Loading...
HomeMy WebLinkAboutSWPP-2E E E E E E EEEEEEEEEEEEEGGGGGGGGGGGGGGWWWWWWWWWWWWWWT(U)T(U)T(U)T(U)T(U)T(U)T(U)T(U)T(U)T(U)FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFM FM FM FM FM FM FM FM FM FM FM FM FM FM FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFM US 421 (MICHIGAN ROAD)NOTTINGHAM WAYC© GenslerDateDescriptionProject Name:Project Number:Description:Scale: 1:30Seal / Signature2018SERIAL NUM./MANH. ID:DESIGNATION:NRSP VERSION:2.0BULLETIN:07-2018BANK OF AMERICA& MERRILL LYNCHCarmel21.0352.000SWPPP PHASE 1Tel 312.456.0123Fax 312.456.012411 E. MadisonSuite 300Chicago, IL 60602United StatesJones Lang LaSalleT: 612.271.8218Attn: Patrick HassettEmail:Pat.Hassett@am.jll.comIMEG Corp.MEP, Civil & Structural Engineers4850 Grand AvenueGurnee, IL 60031T: 312.931.3709Attn: Arun GargEmail:Arun.K.Garg@imegcorp.com45 S 7TH ST #3501MINNEAPOLIS, MN 55402Attn: Patrick HassettEmail:Ropo_sanni@gensler.comSWPPP PHASE 1 LEGEND10/23/2019CITY SUBMITTAL11-20-19City ResubmittalMONITORING AND MAINTENANCE GUIDELINES:TIMING OF CONTROLS/MEASURE-AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES EROSION AND SEDIMENT CONTROL MEASURESSHALL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE.AREAS WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR MORE THAN 21 DAYS WILL BESTABILIZED WITH TEMPORARY SEED AND MULCH WITHIN 14 DAYS OF THE LAST DISTURBANCE. ONCECONSTRUCTION ACTIVITY CEASES PERMANENTLY IN AN AREA THAT AREA WILL BE STABILIZED WITHPERMANENT SEED AND MULCH. AFTER THE ENTIRE SITE IS STABILIZED, THE ACCUMULATED SEDIMENTWILL BE REMOVED.MAINTENANCE·WHERE A BASIN HAS BEEN INSTALLED TO CONTROL SEDIMENT DURING CONSTRUCTION ACTIVITIES, THEPERMITTEES SHALL KEEP THE BASINS) IN EFFECTIVE OPERATING CONDITION AND REMOVEACCUMULATED SEDIMENT AS NECESSARY.