Loading...
HomeMy WebLinkAboutL0.00 SITE PREP AND REMOVALSADJOINERMaintain existing decorativerailing and light fixturesRemove and salvage existingpavers for reuseRemove existing metal gazebostructure and concrete padProtect existing paversto remainProtect existing light fixtureto remainProtect existing fence andgate to remainSalvage and relocate existingwater featureProtect all existing utilitiesto remainProtect existing concreteband to remainBOVACONTI COFFEEINDIANA ARTISANGIFTS & GALLERYExisting gas valveBOVACONTI COFFEECARMEL2 West Main StreetCarmel, Indiana 46032NORTH HILL REALTY, LLC484 E Carmel Drive, Suite 206Carmel, Indiana 46032PREPARED FORPROJECTNORTH©2024 Anderson + Bohlander, LLC1054 Virginia Ave, Suite 210Indianapolis, Indiana 46203www.andersonbohlander.comSCALE :ISSUE FOR CITY REVIEW July 25, 2024REVISIONSNo.DateIssueDRAWN BY:CHECKED BY:SHEET TITLESHEET NUMBER0106.07.24Issue For City ReviewDMMJBBCONSULTANTSSITE PREPARATIN &REMOVALS PLANL0.001/4" = 1'-0"2'-0" 4'-0" 8'-0"LEGEND-SITE PREP & REMOVALSExisting Hardscape ElementsTo Be RemovedNOTES - SITE PREP & REMOVALS1.Contractor to submit staging and construction access plan forOwner review and approval prior to start of construction. Referto specifications for additional information2.Contractor responsible for acquiring all permits and necessaryapprovals.3.Contractor to install and maintain Tree Protection Fencing toallow for maximum protection of existing downhill root zonesat all times.4.Contractor may adjust Tree Protection Fencing as needed toaccommodate construction activity, but limits may not be lessthan Minimum Limits shown on plan. Contractor to limitfrequency of adjustments to temporary fence layout andreview all adjustments with owner and Landscape Architect.5. Storage of materials, vehicular access, and all otherconstruction activities are strictly prohibited within theMinimum Limits of tree protection fencing area, existing treecanopy and root zones. Soil compaction within the tree's rootszones will have adverse impact on the tree's health andlongevity.6.Protect existing utility structures & inlets, refer to civil plansfor more information.7.Refer to Layout & Materials Plan for more specific informationregarding proposed improvements and verify conditions in thefield prior to performing removals.Existing Hardscape ElementsTo Be Salvaged For Reuse