Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Civil Details-C60004
A = CLEAR OPENINGB = POST SPACING C/CC = OVERALL GATE LENGTHD = NOM. GATE HEIGHTE = POST HEIGHT 4'-0" MIN GATE HEIGHT21"12"4 1/2"4 1/2"19"12"25 1/4"3 1/2"11"7 1/2"18 3/4"A = CLEAR OPENING10 1/2"7" 11"22 1/2"21" 14 1/2"21"18"10 1/2"B = POST SPACING C/C7 1/2"12"t: +1.614.744.4300 | f: +1.614.744.4350150 E. Gay StreetSuite 1510Columbus, OH 43215U.S.A.www.exp.comExp A/E, Inc.BUILDINGS EARTH & ENVIRONMENT ENERGYINDUSTRIAL INFRASTRUCTURE SUSTAINABILITYPLAN VIEW1GS1003-1R4" O.D. POST (TYP.)TYM-2000 GATEOPERATOR (SEE SHEETGS1003-3)HANGER ASSEMBLY (SEE DETAIL#2/GS1003-2, TYP.)CATCH ASSEMBLY(SEE DETAIL #3/GS1003-2)HANGER ASSEMBLY (SEE DETAIL#2/GS1003-2, TYP.)DRIVE CHAIN1" x 2" ALUM.TUBE (TYP.)TOP PRIMARY MEMBER4" O.D. POST (TYP.)ALUMINIZED STEELCHAIN LINK FABRICCABLECATCH ASSEMBLY(SEE DETAIL #3/GS1003-2)TYM-2000 GATE OPERATOR (SEESHEET GS1003-3)2" x 5" ALUM. TUBE (NOTE #2)BOTTOM GUIDE ASSEMBLY (SEEDETAIL #4/GS1003-2, TYP.)2" x 2" ALUM. TUBE (TYP.)GS1003-21ELEVATIONGS1003-1R2NOTES:1. ALL FITTINGS PROVIDED FOR 4" O.D. POSTS. OTHER SIZES ARE AVAILABLE UPONREQUEST.2. FOR GATES THAT REQUIRE TWO PIECE FABRICATION, A 5" ALUMINUM CHANNEL WILLBE SUBSTITUTED FOR THE 2" x 5" ALUM. TUBE, AND A VERTICAL SPLICE WILL BE ADDED.3. GATE ELEVATION IS VIEWED FROM THE OUTSIDE OF THE SECURE AREA LOOKING IN.NOMINAL GATE SIZE30'-0" x 8-0"OVERALL GATE LENGTHCLEAR OPENINGPOST SPACING C/CBCAPOST HEIGHTNOMINAL GATE HEIGHTEDCRITICAL DIMENSION CHART14'-1"45'-0"30'-0"8'-6"8'-0"VERTICAL PRIMARYVERTICAL SPLICESEE NOTE 2.STANDARD Hung - RIGHT to OpenASSEMBLY SECTION1GS1003-2BOTTOM GUIDE4GS1003-2BOTTOM GUIDE ASSEMBLY(SEE DETAIL #4)2" x 5" ALUM. TUBETOP PRIMARY MEMBERSTANDARD TRACKGATE HANGER ASSEMBLY(SEE DETAIL #2)VERTICAL PRIMARY,ENDS (BEHIND)4" O.D. POST2" x 2" ALUM. TUBE (BEHIND)1" x 2" ALUM. TUBECATCH ASSEMBLY3GS1003-2GATE HANGER2GS1003-2BOTTOM GUIDE BRACKET4" O.D. POSTGUIDE WHEELSWITH UL COVERSHANGER BRACKET5/8" BOLTLOCK NUTHEX NUTW4 TRUCKCOMPANION4" O.D. POSTGATE FRAMECATCHERINSIDEOUTSIDEGATE FRAMEOPERATOR PADGATE POSTGATE FRAMEINCOMING CONDUITOPERATOR PAD LAYOUT PLANOPERATOR FRONT ELEVATIONSEE NOTE 1GS1003-32GRADETYM-2000GATE OPERATOROPERATOR PADPEDESTALGS1003-31PEDESTALTYM-2000GATE OPERATOROPERATOR PADCHAIN SUPPORTBRACKET ATTACHEDTO 1" x 2" VERTICALOPERATOR SIDE ELEVATIONGS1003-33PEDESTALGRADENOTES:1) OPERATOR PAD DEPTHTO BE MINIMUM OF 24" ANDIN ACCORDANCE WITH ALLLOCAL CODES AND SOILCONDITIONS.INSIDEOUTSIDE1CANTILEVER SLIDING GATENTS