Loading...
HomeMy WebLinkAboutL100_Landscape PlanWWWWWWWWWWWWWWWWWEECTVFOFOFOGAS GAS GAS GAS GAS GAS GASGAS GASGASWWWWWWWWWWWWWWWWWWWWWW W FOFOFOFOFOFOCTVFOFOFOFOFOFOCTVFOFOCTVCTVCTVGASGASGASGASCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASOHE OHE OHEOHEF O FOFOFOEEEEEEEEEEEEEEEEEEEFOFOFOFOSSSSSSFSSSWVF(5) Ile-v(5) Ile-v(1) Gle-i(3) Jun-g(5) Phy-o(4) Cal-x(5) Nep-x(5) Pot-f(7) Hyd-q(5) Pot-f(3) Cal-x(6) Nep-x(19) Lir-s(2) Pla-a(9) Ile-v(2) Pla-a(7) Ile-v(1) Syr-r(5) Ite-v(6) Vib-x(5) Die-k(5) Die-k(3) Phy-o(3) Ite-v(2) Que-x(1) Que-x(1) Que-x(3) Cor-c(7) Bux-x(15) Lav-x(3) Ile-v(10) Sch-s(13) Cor-c(11) Tax-m(10) Lav-x(8) Ite-v(3) Vib-x(10) Hyd-q(6) Nep-x(11) Tax-m(31) Lir-s(8) Lav-x(3) Aro-m(5) Spo-h(3) Bux-x(5) Lav-x(3) Pan-h(3) Ite-v(2) Pan-h(3) Aro-m(3) Ite-v(2) Pan-h(2) Aro-m(16) Cha-l(7) Pot-f(4) Cha-l(4) Pot-f(12) Cha-l(5) Pan-h(5) Hyd-q(5) Pan-h(3) Hyd-q(5) Pot-f(5) Cal-x(6) Hyd-q(5) Nep-x(5) Vib-x(5) Die-k(5) Cal-x(7) Cor-c(3) Bux-x(3) Cal-x(3) Bux-x(3) Cal-x(1) Gle-s(1) Cer-c(2) Bux-x(7) Vib-x(54) Lav-x(1) Bet-n(16) Ite-v(30) Lir-s(4) Cha-l(6) Pot-f(6) Cha-l(3) Pot-f(3) Hyd-q(6) Cha-l(3) Hyd-q(2) Gle-s(3) Rhu-a(1) Gle-s(5) Ile-v(1) Gle-i(5) Cal-x(12) Cor-c(2) Cal-x(7) Aro-m(6) Cal-x(13) Pot-f(3) Aro-a(4) Rhu-aZONING: PUD - JACKSON'S GRANT VILLAGE (ord. # Z-653-20)OVERLAY: W 116TH ST OVERLAYADJACENT ZONING:NORTH: GREEN FIELD DRIVEEAST: SPRING MILL ROADSOUTH: PUDWEST: PUDFOUNDATION PLANTINGSRequirement: Provide planting beds with a minimum width of 5' along the length ofall building facades with the exception of hardscape areas.Required:Building A @ 309 l.f. = 1,545 s.f. planting bedBuilding B @ 327 l.f. = 1,635 s.f. planting bedBuilding C @ 309 l.f. = 1,545 s.f. planting bedProvided:Building A = 1,575 s.f. planting bedBuilding B = 1,705 s.f. planting bedBuilding C = 1,550 s.f. planting bedPARKINGRequirement: (Interior Parking Lot) Provide 1 tree + 5 shrubs for every 15 parkingspaces.Required: 51 spaces / 15 = 4 shade trees + 17 shrubsProvided: 4 shade trees + 17 shrubsSTREET TREESRequirement: Provide 1 shade tree within the R.O.W. with a minimum spacing of25' and a maximum spacing of 50'.Required: Spring Mill Road @ 263 LF = 6-11 trees Village Green Drive 112 @ LF = 3-5 treesProvided:Spring Mill Road = 6 trees (spaced to avoid utility easement conflicts)Village Green Drive = 3 trees*LOT PLANTINGS (per PUD 12.6.D)Requirement: Trees planted along front of commercial uses with a maximumspacing of 50' O.C. Alternatively, the an equivalent number of trees to therequirement may be clustered at variable intervals along the street frontage.BUFFER YARDS (per PUD 12.4.A.ii)Requirement: A minimum 20' greenbelt required where real estate abuts Spring MillRoad. Greenbelt shall include street trees with a maximum spacing of 50' O.C.Required:Provided:LANDSCAPE PLANL1000Scale 1" = 20'-0"40'20'10'NorthThese Drawings and Specifications, and all copiesthereof are and shall remain the property andcopyright of the Landscape Architect. They shallbe used only with respect to this Project and arenot to be used on any other Project or Workwithout prior written permission from theLandscape Architect.Sheet No: Revision Date Description Certified by:Sheet Title: Date: Project No: Drawn by: Checked by:24-1809APPAPP06/19/20245825 Lawton Loop E. Dr. | Indianapolis, IN 46216 317-485-6900 | www.context-design.com N O T F O R C O N S T R U C T I O N SUBMITTAL DRAWINGS SPRING MILL SHOPS Carmel, Indiana 1.Plant material to be installed and maintained by a qualified and experienced landscapeinstaller.2.All materials are subject to the approval of the Landscape Architect and Owner at anytime. Landscape Architect to inspect all plant locations and plant bed conditions prior toinstallation. Stake all plant locations for review and approval by the Landscape Architectbefore planting. On-site adjustments may be required. Plants are to be freshly dug.Transporting of plants shall be done in a manner as to not destroy the natural shape,compromise the health, or alter the characteristics of plant materials.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards forNursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. Removefrom the site any plant material that turns brown or defoliates within five (5) days afterplanting. Replace immediately with approved, specified material.4.Plant counts indicated on drawings are for Landscape Architect's use only. Contractorshall make own plant quantity takeoffs using drawings, specifications, and plant schedulerequirements (i.e., spacing), unless otherwise directed by Landscape Architect.Contractor to verify bed measurements and install appropriate quantities as governed byplant spacing per schedule.5.All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch(unless otherwise noted). Apply pre-emergent herbicide as directed by the manufacturerprior to installing mulch. Seed all areas disturbed by construction activities that are nototherwise noted to receive pavement, planting bed, or other treatment.6.The Contractor shall install and/or amend topsoil in all proposed bed areas to meetASTM D5268 standards. Landscaper shall verify depth and quality of topsoil prior toplant installation. A minimum of 4" of topsoil is required for lawn areas; 12" for plant beds.Topsoil sources shall include the reuse of surface soil stockpiled on site, clean of roots,plants, sod, stones, clay lumps, and other extraneous or foreign materials larger than 1".Supplement with imported topsoil from off-site sources when quantities are insufficient.Do not obtain supplemental topsoil from agricultural land, bogs, or marshes. Inorganicamendments, organic amendments, and fertilizers shall be used to amend topsoil asneeded for long-term plant health.7.Verify all utility locations in the field prior to beginning work. Repair all damaged utilities tosatisfaction of the Owner and Operating Authority at no additional cost.8.Install all plant material in accordance with all local codes and ordinances. Coordinatewith the Owner to obtain any required permits necessary to complete work. Allworkmanship and materials shall be guaranteed by the Contractor for a period of one (1)calendar year after Final Acceptance.9.Maintain all plant material for a three (3) month period from date of SubstantialCompletion. Maintenance shall include pruning, cultivating, watering, weeding, fertilizing,restoring plant saucers, spraying for disease and insects, and replacing tree wrappings.Recommended long-term maintenance procedures shall be provided to the Owner beforeexpiration of this period.10.Satisfactory Seeded Lawn: At end of maintenance period, a healthy, uniform, closestand of grass has been established, free of weeds and surface irregularities, withcoverage exceeding 90 percent over any 10 sq. ft. (0.92 sq. m) and bare spots notexceeding 3 by 3 inches.Reestablish lawns that do not comply with requirements andcontinue maintenance until lawns are fully satisfactory to the Owner.PLANTING NOTESORDINANCE CHARTALL PLANTS SHALL BEINSTALLED PER DETAILS ONL101. REFER TO SHEET L101.REFER TO SHEET L101 FORPLANT SCHEDULE