HomeMy WebLinkAboutC001City of Carmel Rigght-of-Way Paving Policy
November 2, 2005
General
A The work subject to the requirements of thisp li shall include the roduction haulin /deliva s readin fnishin corn coon and other work necessa to re are foundations install aggregate bases and
). I eq poo cY . P 9. ry .P 9, .9• Pa rY P P
Install one or more courses of base intermetllate or surface hot mix as halt mixtures within existin or ro sed ri htof-wa for roadwa s auxilia lanes and as halt multi -use aths.
P 9 P W 9 Y Y, ry P P
B)This policy shall bathe basis for acceptance of the work by the City. Failure to adhere to the requirements of this policy may result in nonacceptance of the work or other remedies outlined in this policy.
C)Workmanship, materials and duality of the work completed shall conform to the 2006 Standard Specifications of the Indiana Department of Transportation (hereinafter referred to as Standard Specifications),
except where deviations are allowed herein, or variances are granted.
D) Where the minimum standards of any other governmental agency having concurrent jurisdiction exceed these standards, the higher standards shall apply.
E)If any plan or other note or specification on the approved construction documents exceeds the minimum standards of this policy, the higher standards shall apply.
F Nolhin contained herein shall he construed as rohibitin the design and construction of im roven-PI meeting higher standards nor as discoura in petitions to appropriate ovemin bodies for variances for
g P. 9 gg P 9 gg 9 9Pgoverning
alternatives which ran be supported b advances In technology an area roved b other agencies with concurent'urisdiction.
PP Y 9Y PP Y 9 1
G)AII work shall comply with the requirements of Section 105.03 of the Standard Specifications.
H)For the purposes of this policy, where the term Engineer is used in this policy and the Standard Specifications, it shall mean:
a) The Carmel City Engineer, staff of the Department of Engineering, other personnel employed by the City of Carmel, or authorized agent(s) that may be retained to represent the City of Carmel.
ii) The Hamilton County Highway Engineer, staff of the Hamilton County Highway Department, other personnel employed by Hamilton County, or authorized agent(s) that may be retained to represent Hamilton
County Highway, depending on the location of the work.
I) Authority of the Engineer over the work shall be per Section 105.01 of the Standard Specifications.
J) Prior to commencing the work, the Contractor performing the work shall contact the Engineer to schedule a pre -construction meeting to review the Engineers construction requirements, staff notification
requirements, required inspections for certain sta es of the work and to review the author) of the Engineer as it relates to the work.
Q � eq P 9 authority 9
K)Under no circumstances shall work subject to the standards established by this policy commence without obtaining approved construction drawings by the City of Carmel Department of Engineering.
2) Foundation
A)General
i) This work shall consist of the construction/preparation of the foundation in accordance with Section 105.03 of the Standard Specifications.
B)Excavation and Embankment
i) Prior to beginning excavation and embankment operations, all necessary clearing, grubbing, scalping and topsoil stripping and subsequent backflling for removed items within the slope stake limits shall be
pperformed in accordance with Section 201.03 antl 201.04 of the Standard Specifications. All topsoil, vegetation, roots, stumps, friable and deleterious material shall be completely removed within the limits of
the slope stakes.
ii) Excavations
(1) After excavation operations, all spongy and yielding material that does not readily compact shall be removed from within the slope stake limits and the resulting void shall be refilled with suitable material
and compacted in accordance with Section 203 of the Standard Specifications.
(2) An pronounced depressions within the slope stake limits resulting after excavation operations shall he refilled with suitable material and compacted in accordance with Section 203 of the Standard
SpecifYcetions.
iii)Embankments
(1) Embankments shall be constructed in accordance with Section 203 of the Standard Specifications.
(2) All spongy and yielding material that does not readily compact shall be removed from within the slope stake limits prior to embankment operations.
(3) Any pronounced depressions within the slope stake limits resulting after clearing, grubbing, scalping and topsoil removal shall be refilled with suitable material and compacted in accordance with Section
203 of the Standard Specifications prior to embankment operations.
(4) Prior to the construction of any embankment, the original ground surface within the limits of the slope stakes shall be leveled and the upper 6-inches shall be compacted in accordance with Section 203 of
the Standard Specifications.
(5) Embankments shall be shaped to be well drained and shall be protected to prevent erosion.
(6) Loose depth of each embankment lift, final compacted depth, compaction method and compaction requirements shall be in accordance with Section 203 of the Standard Specifications.
C)Soil Subgrades
i) Subgrades shall be installed on foundations constructed in accordance with Section 2(A) and Section 2(B) of this policy and only the installation of all utilities and subsurface drains indicated on the approved
construction documents to be located under the pavement are completed. Trench backkfilling work of these installations shall be in accordance with the City of Carmel Trench Backfilling specifications.
ii) The subgrade shall be shaped to the required grade and sections, free from all ruts, corrugations, or other irregularities.
iii)The subgrade shall be uniformly prepared, compacted and approved in accordance with Sections 207.02, 207.03 and 207.04 of the Standard Specifications.
iv)Subgrades shall be inspected and ap roved by the Engineer before any aggregate base or hot mix asphalt pavements are constructed. A proofroll shall be conducted in accordance with Section 203.26 of the
Standard Specifications. Unacceptabea areas shall be corrected to the satisfaction of the Engineer before any aggregate base or hot mix asphalt paving operations commence.
v) At the discretion of the Engineer, SIMI that has satisfactorily Passed a proofroll, but remains uncovered for a period of 14 calendar days prior to placing stone or is subject to a measurable rain event prior
to placing stone, shall be subject to additional proof rolls prior to p acement of the Aggregate Base.
D)Exisling Pavement
i) Milling of existing pavement surfaces shall be in accordance with Section 306.02, 306.03, 306.05, 306.07 and 306.08 of the Standard Specifications.
ii) Localized weak areas of the existing pavement section uncovered during the milling process shall be repaired in accordance with Section 304.02, 304.03, 304.05 or 305 of the Standard Specifications.
iii)Prior to opening milled areas to traffic, the milled areas shall be cleaned of all material, debris and dust resulting from the operation.
iv)Milled areas that remain open to traffic longer than those times stipulated in Section 306.05 of the Standard Specifcetions shall be subject to liquidated damages outlined in Section 306.05 of the Standard
Specifications. The Contractor shall be responsible for payment of these liquidated damages.
3) Aggregate Bases
A)General
i) This work shall consist of placing a compacted aggregate on a prepared soil subgrade in accordance with Section 105.03 of the Standard Specifications.
ii) Aggregate Base materials shall be in accordance with Section 301.02 of the Standard Specifications.
iii)The material shall be obtained from a Certified Aggregate Producer in accordance with Section 917 of the Standard Specifications.
iv)The Aggregate Base material shall be handled and transported to, and on, the work site in a manner that minimizes segregation and moisture loss.
v) Aggregate Bases shall be constructed on prepared foundations and to thicknesses equal or greater than those indicated on the approved construction documents.
B)Temperature and Seasonal Limitations
i) The Aggregate Base shall be placed in accordance with the temperature limitations of Section 301.04 of the Standard Specifications.
ii) Frozen material shall not be placed.
iii)Aggregate Bases must be placed and pass proof roll prior to November 30 in order to allow paving in accordance with Section 4C(iv) of this policy.
C)Prepamtion
i) The prepared foundation shall be tree from objectionable or foreign materials at the fime of placement.
ii) The subgrade shall be subject to addifional proof rolls in accordance with Section 203.26 of the Standard Specifications just prior to placing the Aggregate Base on the subgrade in accordance with Section
2C(v) of this policy. Unacceptable areas shall be corrected to the satisfaction of the Engineer before any Aggregate Base is placed.
D)Spreading and Finishing
i) The Aggregate Base shall be spread in accordance with Section 301.05 of the Standard Specifications.
ii) The Aggregate Base shall be compacted in accordance with Section 301.06 of the Standard Specifications.
iii)Subsequent paving courses shall be placed over the Aggregate Base within 14 calendar days. Aggregate Bases that lay exposed for a period of time greater than 14 calendar days or experience.a measurable
rain event prior to the placement of subsequent paving courses shall be subject to inspection antl acceptance by the Engineer. At the discretion of the Engineer, additional proof rolls may be required.
4)Asphalt Pavement
A)General
i) This work shall consist of placing one or more courses of base, intermediate, or surface hot mix asphalt (HMA) mixtures on a prepared foundation in accordance with Section 105.03 of the Standard
S ecifi
P cations.
if) HMA base, intermediate, or surface mixtures shall be constructed on prepared foundations and to thicknesses equal or greater than those indicated on the approved construction documents.
iii Materials used in the production of the HMA mixtures shall be in accordance with Section 401.03 of the Standard Specifications.
P P
iv)Equipmenl for HMA operations, including but not limited to production, hauling/transportation, Iaydown, compaction and miscellaneous/ancillary activity shall be in accordance with Section 409 of the Standard
Specifications.
v) Installation of the full pavement section indicated on the approved construction documents for the entire area to be paved must be completed in the same paving season.
vi)Widening operations shall comply with the following:
(1) The outside face of the excavated area shall be left as nearly vertical as the nature of the material will permit and not wider than the outside limits of the widening section.
(2) The existing pavement adjacent to the widening area shall be sawcut to a clean edge.
3 The sub rade in the widened area shall be corn cted in accordance with this policy.
() 9 Pa P Y
4 Widening mixtures shall corn with the pavement section indicated on the approved construction documents.
() 9 PY P PP
(5) Compaction of the widening shall be in accordance with Section 304.05 of the Standard Specifications.
B)Preparation
i) The Aggregate Base shall be subj1ject to additional proof rolls in accordance with Section 203.26 of the Standard Specifications just prior to placing the HMA courses in accordance with Section 3D(iii) of this
policy. Unacceptable areas shall be corrected to the satisfaction of the Engineer before any paving operations commence.
if) All displacement or rutting of the Aggregate Base shall be repaired prior to placing HMA mixtures.
iii)Milled asphalt surfaces shall be tacked in accordance with Section 406 of the Standard Specifications.
iv)Asphalt surfaces between courses shall be tacked in accordance with Section 406 of the Standard Specifications.
v) Contact surfaces of curbing, gutters, manholes, and other structures shall be tacked in accordance with Section 406 of the Standard Specifications.
vi)Surfaces on which a mixture is placed shall be free from objectionable or foreign materials at the time of placement.
vii) Tack Coat material shall be distributed with equipment meeting the requirements of Section 409.03(a) of the Standard Specifications.
C)Weather and Seasonal Limitations
i) HMA courses shall be placed when the ambient temperature and the temperature of the surface on which it is to be placed is 45OF (70C) or above. The Engineer shall determine the ambient temperature. There
shall be no provision for low temperature compaction allowed by Section 402.16 of the Standard Specifications.
ii) No mixture shall be placed on a frozen subgrade.
iii)Under no circumstances shall HMA mixtures be placed between December 15 and March 30.
iv)If a foundation that is to receive one or more courses of base, intermediate, or surface HMA miz[uras is placed and determined to be an approved foundation by the City prior to November 30, placement of
HMA courses will be allowed up to December 15, provided that the ambient and foundation surface temperature complies with the requirements of Section 4C(i) of this policy and the paving contractor pay for
the services of a full time construction inspector and who shall act as an authorized agent of the Engineer. The Engineer shall select the construction inspector.
v) If the ambient and foundation surface temperature complies with the requirements of Section 4C(i) of this policy between April 1 and April 15, HMA course shall be allowed to be placed on an approved
foundation provided that the paving contractor pay for the services of a full time construction inspector and who shall act as an authorized agent of the Engineer. The Engineer shall select the construction
inspector.
vi)The Engineer reserves the right to suspend all paving operations if, in the opinion of the Engineer, that prevailing weather conditions and/or the condition of the Subgrade and/or the Aggregate Base may result
in substandard HMA placement, spreading and finishing.
D)Spreading and Finishing
i) HMA courses shall be placed upon an approved foundation or other HMA course by means of Iaydown equipment in accordance with Section 409.03(c) of the Standard Specifications.
if) Segregation or flushing or bleeding of HMA mixtures will not be permitted. Corrective action shall be taken to prevent continuation of these conditions. Segregated or flushed or bleeding HMA mixtures shall be
removed If directed.
iii)AII areas showing an excess or deficiency of binder shall be removed and replaced.
III HMA mixtures that become loose and broken, mixed with dirt, or is in any way defective shall he removed and replaced.
E)Joints
i) Joints shall conform to the requirements of Section 401.15 of the Standard Specifications.
F)Compaclion
i) The HMA mixture shall be compacted with equipment in accordance with Section 409.03(d) of the Standard Specifications immediately after the mixture has been spread and finished.
I) Rollers shall not cause undue displacement, cracking, or shoving.
5) Inspections
A)AII materials furnished and each part or detail of the work will be subject to inspection per Section 105.10 of the Standard Specifications for the purpose of ascertaining that the work is in substantial conformance
with this policy and the approved construction documents.
B)The Contractor shall notify the Engineer a minimum of 48-hours in advance of commencing any work subject to the standards established by this policy.
C)The Contractor shall schedule proofrolls with the Engineer a minimum of 48-hours in advance of such proofrolls.
D)Sampling and testing of materials, equipment or construction work may be required at the expense of the Contractor at the discretion of the Engineer for the purpose of ascertaining that the work is in substantial
conformance with this policy and the approved construction documents. Sampling and testing shall conform to the requirements of the sections of the Standard Specifications applicable to the portion of the work
suspected to be non -compliant or as directed by the Engineer.
E) Where the Engineer determines that is necessary to confirm compliance with standards of quality or thickness, pavements shall be cored and tested at the expense of the Contractor. The average thicknesses of
all courses must equal or exceed the minimum prescribed by the approved construction documents, and no single core shall show a deficiency greater than one half inch (1/2 ) in any course or total thickness
from the pavement section indicated on the approved construction documents.
F) Such inspections shall not be construed to relieve the developers' engineers or contractors in any way from their obligations and responsibilities under their contracts. Specifically, inspection by the Engineer, or
by retained engineers or testing agencies, shall not require them [o assume responsibili[iesfior the appproved construction documents, for any misinterpretation of the approved construction documents by the
contractors during construction, or for the means and methods of construction, nor for safety on [he lob site.
G)Work identified to not meet the requirements of this policy or the approved construction documents, unacceptable work, whether the result of poor workmanship, use of defective materials, damage through
carelessness, or any other cause found to exist prior to the final acceptance of the work, shall be removed immediately and replaced in an acceptable manner at the Contractors expense.
H)If the Contractor fails to compply forthwith with any order made under the provisions of this subsection, the Engineer will have authority to cause unacceptable work to be remedied or removed and replaced; to
cause unauthorized work to be removed; and to deduct the costs from any monies due or to become due.
I) Work done contrary to instructions provided by the Engineer shall be considered unacceptable and subject to immediate removal and replacement in accordance with the instructions provided by the Engineer.
6) Acceptance
A)Befom acceptance of any phase of construction, the Engineer shall determine if the improvements are in substantial compliance with this policy (except for any variances granted) and the approved construction
documents
B)The Engineer may, at his sole discretion, accept work that is not in conformance with this policy provided that the work is bonded for a period greater than three years. The Engineer shall establish the extended
bonding requirement.
City of Carmel Concrete Curb Policy
December 13, 2006
1) General
A)The work subject to the requirements of this policy shall include the production, hauling/delivery, excavation for, placing, installation, jointing, curing, finishing, and other work necessary to prepare foundations and
soil Subgrades, install aggregate bases and install concrete curbing within property within the corporate limits of the City of Carmel and existing or proposed right-of-way.B)This policy shall be the basis for acceptance of the work by the City. Failure to adhere to the requirements of this policy may result in non -acceptance of the work or other remedies outlined in this policy.
C Workmanshi materials and quality of the work corn feted shall conform to the 2006 Standard Specifications of the Indiana Department of Transportation hereinafter referred to as Standard Specifications), except
P• q Y P P P P ( P )� P
where deviations are allowed or specified herein, or variances are granted.
D) Where the minimum standards of any other governmental agency having concurrent jurisdiction exceed these standards, the higher standards shall apply.
E)lf any plan or other note or specification on the approved construction documents exceeds the minimum standards of this policy, the higher standards shall apply.
F) Nothing contained herein shall be construed as prohibiting the design and construction of improvements meeting higher standards, nor as discouraging petitions to appropriate governing bodies for variances for
alternatives which can be supported by advances in technology and are approved by other agencies with concurrent jurisdiction.
G)AII work shall comply with the requirements of Section 105.03 of the Standard Specifications.
H)For the purposes of this policy, where the term Engineer is used in this policy and the Standard Specifications, it shall mean:
a) The Carmel City Engineer, staff of the Department of Engineering, other personnel employed by the City of Carmel, or authorized agent(s) that may be retained to represent the City of Cannel.
ii) The Hamilton County Highway Engineer, staff of the Hamilton County Highway Department, other personnel employed by Hamilton County, or authorized agent(s) that may be retained to represent Hamilton
County Highway, depending on the location of the work.
I) Authority of the Engineer over the work shall be per Section 105.01 of the Standard Specifications.
J) Prior to commencing the work, the Contractor performing the work shall contact the Engineer to schedule a preconstmction meeting to review the Engineer's construction requirements, staff notification
requirements, required inspections for certain stages of the work and to review the authority of the Engineer as it relates to the work.
K)Under no circumstances shall work subject to the standards established by this policy commence without obtaining approved construction drawings by the City of Carmel Department of Engineering.
L) At the sole discretion of the Engineer, the portions of this policy related to inspections and testing of work subject to the requirements of this policy outside of the right-of-way shall be determined at the
preconslruction meeting.
M) Dimensional and other standards for concrete curb shall be in accordance with the City of Carmel Standard Details.
N Under no circumstances shall material other than Portland Cement Concrete meetingthe standards established b this policy be utilized to construct concrete curbs within the corporate limits of the City of Carmel.
Y P Y P lY
O)Under no circumstances shall extruded type curb be installed within the corporate limits of the City of Carmel.
2)Foundation
A)General
i) This work shall consist of the construction/preparation of the foundation in accordance with Section 105.03 of the Standard Specifications.
ii) The foundation shall be prepared in accordance with Section 605.03(a) of the Standard Specifications and the requirements of this policy.
B)Excavation and Embankment
i) Prior to beginning excavation and embankment operations, all necessary clearing, grubbing, scalping and topsoil stripping and subsequent backfilling for removed items within the slope stake limits shall be
performed in accordance with Section 201.03 and 201.04 of the Standard Specifications. All topsoil, vegetation, roots, stumps, friable and deleterious material shall be completely removed within the limits of the
slope stakes.
ii) Excavations
(1) After excavation operations, all spongy and yielding material that does not readily compact shall be removed from within the slope stake limits and the resulting void shall be refilled with suitable material and
compacted in accordance with Section 203 of the Standard Specifications.
(2) Any pronounced depressions within the slope stake limits resulting after excavation operations shall be refilled with suitable material and compacted in accordance with Section 203 of the Standard
Specifications.
iii)Embankments
(1) Embankments shall be constructed in accordance with Section 203 of the Standard Specifications.
(2) All spongy and yielding material that does not readily compact shall be removed from within the slope stake limits prior to embankment operations.
(3) Any pronounced depressions within the slope stake limits resulting after clearing, grubbing, scalping and topsoil removal shall be refilled with suitable material and compacted in accordance with Section
203 of the Standard Specifications prior to embankment operations.
(4) Prior to the construction of any embankment, the original ground surface within the limits of the slope stakes shall be leveled and the upper 6-inches shall be compacted in accordance with Section 203 of
the Standard Specifications.
(5) Embankments shall be shaped to be well drained and shall be protected to prevent erosion.
(6) Loose depth of each embankment lift, final compacted depth, compaction method and compaction requirements shall be in accordance with Section 203 of the Standard Specifications.
C)Soil Subgrades
i) Subgrades shall be installed on foundations constructed in accordance with Section 2(A) and Section 2(B) of this policy and only after the installation of all utilities and subsurface drains indicated on the approved
construction documents to be located under the pavement are completed. Trench backflling work of these installations shall be in accordance with the City of Carmel Trench Backfilling specifications.
ii) The subgrade shall be shaped to the required grade and sections, free from all ruts, corrugations, or other irregularities.
iii)The subgrade shall be uniformly prepared, compacted and approved in accordance with Sections 207.02, 207.03 and 207.04 of the Standard Specifications.
iv)Subgrades shall be inspected and approved by the Engineer before any aggregate base or concrete curbs are constructed. A proofroll shall be conducted in accordance with Section 203.26 of the Standard
Specifications. Unacceptable areas shall be corrected to the satisfaction of the Engineer before the placement of any Aggregate Base or concrete curbing.
v) At the discretion of the Engineer, Subgrade that has satisfactorily passed a proofroll, but remains uncovered for a period of 14 calendar days prior to placing Aggregate Base or concrete curbing or is subject to a
measurable rain event prior to placing Aggregate Base or concrete curbing, shall be subject to additional proof rolls prior to placement of the Aggregate Base or concrete curbing.
3) Aggregate Bases
A)General
i) This work shall consist of placing a compacted Aggregate Base on a prepared soil subgrade in accordance with Section 105.03 of the Standard Specifications.
ill Aggregate Base materials shall be in accordance with Section 301.02 of the Standard Specifications.
iii)The Aggregate Base material shall be obtained from a Certified Aggregate Producer in accordance with Section 917 of the Standard Specifications.
iv)The Aggregate Base material shall be handled and transported to, and on, the work site in a manner that minimizes segregation and moisture loss.
v) Aggregate Bases shall be constructed on approved soil subgrades and to thicknesses equal or greater than those indicated on the approved construction documents.
B)Temperature and Seasonal Limitations
i) The Aggregate Base shall be placed in accordance with the temperature limitations of Section 301.04 of the Standard Specifications.
ii) Frozen material shall not be placed.
ill)Aggregate Bases must be placed and pass proof roll prior to November 30 in order to allow paving in accordance with Section 4C(iv) of this policy.
C)Pmpamtion
i) The prepared soil subgrade shall be free from objectionable or foreign materials at the time of placement.
ii) The subgrade shall be subject to additional proof rolls in accordance with Section 203.26 of the Standard Specifications just prior to placing the Aggregate Base on the subgrade in accordance with Section 2C(v)
of this policy. Unacceptable areas shall he corrected to the satisfaction of the Engineer before any Aggregate Base is placed.
D S readin and Finishing
P 9 9
i The Aggregate Base shall he spread in accordance with Section 301.05 of the Standard Specifications.
P Pe
ill The Aggregate Base shall be compacted in accordance with Section 301.06 of the Standard Specifications.
II)Concrete curb shall be placed over the Aggregate Base within 14 calendar days. Aggregate Bases that lay exposed for a period of time greater than 14 calendar days or experience a measurable rain event prior
to the placement of concrete curb shall be subject to inspection and acceptance by the Engineer. At the discretion of the Engineer, additional proof rolls may be required.
4)Concrete Curb
A)General
i) This work shall consist of placing concrete curbing on prepared soil subgrades or Aggregate Bases in accordance with Section 105.03 of the Standard Specifications.
ii) Concrete curb shall be constructed on prepared soil subgrades or Aggregate Bases to the dimensional standards of the applicable City of Carmel Standard Details or in accordance with the curbing details of the
approved construction documents.
iii)Materials used in the production of the concrete for the curbing shall be in accordance with Section 605.02 of the Standard Specifications. High early strength admixtures may be utilized but shall not be
considered in waiving any requirements of this policy. Freeze protection admixtures shall not be utilized under any circumstances.
iv)Equipment utilized for concrete curbing installation work, including but not limited to production, hauling/delivery, placing, installation, jointing, curing, finishing and miscellaneous/ancillary activity shall be in
accordance with Section 508 of the Standard Specifications.
v) Concrete production, mixing and hauling/delivery shall be in accordance with Section 502.10 of the Standard Specifications.
vi)Installation of the concrete curbing indicated on the approved construction documents shall be completed in the same paving season.
B)Pmpamtion
i) The soil subgrade or Aggregate Base shall be subject to additional proof rolls in accordance with Section 203.26 of the Standard Specifications just prior to placing the HMA courses in accordance with Section
2C(v) and 3D(iii) of this policy. Unacceptable areas shall he corrected to the satisfaction of the Engineer before placement of any concrete curbing.
ill All displacement or rutting of the soil subgrade or Aggregate Base shall be repaired prior to placing concrete curbing.
C)Weather and Seasonal Limitations
i) Concrete curbing shall only be placed in accordance with Section 502.11 of the Standard Specifications with the exception that placement operations shall not begin until the ambient temperature is 50OF and
rising. Placement operations shall be discontinued when the ambient temperature is descending and is 50°F or below. Al the discretion of the Engineer, concrete may be laced al ambient temperatures less than
9 Pe Pe 9 9 Y P P
noted above provided that placement, jointing, finishing and curing operations conform to Sections 502.11 and 702.11 of the Standard Specifications.
ii) No mixture shall be placed on a frozen subgrade or Aggregate Base.
iii)Under no circumstances shall concrete curb be placed between December 15 and March 30.
iv)lf a soil subgrade or Aggregate Base over which concrete curb is to placed, is placed and approved by the City prior to November 30, placement of the concrete curb will be allowed up to December 15, provided
that the ambient and soil subgrade or Aggregate Base surface temperature complies with the requirements of Section 4C(i) of this policy and the paving contractor pay for the services of a full time construction
inspector and who shall act as an authorized agent of the Engineer. The Engineer shall select the construction inspector.
v) If the ambient and soil subgrade or Aggregate Base surface temperature complies with the requirements of Section 4C(i) of this policy between April 1 and April 15, concrete curb shall be allowed to be placed on
an approved soil subgrade or Aggregate Base provided that the paving contractor pay for the services of a full time construction inspector and who shall act as an authorized agent of the Engineer. The Engineer
shall select the construction inspector.
vi)The Engineer reserves the right to suspend all concrete curb placement operations if, in the opinion of the Engineer, that prevailing weather conditions and/or the condition of the Subgrade and/or the Aggregate
Base may result in substandard concrete curb placement, curing and finishing.
D)Placement
i) Concrete curb shall be placed in accordance with Section 502.09, 502.12 and 605.04(c) and 605.04(d) of the Standard Specifications.
ii) Curb machines may be utilized in accordance with Section 605.04(c) and 605.04(h) of the Standard Specifications provided that the equipment conforms to the requirements of Section 508 of the Standard
Specifications.
iii)Formwork shall comply with the requirements of Section 605.04(b) of the Standard Specifications.
iv)Forms shall be removed in accordance with Section 502.16 and 605.04(b) of the Standard Specifications.
E)Joints
i) Joints shall conform to the requirements of Section 503 and 605.04(e) of the Standard Specifications.
ii) Joints shall be installed at intervals of 10-feet or less; 5-foot or less along radii. Joints in integral curb and sidewalks shall be located at the same location as the joints in the adjoining sidewalk. Joints may be
sawed or tooled to a minimum depth of Y inch.
iii)Preformed expansion joints shall be placed at intervals of 50-feet or less, at all castings, the beginning and end of all curb returns, the end of each days work and where abutting existing construction. In addition
to these requirements, expansion joints in integral curb and sidewalks shall be located at the same location as the expansion joints in the adjoining sidewalk.
F)Finishing and Curing
i) The concrete curb shall be finished and cured in accordance with Section 502.14, 502.15, 504 and 605.04(f) of the Standard Specifications.
ii) Curing compound shall be applied to all exposed surfaces on slip -formed concrete curb. For formed concrete curb, curing compound shall be applied to all exposed surfaces including sides after any forms are
removed.
iii)The concrete curb shall be allowed to cure for a minimum of 5-days prior to commencing backfilling operations adjacent to the concrete curbing.
G)Backfilling
i) The spaces adjacent to the concrete curb shall be backfilled in accordance with Section 605.04(g) of the Standard Specifications only after the concrete curbing is inspected and accepted by the Engineer in
accordance with Section 5 of this policy.
ii) Backfilling operations shall be completed prior to opening the area to regular construction traffic.
5) Inspections
A)AII materials furnished and each part or detail of the work will be subject to inspection per Section 105.10 of the Standard Specifications for the purpose of ascertaining that the work is in substantial conformance
with this policy and the approved construction documents.
B)The Contractor shall notify the Engineer a minimum of 48-hours in advance of commencing any work subject to the standards established by this policy.
C)The Contractor shall schedule proofrolls with the Engineer a minimum of 48-hours in advance of such proofrolls.
D)The Contractor and Engineer will conduct an inspection of the new concrete curbing for any damage, including freezing or random cracks. The inspection and all necessary repairs shall be completed prior to
backfilling operations.
E)Sampling and testing of materials, equipment or construction work may be required at the expense of the Contractor at the discretion of the Engineer for the purpose of ascertaining that the work is in substantial
conformance with this policy and the approved construction documents. Sampling and testing shall conform to the requirements of the sections of the Standard Specifications applicable to the portion of the work
suspected to be noncompliant or as directed by the Engineer.
F) Where the Engineer determines that is necessary to confirm compliance with standards of quality or thickness, concrete curb shall be cored and tested at the expense of the Contractor. The average thicknesses of
the curb must equal or exceed the minimum prescribed by the approved construction documents.
G Such inspections shall not be construed to relieve the develo rs' en ineers or contractors in an way from their obligations and responsibilities under their contracts. Specifically, inspection b the Engineer, or
P Pe 9 Y Y 9 P P Y, Pe Y 9
by retained engineers or testing agencies, shall not require them to assume responsibilities for the approved construction documents, for any misinterpretation of the approved construction documents by the
contractors during construction, or for the means and methods of construction, nor for safety on the job site.
H Work identified to not meet the requirements of this policy or the approved construction documents unacceptable work whether the result of poor workmanship, use of defective materials damage through
q P cY PP P P P� 9 9
carelessness, or any other cause found to exist prior to the final acceptance of the work, shall be removed immediately and replaced in an acceptable manner at the Contractors expense.
I) If the Contractor fails to comply forthwith with any order made under the provisions of this subsection, the Engineer will have authority to cause unacceptable work to be remedied or removed and replaced; to cause
unauthorized work to be removed; and to deduct the costs from any monies due or to become due.
J) Work done contrary to instructions provided by the Engineer shall be considered unacceptable and subject to immediate removal and replacement in accordance with the instructions provided by the Engineer.
6)Acceptance
A)Befom acceptance of the concrete curb, the Engineer shall determine if the improvements are in substantial compliance with this policy (except for any variances granted) and the approved construction documents.
B)The Engineer may, at his sole discretion, accept work that is not in conformance with this policy provided that the work is bonded for a period greater than three years. The Engineer shall establish the extended
bonding requirement.
CITY OF CARMEL COVER AND BACKFILL REQUIREMENTS
Storm Sewers Under Pavement Sidewalk Paved areas and within Ri ht-of-Wa
9 Y
Bedding and Haunching
Bedding and haunching for all reinforced concrete pipe installations shall be #8 stone meeting the material requirements of the INDOT. The material shall be approved by the City of Carmel Department of Engineering
at time of installation. Bedding shall be placed in the trench bottom such that after the pipe is installed to grade and line, there remains a 4-inch minimum depth of material below the pipe barrel and a minimum of
3-inches below the bell. For pipe sizes 66-inches and larger, the minimum depth of material below the pipe barrel shall be 6-inches.
Bedding shall be placed to be uniform as possible, but shall be loosely placed uncompacted material under the middle third of the pipe prior to placement of the pipe. If the underlying soils of the trench bottom are soft
or yielding, the soil shall be undercut to such a depth that when repaired with #2 stone it will produce a uniform and stable foundation along the entire length of the pipe. Haunching shall be compacted in 8-inch
maximum lifts to not less than 90 % Standard Proctor Density for the entire depth of the material placed. The backfill shall be brought up evenly on both sides of the pipe for the full length of the pipe. Haunching shall
extend to the springline of the pipe. Minimum trench width shall be the outside diameter of the pipe plus 18-inches.
Final Backfill
Final backfill for all reinforced concrete pipe installations under and within 5-feet of pavement or sidewalk or other paved areas and for all installations within City right-of-way shall be B-Borrow for Structure Backfill
meeting the material requirements of the INDICT. The material shall be approved by the City of Carmel Department of Engineering at time of installation. Final backfill shall be compacted in 6-inch maximum lifts to not
less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6-inches of the excavation below the start of the aggregate sub -base of the pavement shall be No. 53 Stone
meeting the material requirements of the INDICT and shall be compacted to not less than 95% Standard Proctor Density. Final Backfill for all reinforced concrete pipe installations greater than 5-feet from pavement,
sidewalk, other paved areas or the limit of City right-of-way shall be clean fill material free of rocks larger than 6-inches in diameter, frozen lumps of soil, wood or other extraneous material, compacted in 12-inch
maximum lifts to not less than 90% Standard Proctor Density for the entire depth of the excavation. The final 6-inches of the excavation shall consist of topsoil.
Water and Sewer Under Pavement, Sidewalk, Paved areas and within Rightof-Way
Bedding, Haunching, Initial Backfill
Bedding, haunching and initial backfill materials, placement and compaction for water mains, water service laterals, Sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the
utility that has jurisdiction over the installation.
Final Backfill
Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5-feet of pavement or sidewalk or other paved areas and for all installations within City rightof-way shall
be B-Borrow for Structure Backfill meeting the material requirements of the INDOT. The material shall be approved by the City of Carmel Department of Engineering at time of installation. Final backfill shall be
compacted in 6-inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6-inches of the excavation below the start of the aggregate sub -base
of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. If the standard practice of the utility that has jurisdiction
over the installation has a more stringent final backfll requirement, the more stringent requirement shall govern.
Minimum Cover for Pipe Crossings within City Right -of -Way
For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the
installed pavement to the top of the installed pipe shall be the pavement section thickness (all bituminous and aggregate material above the subgrade) plus 1-0", but under no circumstances shall the cover along any
part of the pipe from the final pavement elevation to the top of the pipe be less than 2.5-feet. If the standard practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the
more stringent requirement shall govern.
Cover heights for reinforced concrete pipe storm sewer that are less than those required will be evaluated on a case by case condition and approved only with written permission by the city engineer.
CITY OF CARMEL DEPARTMENT OF ENGINEERING NOTES:
1. ALL WORK IN THE PUBLIC RIGHT-OF-WAY SHALL COMFORM TO CURRENT CITY OF CARMEL STANDARDS. ALL STREETS AND WATER MAINS
ARE TO BE CONSTRUCTED TO CARMEL STANDARD SPECIFICATIONS. ALL STORM SEWERS SHALL BE CONSTRUCTED TO CITY OF CARMEL AND
HAMILTON COUNTY STANDARDS. CONTACT THE APPROPRIATE AGENCIES FOR ADDITIONAL INFORMATION AND/OR DETAILS.
2. ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF
ENGINEERING. CONTRACTOR SHALL CONTACT DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE -CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK
AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN ANY EXISTING AND PROPOSED CITY RIGHT-OF-WAY.
3. ALL PAVING IS TO BE COMPLETED WITHIN THE SAME PAVING SEASON.
,
.
-
- Indiana -
Know what'sbelow.
Call beforeyou • •
enverity
E N G I N E E R I N G
9229 Delegates Row, Suite 150
Indianapolis, IN 46240
317.706.2075
www.enverityENG.com
Engineer:
LL-i I ❑
= ❑ I0=
UJ
[P 0 0
IL
KEY PLAN
OVERALL SITE "A"
SCALE:NTS (&
PLAN NORTh
Developer:
P E D C O R
�� 'VeN&W
DEVELOPMENT CO.
Project
11111111111
a
N
i0
Z
W
M
p
o�
W
F_
LLJ
a0o
a
E
=
cv
(::)
`^
J
C:
Z
-
J
a
Q
W
NM
0.
-
a;
E
aQ
a
D�
LLI
a
cn
U
OM
W
O
Im
COPYRIGHT & OW NERSHIP OF DOCUMENTS
THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND B THE
'PROPERTY IF "o oisTxleUTION OOTHER Penn PARTIES is NOT TO BECONSTRUEDAS
NATION CONTAINRESERVEDEIRTY R OR OTHER EDH REN CONSTNTESTE
ORIGINPLPND
L AND
PEDCOR DESIGN GROUPIIJILIGHEI WORK OF ELLCC NIO PART OR WHOLE OF3THB DESIGN.
PORTIONS GS SAY BE
RECOPIED THE EI EXHIBITED. OTOHROR �PUBLISH
GROTHERWIS
sputum RAND PEDCORD SIGNc FTPOOC,*COPvrreicM'
SOLE
ALL
R.
zaiss R.