Loading...
HomeMy WebLinkAboutDoor detailsSteven Jenison10520 Shelbourne RdCarmel, IN 46032ENG. BY : PSC : DRAWN BY : MTO BY : FBi PROJECT # : SHEET : Rustin S XX Alan S Daniel L 20-2060-00BYDESCRIPTIONNO.DATE12024-06-20Rustin SApproval Set.........NOTE: THIS IS A GENERIC DEPICTION OF THE INTERIOR ELEVATION. ACTUAL SIZES MAY VARY. PA-FLASH STEEL LINER J-CHANNEL SCALE: 1/4" = 1'-0" J-CHANNEL FROM FIN. FLOOR TO CEILING FLAT COIL FLAT COIL PA-FLASH OVERHEAD DOOR ROUGH OPENING OHD #3 INTERIOR FINISH ELEVATION DOOR #3 HEADER DETAIL SCALE: 1" = 1'-0" B/ HEADER B/ TRUSS END TOP @ 9' o.c. MAX 2x6 SYP LAMINATED COLUMN BOTTOM CHORD OF END TRUSS 2x6 2x4 JAMB BOARD 107'-11 12" 118'-0" OHD STUB MIDDLE 2x12 SYP BLOCKING 2x6 SYP JAMB BACKER 2x12 SYP BLOCKING REQUIRES (10) 10d NAILS 2x12 SYP BLOCKING REQUIRES (10) 10d NAILS (2) LAYERS OF 23 32" OSB 2-PLY 2x4 STUB @ 48" o.c. 2x12 SYP BLOCKING FASTENED W/ (10) 10d NAILS DOOR #2 HEADER DETAIL SCALE: 1" = 1'-0" B/ HEADER B/ TRUSS END TOP @ 9' o.c. MAX 2x6 SYP LAMINATED COLUMN BOTTOM CHORD OF END TRUSS 2x6 2x4 JAMB BOARD 113'-11 12" 118'-0" OHD STUB MIDDLE 2x12 SYP BLOCKING 2x6 SYP JAMB BACKER 2x12 SYP BLOCKING REQUIRES (10) 10d NAILS 2x12 SYP BLOCKING REQUIRES (10) 10d NAILS (2) LAYERS OF 23 32" OSB 2-PLY 2x4 STUB @ 48" o.c. 2x12 SYP BLOCKING FASTENED W/ (10) 10d NAILS OFFSET PERMA-COLUMN 3-PLY TOP GRADE BOARD OFFSET PERMA-COLUMN GRADE BOARD 3-PLY STANDARD MIDDLE GAP BETWEEN STUB & TOP HEADER AFTER BUILDING IS LIFTED 5th PLY ADDED TO THIS SIDE OF COLUMN W/ (2) 10d NAILS @ 8" o.c. 5th PLY FASTENED ABOVE HEADER W/ (15) 10d NAILS HEADER B/ TRUSS @ 103'-6" BEFORE LIFTING OHD COLUMN DETAIL SCALE: 1 2" = 1'-0" LOWERED RAISED 4' PRE-CUT BLOCK W/ 1/2" NOTCH FOR BRACKET CREW TO FILL IN ABOVE 4' BLOCK PER NOTES (4) STRUCTURAL-S SCREWS THROUGH 3 PLIES (EACH SIDE OF COLUMN) (2) 12" x 7" CARRIAGE BOLTS THROUGH ALL 4 PLIES 1.Place inside face of offset jamb stub flush with inside edge of door opening with bracket away from door opening. 2.Set 3-Ply laminated column in pocket of PC and fasten with structural screws. 3.Drill holes for bolts. 4.Set 4' block on top of concrete and tap against screw heads. Remove and use drill to "countersink" holes for screw heads. 5.Place block against column on top of concrete stub and fasten with (10) 10d air nails. 6.Drill holes in block for bolts. 7.Insert carriage bolts through all four plies. Tighten until head of bolt is flush with jamb. 8.Cut SYP block to fit tight to block/underside of the following: -Beam or header for sliding doors; -Truss for overhead doors. Fasten with (2) 10d nails @ 8" o.c. 9.Set header and truss per specs. NOTES:SEAL600SHEET TITLE:WALL SECTION DETAILSCOPYRIGHT FBi Buildings, Inc.