Loading...
HomeMy WebLinkAboutL101 - Site Materials Plan6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SS D6''SSD6''SSD 6''SSD6''SSD6''SSD6''SSD6''SSDRDRDSTOP STOP DO NOTENTEROHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUSTOPSTOPSTOPDRIVE TO BE CONSTRUCTED BY OTHERS WALK TO BE CONSTRUCTED BY OTHERSx4 PAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAx4PAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAC1.2C1.1P1.1P1.1P1.1P1.1P1.1P1.1P1.3P1.3P1.2P1.2P1.2P1.2P1.2P1.2P2.2P2.2P2.2P2.2P2.2P2.2P2.2R1.1R1.1R1.5R1.2P2.2S1.3C1.3P2.2P2.2P2.2P2.2P2.2P2.2P2.2P1.3P1.2P1.3P1.1R1.3S1.4S1.1S1.1C1.1C1.1C1.1C1.2C1.1C1.2C1.1C1.1C1.1C1.1C1.1C1.1C1.1C1.1C1.1C1.1C1.1C1.2C1.1C1.2C1.1C1.1C1.1C1.1C1.1C1.2C1.1C1.1C1.1C1.2C1.2S1.2S1.1C1.6C1.6C1.8S1.1R1.5R1.4S1.5C1.2C1.1Meet Existing PavementP1.3P2.2P2.4F2.2P3.2P3.2F2.2F2.2F2.2Meet Existing PavementF2.3F2.3F2.2S1.6S1.4S1.7S1.7S1.7C1.8C1.8C1.2C1.2C1.2C1.3S1.5S1.3C1.1Refer to Civil Seriesfor tying to existingroad conditionP2.2C1.1C1.2C1.1C1.2C1.1P2.2P2.2P2.2C1.20Scale 1" = 30'-0"60'30'15'NorthMATERIAL LEGENDP1.0 Pavement, AsphaltHeavy Duty Asphalt Pavement, Refer to Detail 3/L500Standard Asphalt Pavement, Refer to Detail 1/L500Medium Duty Asphalt Pavement, Refer to Detail 2/L500R1.0 Accessible Sidewalk RampsCorner Ramp with Curb, Refer to Detail 1/L501Sidewalk Ramp with Curb, Refer to Detail 1/L501Integrated Sidewalk Ramp, Refer to Detail 1/L501Double Sidewalk Ramp with Curb, Refer to Detail 1/L501Crosswalk Ramp, Refer to Detail 1/L501P2.0 Pavement, ConcreteHeavy Duty Concrete Pavement, Refer to Detail 6/L500and SpecificationsStandard Concrete Pavement, Medium Broom Finish,Refer to Details 4/L500 and SpecificationsStandard Concrete Pavement, Ashlar Stamp Pattern,Refer to Details 4/L500 and SpecificationsMedium Duty Concrete Pavement, Refer to Detail,5/L500R1.1R1.3R1.2P1.1P1.3P2.1P1.2P2.2R1.4F2.0 Fencing and GatesOrnamental Fence and Gate, Refer to Architectural Drawingsand SpecificationsFence, 4'-0" ht., black, vinyl coated, chain link, Refer toDetails 11 and 12/ L502 and SpecificationsDouble Leaf Swing Gate, Match adjacent fencing, Refer toSpecificationsVehicular Barrier Gate, Refer to Specifications.F2.1C1.0 CurbsPost Curb, Refer to Detail 2/L501Integral Curb and Sidewalk, Refer to Detail 9/L500Wheel Stops, Refer to Detail 1/L502Playground Post Curb, Refer to Detail 5/L502Concrete Turndown Edge, Refer to Detail 6/L502Curb and Gutter, Concrete, Type III, Refer to Detail8/L501Flush Turndown Curb, Refer to Detail 10/L500Curb and Gutter, Concrete, Type II, Refer to Detail7/L501C1.1C1.3C1.2P2.3S1.0 Signage, (comply with MUTCD Standards) (VIF Regulatory Signs with City Representative)Stop, Refer to Detail 6/L501ADA Parking, Refer to Detail 4/L501Van Accessible ADA Parking, Refer to Detail 4/L501Do Not Enter, Refer to Detail 6/L501ADA Parking Symbol, Refer to Detail 5/L501Monument Sign, See Architectural DrawingsDirectional Sign, See Architectural DrawingsS1.1S1.3S1.2S1.4S1.5F1.0 Site FurnishingsFlagpole, Refer to Detail 9/L502 and 1/L503Bike Rack, Refer to Detail 4/L502Half Basketball Court, Refer to Detail 2/L5026' Bench, Refer to SpecificationsTrash Receptacle, Refer to SpecificationsSteel Pipe Bollard, Refer to Detail 11/L500Picnic Table and Benches, Refer to SpecificationsADA Picnic Table and Benches, Refer to SpecificationsShade Sails, Refer to SpecificationsF1.1F1.2P3.0 Pavement, SpecialtyPour in Place Play Surface, Refer to Details 5 and 6/L502and SpecificationsStone Maintenance Edge (Mow Strip), #6 River Rock, Referto Detail 3/L502, 8/L410, and SpecificationsP3.1P3.2F2.2F2.3C1.4C1.5F1.3F1.4S1.6S1.7F1.5W1.0 WallsCast-in-Place Concrete Seat Wall, Smooth Finish,Refer to Detail 1/L503 and SpecificationsW1.1C1.6C1.7C1.8P2.4R1.5F2.4F1.6F1.7F1.8F1.9MATCHLINE - REFER TO SHEET L102MATCHLINE - REFER TO SHEET L102MATCHLINE - REFER TO SHEET L103MATCHLINE - REFER TO SHEET L103NOTE:Refer to Specifications for all Pavement Striping20'-0"ElectricalEasement331.Addendum #03 12-20-20193