Loading...
HomeMy WebLinkAboutLyft detailsENG. BY : PSC : DRAWN BY : MTO BY : FBi PROJECT # : SHEET : Rustin S XX Alan S Daniel L 20-2060-00Steven Jenison10520 Shelbourne RdCarmel, IN 46032BYDESCRIPTIONNO.DATE12024-06-20Rustin SApproval Set.........PERMA-COLUMN NOTES: 1.STUB MUST BE SET TO +/- 6" VERTICAL TOLERANCE. 2.MTO TO SEND OUTSIDE PLIES OF COLUMN-TOP 6" LONGER THAN STANDARD PC LENGTH TO BE FIELD TRIMMED AS NECESSARY. 3.MTO TO SEND CENTER PLY OF COLUMN-MIDDLE 6" LONGER THAN STANDARD PC LENGTH TO BE FIELD TRIMMED AS NECESSARY. 4.BOTTOM OF COLUMN-MIDDLE WILL NOT BE CUT. 5.CUT-OFF AMOUNT = X" - 6" 6.GIRT MARKS MEASURED FROM TOP OF CENTER PLY OF COLUMN MIDDLE AFTER CUTTING. END TOP/WIND BRACE CONNECTION SCALE: 1/2" = 1'-0" FASTEN EACH 2x6 x 12" SYP BLOCK W/ (3) STRUCTURAL-S SCREWS CUT BCT & FASTEN TO BLOCK W/ (1) PURLIN SCREW TRUS S BC T END T R U S S END TRUSS FASTENED TO "END TOP" W/ (2) STRUCTURAL-M SCREWS @ EACH CHORD LOCATION & (2) 16d R.S. NAILS @ EACH WEB LOCATION TOP C H O R D BCT FASTENED TO COLUMN TOP W/ (5) 10d NAILS BC T WIND BRACE BRACKET FASTENED TO TRUSS W/ (9) SD#9 x 1 12" SCREWS AND FASTENED TO WIND BRACE W/ (11) SD#9 x 1 12" SCREWS WIND BRACE FASTENED TO COLUMN TOP W/ (5) STRUCTURAL-M SCREWS H1 CLIPS ON NEAREST PURLIN EACH SIDE OF WIND BRACE (10-SD #9 x 1 12" SCREWS TOTAL) - USE H10A-2 CLIPS FOR 2-PLY TRUSSES (18-SD #9 x 1 12" SCREWS TOTAL)30"TOP C H O R D FROM BOTTOM OFTRUSS TO TOP OFWIND BRACEBC T FASTEN WIND BRACE PIECES INTO AN "L" WITH (25) 10d NAILS FASTEN BCT TO BOTTOM CHORD W/ (1) PURLIN SCREW 2x6 BCT CONNECTOR SHALL SPAN ACROSS TOP OF ALL BCTs IN THIS BAY HINGE CONNECTION DETAILS SCALE: 1 2" = 1'-0" BOTTOM OF THE UPPER PART OF THE HINGE IS FLUSH W/ THE BOTTOM OF THE CENTER PLY OF THE "COLUMN TOP" TOP OF THE LOWER PART OF THE HINGE IS FLUSH W/ THE TOP OF THE CENTER PLY OF THE "COLUMN MIDDLE" CUT OFF COLUMN THE SAME AMOUNT AS "COLUMN TOP" BEFORE HINGE FASTENING HINGE FASTENED TO THE "COLUMN TOP" W/ (2) STRUCTURAL-M SCREWS & TO THE "COLUMN MIDDLE" W/ (2) STRUCTURAL-M SCREWS SPLICE CONNECTION DETAILS SCALE: 1 2" = 1'-0"7""COLUMN MIDDLE" FASTENED TO PERMA BRACKET PER SPECS FROM WALL SECTION "COLUMN TOP" FASTENED TO THE COLUMN W/ (3) STRUCTURAL SCREWS PER SIDE ·STRUCTURAL-M SCREWS FOR 3-PLY COLUMNS ·STRUCTURAL-L SCREWS FOR 4-PLY & 5-PLY COLUMNS 99'-9" B/ GRADE BOARD CONCRETE STUB3'-6""COLUMN TOP" TEMPORARILY FASTENED TO PERMA BRACKET W/ (1) STRUCTURAL SCREW EACH SIDE STUB-TO-TOP CONNECTION DETAIL SCALE: 1 2" = 1'-0" CUT BOTTOM OF "COLUMN TOP" (CUT SAME AMOUNT OFF COLUMN CENTER PLY) 100'-0" T/ F.F.XCATWALK INTERSECTION SCALE: 1" = 1'-0" 2x4 BLOCK EACH SIDE OF CATWALK FASTENED W/ (5) 10d NAILS 2x6 SYP FASTENED TO BLOCK W/ (5) 10d NAILS AT CATWALK 2x6 BCT CONNECTOR AT 4"4"(8) 10d NAILS EACH SIDE IN THIS REGION (1) STRUCTURAL-M SCREW EACH SIDE IN THIS REGION (8) 10d NAILS EACH SIDE IN THIS REGION CONNECTION SCALE: 1" = 1'-0" TRUSS-TO-HEEL GIRTS SHALL BE MARKED AFTER "COLUMN MIDDLE" IS CUT - MARKS ARE TO BOTTOM OF GIRTS 14'-6 1/4" 12'-5 3/4" 10'-5 3/4" 8'-5 3/4" 6'-5 3/4" 4'-5 3/4" 2'-5 3/4" 0'-5 3/4"SEAL651SHEET TITLE:Q-Lyft DetailsCOPYRIGHT FBi Buildings, Inc.