43 ft Invert: 847.36 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Comment:
Node: 453
Scenario: Proposed - S3 - FULL BUILD
OUT
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 847.43 ft
Warning Stage: 851.93 ft
Stage [ft]Area [ac]Area [ft2]
847.43 0.0003 13
851.93 0.0003 13
Comment:
Node: 458
Scenario: Proposed - S3 - FULL BUILD
OUT
Type: Stage/Area
Base Flow: 0.00 cfs
03/18/2022
Page 115 of 209
06/14/2024
163
Jacksons Grant FULL BUILD OUT - Scenario 3 7
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Initial Stage: 849.35 ft
Warning Stage: 852.00 ft
Stage [ft]Area [ac]Area [ft2]
849.35 0.0000 0
850.00 0.0410 1786
851.00 0.1011 4404
Comment:
Node: DB
Scenario: Proposed - S3 - FULL BUILD
OUT
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 848.04 ft
Warning Stage: 851.50 ft
Stage [ft]Area [ac]Area [ft2]
848.04 0.0000 0
849.00 0.1786 7781
850.00 0.3121 13597
851.00 0.3479 15153
852.00 0.3849 16765
852.50 0.4036 17579
Comment:
Node: LAKE 1
Scenario: Proposed - S3 - FULL BUILD
OUT
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 847.00 ft
Warning Stage: 853.50 ft
Stage [ft]Area [ac]Area [ft2]
847.00 0.6900 30056
848.00 0.7600 33106
849.00 0.8400 36590
850.00 0.9200 40075
851.00 1.0000 43560
852.00 1.0800 47045
853.00 1.1700 50965
854.00 1.2600 54886
03/18/2022
Page 116 of 209
06/14/2024
164
Jacksons Grant FULL BUILD OUT - Scenario 3 8
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Comment:
Node: NW OUTLET
Scenario: Proposed - S3 - FULL BUILD
OUT
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 846.00 ft
Warning Stage: 847.50 ft
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 846.00
0 0 0 12.0000 847.50
0 0 0 30.0000 846.00
Comment:
Node: SW Outlet 1
Scenario: Proposed - S3 - FULL BUILD
OUT
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 847.36 ft
Warning Stage: 850.00 ft
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 847.36
0 0 0 48.0000 847.36
Comment:
Simulation: 002yr
Scenario: Proposed - S3 - FULL BUILD OUT
Run Date/Time: 9/16/2021 10:39:41 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
03/18/2022
Page 117 of 209
06/14/2024
165
Jacksons Grant FULL BUILD OUT - Scenario 3 9
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area 113 ft2
03/18/2022
Page 118 of 209
06/14/2024
166
Jacksons Grant FULL BUILD OUT - Scenario 3 10
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
(1D):
Energy Switch (1D): Energy
Comment:
Simulation: 010yr
Scenario: Proposed - S3 - FULL BUILD OUT
Run Date/Time: 9/16/2021 10:39:45 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
03/18/2022
Page 119 of 209
06/14/2024
167
Jacksons Grant FULL BUILD OUT - Scenario 3 11
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Proposed - S3 - FULL BUILD OUT
Run Date/Time: 9/16/2021 10:39:50 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
03/18/2022
Page 120 of 209
06/14/2024
168
Jacksons Grant FULL BUILD OUT - Scenario 3 12
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simple Basin Runoff Summary [Proposed - S3 - FULL BUILD OUT]
Basin
Name
Sim Name Max Flow
[cfs]
Time to
Max Flow
[hrs]
Total
Rainfall
[in]
Total
Runoff [in]
Area [ac] Equivalent
Curve
Number
% Imperv % DCIA
457A
Combined
002yr 4.96 12.0833 2.66 1.30 3.2900 84.8 0.00 0.00
457A 010yr 8.72 12.0833 3.83 2.29 3.2900 84.8 0.00 0.00
03/18/2022
Page 121 of 209
06/14/2024
169
Jacksons Grant FULL BUILD OUT - Scenario 3 13
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Basin
Name
Sim Name Max Flow
[cfs]
Time to
Max Flow
[hrs]
Total
Rainfall
[in]
Total
Runoff [in]
Area [ac] Equivalent
Curve
Number
% Imperv % DCIA
Combined
457A
Combined
100yr 17.46 12.0667 6.46 4.72 3.2900 84.8 0.00 0.00
Full Build
Out of
Pond
002yr 35.26 12.0833 2.66 1.54 20.3600 88.2 0.00 0.00
Full Build
Out of
Pond
010yr 58.68 12.0833 3.83 2.60 20.3600 88.2 0.00 0.00
Full Build
Out of
Pond
100yr 111.66 12.0833 6.46 5.10 20.3600 88.2 0.00 0.00
Offsite to
the West -
North
002yr 4.30 12.0833 2.66 1.17 3.1300 82.9 0.00 0.00
Offsite to
the West -
North
010yr 7.81 12.0833 3.83 2.13 3.1300 82.9 0.00 0.00
Offsite to
the West -
North
100yr 16.13 12.0667 6.46 4.51 3.1300 82.9 0.00 0.00
Offsite to
the West -
South
002yr 0.79 12.1333 2.66 1.47 0.5200 87.3 0.00 0.00
Offsite to
the West -
South
010yr 1.33 12.1167 3.83 2.51 0.5200 87.3 0.00 0.00
Offsite to
the West -
South
100yr 2.58 12.1167 6.46 5.00 0.5200 87.3 0.00 0.00
Link Min/Max Conditions with Times [Proposed - S3 - FULL BUILD OUT]
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
453 to
Dry
Basin -
Pipe
002yr 0.93 0.00 0.00 0.00 0.00 12.5168 0.0000 15.6493 0.0000 0.0000
453 to
Dry
Basin -
002yr 0.93 0.00 0.00 4.74 4.74 12.5158 0.0000 15.6111 12.5158 12.5158
03/18/2022
Page 122 of 209
06/14/2024
170
Jacksons Grant FULL BUILD OUT - Scenario 3 14
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
Weir: 1
453 to
Dry
Basin -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
453 to
Dry
Basin -
Pipe
010yr 1.17 0.00 0.00 0.00 0.00 12.6757 0.0000 18.3839 0.0000 0.0000
453 to
Dry
Basin -
Weir: 1
010yr 1.17 0.00 0.00 5.97 5.97 12.6747 0.0000 18.3414 12.6747 12.6747
453 to
Dry
Basin -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
453 to
Dry
Basin -
Pipe
100yr 1.55 0.00 0.00 0.00 0.00 13.2925 0.0000 23.6762 0.0000 0.0000
453 to
Dry
Basin -
Weir: 1
100yr 1.55 0.00 0.00 7.89 7.89 13.2907 0.0000 23.4268 13.2907 13.2907
453 to
Dry
Basin -
Weir: 2
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
453-458 002yr 4.75 0.00 -0.01 6.36 9.71 12.1350 0.0000 12.3102 12.1350 12.1396
453-458 010yr 5.52 0.00 -0.03 7.20 10.03 11.9797 0.0000 12.5000 11.9797 12.4983
453-458 100yr 8.79 0.00 -0.03 11.19 11.47 12.2735 0.0000 13.0784 12.2735 12.2735
L1 -
OUT -
Pipe
002yr 1.12 0.00 0.02 0.00 0.00 15.5517 0.0000 46.0736 0.0000 0.0000
L1 -
OUT -
Weir: 1
002yr 1.12 0.00 0.04 5.69 5.69 15.5517 0.0000 46.0736 15.5517 15.5517
L1 -
OUT -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 - 010yr 1.58 0.00 -0.02 0.00 0.00 16.7217 0.0000 11.6076 0.0000 0.0000
03/18/2022
Page 123 of 209
06/14/2024
171
Jacksons Grant FULL BUILD OUT - Scenario 3 15
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
OUT -
Pipe
L1 -
OUT -
Weir: 1
010yr 1.58 0.00 -0.04 8.03 8.03 16.7185 0.0000 11.6076 16.7185 16.7185
L1 -
OUT -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
100yr 3.59 0.00 -0.02 0.00 0.00 15.3609 0.0000 9.6814 0.0000 0.0000
L1 -
OUT -
Weir: 1
100yr 2.12 0.00 -0.04 10.79 10.79 15.3568 0.0000 9.6814 15.3568 15.3568
L1 -
OUT -
Weir: 2
100yr 1.47 0.00 0.00 5.90 5.90 15.3568 0.0000 26.3843 15.3568 15.3568
L1 -
OUT -
Weir: 3
100yr 0.00 0.00 0.00 0.00 0.00 15.3568 0.0000 15.4083 0.0000 0.0000
Lake 1
Spillway
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
100yr 0.00 0.00 0.00 0.00 0.00 15.3609 0.0000 15.4083 0.0000 0.0000
SW
Outlet 1
- 453
002yr 5.40 0.00 -0.01 3.77 4.90 12.1445 0.0000 12.3102 12.1451 12.1451
SW
Outlet 1
- 453
010yr 6.52 0.00 -0.01 4.09 5.26 12.4975 0.0000 12.5049 12.4985 12.4987
SW
Outlet 1
- 453
100yr 10.00 0.00 0.02 5.66 6.53 12.2805 0.0000 12.0851 12.2805 12.2812
Node Max Conditions w/ Times [Proposed - S3 - FULL BUILD OUT]
Node
Name
Sim
Name
Warning
Stage
Max
Stage
Min/Max
Delta
Max
Total
Max
Total
Max
Surface
Time to
Max
Time to
Min/Max
Time to
Max
Time to
Max
03/18/2022
Page 124 of 209
06/14/2024
172
Jacksons Grant FULL BUILD OUT - Scenario 3 16
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:44
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
453 002yr 851.93 848.57 0.0010 5.41 5.40 113 12.1417 11.9093 12.1393 12.1445
453 010yr 851.93 848.70 0.0010 6.52 6.52 113 12.4975 11.9659 12.4975 12.4975
453 100yr 851.93 849.08 -0.0010 9.99 10.00 113 12.2789 13.0798 12.2865 12.2805
458 002yr 852.00 850.25 -0.0010 5.06 4.75 2456 12.1342 12.3882 12.0833 12.1350
458 010yr 852.00 850.94 -0.0010 9.10 5.52 4262 12.2318 12.6807 12.0833 11.9797
458 100yr 852.00 852.89 -0.0010 18.61 8.79 4411 12.2741 12.9374 12.0832 12.2735
DB 002yr 851.50 849.26 -0.0010 4.96 0.93 9299 12.5158 15.3534 12.0833 12.5158
DB 010yr 851.50 849.83 -0.0010 8.72 1.17 12594 12.6747 15.4319 12.0833 12.6747
DB 100yr 851.50 850.99 -0.0010 17.46 1.55 15133 13.0827 20.7806 12.0667 13.2907
LAKE 1 002yr 853.50 849.29 -0.0010 35.26 1.12 37615 15.5517 28.7269 12.0835 15.5517
LAKE 1 010yr 853.50 850.78 0.0010 58.67 1.58 42806 16.7185 12.1699 12.0833 16.7185
LAKE 1 100yr 853.50 853.50 0.0010 111.66 3.59 52931 15.3568 11.7124 12.0834 15.3568
NW
OUTLET
002yr 847.50 847.50 0.0021 1.12 0.00 0 12.0000 1.4771 15.5517 0.0000
NW
OUTLET
010yr 847.50 847.50 0.0021 1.58 0.00 0 12.0000 1.4771 16.7217 0.0000
NW
OUTLET
100yr 847.50 847.50 0.0021 3.59 0.00 0 12.0000 1.4771 15.3609 0.0000
SW
Outlet 1
002yr 850.00 847.36 0.0000 5.40 0.00 0 0.0000 0.0000 12.1445 0.0000
SW
Outlet 1
010yr 850.00 847.36 0.0000 6.52 0.00 0 0.0000 0.0000 12.4975 0.0000
SW
Outlet 1
100yr 850.00 847.36 0.0000 10.00 0.00 0 0.0000 0.0000 12.2805 0.0000
03/18/2022
Page 125 of 209
1.17
1.55
1.58
3.59
849.26
849.83
850.99
849.29
850.78
853.50
0.93
1.12
06/14/2024
173
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 1
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Simple Basin: 457A Combined
Scenario: Proposed - S3 - Small Orifice
Node: DB
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 16.2000 min
Max Allowable Q: 999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: UH484
Peaking Factor: 484.0
Area: 3.2900 ac
Curve Number: 84.8
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: Full Build Out of Pond
Scenario: Proposed - S3 - Small Orifice
Node: LAKE 1
Hydrograph Method: NRCS Unit Hydrograph
Infiltration Method: Curve Number
Time of Concentration: 17.3000 min
Max Allowable Q: 999999.00 cfs
Time Shift: 0.0000 hr
Unit Hydrograph: Uh484
Peaking Factor: 484.0
Area: 18.8600 ac
Curve Number: 87.9
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Drop Structure Link: 453 to Dry Basin
Scenario: Proposed - S3 -
FULL BUILD OUT
From Node: DB
To Node: 453
Link Count: 1
Flow Direction: Both
Upstream Pipe Downstream Pipe
Invert: 847.48 ft Invert: 847.43 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.00 ft Default: 0.00 ft
03/18/2022
Page 126 of 209
06/14/2024
174
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 2
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Solution: Combine
Increments: 0
Pipe Count: 1
Damping: 0.0000 ft
Length: 29.00 ft
FHWA Code: 0
Entr Loss Coef: 0.00
Exit Loss Coef: 0.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Pipe Comment:
Weir Component
Weir: 1
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Circular
Invert: 848.04 ft
Control Elevation: 848.04 ft
Max Depth: 0.50 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 2
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Horizontal
Geometry Type: Rectangular
Invert: 851.16 ft
Control Elevation: 851.16 ft
Max Depth: 3.00 ft
Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Drop Structure Comment:
03/18/2022
Page 127 of 209
06/14/2024
175
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 3
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Pipe Link: 453-458
Scenario: Proposed - S3 -
FULL BUILD OUT
From Node: 458
To Node: 453
Link Count: 1
Flow Direction: Both
Damping: 0.0000 ft
Length: 23.00 ft
FHWA Code: 0
Entr Loss Coef: 0.00
Exit Loss Coef: 0.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Upstream Downstream
Invert: 849.35 ft Invert: 848.43 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.00 ft Max Depth: 1.00 ft
Bottom Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Comment:
Drop Structure Link: L1 - OUT
Scenario: Proposed - S3 -
FULL BUILD OUT
From Node: LAKE 1
To Node: NW OUTLET
Link Count: 1
Flow Direction: Both
Solution: Combine
Increments: 10
Pipe Count: 1
Damping: 0.0000 ft
Length: 111.00 ft
FHWA Code: 1
Entr Loss Coef: 0.00
Exit Loss Coef: 1.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Upstream Pipe Downstream Pipe
Invert: 847.00 ft Invert: 846.60 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.50 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0130 Manning's N: 0.0130
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0130 Manning's N: 0.0130
Pipe Comment:
Weir Component
Weir: 1
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Circular
Invert: 847.00 ft
Control Elevation: 847.00 ft
Max Depth: 0.50 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
03/18/2022
Page 128 of 209
06/14/2024
176
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 4
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 2
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Sharp Crested Vertical
Geometry Type: Rectangular
Invert: 851.75 ft
Control Elevation: 851.75 ft
Max Depth: 0.50 ft
Max Width: 0.50 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component
Weir: 3
Weir Count: 1
Weir Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Horizontal
Geometry Type: Rectangular
Invert: 853.50 ft
Control Elevation: 853.50 ft
Max Depth: 3.00 ft
Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200
Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Drop Structure Comment:
Weir Link: Lake 1 Spillway
Scenario: Proposed - S3 - FULL BUILD
OUT
From Node: LAKE 1
To Node: NW OUTLET
Link Count: 1
Bottom Clip
Default: 0.00 ft
Op Table:
Ref Node:
Top Clip
03/18/2022
Page 129 of 209
06/14/2024
177
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 5
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Flow Direction: Both
Damping: 0.0000 ft
Weir Type: Broad Crested Vertical
Geometry Type: Trapezoidal
Invert: 853.50 ft
Control Elevation: 853.50 ft
Max Depth: 1.00 ft
Extrapolation Method: Normal Projection
Bottom Width: 40.00 ft
Left Slope: 4.000 (h:v)
Right Slope: 4.000 (h:v)
Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 2.800
Weir Table:
Orifice Default: 0.600
Orifice Table:
Comment:
Pipe Link: SW Outlet 1 - 453
Scenario: Proposed - S3 -
FULL BUILD OUT
From Node: 453
To Node: SW Outlet 1
Link Count: 1
Flow Direction: Both
Damping: 0.0000 ft
Length: 38.00 ft
FHWA Code: 0
Entr Loss Coef: 0.00
Exit Loss Coef: 0.00
Bend Loss Coef: 0.00
Bend Location: 0.00 dec
Energy Switch: Energy
Upstream Downstream
Invert: 847.43 ft Invert: 847.36 ft
Manning's N: 0.0130 Manning's N: 0.0130
Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft
Bottom Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Top Clip
Default: 0.00 ft Default: 0.00 ft
Op Table:Op Table:
Ref Node:Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Comment:
Node: DB
Scenario: Proposed - S3 - Small Orifice
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 848.04 ft
Warning Stage: 851.50 ft
Stage [ft]Area [ac]Area [ft2]
848.04 0.0000 0
849.00 0.1786 7781
850.00 0.3121 13597
851.00 0.3479 15153
852.00 0.3849 16765
852.50 0.4036 17579
03/18/2022
Page 130 of 209
06/14/2024
178
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 6
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Comment:
Node: LAKE 1
Scenario: Proposed - S3 - Small Orifice
Type: Stage/Area
Base Flow: 0.00 cfs
Initial Stage: 847.00 ft
Warning Stage: 853.50 ft
Stage [ft]Area [ac]Area [ft2]
847.00 0.6900 30056
848.00 0.7600 33106
849.00 0.8400 36590
850.00 0.9200 40075
851.00 1.0000 43560
852.00 1.0800 47045
853.00 1.1700 50965
854.00 1.2600 54886
Comment:
Node: NW OUTLET
Scenario: Proposed - S3 - Small Orifice
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 846.00 ft
Warning Stage: 847.50 ft
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 846.00
0 0 0 12.0000 847.50
0 0 0 30.0000 846.00
Comment:
Node: SW Outlet 1
Scenario: Proposed - S3 - Small Orifice
Type: Time/Stage
Base Flow: 0.00 cfs
Initial Stage: 847.36 ft
Warning Stage: 850.00 ft
03/18/2022
Page 131 of 209
06/14/2024
179
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 7
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Boundary Stage:
Year Month Day Hour Stage [ft]
0 0 0 0.0000 847.36
0 0 0 48.0000 847.36
Comment:
Simulation: 002yr
Scenario: Proposed - S3 - Small Orifice
Run Date/Time: 9/16/2021 10:39:55 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
03/18/2022
Page 132 of 209
06/14/2024
180
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 8
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 2.66 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 010yr
Scenario: Proposed - S3 - Small Orifice
Run Date/Time: 9/16/2021 10:40:00 AM
Program Version: ICPR4 4.07.04
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
03/18/2022
Page 133 of 209
06/14/2024
181
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 9
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 3.83 in
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simulation: 100yr
Scenario: Proposed - S3 - Small Orifice
Run Date/Time: 9/16/2021 10:40:05 AM
Program Version: ICPR4 4.07.04
03/18/2022
Page 134 of 209
06/14/2024
182
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 10
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
General
Run Mode: Normal
Year Month Day Hour [hr]
Start Time:0 0 0 0.0000
End Time:0 0 0 48.0000
Hydrology [sec] Surface Hydraulics
[sec]
Min Calculation Time: 60.0000 0.1000
Max Calculation Time:60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Surface Hydraulics
Year Month Day Hour [hr]Time Increment [min]
0 0 0 0.0000 5.0000
Restart File
Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables
Rainfall Folder: ICPR3 Boundary Stage Set:
Extern Hydrograph Set:
Unit Hydrograph
Folder:
ICPR3 Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr
Max Iterations: 6
Over-Relax Weight
Fact:
0.5 dec
dZ Tolerance: 0.0010 ft Smp/Man Basin Rain
Opt:
Global
Max dZ: 1.0000 ft
Link Optimizer Tol: 0.0001 ft Rainfall Name: Scsii-24
Rainfall Amount: 6.46 in
03/18/2022
Page 135 of 209
06/14/2024
183
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 11
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (1D): 0.0050 ft
Min Node Srf Area
(1D):
113 ft2
Energy Switch (1D): Energy
Comment:
Simple Basin Runoff Summary [Proposed - S3 - Small Orifice]
Basin
Name
Sim Name Max Flow
[cfs]
Time to
Max Flow
[hrs]
Total
Rainfall
[in]
Total
Runoff [in]
Area [ac] Equivalent
Curve
Number
% Imperv % DCIA
457A
Combined
002yr 4.96 12.0833 2.66 1.30 3.2900 84.8 0.00 0.00
457A
Combined
010yr 8.72 12.0833 3.83 2.29 3.2900 84.8 0.00 0.00
457A
Combined
100yr 17.46 12.0667 6.46 4.72 3.2900 84.8 0.00 0.00
Full Build
Out of
Pond
002yr 32.20 12.0833 2.66 1.52 18.8600 87.9 0.00 0.00
Full Build
Out of
Pond
010yr 53.86 12.0833 3.83 2.57 18.8600 87.9 0.00 0.00
Full Build
Out of
Pond
100yr 102.96 12.0833 6.46 5.07 18.8600 87.9 0.00 0.00
Link Min/Max Conditions with Times [Proposed - S3 - Small Orifice]
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
DB -
Out -
Pipe
002yr 0.34 0.00 0.00 0.00 0.00 13.6236 0.0000 11.5054 0.0000 0.0000
DB -
Out -
Weir: 1
002yr 0.34 0.00 0.00 5.15 5.15 13.4907 0.0000 26.6477 13.4907 13.4907
DB -
Out -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
03/18/2022
Page 136 of 209
06/14/2024
184
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 12
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
DB -
Out -
Pipe
010yr 0.43 0.00 0.00 0.00 0.00 14.1219 0.0000 32.8825 0.0000 0.0000
DB -
Out -
Weir: 1
010yr 0.43 0.00 0.00 6.36 6.36 14.1219 0.0000 33.0560 14.1219 14.1219
DB -
Out -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
DB -
Out -
Pipe
100yr 1.59 0.00 0.01 0.00 0.00 12.9927 0.0000 12.6176 0.0000 0.0000
DB -
Out -
Weir: 1
100yr 0.54 0.00 0.00 8.01 8.01 16.0541 0.0000 43.7627 16.0541 16.0541
DB -
Out -
Weir: 2
100yr 1.07 0.00 0.00 0.97 0.97 12.9603 0.0000 12.6076 12.9603 12.9603
L1 -
OUT -
Pipe
002yr 0.54 0.00 -0.01 0.00 0.00 20.1829 0.0000 12.0297 0.0000 0.0000
L1 -
OUT -
Weir: 1
002yr 0.54 0.00 -0.01 6.20 6.20 20.1606 0.0000 12.0297 20.1606 20.1606
L1 -
OUT -
Weir: 2
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
010yr 0.75 0.00 -0.01 0.00 0.00 23.8799 0.0000 11.8009 0.0000 0.0000
L1 -
OUT -
Weir: 1
010yr 0.75 0.00 -0.01 8.55 8.55 23.8683 0.0000 11.8009 23.8683 23.8683
L1 -
OUT -
Weir: 2
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Weir: 3
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
L1 -
OUT -
Pipe
100yr 2.39 0.00 -0.01 0.00 0.00 17.1874 0.0000 10.4519 0.0000 0.0000
03/18/2022
Page 137 of 209
06/14/2024
185
Jacksons Grant FULL BUILD OUT - Scenario 3 - small orifice 13
C:\Users\nstambro\Desktop\Jacksons Grant Village\9/16/2021 10:47
Link
Name
Sim
Name
Max
Flow
[cfs]
Min
Flow
[cfs]
Min/Max
Delta
Flow
[cfs]
Max Us
Velocity
[fps]
Max Ds
Velocity
[fps]
Time to
Max
Flow
[hrs]
Time to
Min
Flow
[hrs]
Time to
Min/Max
Delta
Flow
[hrs]
Time to
Max Us
Velocity
[hrs]
Time to
Max Ds
Velocity
[hrs]
L1 -
OUT -
Weir: 1
100yr 0.96 0.00 -0.01 11.00 11.00 17.1708 0.0000 10.4519 17.1708 17.1708
L1 -
OUT -
Weir: 2
100yr 1.43 0.00 0.00 5.72 5.72 17.1708 0.0000 30.5449 17.1708 17.1708
L1 -
OUT -
Weir: 3
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
002yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
010yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Lake 1
Spillway
100yr 0.00 0.00 0.00 0.00 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Node Max Conditions w/ Times [Proposed - S3 - Small Orifice]
Node
Name
Sim
Name
Warning
Stage
[ft]
Max
Stage
[ft]
Min/Max
Delta
Stage
[ft]
Max
Total
Inflow
[cfs]
Max
Total
Outflow
[cfs]
Max
Surface
Area
[ft2]
Time to
Max
Stage
[hr]
Time to
Min/Max
Delta
Stage
[hr]
Time to
Max
Total
Inflow
[hr]
Time to
Max
Total
Outflow
[hr]
DB 002yr 851.50 849.47 -0.0010 4.96 0.34 10493 13.5387 24.3425 12.0833 13.4907
DB 010yr 851.50 850.10 -0.0010 8.72 0.43 13754 14.1515 18.2015 12.0834 14.1219
DB 100yr 851.50 851.25 0.0010 17.46 1.59 15558 12.9688 5.9526 12.0667 12.9603
LAKE 1 002yr 853.50 849.40 0.0010 32.20 0.54 37973 20.1717 12.0294 12.0836 20.1606
LAKE 1 010yr 853.50 850.94 0.0010 53.85 0.75 43345 23.8683 14.6048 12.0834 23.8683
LAKE 1 100yr 853.50 853.42 0.0010 102.96 2.39 52593 17.1708 12.3183 12.0833 17.1708
NW
OUTLET
002yr 847.50 847.50 0.0021 0.54 0.00 0 12.0002 1.4771 20.1829 0.0000
NW
OUTLET
010yr 847.50 847.50 0.0021 0.75 0.00 0 12.0001 1.4771 23.8799 0.0000
NW
OUTLET
100yr 847.50 847.50 0.0021 2.39 0.00 0 12.0001 1.4771 17.1874 0.0000
SW
Outlet 1
002yr 850.00 847.36 0.0000 0.34 0.00 0 0.0000 0.0000 13.6236 0.0000
SW
Outlet 1
010yr 850.00 847.36 0.0000 0.43 0.00 0 0.0000 0.0000 14.1219 0.0000
SW
Outlet 1
100yr 850.00 847.36 0.0000 1.59 0.00 0 0.0000 0.0000 12.9927 0.0000
03/18/2022
Page 138 of 209
0.34
0.43
1.59
0.54
0.75
2.39
849.47
850.10
851.25
849.40
850.94
853.42
06/14/2024
186
APPENDIX C
STORM SEWER DESIGN
CALCULATIONS
03/18/2022
Page 139 of 209
06/14/2024
187
-DFNVRQ
V*UDQW9LOODJH5XQRII&RHIILFLHQWV -RE-*9:HLJKWHG&XUYH1XPEHUV7RWDO'UDLQDJH$UHD7RWDO,PSHUYLRXV$UHD$LPS7RWDO,PSHUYLRXV$UHD$LPS7RWDO3HUYLRXV$UHD$SHU7RWDO$JULFXOWXUDO$UHD$DJ6XE%DVLQ:HLJKWHG&)DFWRU6XE%DVLQ:HLJKWHG&1DFVTIWDFDFDF&Z&1Z 3RVW'HYHORSHG6LWHCw = 0.85Aimp+ 0.16Aper+ 0.5AagTotal Drainage Area6WUXFWXUH03/18/2022
Page 140 of 209
06/14/2024
188
$ '5<%$6,1 /DNH $ $5LJKW $/HIW )XOO%XLOG2XWRI3RQG $&RPELQHG%DVLQ ,QWHULP3RQG6 %DVLQ2QVLWH6 %DVLQ2IIVLWH6 ,QWHULP3RQG6 6WUXFWXUH DQG$OWHUHG%DVLQ$UHDV $OWHUHG%DVLQ$UHDV %DVLQ2QVLWH6 5() %DVLQ2IIVLWH6 2))6,7(727+(:(676287+ 2))6,7(727+(($67:(67&XOYHUW 52$'2))6,7(727+(($67 ,QOHWVWKDWGUDLQWRWKHGU\EDVLQ,QWHULP&RQGLWLRQV6FHQDULR&DOFXODWHG9DOXHV1275XQRII&RHIILFLHQWVIRUDQLQGLYLGXDOVWUXFWXUHV,QWHULP&RQGLWLRQV6FHQDULR)XOO%XLOG2XW6FHQDULR03/18/2022
Page 141 of 209
06/14/2024
189
7LPHRI&RQFHQWUDWLRQV-RE-*96WRUP&$'3RVW'HYHORSHG6LWH'HVFULSWLRQQ / 3 V 7W Q/3V'HVFULSWLRQ V 9 / 7W /97FWRWDO7FWRWDOIW LQ IWIWKUV3DYHG8QSDYHG IWIW IWV IW KUV KUVPLQ'HQVH*UDVVHV 8QSDYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 3DYHPHQW 8QSDYHG 'HQVH*UDVVHV 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG $3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 8QSDYHG 3DYHPHQW 3DYHG 'HQVH*UDVVHV 3DYHG 'HQVH*UDVVHV 8QSDYHG 'HQVH*UDVVHV 8QSDYHG '5<%$6,1'HQVH*UDVVHV 8QSDYHG $'HQVH*UDVVHV 8QSDYHG $/HIW'HQVH*UDVVHV 8QSDYHG -DFNVRQ
V*UDQW9LOODJH%DVLQ6KHHW)ORZ0DQXDO/903/18/2022
Page 142 of 209
06/14/2024
190
'HVFULSWLRQQ / 3 V 7W Q/3V'HVFULSWLRQ V 9 / 7W /97FWRWDO7FWRWDO%DVLQ6KHHW)ORZ0DQXDO/9)XOO%XLOG2XWRI3RQG'HQVH*UDVVHV 8QSDYHG $&RPELQHG%DVLQ'HQVH*UDVVHV 3DYHG ,QWHULP3RQG6'HQVH*UDVVHV 8QSDYHG %DVLQ2QVLWH6'HQVH*UDVVHV 3DYHG %DVLQ2IIVLWH6'HQVH*UDVVHV 8QSDYHG ,17(5,0321'6'HQVH*UDVVHV 8QSDYHG ,17(5,0'HQVH*UDVVHV 8QSDYHG %DVLQ2QVLWH6'HQVH*UDVVHV 3DYHG %DVLQ2IIVLWH6'HQVH*UDVVHV 8QSDYHG 2))6,7(727+(($671257+&XOYHUW'HQVH*UDVVHV 8QSDYHG 2))6,7(727+(($676287+'HQVH*UDVVHV 8QSDYHG 5RDGWRWKH(DVW3DYHPHQW 8QSDYHG ,QWHULP&RQGLWLRQV6FHQDULR,QWHULP&RQGLWLRQV6FHQDULR)XOO%XLOG2XW6FHQDULR,QOHWVWKDWGUDLQWRWKHGU\EDVLQ03/18/2022
Page 143 of 209
06/14/2024
191
Project Description
Jacksons Grant Village 03-15-22.SPF
Project Options
CFS
Elevation
Rational
User-Defined
Steady Flow
YES
NO
Analysis Options
Apr 19, 2021 00:00:00
Apr 20, 2021 00:00:00
Apr 19, 2021 00:00:00
0days
0 01:00:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
30 seconds
Number of Elements
Qty
0
48
59
53
2
0
0
4
60
1
54
0
5
0
0
0
0
Rainfall Details
10 year(s)
Outlets ..........................................................................
Pollutants ..............................................................................
Land Uses ............................................................................
Return Period........................................................................
Links......................................................................................
Channels ......................................................................
Pipes ............................................................................
Pumps ..........................................................................
Orifices .........................................................................
Weirs ............................................................................
Nodes....................................................................................
Junctions ......................................................................
Outfalls .........................................................................
Flow Diversions ...........................................................
Inlets ............................................................................
Storage Nodes .............................................................
Runoff (Dry Weather) Time Step ..........................................
Runoff (Wet Weather) Time Step ........................................
Reporting Time Step ............................................................
Routing Time Step ................................................................
Rain Gages ...........................................................................
Subbasins..............................................................................
Enable Overflow Ponding at Nodes ......................................
Skip Steady State Analysis Time Periods ............................
Start Analysis On ..................................................................
End Analysis On ...................................................................
Start Reporting On ................................................................
Antecedent Dry Days ............................................................
File Name .............................................................................
Flow Units .............................................................................
Elevation Type ......................................................................
Hydrology Method .................................................................
Time of Concentration (TOC) Method ..................................
Link Routing Method .............................................................
03/18/2022
Page 144 of 209
06/14/2024
192
Subbasin Summary
SN Subbasin Area Weighted Total Total Total Peak Time of
ID Runoff Rainfall Runoff Runoff Runoff Concentration
Coefficient Volume
(ac)(in) (in) (ac-in) (cfs) (days hh:mm:ss)
1 Sub-403 0.18 0.2600 1.63 0.42 0.08 0.15 0 00:30:06
2 Sub-405 0.92 0.6100 1.14 0.69 0.64 2.55 0 00:15:00
3 Sub-406 0.15 0.3900 1.36 0.53 0.08 0.23 0 00:20:54
4 Sub-407 0.17 0.3700 1.31 0.48 0.08 0.26 0 00:19:12
5 Sub-408 0.37 0.2600 1.31 0.34 0.13 0.39 0 00:19:12
6 Sub-409 0.36 0.3500 1.50 0.52 0.19 0.45 0 00:25:06
7 Sub-411 0.41 0.4100 1.37 0.56 0.23 0.66 0 00:20:48
8 Sub-413 0.25 0.2400 1.05 0.25 0.06 0.28 0 00:13:18
9 Sub-414 0.41 0.4200 1.04 0.44 0.18 0.82 0 00:13:00
10 Sub-415 0.49 0.6400 1.21 0.78 0.38 1.36 0 00:16:53
11 Sub-417 0.59 0.4900 1.19 0.58 0.34 1.27 0 00:16:12
12 Sub-417A 0.09 0.1600 0.51 0.08 0.01 0.09 0 00:05:00
13 Sub-418 0.28 0.6300 1.16 0.73 0.20 0.79 0 00:15:30
14 Sub-421 0.19 0.4700 1.14 0.54 0.10 0.41 0 00:15:00
15 Sub-422 0.16 0.6400 0.51 0.33 0.05 0.63 0 00:05:00
16 Sub-423 0.49 0.6100 0.78 0.48 0.23 1.61 0 00:08:42
17 Sub-424 0.60 0.3300 1.34 0.44 0.26 0.80 0 00:19:48
18 Sub-428 0.05 0.1600 0.90 0.14 0.01 0.04 0 00:10:30
19 Sub-429 0.18 0.5600 1.20 0.67 0.12 0.44 0 00:16:18
20 Sub-430 0.51 0.5900 1.39 0.82 0.42 1.17 0 00:21:30
21 Sub-432 0.13 0.3500 1.37 0.48 0.06 0.18 0 00:20:48
22 Sub-434 0.25 0.4800 0.51 0.25 0.06 0.73 0 00:05:00
23 Sub-435 0.41 0.6200 1.36 0.85 0.35 1.00 0 00:20:54
24 Sub-436 0.30 0.6000 0.51 0.31 0.09 1.10 0 00:05:00
25 Sub-436A 1.77 0.7500 0.87 0.65 1.15 6.93 0 00:10:00
26 Sub-436A( Interim) 1.38 0.5300 1.37 0.73 1.00 2.87 0 00:21:00
27 Sub-438 0.46 0.5800 1.26 0.73 0.34 1.12 0 00:18:00
28 Sub-439 0.42 0.6600 0.51 0.34 0.14 1.70 0 00:05:00
29 Sub-440 0.24 0.5500 0.51 0.28 0.07 0.81 0 00:05:00
30 Sub-441 0.41 0.8100 0.51 0.41 0.17 2.03 0 00:05:00
31 Sub-442 0.45 0.6300 1.19 0.75 0.34 1.25 0 00:16:12
32 Sub-443 0.28 0.6100 0.51 0.31 0.09 1.05 0 00:05:00
33 Sub-444 1.12 0.5100 0.51 0.26 0.29 3.50 0 00:05:00
34 Sub-445 0.61 0.6700 0.51 0.34 0.21 2.50 0 00:05:00
35 Sub-446 0.60 0.5900 1.43 0.84 0.50 1.33 0 00:22:54
36 Sub-447 0.38 0.5400 1.29 0.70 0.26 0.85 0 00:18:36
37 Sub-447A 0.21 0.5200 0.51 0.27 0.06 0.67 0 00:05:00
38 Sub-448 0.71 0.6600 1.64 1.08 0.77 1.50 0 00:30:54
39 Sub-450 0.31 0.6200 0.79 0.49 0.15 1.03 0 00:08:54
40 Sub-451 0.25 0.6900 0.51 0.35 0.09 1.06 0 00:05:00
41 Sub-451a 0.40 0.7300 0.51 0.37 0.15 1.79 0 00:05:00
42 Sub-452 0.11 0.2200 0.92 0.20 0.02 0.12 0 00:10:54
43 Sub-454 0.30 0.4300 1.21 0.52 0.16 0.56 0 00:16:36
44 Sub-456 0.16 0.4900 1.32 0.65 0.10 0.32 0 00:19:18
45 Sub-457 0.37 0.2300 1.24 0.28 0.11 0.36 0 00:17:18
46 Sub-458 0.21 0.3600 0.94 0.34 0.07 0.38 0 00:11:06
47 Sub-458EW 0.52 0.4400 1.37 0.60 0.31 0.90 0 00:21:00
48 Sub-458offWS 3.13 0.2700 1.17 0.32 0.99 3.75 0 00:15:54
03/18/2022
Page 145 of 209
06/14/2024
193
Node Summary
SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time
ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded
Elevation Elevation Attained Depth Attained Flooding Volume
Attained Occurrence
(ft) (ft) (ft) (ft) (ft²) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min)
1 401 Junction 847.00 848.17 847.00 848.17 0.00 0.93 847.37 0.00 3.61 0 00:00 0.00 0.00
2 403 Junction 847.15 853.80 847.15 853.80 0.00 3.57 848.01 0.00 5.79 0 00:00 0.00 0.00
3 404 Junction 850.44 854.37 850.44 854.37 0.00 2.55 851.32 0.00 3.05 0 00:00 0.00 0.00
4 405 Junction 850.58 854.20 850.58 854.20 0.00 2.55 851.37 0.00 2.83 0 00:00 0.00 0.00
5 406 Junction 848.84 853.80 848.84 853.80 0.00 1.20 849.44 0.00 4.36 0 00:00 0.00 0.00
6 407 Junction 849.38 853.80 849.38 853.80 0.00 0.99 849.90 0.00 3.90 0 00:00 0.00 0.00
7 408 Junction 849.89 853.80 849.89 853.80 0.00 0.74 850.32 0.00 3.48 0 00:00 0.00 0.00
8 409 Junction 850.40 853.60 850.40 853.60 0.00 0.45 850.73 0.00 2.87 0 00:00 0.00 0.00
9 411 Junction 847.19 853.80 847.19 853.80 0.00 4.24 848.18 0.00 5.61 0 00:00 0.00 0.00
10 412 Junction 847.53 854.61 847.53 854.61 0.00 3.83 848.52 0.00 6.08 0 00:00 0.00 0.00
11 413 Junction 847.68 854.39 847.68 854.39 0.00 3.83 848.75 0.00 5.64 0 00:00 0.00 0.00
12 414 Junction 847.85 854.39 847.85 854.39 0.00 3.61 849.57 0.00 4.82 0 00:00 0.00 0.00
13 415 Junction 848.88 854.38 848.88 854.38 0.00 3.06 849.96 0.00 4.42 0 00:00 0.00 0.00
14 417 Junction 849.77 853.67 849.77 853.67 0.00 1.27 850.29 0.00 3.38 0 00:00 0.00 0.00
15 417A Junction 851.49 855.68 851.49 855.68 0.00 0.09 851.58 0.00 4.10 0 00:00 0.00 0.00
16 418 Junction 849.58 853.67 849.58 853.67 0.00 2.03 850.20 0.00 3.47 0 00:00 0.00 0.00
17 421 Junction 849.36 854.06 849.36 854.38 0.00 2.36 850.24 0.00 3.82 0 00:00 0.00 0.00
18 422 Junction 849.54 854.79 849.54 854.79 0.00 2.13 850.57 0.00 4.22 0 00:00 0.00 0.00
19 423 Junction 849.89 854.76 849.89 854.76 0.00 1.96 850.67 0.00 4.09 0 00:00 0.00 0.00
20 424 Junction 850.41 853.51 850.41 853.51 0.00 0.80 850.86 0.00 2.66 0 00:00 0.00 0.00
21 428 Junction 849.03 853.80 849.03 853.80 0.00 1.47 849.64 0.00 4.16 0 00:00 0.00 0.00
22 428A Junction 849.87 854.48 849.87 854.48 0.00 1.47 850.48 0.00 4.00 0 00:00 0.00 0.00
23 429 Junction 850.07 854.22 850.07 854.22 0.00 1.47 850.73 0.00 3.50 0 00:00 0.00 0.00
24 430 Junction 850.26 854.22 850.26 854.22 0.00 1.16 850.82 0.00 3.41 0 00:00 0.00 0.00
25 432 Junction 847.15 853.60 847.15 853.60 0.00 22.77 849.29 0.00 4.31 0 00:00 0.00 0.00
26 433 Junction 847.90 854.64 847.90 854.64 0.00 7.41 849.35 0.00 5.29 0 00:00 0.00 0.00
27 434 Junction 848.20 854.37 848.20 854.37 0.00 7.41 849.57 0.00 4.80 0 00:00 0.00 0.00
28 435 Junction 848.38 854.08 848.38 854.08 0.00 7.41 849.68 0.00 4.40 0 00:00 0.00 0.00
29 436 Junction 848.87 854.08 848.87 854.08 0.00 6.93 850.07 0.00 4.01 0 00:00 0.00 0.00
30 437 Junction 847.45 854.18 847.45 854.18 0.00 17.19 849.53 0.00 4.66 0 00:00 0.00 0.00
31 438 Junction 847.60 854.04 847.60 854.04 0.00 17.19 849.59 0.00 4.45 0 00:00 0.00 0.00
32 439 Junction 847.75 854.04 847.75 854.04 0.00 16.88 849.88 0.00 4.16 0 00:00 0.00 0.00
33 440 Junction 848.03 853.77 848.03 853.77 0.00 15.18 850.05 0.00 3.72 0 00:00 0.00 0.00
34 441 Junction 848.35 853.98 848.35 853.98 0.00 11.47 851.08 0.00 2.90 0 00:00 0.00 0.00
35 442 Junction 848.88 854.10 848.88 854.10 0.00 8.86 850.29 0.00 3.81 0 00:00 0.00 0.00
36 443 Junction 849.07 854.10 849.07 854.10 0.00 8.47 850.49 0.00 3.61 0 00:00 0.00 0.00
37 444 Junction 849.48 854.19 849.48 854.19 0.00 7.43 850.80 0.00 3.38 0 00:00 0.00 0.00
38 445 Junction 849.87 854.19 849.87 854.19 0.00 3.93 850.88 0.00 3.30 0 00:00 0.00 0.00
39 446 Junction 850.49 854.19 850.49 854.19 0.00 1.33 851.03 0.00 3.15 0 00:00 0.00 0.00
40 447 Junction 850.46 854.22 850.46 854.22 0.00 0.90 850.97 0.00 3.26 0 00:00 0.00 0.00
41 447A Junction 851.05 854.75 851.05 854.75 0.00 0.67 851.45 0.00 3.30 0 00:00 0.00 0.00
42 448 Junction 850.49 854.19 850.49 854.19 0.00 1.49 850.99 0.00 3.19 0 00:00 0.00 0.00
43 450 Junction 851.07 854.77 851.07 854.77 0.00 1.03 851.59 0.00 3.18 0 00:00 0.00 0.00
44 451 Junction 849.82 853.62 849.82 853.62 0.00 2.90 850.63 0.00 2.99 0 00:00 0.00 0.00
45 451A Junction 850.35 854.20 850.35 854.20 0.00 1.84 850.92 0.00 3.28 0 00:00 0.00 0.00
46 452 Junction 851.07 854.61 851.07 854.77 0.00 0.12 851.21 0.00 3.40 0 00:00 0.00 0.00
47 453 Junction 847.93 851.92 847.93 851.92 0.00 2.27 848.72 0.00 3.21 0 00:00 0.00 0.00
48 454 Junction 847.98 851.37 847.98 851.37 0.00 1.35 848.55 0.00 2.83 0 00:00 0.00 0.00
49 455B Junction 848.42 851.89 848.42 851.89 0.00 4.90 849.62 0.00 2.27 0 00:00 0.00 0.00
50 456 Junction 848.68 852.14 848.68 852.14 0.00 3.45 849.79 0.00 2.36 0 00:00 0.00 0.00
51 457 Junction 848.90 852.16 848.90 852.16 0.00 3.15 850.10 0.00 2.05 0 00:00 0.00 0.00
52 457A Junction 850.48 850.48 850.48 850.48 0.00 2.87 850.92 0.00 0.56 0 00:00 0.00 0.00
53 Jun-04 Junction 851.03 852.50 851.03 852.50 0.00 0.17 851.34 0.00 1.16 0 00:00 0.00 0.00
54 Out-1400-401 Outfall 846.60 0.93 846.97
55 Out-1EX-453 Outfall 847.86 2.27 848.62
56 458 Storage Node 848.95 851.00 848.95 0.00 1.01 849.24 0.00 0.00
57 DryBasin Storage Node 848.04 851.00 848.04 0.00 4.90 849.38 0.00 0.00
58 Jun-03 Storage Node 851.32 854.00 851.32 0.00 3.75 851.78 0.00 0.00
59 Lake1 Storage Node 847.00 853.00 847.00 0.00 27.27 848.18 0.00 0.00
03/18/2022
Page 146 of 209
06/14/2024
194
Link SummarySN Element Element From To (Outlet)Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time ReportedID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged ConditionNode Elevation Elevation Ratio Total DepthRatio(ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min)1 400-401 Pipe 401 Out-1400-401 111.10 847.00 846.60 0.3600 18.000 0.0120 0.93 6.83 0.14 2.71 0.37 0.25 0.00 Calculated2 402-403 Pipe 403 Lake1 51.54 847.15 847.00 0.2900 18.000 0.0130 3.57 5.75 0.62 3.43 0.86 0.57 0.00 Calculated3 403-404 Pipe 404 403115.43 850.44 847.40 2.6300 15.000 0.0130 2.55 10.48 0.24 7.04 0.42 0.34 0.00 Calculated4 403-406 Pipe 406 40368.44 848.84 847.65 1.7400 12.000 0.0130 1.20 4.70 0.26 5.01 0.35 0.35 0.00 Calculated5 404-405 Pipe 405 40415.00 850.58 850.54 0.3000 15.000 0.0130 2.55 3.54 0.72 3.14 0.79 0.63 0.00 Calculated6 406-407 Pipe 407 406146.97 849.38 848.94 0.3000 12.000 0.0130 0.99 1.95 0.51 2.50 0.51 0.51 0.00 Calculated7 407-408 Pipe 408 407137.70 849.89 849.48 0.3000 12.000 0.0130 0.74 1.95 0.38 2.31 0.43 0.43 0.00 Calculated8 408-409 Pipe 409 408137.18 850.40 849.99 0.3000 12.000 0.0130 0.45 1.95 0.23 2.02 0.33 0.33 0.00 Calculated9 410-411 Pipe 411 Lake1 61.96 847.19 847.00 0.3000 18.000 0.0130 4.24 5.75 0.74 3.56 0.96 0.64 0.00 Calculated10 411-412 Pipe 412 41180.83 847.53 847.29 0.3000 18.000 0.0130 3.83 5.75 0.67 3.48 0.89 0.60 0.00 Calculated11 412-413 Pipe 413 41215.00 847.68 847.63 0.3000 18.000 0.0130 3.83 5.75 0.67 3.48 0.89 0.60 0.00 Calculated12 413-414 Pipe 414 41333.01 847.85 847.78 0.2100 18.000 0.0130 3.61 4.84 0.75 3.00 0.97 0.64 0.00 Calculated13 414-415 Pipe 415 414119.95 848.88 848.66 0.1800 18.000 0.0130 3.06 4.50 0.68 2.74 0.91 0.61 0.00 Calculated14 415-421 Pipe 421 415104.69 849.36 849.13 0.2200 15.000 0.0130 2.36 3.03 0.78 2.73 0.83 0.66 0.00 Calculated15 417-417A Pipe 417A 417117.69 851.49 849.87 1.3800 15.000 0.0130 0.09 7.58 0.01 2.07 0.09 0.08 0.00 Calculated16 417-418 Pipe 417 41830.41 849.77 849.68 0.3000 15.000 0.0130 1.27 3.51 0.36 2.63 0.52 0.42 0.00 Calculated17 418-455B Pipe 418 455B 136.11 849.58 848.52 0.7800 15.000 0.0130 2.03 5.70 0.36 4.25 0.52 0.41 0.00 Calculated18 421-422 Pipe 422 42137.02 849.54 849.46 0.2200 15.000 0.0130 2.13 3.00 0.71 2.65 0.78 0.62 0.00 Calculated19 422-423 Pipe 423 42230.00 849.89 849.79 0.3300 12.000 0.0130 1.96 2.06 0.95 2.98 0.78 0.78 0.00 Calculated20 423-424 Pipe 424 423140.05 850.41 849.99 0.3000 12.000 0.0130 0.80 1.95 0.41 2.36 0.45 0.45 0.00 Calculated21 427-428 Pipe 428 Lake1 67.82 849.03 847.00 3.0000 12.000 0.0130 1.47 6.17 0.24 6.43 0.33 0.33 0.00 Calculated22 428-428A Pipe 428A 428115.00 849.87 849.13 0.6400 12.000 0.0130 1.47 2.85 0.51 3.65 0.51 0.51 0.00 Calculated23 428-429 Pipe 429 428A15.00 850.07 849.97 0.6400 12.000 0.0130 1.47 2.85 0.51 3.65 0.51 0.51 0.00 Calculated24 429-430 Pipe 430 42930.00 850.26 850.17 0.3000 12.000 0.0130 1.16 1.95 0.60 2.59 0.56 0.56 0.00 Calculated25 431-432 Pipe 432 Lake1 49.00 847.16 847.00 0.3300 30.000 0.0130 22.77 23.44 0.97 5.44 1.99 0.80 0.00 Calculated26 432-433 Pipe 433 432136.91 847.90 847.65 0.1800 24.000 0.0130 7.41 9.72 0.76 3.41 1.31 0.65 0.00 Calculated27 432-437 Pipe 437 432106.00 847.45 847.26 0.1800 30.000 0.0130 17.19 17.37 0.99 4.03 2.03 0.81 0.00 Calculated28 433-434 Pipe 434 43315.00 848.20 848.15 0.3300 21.000 0.0130 7.41 9.15 0.81 4.23 1.20 0.68 0.00 Calculated29 434-435 Pipe 435 43428.00 848.38 848.30 0.2900 21.000 0.0130 7.41 8.47 0.87 3.97 1.27 0.72 0.00 Calculated30 435-436 Pipe 436 435135.74 848.87 848.48 0.2900 21.000 0.0130 6.93 8.49 0.82 3.94 1.20 0.69 0.00 Calculated31 437-438 Pipe 438 43726.52 847.60 847.55 0.1900 30.000 0.0130 17.19 17.81 0.97 4.13 1.98 0.79 0.00 Calculated32 438-439 Pipe 439 43830.00 847.76 847.70 0.2000 30.000 0.0130 16.88 18.34 0.92 4.24 1.89 0.76 0.00 Calculated33 439-440 Pipe 440 439120.65 848.03 847.86 0.1400 30.000 0.0130 15.18 15.40 0.99 3.57 2.02 0.81 0.00 Calculated34 440-441 Pipe 441 44034.00 848.35 848.24 0.3200 24.000 0.0130 11.47 12.87 0.89 4.63 1.47 0.74 0.00 Calculated35 440-451 Pipe 451 440122.00 849.82 849.00 0.6700 12.000 0.0130 2.90 2.92 0.99 4.24 0.81 0.81 0.00 Calculated36 441-442 Pipe 442 441121.00 848.88 848.45 0.3600 21.000 0.0130 8.86 9.450.94 4.46 1.35 0.77 0.00 Calculated37 441-450 Pipe 450 441168.91 851.07 850.56 0.3000 12.000 0.0130 1.03 1.96 0.53 2.52 0.52 0.52 0.00 Calculated38 442-443 Pipe 443 44226.14 849.07 848.98 0.3400 21.000 0.0130 8.47 9.30 0.91 4.38 1.31 0.75 0.00 Calculated39 443-444 Pipe 444 443119.06 849.48 849.17 0.2600 21.000 0.0130 7.43 8.08 0.92 3.81 1.32 0.76 0.00 Calculated40 444-445 Pipe 445 444134.04 849.87 849.58 0.2200 18.000 0.0130 3.93 4.930.80 3.10 1.01 0.68 0.00 Calculated41 445-446 Pipe 446 445124.32 850.49 849.97 0.4200 12.000 0.0130 1.33 2.300.58 3.03 0.54 0.54 0.00 Calculated42 445-447 Pipe 447 445165.00 850.46 849.97 0.3000 12.000 0.0130 0.90 1.95 0.46 2.43 0.48 0.48 0.00 Calculated43 445-448 Pipe 448 44575.00 850.49 849.97 0.6900 12.000 0.0130 1.49 2.97 0.50 3.78 0.50 0.50 0.00 Calculated44 447-447A Pipe 447A 447162.00 851.05 850.56 0.3000 12.000 0.0130 0.67 1.95 0.34 2.25 0.40 0.40 0.00 Calculated45 451-452 Pipe 452 451A 108.00 851.07 850.45 0.5700 12.000 0.0130 0.12 2.70 0.05 1.75 0.14 0.14 0.00 Calculated46 453-454 Pipe 454 45329.35 847.98 847.93 0.1800 18.000 0.0130 1.35 4.46 0.30 2.21 0.57 0.38 0.00 Calculated47453-458 Pipe 458 45323.00 848.95 848.43 2.2600 12.000 0.0130 0.96 5.36 0.18 5.15 0.29 0.29 0.00 Calculated48 455A-455B Pipe 455B DryBasin 69.73 848.42 848.26 0.2300 18.000 0.0130 4.90 5.03 0.97 3.24 1.20 0.80 0.00 Calculated49 455B-456 Pipe 456 455B84.13 848.68 848.52 0.1900 18.000 0.0130 3.45 4.58 0.75 2.85 0.97 0.65 0.00 Calculated50 456-457 Pipe 457 45668.80 848.95 848.78 0.2500 15.000 0.0130 3.15 3.21 0.98 2.98 1.01 0.80 0.00 Calculated51 457-457A Pipe 457A 45721.00 850.48 849.66 3.9000 12.000 0.0130 2.87 7.04 0.41 8.50 0.44 0.44 0.00 Calculated52 6inch Pipe Jun-03 Jun-04 18.00 851.64 851.03 3.3900 6.000 0.0130 0.17 1.03 0.17 3.89 0.14 0.28 0.00 Calculated53 EX-453 Pipe 453 Out-1EX-453 37.64 847.93 847.86 0.1800 18.000 0.0130 2.27 4.46 0.51 2.53 0.76 0.51 0.00 Calculated54 Link-07 Pipe 451A 45162.30 850.35 849.92 0.6900 12.000 0.0130 1.84 2.96 0.62 3.97 0.57 0.57 0.00 Calculated55 swale Channel Jun-04 458196.00 851.03 848.95 1.0600 12.000 0.0320 0.174.00 0.04 1.21 0.31 0.31 0.0056 Lake1OCS2 Orifice Lake1 401847.00 847.006.0000.0057 Lake1OCSTC Orifice Lake1 401847.00 847.0036.0000.0058 Lake1OCSWQ Orifice Lake1 401847.00 847.006.0000.9303/18/2022
Page 147 of 209
06/14/2024
195
Link SummarySN Element Element From To (Outlet)Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time ReportedID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged ConditionNode Elevation Elevation Ratio Total DepthRatio(ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min)59 Orifice-04 Orifice DryBasin 454848.04 847.986.0001.0160 Orifice-05 Orifice DryBasin 454848.04 847.9836.0000.0003/18/2022
Page 148 of 209
06/14/2024
196
Junction Input
SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum
ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe
Elevation Offset Elevation Depth Cover
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft²) (in)
1 401 847.00 848.17 1.17 847.00 0.00 848.17 0.00 0.00 0.00
2 403 847.15 853.80 6.64 847.15 0.00 853.80 0.00 0.00 0.00
3 404 850.44 854.37 3.93 850.44 0.00 854.37 0.00 0.00 0.00
4 405 850.58 854.20 3.62 850.58 0.00 854.20 0.00 0.00 0.00
5 406 848.84 853.80 4.96 848.84 0.00 853.80 0.00 0.00 0.00
6 407 849.38 853.80 4.42 849.38 0.00 853.80 0.00 0.00 0.00
7 408 849.89 853.80 3.91 849.89 0.00 853.80 0.00 0.00 0.00
8 409 850.40 853.60 3.20 850.40 0.00 853.60 0.00 0.00 0.00
9 411 847.19 853.80 6.61 847.19 0.00 853.80 0.00 0.00 0.00
10 412 847.53 854.61 7.07 847.53 0.00 854.61 0.00 0.00 0.00
11 413 847.68 854.39 6.71 847.68 0.00 854.39 0.00 0.00 0.00
12 414 847.85 854.39 6.54 847.85 0.00 854.39 0.00 0.00 0.00
13 415 848.88 854.38 5.50 848.88 0.00 854.38 0.00 0.00 0.00
14 417 849.77 853.67 3.90 849.77 0.00 853.67 0.00 0.00 0.00
15 417A 851.49 855.68 4.19 851.49 0.00 855.68 0.00 0.00 0.00
16 418 849.58 853.67 4.09 849.58 0.00 853.67 0.00 0.00 0.00
17 421 849.36 854.06 4.70 849.36 0.00 854.38 0.32 0.00 0.00
18 422 849.54 854.79 5.25 849.54 0.00 854.79 0.00 0.00 0.00
19 423 849.89 854.76 4.87 849.89 0.00 854.76 0.00 0.00 0.00
20 424 850.41 853.51 3.10 850.41 0.00 853.51 0.00 0.00 0.00
21 428 849.03 853.80 4.77 849.03 0.00 853.80 0.00 0.00 0.00
22 428A 849.87 854.48 4.61 849.87 0.00 854.48 0.00 0.00 0.00
23 429 850.07 854.22 4.15 850.07 0.00 854.22 0.00 0.00 0.00
24 430 850.26 854.22 3.96 850.26 0.00 854.22 0.00 0.00 0.00
25 432 847.15 853.60 6.45 847.15 0.00 853.60 0.00 0.00 0.00
26 433 847.90 854.64 6.74 847.90 0.00 854.64 0.00 0.00 0.00
27 434 848.20 854.37 6.17 848.20 0.00 854.37 0.00 0.00 0.00
28 435 848.38 854.08 5.70 848.38 0.00 854.08 0.00 0.00 0.00
29 436 848.87 854.08 5.21 848.87 0.00 854.08 0.00 0.00 0.00
30 437 847.45 854.18 6.73 847.45 0.00 854.18 0.00 0.00 0.00
31 438 847.60 854.04 6.44 847.60 0.00 854.04 0.00 0.00 0.00
32 439 847.75 854.04 6.29 847.75 0.00 854.04 0.00 0.00 0.00
33 440 848.03 853.77 5.74 848.03 0.00 853.77 0.00 0.00 0.00
34 441 848.35 853.98 5.63 848.35 0.00 853.98 0.00 0.00 0.00
35 442 848.88 854.10 5.22 848.88 0.00 854.10 0.00 0.00 0.00
36 443 849.07 854.10 5.03 849.07 0.00 854.10 0.00 0.00 0.00
37 444 849.48 854.19 4.71 849.48 0.00 854.19 0.00 0.00 0.00
38 445 849.87 854.19 4.32 849.87 0.00 854.19 0.00 0.00 0.00
39 446 850.49 854.19 3.70 850.49 0.00 854.19 0.00 0.00 0.00
40 447 850.46 854.22 3.76 850.46 0.00 854.22 0.00 0.00 0.00
41 447A 851.05 854.75 3.70 851.05 0.00 854.75 0.00 0.00 0.00
42 448 850.49 854.19 3.70 850.49 0.00 854.19 0.00 0.00 0.00
43 450 851.07 854.77 3.70 851.07 0.00 854.77 0.00 0.00 0.00
44 451 849.82 853.62 3.80 849.82 0.00 853.62 0.00 0.00 0.00
45 451A 850.35 854.20 3.85 850.35 0.00 854.20 0.00 0.00 0.00
46 452 851.07 854.61 3.54 851.07 0.00 854.77 0.16 0.00 0.00
47 453 847.93 851.92 4.00 847.93 0.00 851.92 0.00 0.00 0.00
48 454 847.98 851.37 3.39 847.98 0.00 851.37 0.00 0.00 0.00
49 455B 848.42 851.89 3.47 848.42 0.00 851.89 0.00 0.00 0.00
50 456 848.68 852.14 3.46 848.68 0.00 852.14 0.00 0.00 0.00
51 457 848.90 852.16 3.26 848.90 0.00 852.16 0.00 0.00 0.00
52 457A 850.48 850.48 0.00 850.48 0.00 850.48 0.00 0.00 0.00
53 Jun-04 851.03 852.50 1.47 851.03 0.00 852.50 0.00 0.00 0.00
03/18/2022
Page 149 of 209
06/14/2024
197
Junction Results
SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time
ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded
Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume
Attained Occurrence
(cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (days hh:mm) (days hh:mm) (ac-in) (min)
1 401 0.93 0.00 847.37 0.37 0.00 3.61 847.20 0.20 0 00:45 0 00:00 0.00 0.00
2 403 3.57 0.15 848.01 0.86 0.00 5.79 847.66 0.51 0 00:15 0 00:00 0.00 0.00
3 404 2.55 0.00 851.32 0.88 0.00 3.05 850.55 0.11 0 00:15 0 00:00 0.00 0.00
4 405 2.55 2.55 851.37 0.79 0.00 2.83 850.59 0.01 0 00:15 0 00:00 0.00 0.00
5 406 1.20 0.23 849.44 0.60 0.00 4.36 848.95 0.11 0 00:19 0 00:00 0.00 0.00
6 407 0.99 0.26 849.90 0.52 0.00 3.90 849.49 0.11 0 00:19 0 00:00 0.00 0.00
7 408 0.74 0.39 850.32 0.43 0.00 3.48 850.00 0.11 0 00:19 0 00:00 0.00 0.00
8 409 0.45 0.45 850.73 0.33 0.00 2.87 850.41 0.01 0 00:25 0 00:00 0.00 0.00
9 411 4.24 0.66 848.18 0.99 0.00 5.61 847.31 0.12 0 00:13 0 00:00 0.00 0.00
10 412 3.83 0.00 848.52 0.99 0.00 6.08 847.65 0.12 0 00:13 0 00:00 0.00 0.00
11 413 3.83 0.28 848.75 1.08 0.00 5.64 847.80 0.13 0 00:08 0 00:00 0.00 0.00
12 414 3.61 0.82 849.57 1.72 0.00 4.82 848.68 0.83 0 00:08 0 00:00 0.00 0.00
13 415 3.06 1.36 849.96 1.08 0.00 4.42 849.14 0.26 0 00:08 0 00:00 0.00 0.00
14 417 1.27 1.27 850.29 0.52 0.00 3.38 849.88 0.11 0 00:16 0 00:00 0.00 0.00
15 417A 0.09 0.09 851.58 0.09 0.00 4.10 851.49 0.00 0 00:05 0 00:00 0.00 0.00
16 418 2.03 0.79 850.20 0.62 0.00 3.47 849.69 0.11 0 00:16 0 00:00 0.00 0.00
17 421 2.36 0.41 850.24 0.88 0.00 3.82 849.47 0.11 0 00:08 0 00:00 0.00 0.00
18 422 2.13 0.63 850.57 1.03 0.00 4.22 849.80 0.26 0 00:08 0 00:00 0.00 0.00
19 423 1.96 1.61 850.67 0.78 0.00 4.09 850.00 0.11 0 00:08 0 00:00 0.00 0.00
20 424 0.80 0.80 850.86 0.45 0.00 2.66 850.42 0.01 0 00:20 0 00:00 0.00 0.00
21 428 1.47 0.04 849.64 0.61 0.00 4.16 849.14 0.11 0 00:21 0 00:00 0.00 0.00
22 428A 1.47 0.00 850.48 0.61 0.00 4.00 849.98 0.11 0 00:21 0 00:00 0.00 0.00
23 429 1.47 0.44 850.73 0.66 0.00 3.50 850.18 0.11 0 00:21 0 00:00 0.00 0.00
24 430 1.16 1.16 850.82 0.56 0.00 3.41 850.27 0.01 0 00:21 0 00:00 0.00 0.00
25 432 22.77 0.18 849.29 2.14 0.00 4.31 847.67 0.52 0 00:05 0 00:00 0.00 0.00
26 433 7.41 0.00 849.35 1.45 0.00 5.29 848.17 0.27 0 00:10 0 00:00 0.00 0.00
27 434 7.41 0.73 849.57 1.37 0.00 4.80 848.32 0.12 0 00:10 0 00:00 0.00 0.00
28 435 7.41 1.00 849.68 1.30 0.00 4.40 848.49 0.11 0 00:10 0 00:00 0.00 0.00
29 436 6.93 6.93 850.07 1.20 0.00 4.01 848.88 0.01 0 00:10 0 00:00 0.00 0.00
30 437 17.19 0.00 849.53 2.08 0.00 4.66 847.58 0.13 0 00:05 0 00:00 0.00 0.00
31 438 17.19 1.12 849.59 1.99 0.00 4.45 847.73 0.13 0 00:05 0 00:00 0.00 0.00
32 439 16.88 1.70 849.88 2.13 0.00 4.16 847.89 0.14 0 00:05 0 00:00 0.00 0.00
33 440 15.18 0.81 850.05 2.02 0.00 3.72 849.00 0.97 0 00:05 0 00:00 0.00 0.00
34 441 11.47 2.03 851.08 2.73 0.00 2.90 850.56 2.21 0 00:09 0 00:00 0.00 0.00
35 442 8.86 1.25 850.29 1.41 0.00 3.81 849.00 0.12 0 00:05 0 00:00 0.00 0.00
36 443 8.47 1.05 850.49 1.42 0.00 3.61 849.19 0.12 0 00:05 0 00:00 0.00 0.00
37 444 7.43 3.50 850.80 1.32 0.00 3.38 849.60 0.12 0 00:05 0 00:00 0.00 0.00
38 445 3.93 2.50 850.88 1.01 0.00 3.30 849.99 0.12 0 00:05 0 00:00 0.00 0.00
39 446 1.33 1.33 851.03 0.54 0.00 3.15 850.50 0.01 0 00:23 0 00:00 0.00 0.00
40 447 0.90 0.85 850.97 0.51 0.00 3.26 850.57 0.11 0 00:05 0 00:00 0.00 0.00
41 447A 0.67 0.67 851.45 0.40 0.00 3.30 851.05 0.00 0 00:05 0 00:00 0.00 0.00
42 448 1.49 1.49 850.99 0.50 0.00 3.19 850.50 0.01 0 00:31 0 00:00 0.00 0.00
43 450 1.03 1.03 851.59 0.52 0.00 3.18 851.07 0.00 0 00:09 0 00:00 0.00 0.00
44 451 2.90 1.06 850.63 0.81 0.00 2.99 849.92 0.10 0 00:05 0 00:00 0.00 0.00
45 451A 1.84 1.79 850.92 0.57 0.00 3.28 850.45 0.10 0 00:05 0 00:00 0.00 0.00
46 452 0.12 0.12 851.21 0.14 0.00 3.40 851.07 0.00 0 00:11 0 00:00 0.00 0.00
47 453 2.27 0.00 848.72 0.79 0.00 3.21 848.47 0.54 0 00:21 0 00:00 0.00 0.00
48 454 1.35 0.56 848.55 0.57 0.00 2.83 848.03 0.05 0 00:16 0 00:00 0.00 0.00
49 455B 4.90 0.00 849.62 1.20 0.00 2.27 848.54 0.12 0 00:19 0 00:00 0.00 0.00
50 456 3.45 0.32 849.79 1.11 0.00 2.36 848.80 0.12 0 00:21 0 00:00 0.00 0.00
51 457 3.15 0.36 850.10 1.20 0.00 2.05 849.67 0.77 0 00:21 0 00:00 0.00 0.00
52 457A 2.87 2.87 850.92 0.44 0.00 0.56 850.49 0.01 0 00:21 0 00:00 0.00 0.00
53 Jun-04 0.17 0.00 851.34 0.31 0.00 1.16 851.14 0.11 0 00:31 0 00:00 0.000.00
03/18/2022
Page 150 of 209
06/14/2024
198
Channel Input
SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap
ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate
Elevation Offset Elevation Offset
(ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs)
1 swale 196.00 851.03 0.00 848.95 0.00 2.08 1.0600 Triangular 1.000 3.000 0.0320 0.5000 0.5000 0.0000 0.00 No
03/18/2022
Page 151 of 209
06/14/2024
199
Channel Results
SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported
ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition
Occurrence Ratio Total Depth
Ratio
(cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min)
1 swale 0.17 0 00:31 4.00 0.04 1.21 2.70 0.31 0.31 0.00
03/18/2022
Page 152 of 209
06/14/2024
200
Pipe Input
SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. of
ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels
Elevation Offset Elevation Offset Height
(ft) (ft) (ft) (ft) (ft) (ft) (%)(in) (in)(cfs)
1 400-401 111.10 847.00 0.00 846.60 0.00 0.40 0.3600 CIRCULAR 18.000 18.000 0.0120 0.5000 0.5000 0.0000 0.00 No 1
2 402-403 51.54 847.15 0.00 847.00 0.00 0.15 0.2900 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
3 403-404 115.43 850.44 0.00 847.40 0.25 3.04 2.6300 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
4 403-406 68.44 848.84 0.00 847.65 0.50 1.19 1.7400 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
5 404-405 15.00 850.58 0.00 850.54 0.09 0.05 0.3000 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
6 406-407 146.97 849.38 0.00 848.94 0.10 0.44 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
7 407-408 137.70 849.89 0.00 849.48 0.10 0.41 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
8 408-409 137.18 850.40 0.00 849.99 0.10 0.41 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
9 410-411 61.96 847.19 0.00 847.00 0.00 0.19 0.3000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
10 411-412 80.83 847.53 0.00 847.29 0.10 0.24 0.3000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
11 412-413 15.00 847.68 0.00 847.63 0.10 0.04 0.3000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
12 413-414 33.01 847.85 0.00 847.78 0.11 0.07 0.2100 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
13 414-415 119.95 848.88 0.00 848.66 0.81 0.22 0.1800 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
14 415-421 104.69 849.36 0.00 849.13 0.25 0.23 0.2200 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
15 417-417A 117.69 851.49 0.00 849.87 0.10 1.62 1.3800 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
16 417-418 30.41 849.77 0.00 849.68 0.10 0.09 0.3000 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
17 418-455B 136.11 849.58 0.00 848.52 0.10 1.06 0.7800 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
18 421-422 37.02 849.54 0.00 849.46 0.10 0.08 0.2200 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
19 422-423 30.00 849.89 0.00 849.79 0.25 0.10 0.3300 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
20 423-424 140.05 850.41 0.00 849.99 0.10 0.42 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
21 427-428 67.82 849.03 0.00 847.00 0.00 2.03 3.0000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
22 428-428A 115.00 849.87 0.00 849.13 0.10 0.74 0.6400 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
23 428-429 15.00 850.07 0.00 849.97 0.10 0.10 0.6400 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
24 429-430 30.00 850.26 0.00 850.17 0.10 0.09 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
25 431-432 49.00 847.16 0.01 847.00 0.00 0.16 0.3300 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
26 432-433 136.91 847.90 0.00 847.65 0.50 0.25 0.1800 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
27 432-437 106.00 847.45 0.00 847.26 0.11 0.19 0.1800 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
28 433-434 15.00 848.20 0.00 848.15 0.25 0.05 0.3300 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
29 434-435 28.00 848.38 0.00 848.30 0.10 0.08 0.2900 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
30 435-436 135.74 848.87 0.00 848.48 0.10 0.39 0.2900 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
31 437-438 26.52 847.60 0.00 847.55 0.10 0.05 0.1900 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
32 438-439 30.00 847.76 0.01 847.70 0.10 0.06 0.2000 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
33 439-440 120.65 848.03 0.00 847.86 0.11 0.17 0.1400 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
34 440-441 34.00 848.35 0.00 848.24 0.21 0.11 0.3200 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
35 440-451 122.00 849.82 0.00 849.00 0.97 0.82 0.6700 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
36 441-442 121.00 848.88 0.00 848.45 0.10 0.43 0.3600 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
37 441-450 168.91 851.07 0.00 850.56 2.21 0.51 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
38 442-443 26.14 849.07 0.00 848.98 0.10 0.09 0.3400 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
39 443-444 119.06 849.48 0.00 849.17 0.10 0.31 0.2600 CIRCULAR 21.000 21.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
40 444-445 134.04 849.87 0.00 849.58 0.10 0.29 0.2200 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
41 445-446 124.32 850.49 0.00 849.97 0.10 0.52 0.4200 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
42 445-447 165.00 850.46 0.00 849.97 0.10 0.50 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
43 445-448 75.00 850.49 0.00 849.97 0.10 0.52 0.6900 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
44 447-447A 162.00 851.05 0.00 850.56 0.10 0.49 0.3000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
45 451-452 108.00 851.07 0.00 850.45 0.10 0.62 0.5700 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
46 453-454 29.35 847.98 0.00 847.93 0.00 0.05 0.1800 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
47 453-458 23.00 848.95 0.00 848.43 0.50 0.52 2.2600 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
48 455A-455B 69.73 848.42 0.00 848.26 0.22 0.16 0.2300 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
49 455B-456 84.13 848.68 0.00 848.52 0.10 0.16 0.1900 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
50 456-457 68.80 848.95 0.05 848.78 0.10 0.17 0.2500 CIRCULAR 15.000 15.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
51 457-457A 21.00 850.48 0.00 849.66 0.76 0.82 3.9000 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
52 6inch 18.00 851.64 0.32 851.03 0.00 0.61 3.3900 CIRCULAR 6.000 6.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
53 EX-453 37.64 847.93 0.00 847.86 0.00 0.07 0.1800 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
54 Link-07 62.30 850.35 0.00 849.92 0.10 0.43 0.6900 CIRCULAR 12.000 12.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1
03/18/2022
Page 153 of 209
06/14/2024
201
Pipe Results
SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported
ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition
Occurrence Ratio Total Depth
Ratio
(cfs) (days hh:mm) (cfs)(ft/sec) (min) (ft)(min)
1 400-401 0.93 0 00:45 6.83 0.14 2.71 0.68 0.37 0.25 0.00 Calculated
2 402-403 3.57 0 00:15 5.75 0.62 3.43 0.25 0.86 0.57 0.00 Calculated
3 403-404 2.55 0 00:15 10.48 0.24 7.04 0.27 0.42 0.34 0.00 Calculated
4 403-406 1.20 0 00:19 4.70 0.26 5.01 0.23 0.35 0.35 0.00 Calculated
5 404-405 2.55 0 00:15 3.54 0.72 3.14 0.08 0.79 0.63 0.00 Calculated
6 406-407 0.99 0 00:19 1.95 0.51 2.50 0.98 0.51 0.51 0.00 Calculated
7 407-408 0.74 0 00:19 1.95 0.38 2.31 0.99 0.43 0.43 0.00 Calculated
8 408-409 0.45 0 00:25 1.95 0.23 2.02 1.13 0.33 0.33 0.00 Calculated
9 410-411 4.24 0 00:13 5.75 0.74 3.56 0.29 0.96 0.64 0.00 Calculated
10 411-412 3.83 0 00:13 5.75 0.67 3.48 0.39 0.89 0.60 0.00 Calculated
11 412-413 3.83 0 00:13 5.75 0.67 3.48 0.07 0.89 0.60 0.00 Calculated
12 413-414 3.61 0 00:08 4.84 0.75 3.00 0.18 0.97 0.64 0.00 Calculated
13 414-415 3.06 0 00:08 4.50 0.68 2.74 0.73 0.91 0.61 0.00 Calculated
14 415-421 2.36 0 00:08 3.03 0.78 2.73 0.64 0.83 0.66 0.00 Calculated
15 417-417A 0.09 0 00:05 7.58 0.01 2.07 0.95 0.09 0.08 0.00 Calculated
16 417-418 1.27 0 00:16 3.51 0.36 2.63 0.19 0.52 0.42 0.00 Calculated
17 418-455B 2.03 0 00:16 5.70 0.36 4.25 0.53 0.52 0.41 0.00 Calculated
18 421-422 2.13 0 00:08 3.00 0.71 2.65 0.23 0.78 0.62 0.00 Calculated
19 422-423 1.96 0 00:08 2.06 0.95 2.98 0.17 0.78 0.78 0.00 Calculated
20 423-424 0.80 0 00:20 1.95 0.41 2.36 0.99 0.45 0.45 0.00 Calculated
21 427-428 1.47 0 00:21 6.17 0.24 6.43 0.18 0.33 0.33 0.00 Calculated
22 428-428A 1.47 0 00:21 2.85 0.51 3.65 0.53 0.51 0.51 0.00 Calculated
23 428-429 1.47 0 00:21 2.85 0.51 3.65 0.07 0.51 0.51 0.00 Calculated
24 429-430 1.16 0 00:21 1.95 0.60 2.59 0.19 0.56 0.56 0.00 Calculated
25 431-432 22.77 0 00:05 23.44 0.97 5.44 0.15 1.99 0.80 0.00 Calculated
26 432-433 7.41 0 00:10 9.72 0.76 3.41 0.67 1.31 0.65 0.00 Calculated
27 432-437 17.19 0 00:05 17.37 0.99 4.03 0.44 2.03 0.81 0.00 Calculated
28 433-434 7.41 0 00:10 9.15 0.81 4.23 0.06 1.20 0.68 0.00 Calculated
29 434-435 7.41 0 00:10 8.47 0.87 3.97 0.12 1.27 0.72 0.00 Calculated
30 435-436 6.93 0 00:10 8.49 0.82 3.94 0.57 1.20 0.69 0.00 Calculated
31 437-438 17.19 0 00:05 17.81 0.97 4.13 0.11 1.98 0.79 0.00 Calculated
32 438-439 16.88 0 00:05 18.34 0.92 4.24 0.12 1.89 0.76 0.00 Calculated
33 439-440 15.18 0 00:05 15.40 0.99 3.57 0.56 2.02 0.81 0.00 Calculated
34 440-441 11.47 0 00:05 12.87 0.89 4.63 0.12 1.47 0.74 0.00 Calculated
35 440-451 2.90 0 00:05 2.92 0.99 4.24 0.48 0.81 0.81 0.00 Calculated
36 441-442 8.86 0 00:05 9.45 0.94 4.46 0.45 1.35 0.77 0.00 Calculated
37 441-450 1.03 0 00:09 1.96 0.53 2.52 1.12 0.52 0.52 0.00 Calculated
38 442-443 8.47 0 00:05 9.30 0.91 4.38 0.10 1.31 0.75 0.00 Calculated
39 443-444 7.43 0 00:05 8.08 0.92 3.81 0.52 1.32 0.76 0.00 Calculated
40 444-445 3.93 0 00:05 4.93 0.80 3.10 0.72 1.01 0.68 0.00 Calculated
41 445-446 1.33 0 00:23 2.30 0.58 3.03 0.68 0.54 0.54 0.00 Calculated
42 445-447 0.90 0 00:05 1.95 0.46 2.43 1.13 0.48 0.48 0.00 Calculated
43 445-448 1.49 0 00:31 2.97 0.50 3.78 0.33 0.50 0.50 0.00 Calculated
44 447-447A 0.67 0 00:05 1.95 0.34 2.25 1.20 0.40 0.40 0.00 Calculated
45 451-452 0.12 0 00:11 2.70 0.05 1.75 1.03 0.14 0.14 0.00 Calculated
46 453-454 1.35 0 00:16 4.46 0.30 2.21 0.22 0.57 0.38 0.00 Calculated
47 453-458 0.96 0 00:21 5.36 0.18 5.15 0.07 0.29 0.29 0.00 Calculated
48 455A-455B 4.90 0 00:19 5.03 0.97 3.24 0.36 1.20 0.80 0.00 Calculated
49 455B-456 3.45 0 00:21 4.58 0.75 2.85 0.49 0.97 0.65 0.00 Calculated
50 456-457 3.15 0 00:21 3.21 0.98 2.98 0.38 1.01 0.80 0.00 Calculated
51 457-457A 2.87 0 00:21 7.04 0.41 8.50 0.04 0.44 0.44 0.00 Calculated
52 6inch 0.17 0 00:31 1.03 0.17 3.89 0.08 0.14 0.28 0.00 Calculated
53 EX-453 2.27 0 00:21 4.46 0.51 2.53 0.25 0.76 0.51 0.00 Calculated
54 Link-07 1.84 0 00:05 2.96 0.62 3.97 0.26 0.57 0.57 0.00 Calculated
03/18/2022
Page 154 of 209
06/14/2024
202
Storage Nodes
Storage Node : 458
Input Data
848.95
851.00
2.05
848.95
0.00
0.00
0.00
Storage Area Volume Curves
Storage Curve : 458 storage
Stage Storage Storage
Area Volume
(ft) (ft²) (ft³)
0 0 0.000
1.05 3500 1837.50
2.05 5200 6187.50
Evaporation Loss .....................................................................
Invert Elevation (ft) ...................................................................
Max (Rim) Elevation (ft) ...........................................................
Max (Rim) Offset (ft) ................................................................
Initial Water Elevation (ft) .........................................................
Initial Water Depth (ft) ..............................................................
Ponded Area (ft²) .....................................................................
03/18/2022
Page 155 of 209
06/14/2024
203
03/18/2022
Page 156 of 209
06/14/2024
204
Storage Node : 458 (continued)
Output Summary Results
1.01
0.94
0.96
0.00
849.24
0.29
848.99
0.04
0 00:21
0.000
0
0
0.00
Total Time Flooded (min) ........................................................
Total Retention Time (sec) ......................................................
Max HGL Depth Attained (ft) ...................................................
Average HGL Elevation Attained (ft) ........................................
Average HGL Depth Attained (ft) .............................................
Time of Max HGL Occurrence (days hh:mm) ..........................
Total Exfiltration Volume (1000-ft³) ..........................................
Total Flooded Volume (ac-in) ..................................................
Peak Inflow (cfs) ......................................................................
Peak Lateral Inflow (cfs) ..........................................................
Peak Outflow (cfs) ...................................................................
Peak Exfiltration Flow Rate (cfm) ............................................
Max HGL Elevation Attained (ft) ..............................................
03/18/2022
Page 157 of 209
06/14/2024
205
Storage Node : DryBasin
Input Data
848.04
851.00
2.96
848.04
0.00
0.00
0.00
Storage Area Volume Curves
Storage Curve : Storage-02 (DB)
Stage Storage Storage
Area Volume
(ft) (ft²) (ft³)
0 0 0.000
0.96 4993.92 2397.08
1.96 10199.03 9993.56
2.96 11623.25 20904.70
Initial Water Depth (ft) ..............................................................
Ponded Area (ft²) .....................................................................
Evaporation Loss .....................................................................
Invert Elevation (ft) ...................................................................
Max (Rim) Elevation (ft) ...........................................................
Max (Rim) Offset (ft) ................................................................
Initial Water Elevation (ft) .........................................................
03/18/2022
Page 158 of 209
06/14/2024
206
03/18/2022
Page 159 of 209
06/14/2024
207
Storage Node : DryBasin (continued)
Outflow Orifices
SN Element Orifice Orifice Flap Circular Rectangular Rectangular OrificeOrifice
ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient
Diameter Height Width Elevation
(in) (in) (in) (ft)
1 Orifice-04 Side CIRCULAR No 6.00 848.04 0.61
2 Orifice-05 Bottom Rectangular No 36.00 36.00 851.16 0.63
Output Summary Results
4.90
0.00
1.01
0.00
849.38
1.34
848.13
0.09
0 00:35
0.000
0
0
0.00
Total Exfiltration Volume (1000-ft³) ..........................................
Total Flooded Volume (ac-in) ..................................................
Total Time Flooded (min) ........................................................
Total Retention Time (sec) ......................................................
Peak Exfiltration Flow Rate (cfm) ............................................
Max HGL Elevation Attained (ft) ..............................................
Max HGL Depth Attained (ft) ...................................................
Average HGL Elevation Attained (ft) ........................................
Average HGL Depth Attained (ft) .............................................
Time of Max HGL Occurrence (days hh:mm) ..........................
Peak Inflow (cfs) ......................................................................
Peak Lateral Inflow (cfs) ..........................................................
Peak Outflow (cfs) ...................................................................
03/18/2022
Page 160 of 209
06/14/2024
208
Storage Node : Jun-03
Input Data
851.32
854.00
2.68
851.32
0.00
0.00
0.00
Storage Area Volume Curves
Storage Curve : 6inch
Stage Storage Storage
Area Volume
(ft) (ft²) (ft³)
0 0 0.000
0.68 22518.21 7656.19
1.68 49019.08 43424.84
Max (Rim) Offset (ft) ................................................................
Initial Water Elevation (ft) .........................................................
Initial Water Depth (ft) ..............................................................
Ponded Area (ft²) .....................................................................
Evaporation Loss .....................................................................
Invert Elevation (ft) ...................................................................
Max (Rim) Elevation (ft) ...........................................................
03/18/2022
Page 161 of 209
06/14/2024
209
03/18/2022
Page 162 of 209
06/14/2024
210
Storage Node : Jun-03 (continued)
Output Summary Results
3.75
3.75
0.17
0.00
851.78
0.46
851.68
0.36
0 00:31
0.000
0
0
0.00
Average HGL Depth Attained (ft) .............................................
Time of Max HGL Occurrence (days hh:mm) ..........................
Total Exfiltration Volume (1000-ft³) ..........................................
Total Flooded Volume (ac-in) ..................................................
Total Time Flooded (min) ........................................................
Total Retention Time (sec) ......................................................
Peak Lateral Inflow (cfs) ..........................................................
Peak Outflow (cfs) ...................................................................
Peak Exfiltration Flow Rate (cfm) ............................................
Max HGL Elevation Attained (ft) ..............................................
Max HGL Depth Attained (ft) ...................................................
Average HGL Elevation Attained (ft) ........................................
Peak Inflow (cfs) ......................................................................
03/18/2022
Page 163 of 209
06/14/2024
211
Storage Node : Lake1
Input Data
847.00
853.00
6.00
847.00
0.00
0.00
0.00
Storage Area Volume Curves
Storage Curve : Storage-01
Stage Storage Storage
Area Volume
(ft) (ft²) (ft³)
0 22512.18 0.000
1 25490.48 24001.33
2 28569.17 51031.16
3 31748.08 81189.79
4 35027.20 114577.43
5 38406.58 151294.32
6 41886.61 191440.92
7 46467.50 235617.98
Evaporation Loss .....................................................................
Invert Elevation (ft) ...................................................................
Max (Rim) Elevation (ft) ...........................................................
Max (Rim) Offset (ft) ................................................................
Initial Water Elevation (ft) .........................................................
Initial Water Depth (ft) ..............................................................
Ponded Area (ft²) .....................................................................
03/18/2022
Page 164 of 209
06/14/2024
212
03/18/2022
Page 165 of 209
06/14/2024
213
Storage Node : Lake1 (continued)
Outflow Orifices
SN Element Orifice Orifice Flap Circular Rectangular Rectangular OrificeOrifice
ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient
Diameter Height Width Elevation
(in) (in) (in) (ft)
1 Lake1OCS2 Side Rectangular No 6.00 9.00 850.48 0.63
2 Lake1OCSTC Bottom Rectangular No 36.00 36.00 853.50 0.63
3 Lake1OCSWQ Side CIRCULAR No 6.00 847.00 0.61
Output Summary Results
27.27
0.00
0.93
0.00
848.18
1.18
847.41
0.41
0 00:45
0.000
0
0
0.00
Total Time Flooded (min) ........................................................
Total Retention Time (sec) ......................................................
Max HGL Depth Attained (ft) ...................................................
Average HGL Elevation Attained (ft) ........................................
Average HGL Depth Attained (ft) .............................................
Time of Max HGL Occurrence (days hh:mm) ..........................
Total Exfiltration Volume (1000-ft³) ..........................................
Total Flooded Volume (ac-in) ..................................................
Peak Inflow (cfs) ......................................................................
Peak Lateral Inflow (cfs) ..........................................................
Peak Outflow (cfs) ...................................................................
Peak Exfiltration Flow Rate (cfm) ............................................
Max HGL Elevation Attained (ft) ..............................................
03/18/2022
Page 166 of 209
06/14/2024
214
&DVWLQJVDUHGHSUHVVHG
:HLU(TXDWLRQ2ULILFH(TXDWLRQ1HHQDK,QOHW7\SH6WUHHW:LGWKIW3HULPHWHU $UHD&ORJJHG 0LQ&OHDU/DQH:LGWKIW8QFORJJHG ,QOHW 5DWLRQDO)ORZ&RQWULEXWLQJ%\SDVV%DVLQV%\SDVV)ORZ 7RWDO)ORZ*UDWH3HULPHWHU*UDWH$UHD'HSWKDW&DVWLQJ:HLU'HSWKDW&DVWLQJ2ULILFH&URVV6HFWLRQDO6ORSH*XWWHU6SUHDG:HLU*XWWHU6SUHDG2ULILFH&OHDU/DQH:LGWK FIV FIV FIV IWIWIW IW IW IW IW 'RXEOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH 6LQJOH-DFNVRQ
V*UDQW9LOODJH&XUE,QOHW&DSDFLWLHV-RE-*957/RU75&OHDU/DQH:LGWKIRUPXODVXEWUDFWVIWIRUFXUELQJ,QOHW7\SH
1RWH3HULPHWHUORVVGXHWRFORJLVRQO\UHGXFHGOHQJWK03/18/2022
Page 167 of 209
06/14/2024
215
7\SH 5 3HULPHWHU $UHD )RU\DUGLQOHWVORFDWHGLQUHDU\DUGV
&ORJJHG
0.6A(2gh)0.5
,QOHW 5DWLRQDO)ORZ
*UDWH
3HULPHWHU *UDWH$UHD 'HSWKDW&DVWLQJ
:HLU
'HSWKDW&DVWLQJ
2ULILFH
FIVIWIWIW IW
3RQGLQJGHSWKDWFDVWLQJFDQEHQRJUHDWHUWKDQ
LQFKHVRUIHHW
-DFNVRQ
V*UDQW9LOODJH <DUG,QOHW&DSDFLWLHV
-RE-*9
03/18/2022
Page 168 of 209
06/14/2024
216
Type:R-3402-E Perimeter Area For yard inlets located in rear yards
Unclogged 8.00 2.10
50% Clogged 6.00 1.05
0.6A(2gh)0.5
Inlet Rational Flow
Grate
Perimeter Grate Area Depth at Casting
(Weir)
Depth at Casting
(Orifice)
(#) (cfs)(ft)(ft2)(ft) (ft)
415 1.36 6.00 1.05 0.18 0.07
421 0.41 6.00 1.05 0.08 0.01
436 6.93 6.00 1.05 0.53 1.82
440 0.81 6.00 1.05 0.13 0.02
441 2.03 6.00 1.05 0.23 0.16
445 2.60 6.00 1.05 0.28 0.26
446 1.30 6.00 1.05 0.17 0.06
447 1.02 6.00 1.05 0.15 0.04
448 1.61 6.00 1.05 0.20 0.10
450 1.03 6.00 1.05 0.15 0.04
451 2.26 6.00 1.05 0.25 0.19
452 0.77 6.00 1.05 0.12 0.02
Jackson's Grant Village Street Inlet Capacities
Job #60160JGV
Ponding depth at casting can be no greater than 9
inches or 0.75 feet
03/18/2022
Page 169 of 209
06/14/2024
217
(URVLRQ3URWHFWLRQ0HWKRG9HORFLW\YIWV5HYHWPHQW5LSUDSч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
V*UDQW9LOODJHܮ ൌ ͳǤͺܦܳܦଶǤହܦ03/18/2022
Page 170 of 209
06/14/2024
218
APPENDIX D
WATER QUALITY CALCULATIONS
03/18/2022
Page 171 of 209
06/14/2024
219
-DFNVRQ
V*UDQW9LOODJH 2XWOHW6WUXFWXUH
'U\%DVLQ
72&:LGWKLQ
*UDWH7\SH
72&/HQJWKLQ
2XWOHW3LSHLQ
72&'HSWKLQ
72&:LGWKLQ
72&(OHYIW
2XWOHW3LSHLQ
22ѐ+LQ ,QYHUWIW
2ULILFH:4
2ULILFHLQ
1RUPDO3RROIW
-RE-*9
03/18/2022
Page 172 of 209
06/14/2024
220
-DFNVRQ
V*UDQW9LOODJH 2XWOHW6WUXFWXUH
/DNH
72&:LGWKLQ
*UDWH7\SH
72&/HQJWKLQ
2XWOHW3LSHLQ
72&'HSWKLQ
72&:LGWKLQ
72&(OHYIW
22¨+LQ
2ULILFH'HSWKLQ
2ULILFH:LGWKLQ
2ULILFH(OHYIW
2XWOHW3LSHLQ
22ѐ+LQ ,QYHUWIW
2ULILFH:4
2ULILFHLQ
1RUPDO3RROIW
-RE-*9
03/18/2022
Page 173 of 209
06/14/2024
221
:DWHU4XDOLW\9ROXPH
PR V A
12
P = 1
DF
/DNH
$YHUDJ
H$UHD
$YHUDJ
H$UHD 9ROXPH &XPXODWLYH
9ROXPH
IWDFIWIW
1RUPDO3RRO
7RSRI%DQN
Q =0.6A(2gh)0.5
7LPH K 4
,QLWLDO:4
9ROXPH
5HPDLQLQJ
:49ROXPH
KU IW FIVIWIW
WQ V =
:DWHU4XDOLW\2ULILFH6L]LQJ
:DWHU4XDOLW\
9ROXPH:4Y
IW
-DFNVRQ
V*UDQW9LOODJH
-RE-*9
R V = 0.05 + 0.009I
'HWHQWLRQ
3RQG
7RWDO'UDLQDJH
$UHD ,$
3HUFHQW
,PSHUYLRXV
9ROXPHWULF5XQRII
&RHIILFLHQW
DF59
:DWHU4XDOLW\(OHYDWLRQ
/DNH6WDJLQJ$ERYH1RUPDO3RRO
:DWHU4XDOLW\9ROXPHIW
1RUPDO3RRO(OHYDWLRQ
2ULILFH6L]LQJ&DOFXODWLRQV
2ULILFH'LDPHWHULQ
2ULILFH$UHDIW
:DWHU4XDOLW\6WDJH+HLJKWIW
(OHYDWLRQ
03/18/2022
Page 174 of 209
06/14/2024
222
TR-55 Calculation
Project Name:Jackson's Grant Village
Site Designation:WQ STR 404 Date:5/5/21
County or Independent City:Carmel Design Engineer:MAK
State:IN
Design Storm, P (inches):
Impervious Area, (acres):
Pervious Area, (acres):
Total Area, AT (acres):
Storm Distrubution:
Composite Curve Number, CN from Manual:
Time of Concentration (min.)
Water Quality Volume in inches, Qwv (in.):
S=1000/CN-10, (Inches):
Ia=0.2s, (inches):
Ia/P (unitless):
Tc, (hr):
Drainage Area, AT (sq.mi):
Unit Peak Flow, qU (cfs/sqmi/in.):
Peak Discharge, qp (cfs)
Model Name
0.0014
731
0.66
2020-5
0.2500
1.00
0.60
0.32
0.92
II
96
15.00
0.6302
0.4167
0.0833
0.0833
03/18/2022
Page 175 of 209
OFFLINE CS-3
ONLINE CS-4
06/14/2024
223
7037 Ridge Road, Hanover, MD 21076866-740-3318 410-796-5505 866-376-8511 FAXOUTSIDE BOTTOMELEV. 845.94'TOP OF SYSTEMELEV. 854.46' OUTLET 1 INVERTELEV. 850.44'INLET 1 INVERTELEV. 850.54'RIM ELEV. 855.39+/- INLET 115"Ø RCP(24"Ø OPENING)SOLIDSSTORAGESUMPOUTLET 115"Ø RCP(24"Ø OPENING)PERMANENTPOOLCASCADECYLINDERINSERTCONTRACTOR TO PROVIDEGRADE RINGS/RISERSCONTRACTOR TO GROUT TOFINISHED GRADE4'-6"4'-1112"11"4'-10"ØELEVATION VIEWINLET 1OUTLET 14'Ø I.D.4'-10"Ø O.D.30"Ø x 4"FRAME AND COVERPLAN VIEW(INTERNALS NOT SHOWN)CASCADEFIBERGLASSINTERNALS180°SECTION FOR PIPE ORIENTATION(TOP SLAB NOT SHOWN)05/24/21DATE:APPROVED:CHECKED:SHEET:I:\MERLIN\PROJECT\ACTIVE\679500\679557\679557-10-CASCADE\DRAWINGS\679557-010-CS-4-CONFAB.DWG 5/24/2021 10:43 AMOFMAKDRAWN:DESIGNED:The design and information shown on this drawing isprovided as a service to the project owner, engineer andcontractor by CONTECH Construction Products Inc. orone of its affiliated companies ("CONTECH"). Neitherthis drawing, nor any part thereof, may be used,reproduced or modified in any manner without the priorwritten consent of CONTECH. Failure to comply isdone at the user's own risk and CONTECH expresslydisclaims any liability or responsibility for such use.If discrepancies between the supplied information uponwhich the drawing is based and actual field conditionsare encountered as site work progresses, thesediscrepancies must be reported to CONTECHimmediately for re-evaluation of the design. CONTECHaccepts no liability for designs based on missing,incomplete or inaccurate information supplied by others.679557SEQUENCE No.:10PROJECT No.:MAKMAKMAK11www.ContechES.comREVISION DESCRIPTIONDATEMARKBYPROPOSALCONTECHDRAWINGNCILAYOUT 1AGENERAL NOTES1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACTYOUR CONTECH REPRESENTATIVE. www.ContechES.com3. CASCADE SEPARATOR WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA ANDINFORMATION CONTAINED IN THIS DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETSREQUIREMENTS OF PROJECT.4. STRUCTURE SHALL MEET AASHTO HS-20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 2', ANDGROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TOCONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITHTHE CONTECH LOGO.5. CASCADE SEPARATOR STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 ANDAASHTO LOAD FACTOR DESIGN METHOD.INSTALLATION NOTESA. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGNCONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD.B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SETTHE CASCADE SEPARATOR MANHOLE STRUCTURE.C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE.D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN.ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES.E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TOFLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.STRUCTURE WEIGHTAPPROXIMATE HEAVIEST PICK = 5000 LBS.OF 3 PIECESMAXIMUM FOOTPRINT = 4'-10"ØCS-4 - 679557-10JACKSON'S GRANT VILLAGECARMEL, INfor SYSTEM: WQ STR 404MATERIAL LIST (PROVIDED BY CONTECH)COUNT DESCRIPTIONINSTALLED BY1CS-4 FIBERGLASS CYLINDER INSERT, STD.CONTECH4 CS-4 ALUMINUM INSTALLATION BRACKETCONTECH1 SEALANT FOR JOINTSCONTRACTOR130"Ø x 4" FRAME & COVER, EJ#41600484, OR EQUIV.CONTRACTOR03/18/2022 Page 176 of 209 06/14/2024
224
TR-55 Calculation
Project Name:Jackson's Grant Village
Site Designation:WQ STR 455B Date:5/5/21
County or Independent City:Carmel Design Engineer:MAK
State:IN
Design Storm, P (inches):
Impervious Area, (acres):
Pervious Area, (acres):
Total Area, AT (acres):
Storm Distrubution:
Composite Curve Number, CN from Manual:
Time of Concentration (min.)
Water Quality Volume in inches, Qwv (in.):
S=1000/CN-10, (Inches):
Ia=0.2s, (inches):
Ia/P (unitless):
Tc, (hr):
Drainage Area, AT (sq.mi):
Unit Peak Flow, qU (cfs/sqmi/in.):
Peak Discharge, qp (cfs)
Model Name
0.0061
594
1.03
2020-5
0.3317
1.00
0.99
2.91
3.90
II
89
19.90
0.2850
1.2360
0.2472
0.2472
03/18/2022
Page 177 of 209
OFFLINE CS-4
ONLINE CS-5
06/14/2024
225
7037 Ridge Road, Hanover, MD 21076866-740-3318 410-796-5505 866-376-8511 FAXOUTSIDE BOTTOMELEV. 843.25'TOP OF SYSTEMELEV. 851.48' OUTLET 1 INVERTELEV. 848.42'INLET 1 INVERTELEV. 848.42'INLET 2 INVERTELEV. 848.52'RIM ELEV. 851.89+/- INLET 118"Ø RCP(28"Ø OPENING)INLET 215"Ø RCP(24"Ø OPENING)SOLIDSSTORAGESUMPOUTLET 118"Ø RCP(28"Ø OPENING)PERMANENTPOOLCASCADECYLINDERINSERTCONTRACTOR TO GROUT TOFINISHED GRADE5'-2"3'-534"434"6'-0"ØELEVATION VIEWINLET 1INLET 2OUTLET 15'Ø I.D.6'Ø O.D.30"Ø x 4"FRAME AND COVERPLAN VIEW(INTERNALS NOT SHOWN)CASCADEFIBERGLASSINTERNALSINLET 118"Ø RCP(28"Ø OPENING)INLET 215"Ø RCP(24"Ø OPENING)OUTLET 118"Ø RCP(28"Ø OPENING)180°78°SECTION FOR PIPE ORIENTATION(TOP SLAB NOT SHOWN)05/24/21DATE:APPROVED:CHECKED:SHEET:I:\MERLIN\PROJECT\ACTIVE\679500\679557\679557-60-CASCADE\DRAWINGS\679557-060-CS-5-CONFAB.DWG 5/24/2021 10:00 AMOFMAKDRAWN:DESIGNED:The design and information shown on this drawing isprovided as a service to the project owner, engineer andcontractor by CONTECH Construction Products Inc. orone of its affiliated companies ("CONTECH"). Neitherthis drawing, nor any part thereof, may be used,reproduced or modified in any manner without the priorwritten consent of CONTECH. Failure to comply isdone at the user's own risk and CONTECH expresslydisclaims any liability or responsibility for such use.If discrepancies between the supplied information uponwhich the drawing is based and actual field conditionsare encountered as site work progresses, thesediscrepancies must be reported to CONTECHimmediately for re-evaluation of the design. CONTECHaccepts no liability for designs based on missing,incomplete or inaccurate information supplied by others.679557SEQUENCE No.:60PROJECT No.:MAKMAKMAK11www.ContechES.comREVISION DESCRIPTIONDATEMARKBYPROPOSALCONTECHDRAWINGNCILAYOUT 1AGENERAL NOTES1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACTYOUR CONTECH REPRESENTATIVE. www.ContechES.com3. CASCADE SEPARATOR WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA ANDINFORMATION CONTAINED IN THIS DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETSREQUIREMENTS OF PROJECT.4. STRUCTURE SHALL MEET AASHTO HS-20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 2', ANDGROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TOCONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITHTHE CONTECH LOGO.5. CASCADE SEPARATOR STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 ANDAASHTO LOAD FACTOR DESIGN METHOD.INSTALLATION NOTESA. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGNCONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD.B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SETTHE CASCADE SEPARATOR MANHOLE STRUCTURE.C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE.D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN.ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES.E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TOFLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.STRUCTURE WEIGHTAPPROXIMATE HEAVIEST PICK = 6500 LBS.OF 3 PIECESMAXIMUM FOOTPRINT = 6'ØCS-5 - 679557-60JACKSON'S GRANT VILLAGECARMEL, INfor SYSTEM: WQ STR 455BMATERIAL LIST (PROVIDED BY CONTECH)COUNT DESCRIPTIONINSTALLED BY1CS-5 FIBERGLASS CYLINDER INSERT, STD.CONTECH4 CS-5 ALUMINUM INSTALLATION BRACKETCONTECH1 SEALANT FOR JOINTSCONTRACTOR130"Ø x 4" FRAME & COVER, EJ#41600484, OR EQUIV.CONTRACTOR03/18/2022 Page 178 of 209 06/14/2024
226
TR-55 Calculation
Project Name:Jackson's Grant Village
Site Designation:WQ STR 437 Date:5/5/21
County or Independent City:Carmel Design Engineer:MAK
State:IN
Design Storm, P (inches):
Impervious Area, (acres):
Pervious Area, (acres):
Total Area, AT (acres):
Storm Distrubution:
Composite Curve Number, CN from Manual:
Time of Concentration (min.)
Water Quality Volume in inches, Qwv (in.):
S=1000/CN-10, (Inches):
Ia=0.2s, (inches):
Ia/P (unitless):
Tc, (hr):
Drainage Area, AT (sq.mi):
Unit Peak Flow, qU (cfs/sqmi/in.):
Peak Discharge, qp (cfs)
Model Name
0.0108
484
3.47
3035-6
0.5917
1.00
4.78
2.11
6.89
II
97
35.50
0.6667
0.3627
0.0725
0.0725
03/18/2022
Page 179 of 209
OFFLINE CS-6
ONLINE CS-10
06/14/2024
227
7037 Ridge Road, Hanover, MD 21076866-740-3318 410-796-5505 866-376-8511 FAXOUTSIDE BOTTOMELEV. 838.78'TOP OF SYSTEMELEV. 853.78' OUTLET 1 INVERTELEV. 847.45'INLET 1 INVERTELEV. 847.55'RIM ELEV. 854.18+/- INLET 130"Ø RCP(42"Ø OPENING)SOLIDSSTORAGESUMPOUTLET 130"Ø RCP(42"Ø OPENING)PERMANENTPOOLCASCADECYLINDERINSERTFLANGEDCYLINDERCONTRACTOR TO GROUT TOFINISHED GRADE8'-8"6'-834"434"12'-10"ØELEVATION VIEWINLET 1OUTLET 110'Ø I.D.11'-10"Ø O.D.12'-10"Ø BASEEXT.(2) 24"Ø x 4"FRAME AND COVERPLAN VIEW(INTERNALS NOT SHOWN)CASCADEFIBERGLASSINTERNALS155°SECTION FOR PIPE ORIENTATION(TOP SLAB NOT SHOWN)05/24/21DATE:APPROVED:CHECKED:SHEET:I:\MERLIN\PROJECT\ACTIVE\679500\679557\679557-50-CASCADE\DRAWINGS\679557-050-CS-10-CONFAB.DWG 5/24/2021 11:04 AMOFMAKDRAWN:DESIGNED:The design and information shown on this drawing isprovided as a service to the project owner, engineer andcontractor by CONTECH Construction Products Inc. orone of its affiliated companies ("CONTECH"). Neitherthis drawing, nor any part thereof, may be used,reproduced or modified in any manner without the priorwritten consent of CONTECH. Failure to comply isdone at the user's own risk and CONTECH expresslydisclaims any liability or responsibility for such use.If discrepancies between the supplied information uponwhich the drawing is based and actual field conditionsare encountered as site work progresses, thesediscrepancies must be reported to CONTECHimmediately for re-evaluation of the design. CONTECHaccepts no liability for designs based on missing,incomplete or inaccurate information supplied by others.679557SEQUENCE No.:50PROJECT No.:MAKMAKMAK11www.ContechES.comREVISION DESCRIPTIONDATEMARKBYPROPOSALCONTECHDRAWINGNCILAYOUT 1AGENERAL NOTES1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACTYOUR CONTECH REPRESENTATIVE. www.ContechES.com3. CASCADE SEPARATOR WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA ANDINFORMATION CONTAINED IN THIS DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETSREQUIREMENTS OF PROJECT.4. STRUCTURE SHALL MEET AASHTO HS-20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 2', ANDGROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TOCONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITHTHE CONTECH LOGO.5. CASCADE SEPARATOR STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 ANDAASHTO LOAD FACTOR DESIGN METHOD.INSTALLATION NOTESA. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGNCONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD.B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SETTHE CASCADE SEPARATOR MANHOLE STRUCTURE.C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE.D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN.ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES.E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TOFLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.STRUCTURE WEIGHTAPPROXIMATE HEAVIEST PICK = 31500 LBS.OF 4 PIECESMAXIMUM FOOTPRINT = 12'-10"ØCS-10 - 679557-50JACKSON'S GRANT VILLAGECARMEL, INfor SYSTEM: WQ STR 437INTERNAL COMPONENTS TO BE INSTALLED ON SITE BY CONTECH FIELD CONSULTANT. PLEASE CONTACT CONTECH FOR CURRENT INSTALLATION LEAD TIME.MATERIAL LIST (PROVIDED BY CONTECH)COUNT DESCRIPTIONINSTALLED BY1CS-10 FIBERGLASS CYLINDER INSERT, STD.CONTRACTOR1CS-10, -12 FLANGED CYLINDER, 2 FT.CONTECH8CS-10 ALUMINUM INSTALLATION BRACKETCONTECH1 SEALANT FOR JOINTSCONTRACTOR224"Ø x 4" FRAME & COVER, EJ#41600389, OR EQUIV.CONTRACTOR03/18/2022 Page 180 of 209 06/14/2024
228
TR-55 Calculation
Project Name:Jackson's Grant Village
Site Designation:WQ STR 433 Date:5/5/21
County or Independent City:Carmel Design Engineer:MAK
State:IN
Design Storm, P (inches):
Impervious Area, (acres):
Pervious Area, (acres):
Total Area, AT (acres):
Storm Distrubution:
Composite Curve Number, CN from Manual:
Time of Concentration (min.)
Water Quality Volume in inches, Qwv (in.):
S=1000/CN-10, (Inches):
Ia=0.2s, (inches):
Ia/P (unitless):
Tc, (hr):
Drainage Area, AT (sq.mi):
Unit Peak Flow, qU (cfs/sqmi/in.):
Peak Discharge, qp (cfs)
Model Name
0.0015
628
0.59
2020-5
0.3533
1.00
0.58
0.38
0.96
II
96
21.20
0.6302
0.4167
0.0833
0.0833
03/18/2022
Page 181 of 209
OFFLINE CS-3
ONLINE CS-6
06/14/2024
229
7037 Ridge Road, Hanover, MD 21076866-740-3318 410-796-5505 866-376-8511 FAXOUTSIDE BOTTOMELEV. 842.23'TOP OF SYSTEMELEV. 853.98' OUTLET 1 INVERTELEV. 847.90'INLET 1 INVERTELEV. 848.15'RIM ELEV. 854.64+/- INLET 121"Ø RCP(32"Ø OPENING)SOLIDSSTORAGESUMPOUTLET 124"Ø RCP(36"Ø OPENING)PERMANENTPOOLCASCADECYLINDERINSERTCONTRACTOR TO PROVIDEGRADE RINGS/RISERSCONTRACTOR TO GROUT TOFINISHED GRADE5'-8"6'-9"734"7'-2"ØELEVATION VIEWINLET 1OUTLET 16'Ø I.D.7'-2"Ø O.D.30"Ø x 4"FRAME AND COVERPLAN VIEW(INTERNALS NOT SHOWN)CASCADEFIBERGLASSINTERNALS172°SECTION FOR PIPE ORIENTATION(TOP SLAB NOT SHOWN)05/24/21DATE:APPROVED:CHECKED:SHEET:I:\MERLIN\PROJECT\ACTIVE\679500\679557\679557-40-CASCADE\DRAWINGS\679557-040-CS-6-CONFAB.DWG 5/24/2021 10:56 AMOFMAKDRAWN:DESIGNED:The design and information shown on this drawing isprovided as a service to the project owner, engineer andcontractor by CONTECH Construction Products Inc. orone of its affiliated companies ("CONTECH"). Neitherthis drawing, nor any part thereof, may be used,reproduced or modified in any manner without the priorwritten consent of CONTECH. Failure to comply isdone at the user's own risk and CONTECH expresslydisclaims any liability or responsibility for such use.If discrepancies between the supplied information uponwhich the drawing is based and actual field conditionsare encountered as site work progresses, thesediscrepancies must be reported to CONTECHimmediately for re-evaluation of the design. CONTECHaccepts no liability for designs based on missing,incomplete or inaccurate information supplied by others.679557SEQUENCE No.:40PROJECT No.:MAKMAKMAK11www.ContechES.comREVISION DESCRIPTIONDATEMARKBYPROPOSALCONTECHDRAWINGNCILAYOUT 1AGENERAL NOTES1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACTYOUR CONTECH REPRESENTATIVE. www.ContechES.com3. CASCADE SEPARATOR WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA ANDINFORMATION CONTAINED IN THIS DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETSREQUIREMENTS OF PROJECT.4. STRUCTURE SHALL MEET AASHTO HS-20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 2', ANDGROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TOCONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITHTHE CONTECH LOGO.5. CASCADE SEPARATOR STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 ANDAASHTO LOAD FACTOR DESIGN METHOD.INSTALLATION NOTESA. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGNCONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD.B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SETTHE CASCADE SEPARATOR MANHOLE STRUCTURE.C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE.D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN.ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES.E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TOFLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.STRUCTURE WEIGHTAPPROXIMATE HEAVIEST PICK = 14000 LBS.OF 4 PIECESMAXIMUM FOOTPRINT = 7'-2"ØCS-6 - 679557-40JACKSON'S GRANT VILLAGECARMEL, INfor SYSTEM: WQ STR 433COUNT DESCRIPTIONINSTALLED BY1CS-6 FIBERGLASS CYLINDER INSERT, STD.CONTECH5 CS-6 ALUMINUM INSTALLATION BRACKETCONTECH1 SEALANT FOR JOINTSCONTRACTOR130"Ø x 4" FRAME & COVER, EJ#41600484, OR EQUIV.CONTRACTOR03/18/2022 Page 182 of 209 06/14/2024
230
TR-55 Calculation
Project Name:Jackson's Grant Village
Site Designation:WQ STR 428A Date:5/5/21
County or Independent City:Carmel Design Engineer:MAK
State:IN
Design Storm, P (inches):
Impervious Area, (acres):
Pervious Area, (acres):
Total Area, AT (acres):
Storm Distrubution:
Composite Curve Number, CN from Manual:
Time of Concentration (min.)
Water Quality Volume in inches, Qwv (in.):
S=1000/CN-10, (Inches):
Ia=0.2s, (inches):
Ia/P (unitless):
Tc, (hr):
Drainage Area, AT (sq.mi):
Unit Peak Flow, qU (cfs/sqmi/in.):
Peak Discharge, qp (cfs)
Model Name
0.0011
619
0.43
2020-5
0.3633
1.00
0.43
0.27
0.70
II
96
21.80
0.6302
0.4167
0.0833
0.0833
03/18/2022
Page 183 of 209
OFFLINE/ONLINE CS-3
06/14/2024
231
7037 Ridge Road, Hanover, MD 21076866-740-3318 410-796-5505 866-376-8511 FAXOUTSIDE BOTTOMELEV. 846.57'TOP OF SYSTEMELEV. 853.27'OUTLET 1 INVERTELEV. 850.07'INLET 1 INVERTELEV. 850.17'INLET 2 INVERTELEV. 851.67'INLET 3 INVERTELEV. 851.67'RIM ELEV. 854.22+/- INLET 112"Ø RCP(20"Ø OPENING)INLET 26"Ø PVC(12"Ø OPENING)INLET 36"Ø PVC(12"Ø OPENING)SOLIDSSTORAGESUMPOUTLET 112"Ø RCP(20"Ø OPENING)PERMANENTPOOLCASCADECYLINDERINSERTCONTRACTOR TO PROVIDEGRADE RINGS/RISERSCONTRACTOR TO GROUT TOFINISHED GRADE3'-6"4'-134"1114"3'-8"ØELEVATION VIEWINLET 1INLET 2INLET 3OUTLET 13'Ø I.D.3'-8"Ø O.D.24" x 24"CURB INLETPLAN VIEW(INTERNALS NOT SHOWN)CASCADEFIBERGLASSINTERNALS90°93°87°SECTION FOR PIPE ORIENTATION(TOP SLAB NOT SHOWN)05/24/21DATE:APPROVED:CHECKED:SHEET:DRAWING11.DWG 5/24/2021 10:37 AMOFMAKDRAWN:DESIGNED:The design and information shown on this drawing isprovided as a service to the project owner, engineer andcontractor by CONTECH Construction Products Inc. orone of its affiliated companies ("CONTECH"). Neitherthis drawing, nor any part thereof, may be used,reproduced or modified in any manner without the priorwritten consent of CONTECH. Failure to comply isdone at the user's own risk and CONTECH expresslydisclaims any liability or responsibility for such use.If discrepancies between the supplied information uponwhich the drawing is based and actual field conditionsare encountered as site work progresses, thesediscrepancies must be reported to CONTECHimmediately for re-evaluation of the design. CONTECHaccepts no liability for designs based on missing,incomplete or inaccurate information supplied by others.679557SEQUENCE No.:30PROJECT No.:MAKMAKMAK11www.ContechES.comREVISION DESCRIPTIONDATEMARKBYPROPOSALCONTECHDRAWINGNCILAYOUT 1AGENERAL NOTES1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACTYOUR CONTECH REPRESENTATIVE. www.ContechES.com3. CASCADE SEPARATOR WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA ANDINFORMATION CONTAINED IN THIS DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETSREQUIREMENTS OF PROJECT.4. STRUCTURE SHALL MEET AASHTO HS-20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 2', ANDGROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TOCONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITHTHE CONTECH LOGO.5. CASCADE SEPARATOR STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 ANDAASHTO LOAD FACTOR DESIGN METHOD.INSTALLATION NOTESA. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGNCONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD.B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SETTHE CASCADE SEPARATOR MANHOLE STRUCTURE.C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE.D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN.ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES.E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TOFLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.STRUCTURE WEIGHTAPPROXIMATE HEAVIEST PICK = 3500 LBS.OF 3 PIECESMAXIMUM FOOTPRINT = 3'-8"ØCS-3 - 679557-30JACKSON'S GRANT VILLAGECARMEL, INfor SYSTEM: WQ STR 429MATERIAL LIST (PROVIDED BY CONTECH)COUNT DESCRIPTIONINSTALLED BY1CS-3 ALUMINUM CYLINDER INSERT, STD.CONTECH3 CS-3 ALUMINUM INSTALLATION BRACKETCONTECH1 24" INLET TRAYCONTRACTOR1 SEALANT FOR JOINTSCONTRACTOR124" x 24" CURB INLET, EJ#0719131C01, OR EQUIV.CONTRACTOR03/18/2022 Page 184 of 209 06/14/2024
232
TR-55 Calculation
Project Name:Jackson's Grant Village
Site Designation:WQ STR 412 Date:5/5/21
County or Independent City:Carmel Design Engineer:MAK
State:IN
Design Storm, P (inches):
Impervious Area, (acres):
Pervious Area, (acres):
Total Area, AT (acres):
Storm Distrubution:
Composite Curve Number, CN from Manual:
Time of Concentration (min.)
Water Quality Volume in inches, Qwv (in.):
S=1000/CN-10, (Inches):
Ia=0.2s, (inches):
Ia/P (unitless):
Tc, (hr):
Drainage Area, AT (sq.mi):
Unit Peak Flow, qU (cfs/sqmi/in.):
Peak Discharge, qp (cfs)
Model Name
0.0040
609
1.09
2020-5
0.3817
1.00
1.14
1.40
2.54
II
93
22.90
0.4504
0.7527
0.1505
0.1505
03/18/2022
Page 185 of 209
OFFLINE/ONLINE CS-4
06/14/2024
233
7037 Ridge Road, Hanover, MD 21076866-740-3318 410-796-5505 866-376-8511 FAXOUTSIDE BOTTOMELEV. 843.03'TOP OF SYSTEMELEV. 853.55' OUTLET 1 INVERTELEV. 847.53'INLET 1 INVERTELEV. 847.63'RIM ELEV. 854.61+/- INLET 118"Ø RCP(28"Ø OPENING)SOLIDSSTORAGESUMPOUTLET 118"Ø RCP(28"Ø OPENING)PERMANENTPOOLCASCADECYLINDERINSERTCONTRACTOR TO PROVIDEGRADE RINGS/RISERSCONTRACTOR TO GROUT TOFINISHED GRADE4'-6"7'-1"1'-034"4'-10"ØELEVATION VIEWINLET 1OUTLET 14'Ø I.D.4'-10"Ø O.D.30"Ø x 4"FRAME AND COVERPLAN VIEW(INTERNALS NOT SHOWN)CASCADEFIBERGLASSINTERNALS180°SECTION FOR PIPE ORIENTATION(TOP SLAB NOT SHOWN)05/24/21DATE:APPROVED:CHECKED:SHEET:I:\MERLIN\PROJECT\ACTIVE\679500\679557\679557-20-CASCADE\DRAWINGS\679557-020-CS-4-CONFAB.DWG 5/24/2021 10:50 AMOFMAKDRAWN:DESIGNED:The design and information shown on this drawing isprovided as a service to the project owner, engineer andcontractor by CONTECH Construction Products Inc. orone of its affiliated companies ("CONTECH"). Neitherthis drawing, nor any part thereof, may be used,reproduced or modified in any manner without the priorwritten consent of CONTECH. Failure to comply isdone at the user's own risk and CONTECH expresslydisclaims any liability or responsibility for such use.If discrepancies between the supplied information uponwhich the drawing is based and actual field conditionsare encountered as site work progresses, thesediscrepancies must be reported to CONTECHimmediately for re-evaluation of the design. CONTECHaccepts no liability for designs based on missing,incomplete or inaccurate information supplied by others.679557SEQUENCE No.:20PROJECT No.:MAKMAKMAK11www.ContechES.comREVISION DESCRIPTIONDATEMARKBYPROPOSALCONTECHDRAWINGNCILAYOUT 1AGENERAL NOTES1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACTYOUR CONTECH REPRESENTATIVE. www.ContechES.com3. CASCADE SEPARATOR WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA ANDINFORMATION CONTAINED IN THIS DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETSREQUIREMENTS OF PROJECT.4. STRUCTURE SHALL MEET AASHTO HS-20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 2', ANDGROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TOCONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITHTHE CONTECH LOGO.5. CASCADE SEPARATOR STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 ANDAASHTO LOAD FACTOR DESIGN METHOD.INSTALLATION NOTESA. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGNCONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD.B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SETTHE CASCADE SEPARATOR MANHOLE STRUCTURE.C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE.D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN.ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES.E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TOFLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.STRUCTURE WEIGHTAPPROXIMATE HEAVIEST PICK = 5000 LBS.OF 4 PIECESMAXIMUM FOOTPRINT = 4'-10"ØCS-4 - 679557-20JACKSON'S GRANT VILLAGECARMEL, INfor SYSTEM: WQ STR 412MATERIAL LIST (PROVIDED BY CONTECH)COUNT DESCRIPTIONINSTALLED BY1CS-4 FIBERGLASS CYLINDER INSERT, STD.CONTECH4 CS-4 ALUMINUM INSTALLATION BRACKETCONTECH1 SEALANT FOR JOINTSCONTRACTOR130"Ø x 4" FRAME & COVER, EJ#41600484, OR EQUIV.CONTRACTOR03/18/2022 Page 186 of 209 06/14/2024
234
APPENDIX E
EMERGENCY SPILLWAY
CALCULATIONS
03/18/2022
Page 187 of 209
06/14/2024
235
/DNH
4ϭϬϬ FIV<HDU(OHY
7RSRI%DQN
6SLOOZD\(OHY DWRUDERYH
&t +LJKZDWHU
)UHHERDUG
K )7
0LQLPXP)ODW%RWWRP/HQJWK
/t )7
3ODQ/HQJWK
66 6LGHVORSHV
-DFNVRQ
V*UDQW9LOODJH /DNH6SLOOZD\&DOFXODWLRQV
-RE-*9
ܮௐ ൌܳଵ כ ͳǤʹͷ
ܥௐ כ݄ଷ
ଶ
03/18/2022
Page 188 of 209
06/14/2024
236
'U\%DVLQ
4ϭϬϬ FIV <HDU(OHY
7RSRI%DQN
6SLOOZD\(OHY DWRUDERYH
&t +LJKZDWHU
)UHHERDUG
K )7
0LQLPXP)ODW%RWWRP/HQJWK
/t )7
3ODQ/HQJWK
66 6LGHVORSHV
-DFNVRQ
V*UDQW9LOODJH /DNH6SLOOZD\&DOFXODWLRQV
-RE-*9
ܮௐ ൌܳଵ כ ͳǤʹͷ
ܥௐ כ݄ଷ
ଶ
03/18/2022
Page 189 of 209
06/14/2024
237
APPENDIX F
SWALE CALCULATIONS
03/18/2022
Page 190 of 209
06/14/2024
238
&KDQQHO5HSRUW
+\GUDIORZ([SUHVV([WHQVLRQIRU$XWRGHVN&LYLO'E\$XWRGHVN,QF 7KXUVGD\-XQ
HDVW
7ULDQJXODU
6LGH6ORSHV]
7RWDO'HSWKIW
,QYHUW(OHYIW
6ORSH
19DOXH
&DOFXODWLRQV
&RPSXWHE\ .QRZQ4
.QRZQ4FIV
+LJKOLJKWHG
'HSWKIW
4FIV
$UHDVTIW
9HORFLW\IWV
:HWWHG3HULPIW
&ULW'HSWK<FIW
7RS:LGWKIW
(*/IW
(OHYIW'HSWKIW6HFWLRQ
5HDFKIW
03/18/2022
Page 191 of 209
06/14/2024
239
&KDQQHO5HSRUW
+\GUDIORZ([SUHVV([WHQVLRQIRU$XWRGHVN&LYLO'E\$XWRGHVN,QF 7KXUVGD\-XQ
ZHVW
7ULDQJXODU
6LGH6ORSHV]
7RWDO'HSWKIW
,QYHUW(OHYIW
6ORSH
19DOXH
&DOFXODWLRQV
&RPSXWHE\ .QRZQ4
.QRZQ4FIV
+LJKOLJKWHG
'HSWKIW
4FIV
$UHDVTIW
9HORFLW\IWV
:HWWHG3HULPIW
&ULW'HSWK<FIW
7RS:LGWKIW
(*/IW
(OHYIW'HSWKIW6HFWLRQ
5HDFKIW
03/18/2022
Page 192 of 209
06/14/2024
240
&KDQQHO5HSRUW
+\GUDIORZ([SUHVV([WHQVLRQIRU$XWRGHVN&LYLO'E\$XWRGHVN,QF 7KXUVGD\-XQ
7ULDQJXODU
6LGH6ORSHV]
7RWDO'HSWKIW
,QYHUW(OHYIW
6ORSH
19DOXH
&DOFXODWLRQV
&RPSXWHE\ .QRZQ4
.QRZQ4FIV
+LJKOLJKWHG
'HSWKIW
4FIV
$UHDVTIW
9HORFLW\IWV
:HWWHG3HULPIW
&ULW'HSWK<FIW
7RS:LGWKIW
(*/IW
(OHYIW'HSWKIW6HFWLRQ
5HDFKIW
03/18/2022
Page 193 of 209
06/14/2024
241
&KDQQHO5HSRUW
+\GUDIORZ([SUHVV([WHQVLRQIRU$XWRGHVN&LYLO'E\$XWRGHVN,QF 7KXUVGD\-XQ
7ULDQJXODU
6LGH6ORSHV]
7RWDO'HSWKIW
,QYHUW(OHYIW
6ORSH
19DOXH
&DOFXODWLRQV
&RPSXWHE\ .QRZQ4
.QRZQ4FIV
+LJKOLJKWHG
'HSWKIW
4FIV
$UHDVTIW
9HORFLW\IWV
:HWWHG3HULPIW
&ULW'HSWK<FIW
7RS:LGWKIW
(*/IW
(OHYIW'HSWKIW6HFWLRQ
5HDFKIW
03/18/2022
Page 194 of 209
06/14/2024
242
&KDQQHO5HSRUW
+\GUDIORZ([SUHVV([WHQVLRQIRU$XWRGHVN&LYLO'E\$XWRGHVN,QF 7KXUVGD\-XQ
7ULDQJXODU
6LGH6ORSHV]
7RWDO'HSWKIW
,QYHUW(OHYIW
6ORSH
19DOXH
&DOFXODWLRQV
&RPSXWHE\ .QRZQ4
.QRZQ4FIV
+LJKOLJKWHG
'HSWKIW
4FIV
$UHDVTIW
9HORFLW\IWV
:HWWHG3HULPIW
&ULW'HSWK<FIW
7RS:LGWKIW
(*/IW
(OHYIW'HSWKIW6HFWLRQ
5HDFKIW
03/18/2022
Page 195 of 209
06/14/2024
243
&KDQQHO5HSRUW
+\GUDIORZ([SUHVV([WHQVLRQIRU$XWRGHVN&LYLO'E\$XWRGHVN,QF 7KXUVGD\-XQ
7ULDQJXODU
6LGH6ORSHV]
7RWDO'HSWKIW
,QYHUW(OHYIW
6ORSH
19DOXH
&DOFXODWLRQV
&RPSXWHE\ .QRZQ4
.QRZQ4FIV
+LJKOLJKWHG
'HSWKIW
4FIV
$UHDVTIW
9HORFLW\IWV
:HWWHG3HULPIW
&ULW'HSWK<FIW
7RS:LGWKIW
(*/IW
(OHYIW'HSWKIW6HFWLRQ
5HDFKIW
03/18/2022
Page 196 of 209
06/14/2024
244
&KDQQHO5HSRUW
+\GUDIORZ([SUHVV([WHQVLRQIRU$XWRGHVN&LYLO'E\$XWRGHVN,QF 7KXUVGD\-XQ
7ULDQJXODU
6LGH6ORSHV]
7RWDO'HSWKIW
,QYHUW(OHYIW
6ORSH
19DOXH
&DOFXODWLRQV
&RPSXWHE\ .QRZQ4
.QRZQ4FIV
+LJKOLJKWHG
'HSWKIW
4FIV
$UHDVTIW
9HORFLW\IWV
:HWWHG3HULPIW
&ULW'HSWK<FIW
7RS:LGWKIW
(*/IW
(OHYIW'HSWKIW6HFWLRQ
5HDFKIW
03/18/2022
Page 197 of 209
06/14/2024
245
&KDQQHO5HSRUW
+\GUDIORZ([SUHVV([WHQVLRQIRU$XWRGHVN&LYLO'E\$XWRGHVN,QF 7XHVGD\6HS
&XOYHUW8QGHUQHDWK:DON
7ULDQJXODU
6LGH6ORSHV]
7RWDO'HSWKIW
,QYHUW(OHYIW
6ORSH
19DOXH
&DOFXODWLRQV
&RPSXWHE\ .QRZQ4
.QRZQ4FIV
+LJKOLJKWHG
'HSWKIW
4FIV
$UHDVTIW
9HORFLW\IWV
:HWWHG3HULPIW
&ULW'HSWK<FIW
7RS:LGWKIW
(*/IW
(OHYIW'HSWKIW6HFWLRQ
5HDFKIW
03/18/2022
Page 198 of 209
06/14/2024
246
&KDQQHO5HSRUW
+\GUDIORZ([SUHVV([WHQVLRQIRU$XWRGHVN&LYLO'E\$XWRGHVN,QF 7XHVGD\6HS
7ULDQJXODU
6LGH6ORSHV]
7RWDO'HSWKIW
,QYHUW(OHYIW
6ORSH
19DOXH
&DOFXODWLRQV
&RPSXWHE\ .QRZQ4
.QRZQ4FIV
+LJKOLJKWHG
'HSWKIW
4FIV
$UHDVTIW
9HORFLW\IWV
:HWWHG3HULPIW
&ULW'HSWK<FIW
7RS:LGWKIW
(*/IW
(OHYIW'HSWKIW6HFWLRQ
5HDFKIW
03/18/2022
Page 199 of 209
06/14/2024
247
APPENDIX G
CULVERT CALCULATIONS
03/18/2022
Page 200 of 209
06/14/2024
248
+<&XOYHUW$QDO\VLV5HSRUW
03/18/2022
Page 201 of 209
06/14/2024
249
&URVVLQJ'LVFKDUJH'DWD
'LVFKDUJH6HOHFWLRQ0HWKRG5HFXUUHQFH
03/18/2022
Page 202 of 209
06/14/2024
250
7DEOH6XPPDU\RI&XOYHUW)ORZVDW&URVVLQJ&XOYHUW
+HDGZDWHU
(OHYDWLRQIW'LVFKDUJH1DPHV7RWDO'LVFKDUJH
FIV'LVFKDUJH
FIV5RDGZD\
'LVFKDUJHFIV,WHUDWLRQV
\HDU
\HDU
\HDU
2YHUWRSSLQJ2YHUWRSSLQJ
03/18/2022
Page 203 of 209
06/14/2024
251
5DWLQJ&XUYH3ORWIRU&URVVLQJ&XOYHUW
03/18/2022
Page 204 of 209
06/14/2024
252
7DEOH&XOYHUW6XPPDU\7DEOH
6WUDLJKW&XOYHUW
,QOHW(OHYDWLRQLQYHUWIW2XWOHW(OHYDWLRQLQYHUWIW
&XOYHUW/HQJWKIW&XOYHUW6ORSH
'LVFKDUJH
1DPHV
7RWDO
'LVFKDUJH
FIV
&XOYHUW
'LVFKDUJH
FIV
+HDGZDWHU
(OHYDWLRQ
IW
,QOHW
&RQWURO
'HSWKIW
2XWOHW
&RQWURO
'HSWKIW
)ORZ
7\SH1RUPDO
'HSWKIW
&ULWLFDO
'HSWKIW
2XWOHW
'HSWKIW7DLOZDWHU
'HSWKIW
2XWOHW
9HORFLW\
IWV
7DLOZDWHU
9HORFLW\
IWV
\HDU6Q \HDU6Q \HDU6Q
03/18/2022
Page 205 of 209
06/14/2024
253
&XOYHUW3HUIRUPDQFH&XUYH3ORW
03/18/2022
Page 206 of 209
06/14/2024
254
:DWHU6XUIDFH3URILOH3ORWIRU&XOYHUW
6LWH'DWD
6LWH'DWD2SWLRQ&XOYHUW,QYHUW'DWD
,QOHW6WDWLRQIW
,QOHW(OHYDWLRQIW
2XWOHW6WDWLRQIW
2XWOHW(OHYDWLRQIW
1XPEHURI%DUUHOV
&XOYHUW'DWD6XPPDU\
%DUUHO6KDSH&LUFXODU
%DUUHO'LDPHWHUIW
%DUUHO0DWHULDO&RQFUHWH
(PEHGPHQWLQ
%DUUHO0DQQLQJ
VQ
&XOYHUW7\SH6WUDLJKW
,QOHW&RQILJXUDWLRQ6TXDUH(GJHZLWK+HDGZDOO
,QOHW'HSUHVVLRQ1RQH
03/18/2022
Page 207 of 209
06/14/2024
255
7DEOH'RZQVWUHDP&KDQQHO5DWLQJ&XUYH&URVVLQJ&XOYHUW
7DLOZDWHU&KDQQHO'DWD&XOYHUW
7DLOZDWHU&KDQQHO2SWLRQ7ULDQJXODU&KDQQHO
6LGH6ORSH+9B
&KDQQHO6ORSH
&KDQQHO0DQQLQJ
VQ
&KDQQHO,QYHUW(OHYDWLRQIW
5RDGZD\'DWDIRU&URVVLQJ&XOYHUW
5RDGZD\3URILOH6KDSH&RQVWDQW5RDGZD\(OHYDWLRQ
&UHVW/HQJWKIW
&UHVW(OHYDWLRQIW
5RDGZD\6XUIDFH3DYHG
5RDGZD\7RS:LGWKIW
)ORZFIV:DWHU6XUIDFH
(OHYIW'HSWKIW9HORFLW\IWV6KHDUSVI)URXGH1XPEHU
03/18/2022
Page 208 of 209
06/14/2024
256
APPENDIX H
BASIN MAPS
03/18/2022
Page 209 of 209
06/14/2024
257
S
S
S
S
S
S
S
S
S
S
S
C.O.
S
Curb Inlet
TC=857.71
SW: 12"RCP, Inv=854.31
Curb Inlet
TC=857.84
N: 12"RCP, Inv=853.80
NE: 12"RCP, Inv=853.87
No Other Pipes Visible
Curb Inlet
TC=853.53
No Pipes Measured
Curb Inlet
TC=857.93
W: 12"RCP, Inv=853.53
Curb Inlet
TC=858.01
E: 12"RCP, Inv=852.87
No Other Pipes Visible
Probable Connection South
Shown BUT NOT Measured
Inlet
TC=855.37
N: 12"RCP, Inv=851.23
S: 12"RCP, Inv=850.84
Inlet
TC=851.65
N: 12"RCP, Inv=850.12
S: 12"RCP, Inv=850.10
Storm Manhole
TC=853.19
N/SW: 12"RCP, Inv=849.7112"RCP W/ Concrete
End Section, Inv=849.44
12" Conc
Headwall
18" Metal Pipe
Inv=848.15
4" Clay, Inv=849.25
6" Clay(2), Inv=848.73
12" RCP W/Concrete
End Section, Inv=845.44
12" RCP W/Concrete
End Section, Inv=845.38
12"RCP W/ Concrete
End Section, Inv=849.26
15"CMP , Inv=850.80
Other End Not Found15"CMP
Inv=850.44
15"CMP
Inv=850.45
15"RCP W/Concrete
End Section, Inv=850.45
12"CMP
Inv=851.40
12"CMP
Inv=851.74
12"CMP W/Concrete
End Section, Inv=851.53 12"CMP W/Concrete
End Section, Inv=850.97
6"CPP
Inv=851.32
6"CPP
Inv=851.03
Curb Inlet
TC=852.29
N: 15"RCP, Inv=848.74
S: 18"RCP, Inv=847.79
Storm Manhole
TC=852.69
N: 12"RCP, Inv=848.33
E: 18"RCP, Inv=845.40
W: 18"RCP, Inv=844.90
Curb Inlet
TC=853.32
No Pipes Measured
ELEVATIONS FOR THIS PROJECT ARE ON NAVD88 DATUM
Ex. Basin West
11.03 Ac.
Ex. Basin North
6.10 Ac.
Ex. Basin #OffsiteWest
3.65 Ac.
Ex. Basin East
8.58 Ac.DATE MARKREVISIONSBYS & A JOB NO.
SHEET NO.
DRAWN BY: CHECKED BY:S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942File Name: S:\60160JGV\Drainage\Basin Maps\Jackson's Grant Village Basin Maps NES.dwg - EXISTING CONDITIONS BASIN MAPModified / By: September 9, 2021 4:28:05 PM / nstambroPlotted / By: September 10, 2021 3:47:24 PM / Nicole StambroEXISTING CONDITIONS MAPJACKSON'S GRANT VILLAGECARMEL, CLAY TOWNSHIPHAMILTON COUNTY, INDIANANES BMB
1
60160JGV
LEGEND
EXISTING STORM SEWER
BASIN BREAKLINE
0
GRAPHIC SCALE
( IN FEET )
80'40' 80'
1" = 80 FT
06/14/2024
258
o o oo o oo o oo o oo o oo o oo o oo o o
o o o
o o o
o o o o o oo o oo o o o o oo o oo o oo o oAcDbG
eo
Ma
p
(
A
cG
eo
l
oc
a
ti
o
nO
bj
)o o oo o oo o oo o oo o oo o oo o oo o oo o oo o oo o oo o o**VAR. R.D.E. & B.M.P.EVAR. D.&U.E.VAR. R.D.E. & B.M.P.E.VAR. T.P.E.VAR. R.D.E. & U.E.VAR. SIGN
EASEMENT VAR. SIGN
EASEMENTVAR. S
IGNEASEMENT o o oo o oo o oo o oo o oo o oo o oo o o o o o
o o o
o o o o o oo o oo o oo o oo o oo o oo o o401430429428427405404403402409408407406424423422421415414413412411410418417436435434433432431447445444443442440439438437448446441450452451457A457456454453458447A> o o o> o o o> o o o> o o o> o o o> o o o > o o o > o o o> o o o> o o o> o o o> o o o > o o o
> o o o > o o o > o o o455455A455B417A
*835836837838839840
845
841842843844 850855851852853854846847848849BIO RETENTION BMP #12 YEAR ELEV.=849.5010 YEAR ELEV.=850.13INTERIM100 YEAR ELEV.=851.51100 YEAR ELEV.=850.99BOTTOM ELEV.=VARIES> o o o40'SPILLWAYEL.=853.50VAR. U.E.15' S.S.E.VAR. U.E.459EX-2x x x x x x x x x x x x
xxxxxxxxxxxxxxxxxxx> o o o> o o o461> o o o> o o o> o o o> o o o> o o o> o o o> o o oLAKE #1N.P.=847.002 YEAR ELEV.=848.3010 YEAR ELEV.=849.26INTERIM100 YEAR ELEV.=851.45100 YEAR ELEV.=853.50BOTTOM ELEV.=835.00400460Basin Onsite S13.08 Ac.CN = 86.86ToC = 16.2Interim Pond S113.26 Ac.CN = 85.01ToC = 28.1Basin Offsite S10.92 Ac.CN = 83.02ToC = 21.1EX Offsite Basin3.65 Ac.DATE MARK REVISIONS BYS & A JOB NO.SHEET NO.DRAWN BY: CHECKED BY:
S T O E P P E L W E R T H
A L W A Y S O N
7965 East 106th Street, Fishers, IN 46038-2505
phone: 317.849.5935 fax: 317.849.5942
File Name: S:\60160JGV\Drainage\Basin Maps\Jackson's Grant Village Basin Maps NES_recover.dwg - POND ROUTING BASIN MAP (Interim) S1Modified / By: January 18, 2022 1:14:30 PM / nstambroPlotted / By: January 18, 2022 1:51:45 PM / Nicole Stambro
POND ROUTING BASIN MAP
JACKSON'S GRANT VILLAGE
SCENARIO 1 - INTERIM CONDITIONS
CARMEL, CLAY TOWNSHIP HAMILTON COUNTY, INDIANANRS BMBPR-160160JGVLEGENDEXISTING STORM SEWERBASIN BREAKLINEPROPOSED STORM SEWERLAKE NORMAL POOLAREA TO BE TEMPORARILYGRADEDAREA TO BE LEFT ALONEo o o0GRAPHIC SCALE( IN FEET )50'25' 50'1" = 50 FT06/14/2024 259
xx x xx> o o o> o o o> o o o> o o o> o o oo o oo o oo o oo o oo o oo o oo o oo o o
o o o
o o o
o o o o o oo o oo o o o o oo o oo o oo o o404405422423452450447A433412413414434447429430444446445448437443442417418436435421415438439441406408407428411403440451432409424457456453455B454455401INTERIM POND - S217.46 Ac.CN = 89.53ToC = 17.3Basin Onsite S23.27 Ac.CN = 84.78ToC = 16.2Basin Offsite S20.92 Ac.CN = 83.02ToC = 21.1Basin Tree Preservation Area3.06 Ac.EX Offsite Basin3.65 Ac.EX-2459404405422423452450447A433412413414434447429430444446445448437443442417418436435421415438439441406408407428411403440451432409424401457456455B453454455EX-2459404405422423452450447A433412413414434447429430444446445448437443442417418436435421415438439441406408407428411403440451432409424401417A457457A456455B453454455458455A410431402427400460461DATE MARK REVISIONS BYS & A JOB NO.SHEET NO.DRAWN BY: CHECKED BY:
S T O E P P E L W E R T H
A L W A Y S O N
7965 East 106th Street, Fishers, IN 46038-2505
phone: 317.849.5935 fax: 317.849.5942
File Name: S:\60160JGV\Drainage\Basin Maps\Jackson's Grant Village Basin Maps NES_recover.dwg - POND ROUTING BASIN MAP (Interim)S2Modified / By: January 18, 2022 1:14:30 PM / nstambroPlotted / By: January 18, 2022 1:49:59 PM / Nicole Stambro
POND ROUTING BASIN MAP
JACKSON'S GRANT VILLAGE
SCENARIO 2 - INTERIM CONDITIONS
CARMEL, CLAY TOWNSHIP HAMILTON COUNTY, INDIANANRS BMBPR-260160JGVLEGENDEXISTING STORM SEWERBASIN BREAKLINEPROPOSED STORM SEWERLAKE NORMAL POOLo o o0GRAPHIC SCALE( IN FEET )50'25' 50'1" = 50 FT06/14/2024 260
o o oo o oo o oo o oo o oo o oo o oo o o
o o o
o o o
o o o o o oo o oo o o o o oo o oo o oo o o404405422423452450447A433412413414434447429430444446445448437443442417418436435421415438439441406408407428411403440451432409424457456453455B454455401Basin Full Build Out of Pond21.57 Ac.CN = 89.76ToC = 17.3Basin 457A Combined3.29 Ac.CN = 84.76ToC = 16.2LAKE 1DRY BASIN1.27 Ac.C = 0.22ToC = 17.3Basin Tree Preservation Area(subtract area from basin full build out of pond)1.04 Ac.EX Offsite Basin3.64 Ac.EX-2459404405422423452450447A433412413414434447429430444446445448437443442417418436435421415438439441406408407428411403440451432409424401457456455B453454455EX-2459404405422423452450447A433412413414434447429430444446445448437443442417418436435421415438439441406408407428411403440451432409424401417A457457A456455B453454455458455A410431402427400460461DATE MARK REVISIONS BYS & A JOB NO.SHEET NO.DRAWN BY: CHECKED BY:
S T O E P P E L W E R T H
A L W A Y S O N
7965 East 106th Street, Fishers, IN 46038-2505
phone: 317.849.5935 fax: 317.849.5942
File Name: S:\60160JGV\Drainage\Basin Maps\Jackson's Grant Village Basin Maps NES_recover.dwg - POND ROUTING BASIN MAP(Full Build Out)Modified / By: January 18, 2022 11:26:41 AM / nstambroPlotted / By: January 18, 2022 11:49:20 AM / Nicole Stambro
POND ROUTING BASIN MAP
JACKSON'S GRANT VILLAGE
SCENARIO 3 - FULL BUILD OUT
CARMEL, CLAY TOWNSHIP HAMILTON COUNTY, INDIANANRS BMBPR-360160JGVLEGENDEXISTING STORM SEWERBASIN BREAKLINEPROPOSED STORM SEWERLAKE NORMAL POOLo o o0GRAPHIC SCALE( IN FEET )50'25' 50'1" = 50 FT06/14/2024 261
TR8
5
8
.
7
3T.P.TR8
5
8
.
6
7TR853.39T.A.C.EACT.A.C.GVT.A.C.T.A.C.EACEACT.A.C.T.P.T.A.C.T.A.C.TR852.88T.A.C.T.A.C.T.P.P.W.P.P.W.P.P.W.P.P.W.P.TV.P.T.P.E.P.E.P.P.W.P.P.W.P.P.W.P.E.P.P.W.P.P.W.P.P.W.P.GVE.T.E852.46M.B.T.A.C.TV.P.E.T.T.A.C.TV.P.T.P.M.B.T.P.T.A.C.P.W.P.P.W.P.T.A.C.8
5
2
.
5
3
8
5
2
.
6
1 852.668
5
2
.
5
8 852.248
5
1
.
9
6
8
5
2
.
5
7
8
5
3
.
1
5E.T.853.45853.10853.37852.02852.33852.91
EEEEEEEEEE
EEE EE E
EEE
E
EEEW
WWWWWWWWWWWWWWWWWWWWWWWWWW> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o oEEE
EWWWWWWWWWWWWWWW
WWWWWWW852.06852.82852.85852.66852.888
5
4
.
5
4 854.378
5
4
.
6
9 853.37853.70855.08854.63853.59853.08854.42GMAC8
5
4
.
2
0E.M.8
5
3
.
7
2 853.738
5
3
.
8
6
8
5
4
.
1
1
854.04855.198
5
5
.
1
9
8
5
5
.
1
5
8
5
5
.
0
7
854.87855.19854.21WATER SPIGOT849.82850.09843.05844.83 854.38852.68850.02P.W.P.842.16843.44852.22P.W.P.P.W.P.855.48855.41855.44 855.39855.39855.42855.44855.60855.57855.58855.38854.91853.94853.06852.39852.07852.14851.27851.36852.46xx x xx> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o o> o o oEField EntranceVAR. D.U.&S.S.E.Gas Line Easement
Inst. No. 2017-013563
Gas Line Easement
Inst. No. 2017-013563
Gas Line Easement
Inst. No. 2017-013563
Gas Line Easement
Inst. No. 2017-013563 VAR. B.M.P.E.&R.D.E.30'30'30' DRAINAGE FLOODROUTE EASEMENTINST. NO. 2020-06914830' DRAINAGE FLOODROUTE EASEMENTINST. NO. 2020-069148o o oo o oo o oo o oo o oo o oo o oo o o
o o o
o o o
o o o o o oo o oo o o
o o oo o oo o oo o oBasin 4500.31 Ac.C=0.62ToC=8.9Basin 436A1.83 Ac.C=0.75ToC=10Basin 4470.38 Ac.C=0.65ToC=18.6Basin 4441.12 Ac.C=0.51ToC=5.0Basin 4240.60 Ac.C=0.33ToC=19.8Basin 4080.37 Ac.C=0.26ToC=19.2Basin 4070.17 Ac.C=0.37ToC=19.2Basin 4060.15 Ac.C=0.39ToC=20.9Basin 4030.18 Ac.C=0.26ToC=30.1Basin 4110.41 Ac.C=0.41ToC=20.8Basin 4130.25 Ac.C=0.24ToC=13.3Basin 4050.92 Ac.C=0.61ToC=15.0Basin 4150.49 Ac.C=0.64ToC=16.9Basin 4350.41 Ac.C=0.62ToC=20.9Basin 4210.19 Ac.C=0.47ToC=15.0Basin 4230.49 Ac.C=0.61ToC=8.7Basin 4560.16 Ac.C=0.41ToC=16.6Basin 4320.13 Ac.C=0.35ToC=20.8Basin 4390.42 Ac.C=0.66ToC=5.0Basin 4380.46 Ac.C=0.58ToC=18.0Basin 4420.45 Ac.C=0.63ToC=16.2Basin 4430.28 Ac.C=0.61ToC=5.0Basin 4360.30 Ac.C=0.60ToC=5.0Basin 4450.59 Ac.C=0.72ToC=5.0Basin 4480.71 Ac.C=0.71ToC=30.9Basin 4460.57 Ac.C=0.61ToC=22.9Basin 4180.28 Ac.C=0.63ToC=43.4Basin 4280.05 Ac.C=0.16ToC=10.5Basin 4290.18 Ac.C=0.56ToC=16.3Basin 4400.24 Ac.C=0.55ToC=5.0Basin 4410.41 Ac.C=0.81ToC=5.0Basin 447A0.21 Ac.C=0.66ToC=5.0Basin 4340.25 Ac.C=0.48ToC=5.0Basin 4140.41 Ac.C=0.42ToC=13.0Basin 4530.15 Ac.C=0.76ToC=5.6Basin 4170.59 Ac.C=0.49ToC=15.5Basin 4090.36 Ac.C=0.35ToC=25.1Basin #1.91 Ac.C=0.21ToC=21.8Basin #4220.16 Ac.C=0.64ToC=5.0LAKE 1DRY BASINBasin 4570.47 Ac.C=0.22ToC=17.3Basin 4540.36 Ac.C=0.24ToC=16.6Basin Tree Preservation Area(subtract area from basin full build out of pond)1.04 Ac.EX Offsite Basin3.64 Ac.Basin 4510.25 Ac.C=0.69ToC=5.0Basin 451A0.40 Ac.C=0.73ToC=5.0Basin 4520.11 Ac.C=0.22ToC=10.9DATE MARK REVISIONS BYS & A JOB NO.SHEET NO.DRAWN BY: CHECKED BY:
S T O E P P E L W E R T H
A L W A Y S O N
7965 East 106th Street, Fishers, IN 46038-2505
phone: 317.849.5935 fax: 317.849.5942
File Name: S:\60160JGV\Drainage\Basin Maps\Jackson's Grant Village Basin Maps NES.dwg - PIPE SIZING BASIN MAPModified / By: March 15, 2022 3:51:23 PM / nstambroPlotted / By: March 16, 2022 10:28:31 AM / Nicole Stambro
PIPE SIZING BASIN MAP
JACKSONS GRANT VILLAGE
SCENARIO 3 - FULL BUILD OUT
CARMEL, CLAY TOWNSHIP HAMILTON COUNTY, INDIANANRS BMBPS-160160JGVLEGENDEXISTING STORM SEWERBASIN BREAKLINEPROPOSED STORM SEWERLAKE NORMAL POOLo o o0GRAPHIC SCALE( IN FEET )50'25' 50'1" = 50 FT06/14/2024 262
APPENDIX C
BASIN MAPS
06/14/2024
263
Basin 4470.38 Ac.C=0.65ToC=18.6Basin 4430.28 Ac.C=0.61ToC=5.0Basin 4450.59 Ac.C=0.72ToC=5.0Basin 447A0.21 Ac.C=0.66ToC=5.0MULTI-TENANT 'A'4,920 gsfMULTI-TENANT 'B'5,030 gsfMULTI-TENANT 'C'4,920 gsf> o o o > o o o > o o o > o o o > o o o> o o o> o o o> o o o> o o o> o o o> o o o > o o o > o o o 476475474473470471448CTVGASGASGASCTVCTVS> o o o> o o o> o o o> o o o> o o o> o o o> o o
o
> o o oBasin 4460.48 Ac.C=0.58ToC=22.90Basin 4710.07 Ac.C=0.47ToC=10.80Basin 4730.31 Ac.C=0.53ToC=28.60Basin 4740.07 Ac.C=0.16 ToC=12.90Basin 4440.75 Ac.C=0.63ToC=31.40Basin 4480.42 Ac.C=0.74ToC=30.90Basin 4720.12 Ac.C=0.42TOC=22.60Basin 4750.15 Ac.C=0.56ToC=15.30DATE MARK REVISIONS BYS & A JOB NO.SHEET NO.DRAWN BY:CHECKED BY:S T O E P P E L W E R T H
A L W A Y S O N
7965 East 106th Street, Fishers, IN 46038-2505
phone: 317.849.5935 fax: 317.849.5942
File Name:S:\60160JGV\Drainage\Basin Maps\JGV C 2.dwg - PIPE SIZING BASIN MAPModified / By:June 14, 2024 9:36:24 AM / nstambroPlotted / By:June 14, 2024 9:55:31 AM / Nicole Stambro
PIPE SIZING BASIN MAP
SPRING MILL SHOPS
CARMEL, CLAY TOWNSHIP HAMILTON COUNTY, INDIANANRSBMBPS-160160JGVLEGENDEXISTING STORM SEWERBASIN BREAKLINEPROPOSED STORM SEWERLAKE NORMAL POOLo o o0GRAPHIC SCALE( IN FEET )20'10'20'1" = 20 FT