HomeMy WebLinkAboutSite Plan w/Aerial ViewSteven Jenison10520 Shelbourne Carmel, IN 46032FBi Buildings, Inc.3823 W 1800 SRemington, IN 47977219-261-2157www.fbibuildings.comDate :
Name:
PRELIMINARY
THESE DRAWINGS
ARE FOR
REVIEW
ONLY
These drawings are
not complete and
are not to be used
for construction.
5/12/24
DJLX:___________________________________________ ____________ Purchaser Approval DateX:____________________________________________ _____________ Seller Approval Date Drawing # ____________________________________ Copyright:
FBi Buildings, Inc.
Building may not be shown to scale.
(Colors shown may not match actual colors.
Refer to color samples for actual colors.)Construction ZoneCZ-101North
Construction Zone Checklist:
Site Access (location, width, and type)
Perimeter Access & Grade (dimensions, type, and grade)
Building Pad (location, dimensions, and type)
Staging Area (location, dimensions, and type)
Dig in Considerations (specified)
Gravel Backfill __Yes __No
Spoils __Inside __Outisde
Obstructions/ Safety Hazards (location and type)
Site Sign (location)
Off Limit Areas (location)
Purchaser understands excess soil will be generated during the construction
process, and takes responsibility for its removal. Purchaser Initials_______
Purchaser understands that any deviations from the defined site conditions when
FBi mobilizes could result in a change order. Purchaser Initials_______
Construction Zone Checklist:
Site Access (location, width, and type)
Perimeter Access & Grade (dimensions, type, and grade)
Building Pad (location, dimensions, and type)
Staging Area (location, dimensions, and type)
Dig in Considerations (specified)
Gravel Backfill __Yes __No
Spoils __Inside __Outisde
Obstructions/ Safety Hazards (location and type)
Site Sign (location)
Off Limit Areas (location)
Purchaser understands excess soil will be generated during the construction
process, and takes responsibility for its removal. Purchaser Initials_______
Purchaser understands that any deviations from the defined site conditions when
FBi mobilizes could result in a change order. Purchaser Initials_______
Proposed
Building
Construction Zone Gravel Drive lane
Crew entrance