Loading...
HomeMy WebLinkAboutC012.0 General Civil NotesCIVIL SEAL12345CBAJOB NO.ISSUED FOR:REVIEWRECORDCONSTRUCTIONPERMITREV.DATE DESCRIPTION A 10/10/19 ISSUED FOR REVIEW 70% SET 520 South Main Street, Suite 2531Akron, OH 44311330.572.2100 Fax: 330.572.2102B 11/19/19 ISSUED FOR REVIEW 90% SET ---------10/10/19CARMEL, IN 46033 12120 BROOKSHIRE PKWY BROOKSHIRE GOLF CLUB 2019706.07DESIGNERPROJECT MANAGERTTPLJBDrawing Name: O:\2019\2019706 INDY MISC\07 Brookshire Golf Club City Of Carmel\DWG\CD\Brookshire Golf Club CDs.dwgNovember 19, 2019 3:43 PM - lbarker C-4BEST MANAGEMENT PRACTICES, EROSION CONTROL DETAILS & NOTES 1.ALL WORK SPECIFIED AS A/AN DOT ITEM SHALL BE GOVERNED BY THE STATE OF INDIANA OFDEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATION HANDBOOK. IT ISCONTRACTORS RESPONSIBILITY TO POSSESS AND BE FAMILIAR WITH APPLICABLE SECTIONS.2.THIS CONTRACT DRAWING SHALL BE MADE AVAILABLE ON SITE AT ALL TIMES AND PRESENTED UPONREQUEST. IF UNFORESEEN STORM WATER POLLUTION PREVENTION IS ENCOUNTERED, ADDITIONALSTORM WATER POLLUTION PREVENTION (SWPP) MEASURES MAY BE REQUESTED BY THE OWNER,COUNTY ENGINEER, PROJECT ENGINEER OR SOIL CONSERVATION SERVICE REPRESENTATIVE ATANYTIME. SUCH REQUESTS SHALL BE IMPLEMENTED IMMEDIATELY AT CONTRACTOR'S EXPENSE.3.ALL STORM WATER POLLUTION PREVENTION ITEMS SHALL BE INSTALLED AS SHOWN OR NOTED ONTHIS SHEET.4.PLANT TEMPORARY SEEDING AND MULCHING IN ALL AREAS THAT SHALL BE INACTIVE FOR 7 DAYS ORMORE. ALL DISTURBED AND ERODED EARTH SHALL BE REGRADED AND SEEDED WITHIN 14 DAYS WITHSEEDING, AS DEFINED ABOVE AND AS SHOWN ON THE TABLE BELOW. TO ESTABLISH STABILITY ANDPROVIDE SEDIMENT CONTROL, WHERE POSSIBLE. TEMPORARY SEEDING GROWTH SHALL NOT BEMOWED UNTIL IT HAS GONE TO SEED FOR 1 YEAR.5.PERMANENT VEGETATION SHALL BE INSTALLED WITHIN 10 DAYS AT THE COMPLETION OF ANYGRADED AREAS, WEATHER PERMITTING. ALL PERMANENT VEGETATION SHALL CONSIST OFPLANTING AND SOD6.AT SUCH TIME ROUGH GRADING OF THE SITE IS COMPLETE AND DRAINAGE DIVERTS TO INLETS,INLET SEDIMENT FILTERS SHALL BE INSTALLED AT ALL INLET STRUCTURES TO KEEP PIPINGSYSTEMS FREE OF SILTATION.7.SILT BARRIERS SHALL BE INSTALLED AROUND ALL EXISTING OR NEW STORM INLETS, CATCH BASINS,AND YARD DRAINS. INSTALL ROCK CHECK DAMS FOR HEADWALL INLETS FOR STORM WATERPOLLUTION PREVENTION.8.STORM WATER POLLUTION PREVENTION MEASURES SHALL BE INSTALLED OR TOPSOIL STOCKPILESAND OTHER TEMPORARILY DISTURBED AREAS AS SHOWN ON THESE PLANS AND AS DIRECTED BYTHE ENGINEER.9.CONTRACTOR SHALL INSPECT ALL SWPP MEASURES DAILY AND REPAIR AS NECESSARY TOPREVENT EROSION. SILTATION SHALL BE REMOVED FROM AREAS WHERE FAILURES HAVEOCCURRED AND CORRECTIVE ACTION TAKEN WITHIN 24 HOURS TO MAINTAIN ALL SWPP.10.SILT BARRIERS, CONSTRUCTION ENTRANCES, AND SILT FENCES SHALL REMAIN IN PLACE UNTIL AGOOD STAND OF GRASS HAS BEEN OBTAINED AND/OR PAVING OPERATIONS ARE COMPLETE.CONTRACTOR SHALL KEEP SILT FROM ENTERING ANY STORM DRAINAGE SYSTEM. ONCE SITE HASBEEN COMPLETELY STABILIZED, ANY SILT IN PIPES AND DRAINAGE SWALES SHALL BE REMOVEDWITHIN 10 DAYS.11.TEMPORARY SEDIMENTATION AND STORM WATER POLLUTION PREVENTION MEASURES MUST BEINSPECTED AND LOGGED BY THE CONTRACTOR FOR INSPECTION, LOGGING SHALL BE WEEKLY ANDAFTER RAIN STORMS.12.UTILITY COMPANIES MUST COMPLY WITH ALL STORM WATER POLLUTION PREVENTION MEASURESAS DEFINED ON THE STORM WATER PREVENTION PLANS, DETAILS AND NOTES.13.THE TOTAL AREA OF DISTURBANCE FOR THIS PROJECT IS APPROXIMATELY 0.96 ACRES.14.ALL EXISTING WATER COURSES WITHIN THE PROJECT LIMITS SHALL BE TEMPORARILY PROTECTEDDURING LAND CLEARING AND GRADING OPERATIONS. SOILS WITHIN 50 FEET OF SAID WATERCOURSES SHALL BE STABILIZED WITHIN 2 DAYS OF THE INITIAL CLEARING / GRADING OPERATION ASSHOWN ON PLANS.15.ALL DISTURBED AREAS SHALL BE STABILIZED WITHIN 7 DAYS OF FINAL GRADING.16.IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ALL SEDIMENTATION AND STORM WATERPOLLUTION PREVENTION ITEMS AT ALL TIMES.17.ALL STORM WATER POLLUTION PREVENTION PRACTICES WILL BE INSTALLED BEFORE ANY OTHEREARTH MOVING OCCURS.18.THE FOLLOWING STORM WATER POLLUTION PREVENTION AND SEDIMENT CONTROL MEASURESWILL BE USED ON THIS SITE: 1. SILT BARRIERS 2. SILT FENCE 3. CONSTRUCTION ENTRANCE 4. EROSION CONTROL SEED BLANKETS - SPEC FOR TEMPORARY EROSION CONTROL BLANKETS ON SLOPES/DITCHES1.STAKE AND/OR FLAG LIMITS OF CLEARING2.DURING PRECONSTRUCTION MEETING ALL EROSION & SEDIMENT CONTROL FACILITIES &PROCEDURES SHALL BE DISCUSSED.3.CLEARING & GRUBBING, AS NECESSARY, FOR INSTALLATION OF PERIMETER CONTROLS.4.INSTALL SILT FENCE PERIMETER CONTROLS AS SHOWN ON PLANS.5.INSTALL CONSTRUCTION ENTRANCE, IF CONDITIONS ARE SUCH THAT MUD IS COLLECTION ONVEHICLE TIRES, THE TIRES MUST BE CLEANED BEFORE THE VEHICLES ENTER THE PUBLICROADWAY. THE SITE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENTTHE TRACKING OR FLOW OF MUD INTO THE PUBLIC RIGHT-OF-WAY. ALL MATERIALS SPILLED,DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO THE ROADWAY MUST BE REMOVEDPROMPTLY.6.CLEARING & GRUBBING THE REMAINING SITE AS NECESSARY.7.BEGIN FILLING & GRADING AS REQUIRED TO REACH SUBGRADE.8.CONSTRUCT AND MAINTAIN TEMPORARY DRAINAGE SWALES DURING FILLING AND GRADINGACTIVITIES.9.CONSTRUCT SITE WORK INCLUDING STORM DRAINAGE FACILITIES.10.MAINTAIN EROSION & SEDIMENTATION CONTROL MEASURES UNTIL THE SITE HAS BEENCOMPLETELY STABILIZED.11.REMOVE SEDIMENT CONTROLS.PERMANENT SEEDINGSDORMANT SEEDINGSTEMPORARY SEEDINGSSODDINGMULCHINGJAN.FEB.MAR.APR.MAYJUN.JUL.AUG.SEP.OCT.NOV.DEC.ACE**BF***BDA. KENTUCKY BLUEGRASS 90LBS./AC/MIXED PERENNIALRYEGRASS 30 LBS./ACREB. KENTUCKY BLUEGRASS135 LBS./AC/MIXEDPERENNIAL RYEGRASS 45LBS./AC. 2 TON STRAWMULCH PER ACREC. SPRING OATS 100 LBS./ACRED. WHEAT OR CEREAL RYE 150 LBS./ACREE. SOD (NURSERY CROWN KENTUCKY BLUEGRASS) 150LBS./ACREF. STRAW MULCH 2 TONS PER ACRE* IRRIGATION NEEDED DURING JUNE, JULY &SEPTEMBER** IRRIGATION NEEDED FOR 2-3 WEEKS AFTER SODDINGPOINTS A SHOULD BE HIGHER THAN POINT BELEVATIONABPLANFLOW AF LOW 1. SET THE STAKES.2. EXCAVATE A 4"x4" TRENCH UPSLOPEALONG THE LINE OF STAKES.4. BACKFILL AND COMPACT THEEXCAVATION SOIL.3. STAPLE FILTER MATERIAL TO STAKES ANDEXTEND IT INTO THE TRENCH.2SCALE: N.T.S.C-4ACCESS ROAD ORCOMPOUNDSURFACEDRAINAGEDITCHLINE2 TO 1SLOPEEXISTINGGRADE2' SILT FENCEEROSION CONTROL BLANKETS OR 6"TO 8" CLASS #2 CHANNEL LINESTONE OR RIP RAP6'-0"6"BELOW GRADE1.WHEN FACED WITH SLOPES LESS THAN 2 TO 1 SLOPES, ALL SLOPESSHOULD BE DOZER TRACKED PRIOR TO SEEDING. ALL SLOPESSHOULD HAVE EROSION CONTROL BLANKETS OR RIP RAPEMBEDDED ON SLOPES SURFACES TO REDUCE EROSION.2.ALL FLOWLINES MUST BE INSTALLED BELOW SUB-GRADE OFCOMPOUND. (AT MINIMUM OF 6" BELOW)NOTES:NOTE:EROSION CONTROL MUST BEMAINTAINED ON ALL SLOPES &DITCH LINES UNTIL VEGETATIONHAS BEEN WELL ESTABLISHED3SCALE: N.T.S.C-410'±SILT FENCE DETAILDRAINAGE DITCHLINE DETAIL (SWALE)EROSION & SEDIMENT CONTROL NOTESCONSTRUCTION SEQUENCE3'-0"DRAINAGEFLOWLINE1SCALE: N.T.S.C-4CONCRETE WASHOUT DETAIL20 CU. YD. ROLL OFFCONTAINER LINED WITH ANIMPERMEABLE FABRICSTRONG ENOUGH TO ASSURENO LEAKAGE. SEE NOTESSAW DUST PILE - AT THEEND OF EACH DAY SAWDUST PILE SHALL BEADDED TO THE CONTAINERIN SUFFICIENT AMOUNTSTO ABSORB ALL LIQUIDS1.CONTAINERS OF SIMILAR CONSTRUCTION MAY BE USED THAT WILLASSURE THAT NO SOLIDS OR LIQUID ESCAPE THE CONTAINERONTO THE SITE.2.THE CONTAINER SHALL BE REMOVED AND EXCHANGED WITH ANEMPTY CONTAINER BEFORE THE TOTAL WEIGHT EXCEEDS THE DOTREGULATIONSNOTES: