HomeMy WebLinkAboutBank of America - ChangemarksChangemarks Report
Project Name:
Workflow Started:
Report Generated:
Cycle
4
3
3
3
2
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Complete?
False
True
False
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
False
True
False
True
True
Status
UnResolved
Resolved
UnResolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
UnResolved
Resolved
UnResolved
Resolved
Resolved
PZ18100014 DP ADLS - Bank of America, US 421
10/31/2018 1:58 PM
11/07/2019 03:10 PM
Department
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Snapshot
File
C050.0.pdf
C060.0.pdf
C040.0.pdf
C070.0.pdf
w170533 o&m manual 2019.03.13.pdf
w170533 o&m manual 2019.03.13.pdf
C300 GRADING PLAN.pdf
C602 DRAINAGE DETAILS.pdf
C101 SWPPP PHASE 2.pdf
C101 SWPPP PHASE 2.pdf
SPP080.0.pdf
SPP030.0.pdf
SPP020.1.pdf
SPP060.0.pdf
SPP060.0.pdf
SPP010.3.pdf
SPP010.1.pdf
SPP010.1.pdf
SPP001.0.pdf
SPP010.0.pdf
SPP010.0.pdf
SPP010.0.pdf
SPP010.0.pdf
SPP010.0.pdf
C080.0.pdf
C070.0.pdf
C060.0.pdf
C060.0.pdf
C060.0.pdf
C060.0.pdf
C060.0.pdf
C060.0.pdf
C060.0.pdf
C060.0.pdf
C060.0.pdf
C030.0.pdf
C030.0.pdf
Markup Name
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
Changemark Subject
Please coordinate this connection with the engineer designing the property to the north
Please show any permenant or temporary seeding on this sheet
Please revise to comply with standard drawing 10-22
Please replace with our most current drawing
Please show BMP easement
Please provide maintenance guidelines for the water quality unit
Please provide a street profile
Inlet and outlet configuration does not match plans
Please clearly call out the BMP on this sheet
Please show a BMP easement over the water quality unit
Will this be public or private?
Please revise water quality treatment
Please provide a cross-section for the street
Please provide a note stating whether the storm sewer will be private or public
There is less that 2' of cover on this structure. Please revise
Please remove the call out to top dress with #53 stone
Please provide stabilization over the disturbance here
Will this be bored or trenched under the sidewalk?
Can the two plan sets be combined to avoid confusion?
Please turn the end of this silt fence up into the site
Please provide inlet protection on this structure
How will this swale be conveyed past the construction entrance?
Please provide perimeter protection along this perimeter
Please extend to be 150' long
Please replace with the City's standard detail
Please replace with City standard drawings
Please extend this to be 150' long
Please close access to this entrance
Please revise perimeter protection here
What is this protecting?
Please place protection along this entrance
Turn silt fence into the site
Please provide a SWPPP narrative for the site
What will be the water quality measure installed with this project?
Please provide a legend for all items shown on the sheet
This roadway is not currently installed
Has a wetland delineation been completed on the site?
Changemark Details
Please revise this entrances to comply with the City standard drawing 10-22 and place detail on the plans.
This detail should be replaced with standard drawing 10-16.
If these road will become public, we will need a street profile showing the street grades. They must be a minimum of 0.5% and can not exceed 8%.
Is the angle show on the plans achievable or will it need to be reconfigured?
Please show the right-of-way dimensions and lines if this road will be public. If not, please show the property lines and an ingress/egress easement on the plans.
We will not accept this tyoe of BMP for the roadway to be constructed. Please remove these and replace with a water quality unit. There appears to be an opportunity to work with the
adjacent project to install a unit that will treat the runoff from both projects.
Whether the street is public or private, we will require it to be built to the City's standards. Please provide the City's local street typical section on the plans. The standard aspalt
paving section will need to be revised to match the pavement section provided on this detail.
We do not allow for constrcution entrances to be top dressed with #53 stone. Please remove all references to do so.
We would like for the two plan sets to be combined into one set. If they cannot be combined, we will require a separate storm water managment permit to be submitted for each plan set.
Will a culvert be installed under the entance to convey the water?
Please replace these with the City's standard drawings for each. These details can be found here: http://carmel.in.gov/department-services/engineering/construction-trades/standards-drawings
Please block this access so that equipment and vehicles must use the construction entrance to enter and exit the site.
Please leave a gap in the silt fence for the sidewalk or provide a perimeter protection that will work on pavement in this area.
This inlet protection do not appear to be over an inlet. Please revise or remove.
Please provide a mulch sock/fiber roll product along this entrance.
Please turn both ends of the silt fence into the site
Please provide a SWPPP narrative for the site with all the required items outlined in the City of Carmel SWPPP Requirements PDF I've uploaded to the correspondence folder.
Please provide a legend for this sheet and all other sheets.
Per our latest aerial photos (taken on 9/19/18), this road is not currently installed. Was this installed without the City being informed? If not, please remove this from the existing
conditions sheet.
There is a low spot on the site that contains hydric soils that could indicate the presence of a wetland.
Markup Date
09/24/2019 1:44 PM
07/01/2019 10:43 AM
06/27/2019 2:54 PM
06/27/2019 2:51 PM
04/26/2019 12:53 PM
04/26/2019 12:53 PM
04/26/2019 12:44 PM
04/26/2019 12:41 PM
04/26/2019 12:45 PM
04/26/2019 12:45 PM
11/19/2018 3:19 PM
11/19/2018 3:14 PM
11/14/2018 2:34 PM
11/14/2018 2:18 PM
11/14/2018 2:18 PM
11/14/2018 2:11 PM
11/14/2018 1:36 PM
11/14/2018 1:36 PM
11/14/2018 1:28 PM
11/14/2018 1:21 PM
11/14/2018 1:21 PM
11/14/2018 1:21 PM
11/14/2018 1:21 PM
11/14/2018 1:21 PM
11/14/2018 1:07 PM
11/14/2018 1:06 PM
11/19/2018 3:16 PM
11/19/2018 3:16 PM
11/19/2018 3:16 PM
11/19/2018 3:16 PM
11/19/2018 3:16 PM
11/19/2018 3:16 PM
11/19/2018 3:16 PM
11/19/2018 3:16 PM
11/19/2018 3:16 PM
11/14/2018 1:40 PM
11/14/2018 1:40 PM
Updated By
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Applicant Response
IMEG and Gensler have been in contact with the engineer to the north. Grades in the north drive have been coordinated.
Seeding hatch added to C-4.
Please revise to be concrete within the right-of-way or ingress/egress easement. Please see "Site Drawings" and general "Drawings" folder for updated drawings
See Sheet C-7.
To be answered by Weihe Engineers
To be answered by Weihe Engineers
Rachel has expressed that this could eventually become a public road. In the meantime, it is being shown within an easement.
AS-6 has been spec'ed. Plans have been updated to reflect this.
Cross section is shown on sheet C201
Storm sewer is being build as private, this not is on the plans sheet C601
Structure has been revised
Detail has been revised
Stabilization will be shown on SWPPP plans by IMEG
If it is cut and trenched, the sidewalk will be repaired to city specifications.
Alex, we discussed this and I think we both agreed that having them both under one plan set was okay.
Silt fence has been updated
IP now shown as directed
Swale is being removed as a part of this project, since a new drainage network is being installed.
Silt fence has been added.
Entrance has been extended
SWPP has been uploaded. Please see "Correspondence" and general "Documents" folders for SWPP.
To be answered by Weihe Engineers
Legends have been added. Please see "Site drawings" and general "Drawings" folders for updated drawings
Alex, yes, Mr. Pearson had a wetland delineation done, there are no wetlands in the project area.