Loading...
HomeMy WebLinkAboutSWPP-1© GenslerDateDescriptionProject Name:Project Number:Description:Scale: N/ASeal / Signature2018SERIAL NUM./MANH. ID:DESIGNATION:NRSP VERSION:2.0BULLETIN:07-2018BANK OF AMERICA& MERRILL LYNCHBANK OF AMERICA SWPPPCITY OF CARMELHAMILTON COUNTY, INDIANALOCATION MAPNOT TO SCALEMAP PROVIDED BY GOOGLESWPPP INDEX OF SHEETSCOVER SHEET SWPPP-1SWPPP 1/SOILS MAP SWPPP-2SWPPP 2 SWPPP-3SWPPP SPECIFICATIONS SWPPP-4SWPPP DETAILS SWPPP-5IMEG CORP. HAS ADOPTED SAFETY PROCEDURES FOR ITS EMPLOYEES WHO PROVIDEPROFESSIONAL ENGINEERING AND SURVEYING SERVICES. A COPY OF THESE PROCEDURES ISAVAILABLE FROM THE SAFETY OFFICER. IMEG CORP. PERSONNEL ARE NOT TRAINED INCONTRACTOR (CONSTRUCTION) SAFETY AND COMPLIANCE PROCEDURES. THE METHODS ANDMEANS TO COMPLY WITH CONSTRUCTION SITE SAFETY ARE THE SOLE RESPONSIBILITY OF THECONTRACTOR.PREPARED BYKnow what'sbelow.before you dig.CallRSITE LOCATIONVACINITY MAPNOT TO SCALEMcClureEngineering Associates, Inc.FORMERLY4850 GRAND AVENUEGURNEE, IL 60031PH: 847.336.7100www.imegcorp.comCarmel21.0352.000Cover SheetPROJECT LOCATION LEGAL DESCRIPTIONA PART OF THE SOUTHWEST QUARTER OF SECTION 6, TOWNSHIP 17 NORTH, RANGE 3 EAST OFTHE SECOND PRINCIPAL MERIDIAN, HAMILTON COUNTY, INDIANA, DESCRIBED AS FOLLOWS:COMMENCING AT THE SOUTHWEST CORNER OF SAID SOUTHWEST QUARTER; THENCE NORTH 00DEGREES 19 MINUTES 30 SECONDS EAST (ASSUMED BEARING) ALONG THE WEST LINE OF SAIDSOUTHWEST QUARTER, A DISTANCE OF 754.78 FEET TO THE POINT OF BEGINNING; THENCECONTINUING NORTH 00 DEGREES 19 MINUTES 30 SECONDS EAST ALONG SAID WEST LINE, ADISTANCE OF 559.62 FEET; THENCE NORTH 85 DEGREES 23 MINUTES 52 SECONDS EAST ADISTANCE OF 546.60 FEET TO THE WEST RIGHT OF WAY LINE FOR STATE ROAD 421; THEFOLLOWING TWO CALLS BEING ALONG SAID WEST RIGHT OF WAY LINE: 1) THENCE SOUTH 20DEGREES 36 MINUTES 55 SECONDS EAST A DISTANCE OF 9.97 FEET TO THE BEGINNING OF ACURVE WITH A RADIUS OF 17336.45 FEET, THE RADIUS POINT OF WHICH BEARS NORTH 72DEGREES 47 MINUTES 55 SECONDS EAST: 2) THENCE ALONG SAID CURVE A DISTANCE OF 420.04FEET: THENCE SOUTH 27 DEGREES 19 MINUTES 31 SECONDS WEST A DISTANCE OF 34.04 FEET;THENCE SOUTH 71 DEGREES 14 MINUTES 52 SECONDS WEST A DISTANCE OF 423.77 FEET TO THEBEGINNING OF A CURVE WITH A RADIUS OF 79.00 FEET, THE RADIUS POINT OF WHICH BEARSSOUTH 18 DEGREES 45 MINUTES 08 SECONDS EAST; THENCE SOUTHWESTERLY ALONG SAIDCURVE A DISTANCE OF 49.66 FEET; THENCE NORTH 89 DEGREES 40 MINUTES 30 SECONDS WESTA DISTANCE OF 224.56 FEET TO THE POINT OF BEGINNING, CONTAINING 7.54 ACRES, MORE ORLESS.Tel 312.456.0123Fax 312.456.012411 E. MadisonSuite 300Chicago, IL 60602United StatesJones Lang LaSalleT: 612.271.8218Attn: Patrick HassettEmail:Pat.Hassett@am.jll.comIMEG Corp.MEP, Civil & Structural Engineers4850 Grand AvenueGurnee, IL 60031T: 312.931.3709Attn: Arun GargEmail:Arun.K.Garg@imegcorp.com45 S 7TH ST #3501MINNEAPOLIS, MN 55402Attn: Patrick HassettEmail:Ropo_sanni@gensler.comDESIGN NOTESBUILDING COVERAGE RATIO: 65%ZONING DISTRICT: B-3SETBACK: 30 FEET FRONT YARD (SEEN ON SHEET C-4)SITE DISTURBANCE: 49,660 SF OR 1.14 ACRESHYDROLOGIC UNIT CODE:05120201120080RECEIVING WATERS:THE SITE DRAINS TO AN EXISTING 24” STORM SEWER THEN DETENTION POND OWNED BYNOTTINGHAM LLC. ULTIMATELY FLOWING TO EAGLE CREEK.PRE-CONSTRUCTION AND POST-CONSTRUCTION PEAK DISCHARGE:PRECONSTRUCTION PEAK DISCHARGE IS 21.57 CFS PRE AND 5.02 CFS POST.10/23/2019CITY SUBMITTAL11-20-19City Resubmittal