Loading...
HomeMy WebLinkAboutSite Plan w/Aerial ViewSteven Jenison10520 Shelbourne Carmel, IN 46032FBi Buildings, Inc.3823 W 1800 SRemington, IN 47977219-261-2157www.fbibuildings.comDate : Name: PRELIMINARY THESE DRAWINGS ARE FOR REVIEW ONLY These drawings are not complete and are not to be used for construction. 5/12/24 DJLX:___________________________________________ ____________ Purchaser Approval DateX:____________________________________________ _____________ Seller Approval Date Drawing # ____________________________________ Copyright: FBi Buildings, Inc. Building may not be shown to scale. (Colors shown may not match actual colors. Refer to color samples for actual colors.)Construction ZoneCZ-101North Construction Zone Checklist: Site Access (location, width, and type) Perimeter Access & Grade (dimensions, type, and grade) Building Pad (location, dimensions, and type) Staging Area (location, dimensions, and type) Dig in Considerations (specified) Gravel Backfill __Yes __No Spoils __Inside __Outisde Obstructions/ Safety Hazards (location and type) Site Sign (location) Off Limit Areas (location) Purchaser understands excess soil will be generated during the construction process, and takes responsibility for its removal. Purchaser Initials_______ Purchaser understands that any deviations from the defined site conditions when FBi mobilizes could result in a change order. Purchaser Initials_______ Construction Zone Checklist: Site Access (location, width, and type) Perimeter Access & Grade (dimensions, type, and grade) Building Pad (location, dimensions, and type) Staging Area (location, dimensions, and type) Dig in Considerations (specified) Gravel Backfill __Yes __No Spoils __Inside __Outisde Obstructions/ Safety Hazards (location and type) Site Sign (location) Off Limit Areas (location) Purchaser understands excess soil will be generated during the construction process, and takes responsibility for its removal. Purchaser Initials_______ Purchaser understands that any deviations from the defined site conditions when FBi mobilizes could result in a change order. Purchaser Initials_______ Proposed Building Construction Zone Gravel Drive lane Crew entrance