Loading...
HomeMy WebLinkAboutCarmel High School Natatorium Full SetE. MAIN STREET KEYSTONE PARKWAYRANGELINE ROADE. 136th STREET PROJECT SITE PROJECT SITE FANNING HOWEY ASSOCIATES INC. OWNERARCHITECT THE SKILLMAN CORPORATION CONSTRUCTION MANAGER TLF ENGINEERS SITE/CIVIL ENGINEER CARMEL CLAY SCHOOLS COVER SHEET REGULATORY REVIEW CONSTRUCTION DOCUMENTS CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS 520 E. MAIN ST. CARMEL, INDIANA 46032 LAKEPORTERLAPORTEST. JOSEPHELKHARTLAGRANGESTEUBENDEKALBNOBLEKOSCIUSKOMARSHALLSTARKEJASPERNEWTONPULASKIFULTONWHITLEYALLENADAMSWELLSHUNTINGTONWABASHMIAMICASSWHITEBENTONCARROLTIPPECANOEWARRENHOWARDGRANTBLACKFORDJAYRANDOLPHDELAWAREMADISONTIPTONCLINTONBOONEHAMILTONHANCOCKHENRYWAYNE UNI ONFAYETTERUSHMONTGOMERYFOUNTAINPARKEVERMILLIONVIGOCLAYPUTNAMMORGANHENDRICKSMARIONJOHNSONSHELBYFRANKLINDECATURBARTHOLOMEWBROWNMONROEOWENGREENESULLIVANDEARBORNRIPLEYJENNINGSLAWRENCEMARTINORANGEWASHINGTONSCOTTJEFFERSON SWI TZER L A ND OHIO CLARK FLOYDHARRISONCRAWFORDPERRYDUBOISDAVIESSKNOXPIKEGIBSONSPENCERWARRICKPOSEYJACKSONVANDER-BURGH STATE OF INDIANA SITE LOCATION VICINITY MAP LOCATION MAP CIVIL SHEET INDEX CS COVER SHEET GD0.1 GENERAL NOTES AND LEGEND GD0.2 OVERALL EXISTING CONDITIONS SV-1 PARTIAL RETRACEMENT BOUNDARY SURVEY SV-2 PARTIAL RETRACEMENT BOUNDARY SURVEY SV-3 TOPOGRAPHIC SURVEY SV-4 TOPOGRAPHIC SURVEY SV-5 TOPOGRAPHIC SURVEY GD1.0 OVERALL SITE DEMOLITION PLAN GD1.1 SITE DEMOLITION PLAN - NORTH GD1.2 SITE DEMOLITION PLAN - SOUTH G0.1 MASTER PARKING PLAN G1.0 OVERALL SITE PLAN G1.1 SITE PLAN - NORTH G1.2 SITE PLAN - SOUTH G1.7 SITE PLAN - MURRAY FIELD PARKING LOT G2.0 OVERALL GRADING PLAN G2.1 GRADING PLAN - NORTH G2.2 GRADING PLAN - SOUTH G3.0 OVERALL EROSION CONTROL PLAN G3.1 EROSION CONTROL PLAN - NORTH G3.2 EROSION CONTROL PLAN - SOUTH G3.3 STORMWATER POLLUTION PREVENTION PLAN G3.4 EROSION CONTROL DETAILS G4.1 SITE DETAILS G4.2 SITE DETAILS G4.3 SITE DETAILS G4.4 SITE DETAILS SU1.0 OVERALL UTILITY PLAN SU1.1 UTILITY PLAN - NORTH SU1.2 UTILITY PLAN - SOUTH SU1.3 UTILITY PLAN - GAS SERVICE SU2.1 UTILITY DETAILS SU2.2 UTILITY DETAILS SU2.3 UTILITY DETAILS SU2.4 UTILITY DETAILS SU2.5 UTILITY DETAILS SU2.6 UTILITY DETAILS L1.0 LANDSCAPE PLAN L2.0 LANDSCAPE DETAILS E2.01 ELECTRICAL SITE PLAN E2.02 ELECTRICAL SITE PLAN E2.03 ELECTRICAL SITE PLAN A1.01 ARCHITECTURAL FLOOR PLAN A1.02 ARCHITECTURAL FLOOR PLAN A2.01 ROOF PLAN A2.02 SECTIONS A3.01 BUILDING ELEVATIONS REV. NO. DESCRIPTION DATE 3901 W 86TH ST., SUITE 200 INDIANAPOLIS, IN 46268 CONTACT: PETE RANKOVICH, P.E. PHONE: (317) 334-1500 EMAIL: prankovich@tlf-engineers.com 3834 S. EMERSON AVE., BLDG A INDIANAPOLIS, IN 46203 CONTACT: TYLER BARKER PHONE: (317) 474-2288 EMAIL: tbarker@skillman.com 5185 E. MAIN ST. CARMEL, INDIANA 46033 CONTACT: TODD FENOGLIO PHONE: (317) 844-8207 EMAIL: tfenogli@ccs.k12.in.us 350 EAST NEW YORK STREET, SUITE 300 INDIANAPOLIS, INDIANA 46204 CONTACT: CHERYL SYDZYIK, RA PHONE: (317) 848-0966, 10344 EMAIL: csydzyik@fhai.com PROJECT NUMBER: 220014.00 PROJECT ISSUE DATE: 11.17.2021 DRAWN BY: HHW TAC SUBMITTAL 11/17/2021A PROJECT INFORMATION ADDENDUM #1 01/25/20221 02/01/20222 ADDENDUM #2 03/15/20223 TAC REVIEW COMMENTS 05/20/22 E. MAIN STREET KEYSTONE PARKWAYRANGELINE ROADE. 136th STREET PROJECT SITE PROJECT SITE FANNING HOWEY ASSOCIATES INC. OWNERARCHITECT THE SKILLMAN CORPORATION CONSTRUCTION MANAGER TLF ENGINEERS SITE/CIVIL ENGINEER CARMEL CLAY SCHOOLS COVER SHEET REGULATORY REVIEW CONSTRUCTION DOCUMENTS CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS 520 E. MAIN ST. CARMEL, INDIANA 46032 LAKEPORTERLAPORTEST. JOSEPHELKHARTLAGRANGESTEUBENDEKALBNOBLEKOSCIUSKOMARSHALLSTARKEJASPERNEWTONPULASKIFULTONWHITLEYALLENADAMSWELLSHUNTINGTONWABASHMIAMICASSWHITEBENTONCARROLTIPPECANOEWARRENHOWARDGRANTBLACKFORDJAYRANDOLPHDELAWAREMADISONTIPTONCLINTONBOONEHAMILTONHANCOCKHENRYWAYNE UNI ONFAYETTERUSHMONTGOMERYFOUNTAINPARKEVERMILLIONVIGOCLAYPUTNAMMORGANHENDRICKSMARIONJOHNSONSHELBYFRANKLINDECATURBARTHOLOMEWBROWNMONROEOWENGREENESULLIVANDEARBORNRIPLEYJENNINGSLAWRENCEMARTINORANGEWASHINGTONSCOTTJEFFERSON SWI TZER L A ND OHIO CLARK FLOYDHARRISONCRAWFORDPERRYDUBOISDAVIESSKNOXPIKEGIBSONSPENCERWARRICKPOSEYJACKSONVANDER-BURGH STATE OF INDIANA SITE LOCATION VICINITY MAP LOCATION MAP CIVIL SHEET INDEX CS COVER SHEET GD0.1 GENERAL NOTES AND LEGEND GD0.2 OVERALL EXISTING CONDITIONS SV-1 PARTIAL RETRACEMENT BOUNDARY SURVEY SV-2 PARTIAL RETRACEMENT BOUNDARY SURVEY SV-3 TOPOGRAPHIC SURVEY SV-4 TOPOGRAPHIC SURVEY SV-5 TOPOGRAPHIC SURVEY GD1.0 OVERALL SITE DEMOLITION PLAN GD1.1 SITE DEMOLITION PLAN - NORTH GD1.2 SITE DEMOLITION PLAN - SOUTH G0.1 MASTER PARKING PLAN G1.0 OVERALL SITE PLAN G1.1 SITE PLAN - NORTH G1.2 SITE PLAN - SOUTH G1.7 SITE PLAN - MURRAY FIELD PARKING LOT G2.0 OVERALL GRADING PLAN G2.1 GRADING PLAN - NORTH G2.2 GRADING PLAN - SOUTH G3.0 OVERALL EROSION CONTROL PLAN G3.1 EROSION CONTROL PLAN - NORTH G3.2 EROSION CONTROL PLAN - SOUTH G3.3 STORMWATER POLLUTION PREVENTION PLAN G3.4 EROSION CONTROL DETAILS G4.1 SITE DETAILS G4.2 SITE DETAILS G4.3 SITE DETAILS G4.4 SITE DETAILS SU1.0 OVERALL UTILITY PLAN SU1.1 UTILITY PLAN - NORTH SU1.2 UTILITY PLAN - SOUTH SU1.3 UTILITY PLAN - GAS SERVICE SU1.4 UTILITY PLAN - EXISTING POOL DRAIN SU2.1 UTILITY DETAILS SU2.2 UTILITY DETAILS SU2.3 UTILITY DETAILS SU2.4 UTILITY DETAILS SU2.5 UTILITY DETAILS SU2.6 UTILITY DETAILS L1.0 LANDSCAPE PLAN L2.0 LANDSCAPE DETAILS E2.01 ELECTRICAL SITE PLAN E2.02 ELECTRICAL SITE PLAN E2.03 ELECTRICAL SITE PLAN A1.01 ARCHITECTURAL FLOOR PLAN A1.02 ARCHITECTURAL FLOOR PLAN A2.01 ROOF PLAN A2.02 SECTIONS A3.01 BUILDING ELEVATIONS REV. NO. DESCRIPTION DATE 3901 W 86TH ST., SUITE 200 INDIANAPOLIS, IN 46268 CONTACT: PETE RANKOVICH, P.E. PHONE: (317) 334-1500 EMAIL: prankovich@tlf-engineers.com 3834 S. EMERSON AVE., BLDG A INDIANAPOLIS, IN 46203 CONTACT: TYLER BARKER PHONE: (317) 474-2288 EMAIL: tbarker@skillman.com 5185 E. MAIN ST. CARMEL, INDIANA 46033 CONTACT: TODD FENOGLIO PHONE: (317) 844-8207 EMAIL: tfenogli@ccs.k12.in.us 350 EAST NEW YORK STREET, SUITE 300 INDIANAPOLIS, INDIANA 46204 CONTACT: CHERYL SYDZYIK, RA PHONE: (317) 848-0966, 10344 EMAIL: csydzyik@fhai.com PROJECT NUMBER: 220014.00 PROJECT ISSUE DATE: 11.17.2021 DRAWN BY: HHW TAC SUBMITTAL 11/17/2021A PROJECT INFORMATION 05/20/22 GENERAL 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL FEDERAL, STATE, COUNTY, CITY, AND LOCAL PERMITS FOR ANY AND ALL WORK REQUIRED UNLESS OTHERWISE NOTED. THIS SHALL INCLUDE ALL SUBMITTALS AS REQUIRED INCLUDING STORMWATER RUNOFF CONTROL (RULE 5). THE CONTRACTOR IS RESPONSIBLE FOR PAYING FOR ALL REQUIRED PERMITS BY ANY OR ALL AGENCIES MENTIONED ABOVE UNLESS OTHERWISE NOTED BY THE CONTRACT OR SPECIFICATIONS. 3. CONTRACTOR SHALL VERIFY DATE OF PLANS WITH ENGINEER PRIOR TO CONSTRUCTION TO ENSURE USE OF CURRENT PLANS. 4. ALL QUANTITIES PROVIDED ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 5. PROTECT AND MAINTAIN BENCHMARKS AND SURVEY CONTROL POINTS FROM DISTURBANCE DURING CONSTRUCTION. SITE LAYOUT 1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 2. DIMENSIONS SHOWN ARE TO FACE OF CURB AND TO FACE OF BUILDING UNLESS NOTED OTHERWISE. 3. RADII NOT DIMENSIONED ARE TO BE 5'. 4. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. 5. REFER TO APPROPRIATE SITE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. 6. TAPER CURB HEIGHT TO 1" IN FINAL 2' OF ALL CURB ENDINGS OR AS NOTED ON PLANS. 7. EXACT LOCATION OF SIGNS TO BE COORDINATED WITH OWNER AND APPROVED PRIOR TO INSTALLATION. 8. SITE BOUNDARY, TOPOGRAPHY, UTILITY, STRUCTURES AND ROAD INFORMATION TAKEN FROM A SURVEY PREPARED BY CEC, DATED AUGUST 3, 2020, AND IS INCLUDED ON SHEETS SV-1 THRU SV-4. GRADING AND EARTHWORK 1. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA. EXISTING UTILITY STRUCTURES ARE SHOWN IN ACCORDANCE WITH AVAILABLE INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH THE APPLICABLE UTILITY COMPANY) IS THE RESPONSIBILITY OF THE CONTRACTOR. 2. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 3. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, WASHOUT, AND OTHER HAZARDS CREATED BY EARTH MOVING OPERATIONS. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACQUAINT HIMSELF WITH SUBSOIL CONDITIONS PRIOR TO BIDDING. 5. CONTRACTOR SHALL VERIFY WITH OWNER EXACT LOCATION AND DEPTH OF ALL PRIVATE/OWNER INSTALLED UTILITIES PRIOR TO CONSTRUCTION. 6. DETERMINE LOCATION OF UNDERGROUND UTILITIES AND PERFORM WORK IN A MANNER WHICH WILL AVOID POSSIBLE DAMAGE. HAND EXCAVATE AS REQUIRED. 7. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 8. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (LOCATIONS, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 9. EXCAVATE TO SUBGRADE ELEVATIONS REGARDLESS OF THE CHARACTER OF SURFACE AND SUBSURFACE CONDITIONS ENCOUNTERED. UNCLASSIFIED EXCAVATED MATERIALS MAY INCLUDE ROCK, SOIL MATERIALS, AND OBSTRUCTIONS. 10. PREVENT SURFACE WATER AND GROUND WATER FROM ENTERING EXCAVATIONS, FROM PONDING ON PREPARED SUBGRADES, AND FROM FLOODING THE PROJECT SITE AND SURROUNDING AREA. REROUTE SURFACE WATER RUNOFF AWAY FROM EXCAVATED AREAS. DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. DO NOT USE EXCAVATED TRENCHES AS TEMPORARY DRAINAGE DITCHES. 11. STOCKPILE BULK MATERIALS AWAY FROM EDGE OF EXCAVATIONS WITHOUT INTERMIXING WITH SUBSOIL. GRADE AND SHAPE STOCKPILES TO DRAIN SURFACE WATER. COVER TO PREVENT WINDBLOWN DUST AND EROSION BY WATER. DO NOT STORE WITHIN DRIP LINE OF TREES THAT WILL REMAIN. 12. CONTRACTOR SHALL INSTALL ALL SLEEVES/CONDUITS AS REQUIRED BY THE UTILITY COMPANIES. COORDINATE FINAL LOCATIONS WITH THE UTILITY COMPANIES. 13. THE CONTRACTOR SHALL PROVIDE AT LEAST 18"' OF COVER OVER ALL STORM SEWERS, UNLESS OTHERWISE INDICATED BY PLANS. 14. PROVIDE COMPACTED "B" BORROW BACKFILL OVER ALL UTILITIES IN PAVED AREAS. 15. PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW GRADES. 16. MAINTAIN GRADE STAKES SET BY OTHERS UNTIL REMOVAL IS MUTUALLY AGREED UPON BY PARTIES CONCERNED. 17. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, WATER OR GAS VALVE BOXES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATION. 18. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, "BIRD BATH" CONDITIONS. 19. MAXIMUM LAWN SLOPE SHALL BE 4:1. 20. DURING FINISH GRADING, ELIMINATE RILLS AND GULLIES. REMOVE ALL STONES, RUBBLE, STICKS, WIRE, PLANT MASS AND DEBRIS OVER 1 INCH IN ANY DIMENSION, AS WELL AS OBVIOUS QUANTITIES OF SMALL STONE. 21. REPAIR AND REESTABLISH GRADES TO SPECIFIED TOLERANCES WHERE COMPLETED OR PARTIALLY COMPLETED SURFACES BECOME ERODED, RUTTED, SETTLED, OR WHERE COMPACTION IS LOST DUE TO SUBSEQUENT CONSTRUCTION OPERATIONS OR WEATHER CONDITIONS. 22. ADD ADDITIONAL TOPSOIL AND GRADE AS NECESSARY IN AREAS OF SETTLEMENT AND EROSION, AND AS REQUIRED TO MEET FINISH GRADE. DEMOLITION 1. DEMOLITION PERMIT WILL BE PROCURED BY THE SUBCONTRACTOR AND COST SHALL BE INCLUDED AS PART OF THEIR WORK. 2. DURING DEMOLITION PROCESS, EROSION CONTROL MEASURES SHALL BE ESTABLISHED. THESE SHALL INCLUDE TREATMENT OF DUST AND POTENTIAL STORMWATER DISCHARGE. REFER TO EROSION CONTROL DRAWINGS. 3. REMOVAL OF THE EXISTING IMPROVEMENTS ARE AS NOTED ON THE PLANS OR AS REQUIRED BY THE PROJECT. THE MATERIALS REMOVED FROM THE SITE SHALL BE DISPOSED OF IN A PROPER AND LEGAL MANNER PER FEDERAL, STATE, AND OR LOCAL LAWS AND ORDINANCES. 4. EXISTING ITEMS TO REMAIN SHALL BE PROTECTED FROM DAMAGE BY THE CONTRACTOR. ANY DAMAGE DURING CONSTRUCTION SHALL BE RESTORED, RECONSTRUCTED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE. ALL DAMAGES SHALL BE RESTORED OR REPLACED TO AT LEAST THEIR ORIGINAL CONDITION OR AS REQUIRED OR DICTATED BY FEDERAL, STATE, COUNTY, CITY OR LOCAL REGULATIONS. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL THE UTILITY COMPANIES AND DEPARTMENTS 72 HOURS BEFORE DEMOLITION IS TO START TO VERIFY ANY UTILITIES THAT MAY BE PRESENT ON SITE. ALL VERIFICATIONS, LOCATIONS, SIZE AND DEPTHS SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES OR DEPARTMENTS. WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THE UTILITY MAY BE PRESENT DURING THE EXCAVATION TO INSTRUCT AND OBSERVE DURING THE EXCAVATION. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH EACH UTILITY COMPANY AND OR AGENT WHO IS RESPONSIBLE TO REMOVE OR RELOCATE EACH EXISTING UTILITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BEAR THE COST FOR THE REMOVAL, TERMINATION OR RELOCATION OF UTILITIES IF THE RESPONSIBILITY IS NOT COVERED BY THE UTILITY COMPANY. 7. LOCATE, IDENTIFY, DISCONNECT, AND SEAL OR CAP UTILITIES INDICATED TO BE REMOVED OR ABANDONED IN PLACE. 8. REMOVAL OF EXISTING CONCRETE OR OTHER PAVED AREAS INDICATED ON THE PLANS SHALL INCLUDE ALL AGGREGATE BASE MATERIALS. AREAS TO BE REMOVED SHALL BE SAW CUT CLEAN, NEAT AND TRUE TO LINE. REMOVE ALL NON-ORGANIC MATTER THAT WOULD INTERFERE WITH THE GROWTH OF TURF OR PLANT MATERIAL. 9. ALL CONTRACTORS MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. ACTUAL FIELD LOCATIONS OF ALL EXISTING UTILITIES ARE THE CONTRACTORS RESPONSIBILITY AND MUST BE LOCATED EITHER BY THE REPRESENTATIVE OF THE UTILITY COMPANY OR BY A PRIVATE UNDERGROUND UTILITY LOCATING COMPANY PRIOR TO THE START OF DEMOLITION ACTIVITIES. 10. SAW CUT THE EDGES OF PAVED AREAS CLEAN, NEAT AND TRUE TO LINE SO NO UNWANTED CHIPPING OR BREAKING OF EXISTING PAVEMENT TO REMAIN WILL OCCUR. 11. UNLESS EXISTING FULL-DEPTH JOINTS COINCIDE WITH LINE OF DEMOLITION, NEATLY SAW-CUT ALONG LINE OF EXISTING PAVEMENT TO REMAIN BEFORE REMOVING ADJACENT EXISTING PAVEMENT. SAW-CUT FACES VERTICALLY. 12. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION TO ACCUMULATE ON THE JOB SITE FOR MORE THAN 48 HOURS. REMOVE AND DISPOSE OF IN A LEGAL MANNER. 13. GRIND DOWN STUMPS AND REMOVE ROOTS, OBSTRUCTIONS, AND DEBRIS TO A DEPTH OF 18 INCHES BELOW EXPOSED SUBGRADE. 14. FILL DEPRESSIONS CAUSED BY CLEARING AND GRUBBING OPERATIONS WITH SATISFACTORY SOIL MATERIAL UNLESS FURTHER EXCAVATION OR EARTHWORK IS INDICATED. 15. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT EACH DAY AND REMOVE ALL MUD, DIRT, GRAVEL AND LOOSE MATERIALS TRACKED, DUMPED, SPILLED OR WIND BLOWN FROM THIS SITE ONTO OTHER SITES, RIGHT OF WAYS, PUBLIC OR PRIVATE STREETS OR ROADS, DRIVEWAYS, YARDS OR SIDEWALKS. THE CONTRACTOR MUST CLEAN OR PICK UP DAILY IF NECESSARY. THE CONTRACTOR SHALL REDUCE THE AIRBORNE DUST DURING THE ENTIRE DEMOLITION SCHEDULE. WATER MAY BE USED AS A REDUCER. 16. THE CONTRACTOR SHALL DOCUMENT THE FINAL DISPOSITION OF ALL MATERIALS REMOVED FROM THE SITE. 17. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THESE DRAWINGS. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ITEMS WHICH INTERFERE WITH NEW CONSTRUCTION. 1. ALL EROSION CONTROL PLANNING AND IMPLEMENTATION OF PROTECTIVE MEASURES SHALL BE IN ACCORDANCE WITH THE STANDARDS AND PROCEDURES OUTLINED IN THE IDEM "INDIANA STORM WATER QUALITY MANUAL". 2. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE AND REPAIR OF ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES DURING EARTHMOVING OPERATIONS. 3. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL AND LIMIT THE TRACKING OF SILT AND SEDIMENT OFFSITE. THE CONTRACTOR SHALL BROOM AND COLLECT TRACKED SILT AND SEDIMENT IMMEDIATELY UPON DISCOVERY THE MATERIAL. 5. DO NOT COMMENCE SITE CLEARING OR EARTH MOVING OPERATIONS UNTIL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES ARE IN PLACE. 6. DUST CONTROL IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL INCLUDE CONSTANT AND REPETITIVE APPLICATION OF WATERING AND STREET SWEEPING. 7. THE CONTRACTOR SHALL TEMPORARILY SEED ALL DISTURBED AREAS PLANNED FOR A PERIOD OF INACTIVITY EXCEEDING 15 DAYS. EROSION CONTROL SITE UTILITIES 1. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION, EXISTING DRAWINGS AND PRIVATE UNDERGROUND UTILITY LOCATING SERVICES. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THE ENGINEER DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION MADE AVAILABLE. THE ENGINEER HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. AN UNDERGROUND UTILITY REPORT IS INCLUDED IN THE CONSTRUCTION DOCUMENTS. 2. CONTRACTOR SHALL VERIFY EXISTING STORM AND SANITARY SEWER CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION TO ENSURE THAT THE NEW SEWERS CAN BE CONSTRUCTED AS SHOWN ON THESE PLANS. REPORT ANY DISCREPANCIES TO THE ENGINEER. 3. CONSTRUCTION OF ALL STORM AND SANITARY SEWER LINES AND STRUCTURES SHALL BE IN ACCORDANCE WITH LOCAL AND STATE CODES, RULES AND REGULATIONS. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION WITH ALL RESPECTIVE UTILITIES. 5. EXISTING UTILITY STRUCTURES ARE SHOWN IN ACCORDANCE WITH AVAILABLE INFORMATION. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR. 6. CONTRACTOR SHALL INSTALL ALL SLEEVES/CONDUITS AS REQUIRED BY THE UTILITY COMPANIES. COORDINATE FINAL LOCATIONS WITH THE UTILITY COMPANIES. CONTRACTOR SHALL SLEEVE ALL PIPING AT FOOTINGS AND BELOW GRADE WALLS. SLEEVES SHALL BE WATER TIGHT. COORDINATE ALL WALL PENETRATIONS WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING PLANS. 7. CONTRACTOR SHALL VERIFY WITH OWNER THE EXACT LOCATION AND DEPTH OF ALL PRIVATE/OWNER-INSTALLED UTILITIES PRIOR TO CONSTRUCTION. 8. CONTRACTORS SHALL CONSULT ARCHITECTURAL, MECHANICAL, PLUMBING AND ELECTRICAL PLANS FOR INVERT ELEVATIONS AND EXACT LOCATION OF DOWNSPOUTS, WATER LINES, STORM LINES, SANITARY LINES, GAS LINES, ELECTRICAL LINES, TELECOM LINES, TRANSFORMER PADS OR POLES, ETC. 9. SEE SITE ELECTRICAL PLANS FOR SITE LIGHTING, POWER AND TELECOM. 10. INSTALL PIPING BEGINNING AT LOW POINT, TRUE TO GRADES AND ALIGNMENT INDICATED WITH UNBROKEN CONTINUITY OF INVERT. PLACE BELL ENDS OF PIPING FACING UPSTREAM. INSTALL GASKETS, SEALS, SLEEVES, AND COUPLINGS ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS. REFER TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR USE OF LUBRICANTS, CEMENTS, AND OTHER INSTALLATION REQUIREMENTS. 11. INSTALL MANHOLES FOR CHANGES IN DIRECTION UNLESS FITTINGS ARE INDICATED. USE FITTINGS FOR BRANCH CONNECTIONS UNLESS DIRECT TAP INTO EXISTING SEWER IS INDICATED. 12. PVC AND HDPE STORM SEWER PIPE TO BE INSTALLED ONLY AT LOCATIONS INDICATED AND SHALL NOT BE SUBSTITUTED FOR LOCATIONS WHERE RCP PIPE IS SPECIFIED. 13. THE CONTRACTOR SHALL PROVIDE AT LEAST 18" OF COVER OVER ALL STORM SEWERS, UNLESS OTHERWISE INDICATED BY PLANS. 14. WHERE WATER LINES AND SEWERS CROSS AND THE WATER LINE CANNOT BE PLACED ABOVE OR BELOW THE SEWER WITH A MINIMUM OF 18" VERTICAL CLEARANCE, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PLASTIC PRESSURE (SDR 21) SEWER PIPE WITH GASKETED, COMPRESSION TYPE JOINTS WITHIN 10' OF THE WATER LINE. THE WATER LINES SHALL BE INSTALLED ABOVE THE SEWER WHEREVER POSSIBLE. 15. WHERE WATER LINES AND SEWERS RUN PARALLEL AND A MINIMUM SEPARATION DISTANCE OF 10' CANNOT BE MAINTAINED, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PLASTIC PRESSURE SEWER PIPE WITH GASKETED, COMPRESSION TYPE JOINTS. 16. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, WATER OR GAS VALVE BOXES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATION. 17. ANY STORM DRAIN, FIELD TILE, OR UTILITY ENCOUNTERED DURING CONSTRUCTION SHALL BE RELOCATED AND POSITIVE DRAINAGE MAINTAINED UNLESS OTHERWISE NOTED TO REMAIN. NOTIFY ENGINEER IF ANY DRAINS ARE ENCOUNTERED. 18. ALL PAVEMENT CUT DUE TO UTILITY INSTALLATION, CONSTRUCTION OF CURBS, ETC., OR DAMAGE TO EXISTING PAVEMENT DURING CONSTRUCTION SHALL BE PATCHED WITH A PAVEMENT SECTION WHICH MEETS OR EXCEEDS THE EXISTING SECTION. LANDSCAPING 1. PRIOR TO CONSTRUCTION, THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES & SHALL AVOID DAMAGE TO ALL UTILITIES DURING THE COURSE OF THE WORK. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY & ALL DAMAGE TO THE UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH OCCURS AS A RESULT OF THE LANDSCAPE CONSTRUCTION. 2. LANDSCAPE CONTRACTOR TO VERIFY EXISTING FIELD CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. 3. THE PLANT COUNTS INDICATED ON DRAWINGS ARE FOR LANDSCAPE ARCHITECT'S USE ONLY. LANDSCAPE CONTRACTOR SHALL MAKE THEIR OWN PLANT QUANTITY TAKEOFFS USING DRAWINGS, SPECIFICATIONS, AND PLANT SCHEDULE REQUIREMENTS (I.E., SPACING), UNLESS OTHERWISE DIRECTED BY LANDSCAPE ARCHITECT. CONTRACTOR TO VERIFY BED MEASUREMENTS AND INSTALL APPROPRIATE QUANTITIES AS GOVERNED BY PLANT SPACING PER SCHEDULE. PLANT MATERIAL QUANTITIES SHOWN ON PLAN ARE MINIMUM QUANTITIES. ADDITIONAL MATERIAL MAY BE NEEDED TO MEET SPACING REQUIREMENTS AND FIELD CONDITIONS. IN CASE OF DISCREPANCIES BETWEEN PLAN AND PLANT LIST, THE PLAN SHALL DICTATE. 4. NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID DATE IN WRITING. 5. DO NOT DUMP OR STORE BULK MATERIALS NEAR STRUCTURES, UTILITIES, WALKWAYS AND PAVEMENTS, OR ON EXISTING TURF AREAS OR PLANTS. 6. PROCEED WITH PLANTING ONLY WHEN EXISTING AND FORECASTED WEATHER CONDITIONS PERMIT PLANTING TO BE PERFORMED WHEN BENEFICIAL AND OPTIMUM RESULTS MAY BE OBTAINED. 7. SUSPEND PLANTING OPERATIONS DURING PERIODS OF EXCESSIVE SOIL MOISTURE UNTIL THE MOISTURE CONTENT REACHES ACCEPTABLE LEVELS TO ATTAIN THE REQUIRED RESULTS. 8. UNIFORMLY MOISTEN EXCESSIVELY DRY SOIL THAT IS NOT WORKABLE OR WHICH IS DUSTY. 9. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREA IN AN ORDERLY CONDITION. 10. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES, TREES, SHRUBS, AND PLANTINGS FROM DAMAGE CAUSED BY PLANTING OPERATIONS AND FROM HYDROSEEDING AND HYDROMULCHING OVERSPRAY. PROMPTLY REPAIR ANY DAMAGE CAUSED BY PLANTING OPERATIONS. 11. ESTABLISH TREE PROTECTIONS ZONES AS REQUIRED BY SPECIFICATIONS. 12. EARTHWORK CONTRACTOR SHALL INSTALL 12" OF TOPSOIL IN ALL PROPOSED BED AREAS. CONTRACTOR SHALL COORDINATE QUANTITY AND PLACEMENT OF TOPSOIL. SUBCONTRACTOR SHALL VERIFY DEPTH OF TOPSOIL PRIOR TO PLANT INSTALLATION. REFER TO SPECIFICATIONS FOR TOPSOIL TESTING AND PLACEMENT REQUIREMENTS. REPLACEMENT SOIL SHALL BE COMPRISED OF 1 PART ORIGINAL, 2 PARTS HUMUS, 1 PART COMPOSTED CATTLE MANURE, 1 PART CLEAN COARSE CUT SAND, AND 1 POUND OF FERTILIZER (12-12-12 NPK BALANCED) PER 10 SQ. FT. - WORKED WELL INTO SOIL. 13. RECONDITION SOIL AND SEED/RE-SEED ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES THAT ARE NOT TO RECEIVE OTHER SURFACE TREATMENT (I.E., ASPHALT PAVEMENT, CONCRETE SLAB, PLANTING BED ETC.). ALL DISTURBED LAWN AREAS TO RECEIVE 4" OF TOPSOIL IN ADDITION TO SOIL AMENDMENTS AS PART OF RECONDITIONING. 14. ALL PLANTS & PLANTING AREAS TO RECEIVE 3" MINIMUM OF SHREDDED HARDWOOD BARK MULCH (UNLESS OTHERWISE NOTED). MULCH SHALL BE UNIFORM IN TEXTURE AND COLOR. NO PROCESSED TREE TRIMMINGS WILL BE ALLOWED. 15. ALL DISTURBED AREAS SHALL BE SEEDED PER SPECIFICATIONS. 16. ALL GRASS AND/OR LANDSCAPING DISTURBED BY NEW CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION. MAINTENANCE OF TRAFFIC 1. THE MAINTENANCE OF TRAFFIC (MOT) EFFORTS CONDUCTED BY THE CONTRACTOR WILL INCLUDE PROVIDING, MANAGING AND MAINTAINING EQUIPMENT AND PERSONNEL NECESSARY FOR MAINTAINING SAFE TRAFFIC CONDITIONS AT ALL TIMES DURING THE PROJECT. TRAFFIC MAINTENANCE INCLUDES BOTH PROTECTING THE TRAVELING PUBLIC APPROACHING THE SITE AND INCORPORATING SAFE AND EFFICIENT CIRCULATION WITHIN THE CONSTRUCTION AREA. 2. THE CONTRACTOR SHALL FURNISH, ERECT, PLACE AND MAINTAIN TRAFFIC CONTROL SIGNS AND DEVICES DURING THE HOURS OF CONSTRUCTION OPERATIONS AND AT ALL OTHER TIMES IN ACCORDANCE WITH LOCAL AND INDOT STANDARDS. IN ADDITION TO THE LOCAL AND STATE STANDARDS, THE CONTRACTOR SHALL CONSULT THE U.S. DOT, FHA, AND MUTCD REGULATIONS REGARDING THE TYPE AND PLACEMENT OF TRAFFIC CONTROL DEVICES. 3. THE CONTRACTOR SHALL PROVIDE ALL DEVICES NECESSARY AND INSTALL TEMPORARY VEHICLE ROUTES, DETOURS AND RUNAROUNDS TO MAINTAIN THE OWNER'S ONGOING ACTIVITIES. MODIFICATIONS AND TEMPORARY SHUTDOWNS FOR THESE TRAFFIC ROUTES SHALL FIRST BE COORDINATED WITH THE OWNER. 4. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM OWNER AND AUTHORITIES HAVING JURISDICTION. 5. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY OWNER OR AUTHORITIES HAVING JURISDICTION. 6. ALL SIDEWALK CLOSURES REQUIRE A SIGNED ALTERNATIVE ROUTE FOR PEDESTRIANS. 7. MAINTAIN FIRE, AMBULANCE AND POLICE VEHICLE ACCESS TO THE BUILDINGS AT ALL TIMES DURING CONSTRUCTION. 8. ALL REQUIRED COMMUNICATION, PERMITS OR NOTICES NEEDED BY THE LOCAL FIRE, POLICE AND CITY OFFICES WILL REMAIN THE CONTRACTOR'S RESPONSIBILITY. THE CONTRACTOR SHALL DETERMINE IF ANY LOCAL ROAD RESTRICTIONS ON WEIGHT OR OTHERWISE EXISTS BEFORE DIRECTING INCOMING AND OUTGOING CONSTRUCTION TRAFFIC. 9. SIGNS AND DEVICES SHOWN ON THE MAINTENANCE OF TRAFFIC PLAN REPRESENT THE MINIMUM STANDARDS. ADDITIONAL SIGNS AND ADJUSTMENTS TO LOCATION MAY BE REQUIRED TO ADDRESS CHANGING FIELD CONDITIONS. 10. PROMPTLY REMOVE TEMPORARY TRAFFIC CONTROL WHEN SIGNS AND DEVICES NO LONGER SERVE ANY PURPOSE. 11. TEMPORARY FACILITIES, INCLUDING REROUTING PEDESTRIAN PATHS AROUND THE WORK SITE ARE THE CONTRACTOR'S RESPONSIBILITY AND WILL BE BASED ON THE OWNER'S NEEDS. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING SITE ACCESS AND PEDESTRIAN MOVEMENT AROUND THE CONSTRUCTION SITE PRIOR TO PLACING CONSTRUCTION FENCING, GATES AND EQUIPMENT OR MATERIALS ON SITE. 12. THE LOCATION OF CONSTRUCTION LAYDOWN AREAS MUST FIRST BE APPROVED BY THE OWNER. LAYDOWN AREAS SHALL BE FENCED AND PROTECTED FROM THE SURROUNDING PROPERTIES. 13. CONSTRUCTION ONSITE JOB TRAILERS SHALL BE COORDINATED WITH THE OWNER. FOR TRAILERS WITH PLUMBING, THE UNITS SHALL BE SERVED BY EITHER A PROPERLY PERMITTED SANITARY SEWER LATERAL OR TEMPORARY WASTE STORAGE REVIEWED AND APPROVED BY BOTH THE OWNER AND THE LOCAL AUTHORITIES. GENERAL NOTES GD0.1 GENERAL NOTES COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 TBM#4 = 810.78 HARROWGATE ADDITIONP.B. 2, PG. 203-205 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 PARCEL 7 PARCEL 8 BENCHMARKS: FLOOD NOTE: UTILITY NOTE: LEGEND: 40 1200 40 80 GD0.2 OVERALL EXISTING CONDITIONS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1. REFER TO TOPOGRAPHIC SURVEY SHEETS SV-3, SV-4 AND SV-5 FOR EXISTING CONDITION INFORMATION. 2. REFER TO BOUNDARY SURVEY SHEET SV-1 FOR BOUNDARY LINES, EASEMENTS AND HORIZONTAL BENCHMARK INFORMATION. 3. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 4. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. GENERAL NOTES INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 05/20/22 HARROWGATE ADDI TI ONP.B. 2, PG. 203-205 LOT 1 LOT 48 LOT 49 LOT 50 LOT 51 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 5 PARCEL 7PARCEL 8 ADJOINER ADJOINER LEGEND: SITE FLOOD NOTE: E MAI N STREET 8 A B 3 4 5 6 7 12 C D E F G H 8 34 5 6 7 12 A B C D E F G H FANNING HOWEY ASSOCIATES, INC.CARMEL HIGH SCHOOL502 E. MAIN STREETCARMEL, INDIANA DESCRIPTIONDATE NO REVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY: APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:PARTIAL RETRACEMENT BOUNDARY SURVEY303-1031"=50' AUGUST 3, 2020 TJTABSABS1 4 SV-1 NORTH 530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comVICINITY MAP PARCEL 1 PARCEL 2 PARCEL 3 PARCEL 4 PARCEL 5 PARCEL 6 PARCEL 7 PARCEL 8 MATCH LINE SEE SHEET SV-2 MATCH LINE SEE SHEET SV-2 NORTHWEST QUARTER SECTION 30 E 136TH STREET MAIN STREETRANGELINE ROADSURVEYOR'S REPORT Reference Surveys and Plats Reference Monuments Record Descriptions Evidence of Occupation SURVEYED PARCEL CARMELWOOD SUBDIVI SI OND.R. 136, PG. 365- 36605/20/22 ADJOINER ADJOINER ADJOINER ADJOINER HARROWGATE ADDITIONP.B. 2, PG. 203-205 LOT 59 LOT 60 LOT 61 LOT 62 ADJOINERCARMELWOOD SUBDIVISIOND.R. 136, PG. 365-366LOT 6 LOT 7 ADJOINER ADJOINER ADJOINER PARCEL 1 PARCEL 2 PARCEL 3 PARCEL 4 ADJOINER PARCEL 5 PARCEL 7 PARCEL 8 PARCEL 6 LEGEND: 8 A B 3 4 5 6 7 12 C D E F G H 8 34 5 6 7 12 A B C D E F G H FANNING HOWEY ASSOCIATES, INC.CARMEL HIGH SCHOOL502 E. MAIN STREETCARMEL, INDIANA DESCRIPTIONDATE NO REVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY: APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:PARTIAL RETRACEMENT BOUNDARY SURVEY303-1031"=50' AUGUST 3, 2020 TJTABSABS2 4 SV-2 NORTH 530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comSMOKEY ROW ROAD / E 136TH STREET COOL CRE E K MATCH LINE SEE SHEET SV-1 MATCH LINE SEE SHEET SV-1 05/20/22 TBM#4 = 810.78 MATCH LINE SEE SHEET SV-3 MATCH LINE SEE SHEET SV-4 BENCHMARKS: UTILITY NOTE: LEGEND: 8 A B 3 4 5 6 7 12 C D E F G H 8 34 5 6 7 12 A B C D E F G H FANNING HOWEY ASSOCIATES, INC.CARMEL HIGH SCHOOL502 E. MAIN STREETCARMEL, INDIANA DESCRIPTIONDATENO REVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY: APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:TOPOGRAPHIC SURVEY303-1031"=30' AUGUST 3, 2020 TJTABSABS3 4 SV-3 NORTH 530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.com05/20/22 TBM#1 = 856.00 E MAIN STREET SMOKEY ROW ROAD / E 136TH STREET TBM#2 = 834.95 MATCH LINE SEE SHEET SV-3 MATCH LINE SEE SHEET SV-4 BENCHMARKS: UTILITY NOTE: LEGEND: 8 A B 3 4 5 6 7 12 C D E F G H 8 34 5 6 7 12 A B C D E F G H FANNING HOWEY ASSOCIATES, INC.CARMEL HIGH SCHOOL502 E. MAIN STREETCARMEL, INDIANA DESCRIPTIONDATENO REVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY: APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:TOPOGRAPHIC SURVEY303-1031"=30' AUGUST 3, 2020 TJTABSABS4 4 SV-4 NORTH 530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.com05/20/22 TBM#2 = 834.95 BENCHMARKS: UTILITY NOTE: LEGEND: SITESITE 8 A B 3 4 5 6 7 12 C D E F G H 8 34 5 6 7 12 A B C D E F G H FANNING HOWEY ASSOCIATES, INC.CARMEL HIGH SCHOOL502 E. MAIN STREETCARMEL, INDIANA DESCRIPTIONDATENO REVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY: APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:TOPOGRAPHIC SURVEY303-1031"=30' JUNE 2, 2021 CJVTJTABS1 1 TOPO NORTH 530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comVICINITY MAP SURVEY CERTIFICATION SV-5 05/20/22 TBM#2 = 834.95 TBM#4 = 810.78 RROWGATE ADDITION.B. 2, PG. 203-205HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 PARCEL 7 PARCEL 8 40 1200 40 80 GD1.0 OVERALL DEMOLITION PLAN COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. 9. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. 10. SEE SHEETS GD1.1 AND GD1.2 FOR DETAILED SITE DEMOLITION INFORMATION. 11. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO CONSTRUCTION. SEE EROSION CONTROL PLANS ON SHEET G3.1 AND G3.2. SEE EROSION CONTROL DETAILS ON SHEET G3.4. GENERAL NOTES DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE PAVEMENT OR WALK REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF 1 1/2" ASPHALT SURFACE MILLING APPROXIMATE LIMITS OF BUILDING DEMOLITION (SEE ARCHITECTURAL PLANS) APPROXIMATE LIMITS OF CONSTRUCTION 3 TAC REVIEW COMMENTS 03/15/2022 05/20/22 TBM#2 = 834.95 TBM#4 = 810.78 RROWGATE ADDITION.B. 2, PG. 203-205HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 PARCEL 7 PARCEL 8 40 1200 40 80 GD1.0 OVERALL DEMOLITION PLAN COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. 9. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. 10. SEE SHEETS GD1.1 AND GD1.2 FOR DETAILED SITE DEMOLITION INFORMATION. GENERAL NOTES DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE PAVEMENT OR WALK REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF 1 1/2" ASPHALT SURFACE MILLING APPROXIMATE LIMITS OF BUILDING DEMOLITION (SEE ARCHITECTURAL PLANS) APPROXIMATE LIMITS OF CONSTRUCTION 05/20/22 TBM#4 = 810.78 HARROWGATE ADDITIONP.B. 2, PG. 203-205 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 PARCEL 7 PARCEL 8 40 1200 40 80 GD1.0 OVERALL DEMOLITION PLAN COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. 9. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. GENERAL NOTES DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE PAVEMENT OR WALK REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF 1 1/2" ASPHALT SURFACE MILLING APPROXIMATE LIMITS OF BUILDING DEMOLITION (SEE ARCHITECTURAL PLANS) 05/20/22 TBM#4 = 810.78TBM#4 = 810.78TBM#4 = 810.78TBM#4 = 810.78 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 4 4 4 1 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 7 7 8 8 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 7 9 9 9 9 9 9 9 9 10 10 10 10 10 12 12 12 12 12 12 12 12 12 12 12 12 12 14 14 17 17 17 17 17 15 15 16 16 16 16 2 A 5 5 1 18 18 18 18 4 11 11 11 11 17 C C C 17 17 C C C C C D D D D E E 17 3 5 A A A 5 21 23 24 22 1 1 2 1 A A 5 1 25 F 9 G A A 9 6 6 6 10 10 H H J J SFSFSFSFSF SF SFSF SF SF MATCHLINE - SHEET GD1.1 MATCHLINE - SHEET GD1.2 20 600 20 40 GD1.1 DEMOLITION PLAN - NORTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. 9. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. 10. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, HYDRANTS, WATER OR GAS VALVES AND UTILITY PEDESTALS SHALL BE ADJUSTED AS REQUIRED TO MEET PROPOSED FINISH GRADE. GENERAL NOTES DEMOLITION KEYNOTES 1. PAVEMENT SAWCUT LINE (ASPHALT AND CONCRETE) 2. REMOVE ASPHALT PAVEMENT 3. REMOVE CONCRETE PAVEMENT 4. REMOVE CONCRETE SIDEWALK 5. REMOVE CONCRETE CURB 6. REMOVE EXISTING 8' CHAIN LINK FENCE 7. REMOVE SIGN 8. REMOVE EXISTING IRON VEHICLE GATE AND POSTS. SALVAGE FOR PROPOSED RELOCATION. REMOVE EXISTING FOUNDATIONS IN THEIR ENTIRETY. 9. REMOVE TREE 10. REMOVE SHRUBS 11. REMOVE GATE POST (SALVAGE FOR LATER REUSE) 12. REMOVE LIGHT POLE AND FOUNDATION 13. REMOVE BUILDING CANOPY AND RELATED COLUMNS, COORDINATE WITH ARCHITECTURAL PLANS 14. REMOVE AND RELOCATE FIRE HYDRANT, COORDINATE NEW LOCATION WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 15. REMOVE FIRE PROTECTION LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 16. REMOVE STORM SEWER LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 17. REMOVE STORM STRUCTURE (MANHOLE OR INLET) 18. MILL EXISTING ASPHALT PAVEMENT 1 1/2" 19. EXISTING BUILDING DEMOLITION, SEE ARCHITECTURAL PLANS 20. ADJUST EXISTING SANITARY CASTING/STRUCTURE TO NEW FINISH GRADE 21. PLUG AND SEAL END OF EXISTING STORM PIPE TO REMAIN IN PLACE 22. REMOVE EXISTING TRENCH DRAIN AND OUTLET PIPE 23. REMOVE APPROXIMATELY 60 L.F. OF EXISTING GUARDRAIL AND POSTS. SALVAGE FOR RE-INSTALLATION 24. REMOVE EXISTING DUMPSTER ENCLOSURE INCLUDING GATES, MASONRY SIDE WALLS AND BOLLARDS 25. REMOVE EXISTING BOLLARD A. PROTECT EXISTING CURB TO REMAIN IN PLACE B. PROTECT EXISTING LIFT STATION AND CONTROL PANEL TO REMAIN IN PLACE C. PROTECT EXISTING STORM PIPE TO REMAIN IN PLACE D. PROTECT EXISTING SANITARY PIPE TO REMAIN IN PLACE E. PROTECT EXISTING SANITARY MANHOLE TO REMAIN IN PLACE F. PROTECT (SUPPORT) EXISTING ELECTRICAL LINES G. PROTECT EXISTING FIRE DEPARTMENT CONNECTION, PIV, FIRE HYDRANT AND VALVE. H. REMOVE MODULAR BLOCK WALL TOP CAP FOR LATER REUSE. J. REMOVE MODULAR BLOCK RETAINING WALL AS REQUIRED TO INSTALL NEW MODULAR BLOCK RETAINING WALL DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE PAVEMENT OR WALK REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF 1 1/2" ASPHALT SURFACE MILLING APPROXIMATE LIMITS OF BUILDING DEMOLITION (SEE ARCHITECTURAL PLANS) APPROXIMATE LIMITS OF CONSTRUCTION EROSION CONTROL LEGEND SF 05/20/22 TBM#4 = 810.78TBM#4 = 810.78TBM#4 = 810.78TBM#4 = 810.78 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 4 4 4 1 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 7 7 8 8 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 7 9 9 9 9 9 9 9 9 10 10 10 10 10 F 12 12 12 12 12 12 12 12 12 12 12 12 12 14 14 17 17 17 17 17 15 15 16 16 16 16 2 A 1 18 18 18 18 4 4 11 11 11 11 17 C C C 17 17 C C C C C D D D D E E 17 3 20 600 20 40 GD1.1 DEMOLITION PLAN - NORTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. 9. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. GENERAL NOTES DEMOLITION KEYNOTES 1. PAVEMENT SAWCUT LINE (ASPHALT AND CONCRETE) 2. REMOVE ASPHALT PAVEMENT 3. REMOVE CONCRETE PAVEMENT 4. REMOVE CONCRETE SIDEWALK 5. REMOVE CONCRETE CURB 6. REMOVE PORTION OF EXISTING RETAINING WALL AND FENCE 7. REMOVE SIGN 8. REMOVE EXISTING IRON VEHICLE GATE AND POSTS. SALVAGE FOR PROPOSED RELOCATION. REMOVE EXISTING FOUNDATIONS IN THEIR ENTIRETY. 9. REMOVE TREE 10. REMOVE SHRUBS 11. REMOVE GATE POST 12. REMOVE LIGHT POLE AND FOUNDATION 13. REMOVE BUILDING CANOPY AND RELATED COLUMNS, COORDINATE WITH ARCHITECTURAL PLANS 14. REMOVE AND RELOCATE FIRE HYDRANT, COORDINATE NEW LOCATION WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 15. REMOVE FIRE PROTECTION LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 16. REMOVE STORM SEWER LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 17. REMOVE STORM STRUCTURE (MANHOLE OR INLET) 18. MILL EXISTING ASPHALT PAVEMENT 1 1/2" 19. EXISTING BUILDING DEMOLITION, SEE ARCHITECTURAL PLANS 20. ADJUST EXISTING SANITARY CASTING/STRUCTURE TO NEW FINISH GRADE A. PROTECT EXISTING CURB TO REMAIN IN PLACE B. PROTECT EXISTING LIFT STATION AND CONTROL PANEL TO REMAIN IN PLACE C. PROTECT EXISTING STORM PIPE TO REMAIN IN PLACE D. PROTECT EXISTING SANITARY PIPE TO REMAIN IN PLACE E. PROTECT EXISTING SANITARY MANHOLE TOT REMAIN IN PLACE F. PROTECT EXISTING DUMPSTER ENCLOSURE TO REMAIN IN PLACE DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE PAVEMENT OR WALK REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF 1 1/2" ASPHALT SURFACE MILLING APPROXIMATE LIMITS OF BUILDING DEMOLITION (SEE ARCHITECTURAL PLANS) 05/20/22 LOT 52 LOT 53 LOT 54 LOT 55 PARCEL 7 LOT 52 LOT 53 LOT 54 LOT 55 PARCEL 7 LOT 52 LOT 53 LOT 54 LOT 55 PARCEL 7 LOT 52 LOT 53 LOT 54 LOT 55 PARCEL 7 2 2 2 2 1 2 1 4 4 4 4 5 5 5 5 5 5 5 5 7 7 7 9 9 9 9 9 9 10 10 12 12 12 13 13 14 14 15 15 15 16 16 17 12 5 2 5 5 B 4 4 19 20 17 C 17 C C D D D D E 5 1 25 9 99 1 3 SEE SHEET SU1.4 FOR DEMOLITION RELATED TO STORM SEWER WORK IN THIS AREA SFSFSFSFSFSFSFSF12 12 MATCHLINE - SHEET GD1.1 MATCHLINE - SHEET GD1.2 21 16 21 20 600 20 40 GD1.2 DEMOLITION PLAN - SOUTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. 9. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. 10. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, HYDRANTS, WATER OR GAS VALVES AND UTILITY PEDESTALS SHALL BE ADJUSTED AS REQUIRED TO MEET PROPOSED FINISH GRADE. GENERAL NOTES DEMOLITION KEYNOTES 1. PAVEMENT SAWCUT LINE (ASPHALT AND CONCRETE) 2. REMOVE ASPHALT PAVEMENT 3. REMOVE CONCRETE PAVEMENT 4. REMOVE CONCRETE SIDEWALK 5. REMOVE CONCRETE CURB 6. REMOVE EXISTING 8' CHAIN LINK FENCE 7. REMOVE SIGN 8. REMOVE EXISTING IRON VEHICLE GATE AND POSTS. SALVAGE FOR PROPOSED RELOCATION. REMOVE EXISTING FOUNDATIONS IN THEIR ENTIRETY. 9. REMOVE TREE 10. REMOVE SHRUBS 11. REMOVE GATE POST (SALVAGE FOR LATER REUSE) 12. REMOVE LIGHT POLE AND FOUNDATION 13. REMOVE BUILDING CANOPY AND RELATED COLUMNS, COORDINATE WITH ARCHITECTURAL PLANS 14. REMOVE AND RELOCATE FIRE HYDRANT, COORDINATE NEW LOCATION WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 15. REMOVE FIRE PROTECTION LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 16. REMOVE STORM SEWER LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 17. REMOVE STORM STRUCTURE (MANHOLE OR INLET) 18. MILL EXISTING ASPHALT PAVEMENT 1 1/2" 19. EXISTING BUILDING DEMOLITION, SEE ARCHITECTURAL PLANS 20. ADJUST EXISTING SANITARY CASTING/STRUCTURE TO NEW FINISH GRADE 21. PLUG AND SEAL END OF EXISTING STORM PIPE TO REMAIN IN PLACE 22. REMOVE EXISTING TRENCH DRAIN AND OUTLET PIPE 23. REMOVE APPROXIMATELY 60 L.F. OF EXISTING GUARDRAIL AND POSTS. SALVAGE FOR RE-INSTALLATION 24. REMOVE EXISTING DUMPSTER ENCLOSURE INCLUDING GATES, MASONRY SIDE WALLS AND BOLLARDS 25. REMOVE EXISTING BOLLARD A. PROTECT EXISTING CURB TO REMAIN IN PLACE B. PROTECT EXISTING LIFT STATION AND CONTROL PANEL TO REMAIN IN PLACE C. PROTECT EXISTING STORM PIPE TO REMAIN IN PLACE D. PROTECT EXISTING SANITARY PIPE TO REMAIN IN PLACE E. PROTECT EXISTING SANITARY MANHOLE TO REMAIN IN PLACE F. PROTECT (SUPPORT) EXISTING ELECTRICAL LINES G. PROTECT EXISTING FIRE DEPARTMENT CONNECTION, PIV, FIRE HYDRANT AND VALVE. H. REMOVE MODULAR BLOCK WALL TOP CAP FOR LATER REUSE. J. REMOVE MODULAR BLOCK RETAINING WALL AS REQUIRED TO INSTALL NEW MODULAR BLOCK RETAINING WALL DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE PAVEMENT OR WALK REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF 1 1/2" ASPHALT SURFACE MILLING APPROXIMATE LIMITS OF BUILDING DEMOLITION (SEE ARCHITECTURAL PLANS) APPROXIMATE LIMITS OF CONSTRUCTION EROSION CONTROL LEGEND SF 05/20/22 LOT 52 LOT 53 LOT 54 LOT 55 PARCEL 7 LOT 52 LOT 53 LOT 54 LOT 55 PARCEL 7 LOT 52 LOT 53 LOT 54 LOT 55 PARCEL 7 LOT 52 LOT 53 LOT 54 LOT 55 PARCEL 7 2 2 2 2 1 2 1 4 4 4 4 5 5 5 5 5 5 5 5 7 7 7 9 9 9 9 9 9 10 10 12 12 12 13 13 14 14 15 15 15 16 16 17 12 A 2 A A B 4 4 4 19 20 17 C 17 C C D D D D E 20 600 20 40 GD1.2 DEMOLITION PLAN - SOUTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. 9. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. GENERAL NOTES DEMOLITION KEYNOTES 1. PAVEMENT SAWCUT LINE (ASPHALT AND CONCRETE) 2. REMOVE ASPHALT PAVEMENT 3. REMOVE CONCRETE PAVEMENT 4. REMOVE CONCRETE SIDEWALK 5. REMOVE CONCRETE CURB 6. REMOVE PORTION OF EXISTING RETAINING WALL AND FENCE 7. REMOVE SIGN 8. REMOVE EXISTING IRON VEHICLE GATE AND POSTS. SALVAGE FOR PROPOSED RELOCATION. REMOVE EXISTING FOUNDATIONS IN THEIR ENTIRETY. 9. REMOVE TREE 10. REMOVE SHRUBS 11. REMOVE GATE POST 12. REMOVE LIGHT POLE AND FOUNDATION 13. REMOVE BUILDING CANOPY AND RELATED COLUMNS, COORDINATE WITH ARCHITECTURAL PLANS 14. REMOVE AND RELOCATE FIRE HYDRANT, COORDINATE NEW LOCATION WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 15. REMOVE FIRE PROTECTION LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 16. REMOVE STORM SEWER LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 17. REMOVE STORM STRUCTURE (MANHOLE OR INLET) 18. MILL EXISTING ASPHALT PAVEMENT 1 1/2" 19. EXISTING BUILDING DEMOLITION, SEE ARCHITECTURAL PLANS 20. ADJUST EXISTING SANITARY CASTING/STRUCTURE TO NEW FINISH GRADE A. PROTECT EXISTING CURB TO REMAIN IN PLACE B. PROTECT EXISTING LIFT STATION AND CONTROL PANEL TO REMAIN IN PLACE C. PROTECT EXISTING STORM PIPE TO REMAIN IN PLACE D. PROTECT EXISTING SANITARY PIPE TO REMAIN IN PLACE E. PROTECT EXISTING SANITARY MANHOLE TOT REMAIN IN PLACE F. PROTECT EXISTING DUMPSTER ENCLOSURE TO REMAIN IN PLACE DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE PAVEMENT OR WALK REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF 1 1/2" ASPHALT SURFACE MILLING APPROXIMATE LIMITS OF BUILDING DEMOLITION (SEE ARCHITECTURAL PLANS) 05/20/22 PROPOSED NATATORIUMBUILDING ADDITIONF.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH2 G SMOKEY ROW ROAD / E 136TH STREET E MAIN STREET PARKING LOT ADDITION (NOT IN SCOPE OF THIS PROJECT) PERFORMING ARTS BUILDING ADDITION (UNDER CONSTRUCTION. NOT IN SCOPE OF THIS PROJECT) 3 10 12 6 PAVING AT MURRAY FIELD (NOT IN SCOPE OF THIS PROJECT) 12 5 5 15 3 NATATORIUM BUILDING ADDITION 15 12 14 13 10 10 9 8 7 6 5 4 3 2 1 11 22 10 26 8 200 6000 200 400 G0.1 MASTER PARKING PLAN 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. GENERAL NOTES KEYNOTES PROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS (NOT IN CONTRACT) PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS (NOT IN CONTRACT) 1 1 THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OF BICYCLE RACKS PROPOSED IN A PARTICULAR AREA. 1 THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATED PARKING LOT IDENTIFICATION. PARKING LOT IDENTIFICATION NUMBER BICYCLE RACK LOCATION SUMMARY TABLE (NOT IN CONTRACT) LOCATION BICYCLE RACKS MAIN BUILDING 94 FOOTBALL STADIUM 28 12 3 137 TENNIS COURTS MURRAY STADIUM TOTAL BICYCLE RACKS 274TOTAL BICYCLE PARKING SPACES THE ABOVE BICYCLE RACKS ACCOMMODATE 5,480 STUDENTS BICYCLE SPACES REQUIRED = 1 PER 20 STUDENTS BUILDING AREA SUMMARY YEAR (2002 THROUGH 2021) PROJECT EXIST. AREA SF. NEW AREA SF. TOTAL AREA SF. % ADDED REMARKS 2002 FRESHMAN CENTER 2004 LOCKER ROOM 2012 PHYSICAL EDUCATION 2019 POOL ENTRANCE #21 2021 DOCK STORAGE 2021 PERFORMING ARTS 776,647 950,591 953,243 980,852 981,547 982,955 173,944 2,652 27,609 695 1,408 25,464 950,591 953,243 980,852 981,547 982,955 1,008,419 22.40 0.28 2.90 0.07 0.14 2.59 BZA APPROVAL WITH VARIANCES NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION 2007 TENNIS BUILDING 1,700 SEPARATE BUILDING AT STADIUM SITE 2011 SECURE ENTRANCE 0 NO NEW CONSTRUCTION 2023 NATATORIUM 1,008,419 93,229 1,101,648 9.25 NO CLASSROOM IN ADDITION OVERALL PARKING SUMMARY LOT NO.LOT NAME STANDARD SPACE OLD SENIOR LOT 651 EXIST. PROPOSED 65 ADA SPACE 0 EXIST. 0 POLICE SPACE 0 EXIST. 0 BUS SPACE 0 EXIST. 0 TOTAL SPACES 65 EXIST. PROPOSED 65 2 3 4 5 6 7 8 9 10 12 13 14 15 DOOR 7 19 19 4 4 0 0 0 0 23 23 FRONT LOT 109 103 3 7 3 3 0 0 115 113 AUDITORIUM LOT 52 0 4 0 0 0 0 0 56 0 WEST LOT 69 69 0 0 0 0 0 0 69 69 FRESHMAN CENTER LOT 142 142 6 6 1 1 0 0 149 149 FIELDHOUSE LOT 29 29 FITNESS CENTER LOT 20 2 22 POOL LOT 110 0 8 0 1 0 0 0 119 TRAIL LOT 152 221 0 7 0 1 0 4 152 229 SUBTOTAL 766 686 27 26 5 5 0 4 799 697 FOOTBALL HOME LOT 948 948 11 11 0 0 0 0 959 959 FOOTBALL SOUTH LOT 143 143 0 0 0 0 21 = 42 21 = 42 185 185 FOOTBALL VISITOR LOT 516 516 9 9 0 0 0 0 525 525 FOOTBALL NORTH LOT 79 79 0 0 0 0 0 0 79 79 29 0 0 0 0 0 0 29 0 0 0 0 0 0 0 0 PROPOSED PROPOSED PROPOSED 2,4452,547 TOTAL CITY OF CARMEL REQUIRED PARKING SPACES (174 CLASSROOMS x 10) + (583 EMPLOYEES) = 2,323 (UPON COMPLETION OF THE NATATORIUM PROJECT) SUBTOTAL 1,686 1,686 20 20 0 0 1,748 1,74821 = 42 21 = 42 AVAILABLE PARKING SPACES UNTIL JUNE 2022 (LOTS 8 & 9) = 2,644 PERMIT PARKING SPACES = 1334 (STUDENTS) + 583 (EMPLOYEES) = 1,917 NOTES: 1. THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE 1,917 PERMITS ISSUED. 2. ENROLLMENT IS EXPECTED TO DROP BY 75 STUDENTS IN 2022 AND REMAIN LEVEL THROUGH 2029. 3. BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT TWO (2) STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES. 4. THE NATATORIUM PROJECT IS SCHEDULED FOR CONSTRUCTION IN JUNE OF 2022. LOTS 8 & 9 WITH 141 SPACES WILL BE AVAILABLE UNTIL THEN. 5. THE CLASSROOM COUNT OF 174 EXCLUDES LABS AND OTHER EXTENDED LEARNING AREAS AS THE LATTER ARE SUPPLEMENTAL TO CLASSROOMS, AND ARE NOT OCCUPIED AT THE SAME TIME AS CLASSROOMS. 11 MURRAY FIELD LOT 0 18 0 2 0 0 0 0 0 20 AVAILABLE PARKING SPACES AFTER JUNE 2022 = 2,351 AVAILABLE PARKING SPACES AFTER DECEMBER 2023 = 2,445 PROJECT PARKING SUMMARY LOT NO. (NATATORIUM BUILDING ADDITION) LOT NAME STANDARD SPACE POOL LOT 1109 EXIST. PROPOSED 0 ADA SPACE 8 EXIST. 0 POLICE SPACE 1 EXIST. 0 BUS SPACE 0 EXIST. 0 TOTAL SPACES 119 EXIST. 0 TRAIL LOT 15210 221 0 7 0 1 0 4 152 229 MURRAY FIELD LOT 011 18 0 2 0 0 0 0 0 20 PROJECT TOTAL 282 239 10 9 1 1 0 4 293 249 NET LOSS = 44 SPACES PROPOSED PROPOSED PROPOSED PROPOSED FITNESS CENTER LOT 208 0 2 0 0 0 0 0 22 0 COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 TBM#2 = 834.95 TBM#4 = 810.78 ARROWGATE ADDITIONP.B. 2, PG. 203-205HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 PARCEL 7 PARCEL 8 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH2 FH4 FH3 G 20 - PROPOSED PARKING SPACES 74 - PROPOSED PARKING SPACES 103.0' 53. 9 ' 25. 0 ' BU I L D I N G SE T B A C K 30. 0'LA N D S C A P E BU F F E R 30.0' LANDSC A P E BUFFER 25.0' BUILDINGSETBAC K 40 1200 40 80 G1.0 OVERALL SITE PLAN COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO SITE DETAILS ON SHEETS G4.1 AND G4.2 GENERAL NOTES PROPOSED SITE LEGEND EXISTING BUILDING BUILDING ADDITION CONCRETE PAVEMENT / WALK ASPHALT PAVEMENT LANDSCAPE OR LAWN / TURF AREA (SEE LANDSCAPE PLAN FOR INFORMATION) APPROXIMATE LIMITS OF CONSTRUCTION 05/20/22 TBM#4 = 810.78 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 FH1 FH2 FH3 28.0'8.0'20.0' TYP. R30.0'23.0'EXISTING23.9' EXISTING 20.0'R30.0'14.0'12.0'25.0'12.0'8.0'8.0'8.2'R30.0' R30.0 '2 2 2 5 7 5 2 2 18 18 18 3 3 3 4 4 4 5 5 5 5 66 6 6 7 4 6 8 8 8 10 10 11 10 11 11 25 13 13 7 16 4 18 11 10 4 2 2 3 20 520 10 10 9 11 10 10 20.0'5.0'4 4 20.0'6 5.0' 24 6 6 8.0' 21 TYP. 21 TYP.20.0'12.5'18 18 10 SPA. @ 9 ' -0" = 90. 0 ' 5' 5' 5' 8.0'8.0' 8.0'8.0' 8.0' 8.0' 8.0' 8.0' 15 SPA. @ 9'-0" = 135.0' 15 SPA. @ 9'-0" = 135.0' 18 SPA. @ 9 ' - 0 " = 1 6 2 . 0 '9 SPA. @ 9'-0" = 81.0'20.0'20.0'25.0'20.0'12.5'20.0' 25.0' 19 19 5 3 12 3 28.0'R50.0'14.0' 25.0' 7.2' 103.0' 25.0' 25.0' 30.0' LANDSC A P E B U F F E R 25.0' BUILDING SETBAC K 16 6 6 6 6 6 6 6 6 26 6 6 26 26 26 26 26 26 26 6.0'26 R22.0' R40.0'R12.0'R1 2.0' R5.0'R5.0'R 4 0 . 0 'R8.0'R2 . 0 ' 28.0' 12.0'R30.0'R3 0 . 0 ' R30.0 '3.0'14.0'15.1' EXIST. 8 16.3'12.0'20.0'12.0'10 11.6'6.7'14.0'15 RISERS2420.0'130.0'2 3 18 18 3 3 19.8'± 25.0' 18.5'± 6R10.0'R10.0'R5.0' R5.0' R20.0'R20.0'R30.0' R105 .0' R18 0.0' R15 5 . 0' R130 .0' R1 0 . 0'R10.0'11.0'R5.0'20.8'±6.6'± 10 8 8.0' 12.0'R10.0'R5.0'15 25 254.0'6.0'6.0'19 10 11 10 9 MATCHLINE - SHEET G1.1 MATCHLINE - SHEET G1.2MATCHLINE - SHEET G1.7MATCHLINE - SHEET G1.1 1727 R15.0' 28 28 28 5 20 600 20 40 G1.1 SITE PLAN - NORTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO SITE DETAILS ON SHEETS G4.1, G4.2 AND G4.3 AND ENLARGED PLANS ON SHEETS G1.3, G1.4, G1.5 AND G1.6 8. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. GENERAL NOTES SITE KEYNOTES 8" CONCRETE PAVEMENT, SEE DETAIL ON SHEET G4.1 HEAVY DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1 MEDIUM DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1 MONOLITHIC CURB AND WALK, SEE DETAIL ON SHEET G4.1 CONCRETE SIDEWALK, SEE DETAIL ON SHEET G4.1 6" CONCRETE CURB, SEE DETAIL ON SHEET G4.1 CONCRETE ROLL CURB & GUTTER, SEE DETAIL ON SHEET G4.1 CONCRETE ADA CURB RAMP, SEE ENLARGED PLANS G1.3, G1.4, G1.5 AND G1.6 FOR MORE INFORMATION CROSS WALK STRIPING, THERMOPLASTIC LANDSCAPE AREA, SEE LANDSCAPE PLAN SHEET L1.0 LAWN / TURF AREA, SEE LANDSCAPE PLAN SHEET L1.0 RETAINING WALL AT RAMP/WALK, SEE STRUCTURAL SHEET S1.01 AND S3.10 CONCRETE STEPS WITH HANDRAILS, SEE ENLARGED PLANS G1.3 AND G1.6 FOR MORE INFORMATION. SEE ARCHITECTURAL SHEET A10.09 FOR HANDRAILS CONCRETE ADA RAMP, SEE ENLARGED PLAN G1.4 FOR MORE INFORMATION RELOCATED 8' CHAIN LINK FENCE RE-INSTALL ±60 L.F. SALVAGED GUARDRAIL TYPE 1, SEE DETAIL ON SHEET G4.2 60 L.F. OF NEW GUARDRAIL TYPE 1, SEE DETAIL ON SHEET G4.2 ASPHALT RESURFACE AREA (1 1/2" ASPHALT SURFACE) RELOCATED IRON VEHICLE GATE AND POSTS STAMPED CONCRETE CONCRETE PARKING BUMPER, SEE DETAIL ON SHEET G4.1 CONCRETE STEPS AT CANOPY WITH 2 RISERS, SEE DETAIL ON SHEET G4.2, SEE GRADING PLAN FOR ELEVATIONS. SEE ARCHITECTURAL SHEET A10.09, DETAILS 3 AND 4 FOR HANDRAILS. PLANTER WALL, SEE DETAIL ON SHEET G4.2 RETAINING WALLS PER STRUCTURAL SHEETS S1.01, S1.02 AND S1.03. HANDRAILS PER ARCHITECTURAL SHEETS. MODULAR BLOCK RETAINING WALL, SEE DETAIL ON SHEET G4.4 EXISTING CONCRETE CURB TO REMAIN IN PLACE ASPHALT SPEED CONTROL BUMP, SEE DETAIL ON SHEET G4.1 FIRE HYDRANT MARKER, BLUE RAISED PAVEMENT MARKER INDOT TYPE 2 TO BE PLACED AT CENTERLINE OF ROAD. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PROPOSED SITE LEGEND EXISTING BUILDING BUILDING ADDITION CONCRETE PAVEMENT / WALK ASPHALT PAVEMENT LANDSCAPE OR LAWN / TURF AREA APPROXIMATE LIMITS OF CONSTRUCTION 3 TAC REVIEW COMMENTS 03/15/2022 05/20/22 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 PARCEL 7 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH4 G 2 5 10 10 4 4 4 1 13 24 14 14 2 2 2 24 22 22 23 23 12 5R50.0'25.0' BUILDING SETBAC K 53. 9 ' 25. 0 ' BUI LDI N G S E T B A C K 30. 0 ' LA N D S C A P E B U F F E R 25.0' 5.0' 23. 0 ' EX I S T I NG 5.0' 6 6 6 6 26 R8.0' R2 .0' 8 14.0' 1.0' 5.0' 1.0 ' 13.0' 43.0'11.5'57.8'51.0 ' R40.0'12.0'8 87.0'R75.0 ' R100 . 0 'R5.0' 10 11 11 MATCHLINE - SHEET G1.1 MATCHLINE - SHEET G1.2 27100.0'28 20 600 20 40 G1.2 SITE PLAN - SOUTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO SITE DETAILS ON SHEETS G4.1, G4.2 AND G4.3 AND ENLARGED PLANS ON SHEETS G1.3, G1.4, G1.5 AND G1.6 8. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. GENERAL NOTES SITE KEYNOTES 6" CONCRETE PAVEMENT, SEE DETAIL ON SHEET G4.1 HEAVY DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1 MEDIUM DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1 MONOLITHIC CURB AND WALK, SEE DETAIL ON SHEET G4.1 CONCRETE SIDEWALK, SEE DETAIL ON SHEET G4.1 6" CONCRETE CURB, SEE DETAIL ON SHEET G4.1 CONCRETE ROLL CURB & GUTTER, SEE DETAIL ON SHEET G4.1 CONCRETE ADA CURB RAMP, SEE ENLARGED PLANS G1.3, G1.4, G1.5 AND G1.6 FOR MORE INFORMATION CROSS WALK STRIPING, THERMOPLASTIC LANDSCAPE AREA, SEE LANDSCAPE PLAN SHEET L1.0 LAWN / TURF AREA, SEE LANDSCAPE PLAN SHEET L1.0 RETAINING WALL AT RAMP/WALK, SEE STRUCTURAL SHEET S1.01 AND S3.10 CONCRETE STEPS WITH HANDRAILS, SEE ENLARGED PLANS G1.3 AND G1.6 FOR MORE INFORMATION. SEE ARCHITECTURAL SHEET A10.09 FOR HANDRAILS CONCRETE ADA RAMP, SEE ENLARGED PLAN G1.4 FOR MORE INFORMATION RELOCATED 8' CHAIN LINK FENCE RE-INSTALL ±60 L.F. SALVAGED GUARDRAIL TYPE 1, SEE DETAIL ON SHEET G4.2 60 L.F. OF NEW GUARDRAIL TYPE 1, SEE DETAIL ON SHEET G4.2 ASPHALT RESURFACE AREA (1 1/2" ASPHALT SURFACE) RELOCATED IRON VEHICLE GATE AND POSTS STAMPED CONCRETE CONCRETE PARKING BUMPER, SEE DETAIL ON SHEET G4.1 CONCRETE STEPS AT CANOPY WITH 2 RISERS, SEE DETAIL ON SHEET G4.2, SEE GRADING PLAN FOR ELEVATIONS. SEE ARCHITECTURAL SHEET A10.09, DETAILS 3 AND 4 FOR HANDRAILS. PLANTER WALL, SEE DETAIL ON SHEET G4.2 RETAINING WALLS PER STRUCTURAL SHEETS S1.01, S1.02 AND S1.03. HANDRAILS PER ARCHITECTURAL SHEETS. MODULAR BLOCK RETAINING WALL, SEE DETAIL ON SHEET G4.2 EXISTING CONCRETE CURB TO REMAIN IN PLACE ASPHALT SPEED CONTROL BUMP, SEE DETAIL ON SHEET G4.1 FIRE HYDRANT MARKER, BLUE RAISED PAVEMENT MARKER INDOT TYPE 2 TO BE PLACED AT CENTERLINE OF ROAD. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PROPOSED SITE LEGEND EXISTING BUILDING BUILDING ADDITION CONCRETE PAVEMENT / WALK ASPHALT PAVEMENT LANDSCAPE OR LAWN / TURF AREA 05/20/22 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 PARCEL 7 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH4 G 2 5 10 10 4 4 4 1 13 24 14 14 2 2 2 24 22 22 23 23 12 R50.0'25.0' BUILDIN G S E T B A CK 53.9' 25. 0 ' BU I L D I NG SET B A C K 30.0' LA N D S C A P E BU F F E R 25.0' 5.0' 23.0'EX I S T I N G 5.0 '6 6 6 6 26R8.0'R2 . 0 ' 8 16.5' 5.0' 1.0' 13.0' 43.0'11.5'57.8'51.0'R40.0'12.0'8 87.0'R75.0 ' R100 .0'R5.0'10 11 11 MATCHLINE - SHEET G1.1 MATCHLINE - SHEET G1.2 27100.0'28 20 600 20 40 G1.2 SITE PLAN - SOUTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO SITE DETAILS ON SHEETS G4.1, G4.2 AND G4.3 AND ENLARGED PLANS ON SHEETS G1.3, G1.4, G1.5 AND G1.6 8. THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. GENERAL NOTES SITE KEYNOTES 8" CONCRETE PAVEMENT, SEE DETAIL ON SHEET G4.1 HEAVY DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1 MEDIUM DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1 MONOLITHIC CURB AND WALK, SEE DETAIL ON SHEET G4.1 CONCRETE SIDEWALK, SEE DETAIL ON SHEET G4.1 6" CONCRETE CURB, SEE DETAIL ON SHEET G4.1 CONCRETE ROLL CURB & GUTTER, SEE DETAIL ON SHEET G4.1 CONCRETE ADA CURB RAMP, SEE ENLARGED PLANS G1.3, G1.4, G1.5 AND G1.6 FOR MORE INFORMATION CROSS WALK STRIPING, THERMOPLASTIC LANDSCAPE AREA, SEE LANDSCAPE PLAN SHEET L1.0 LAWN / TURF AREA, SEE LANDSCAPE PLAN SHEET L1.0 RETAINING WALL AT RAMP/WALK, SEE STRUCTURAL SHEET S1.01 AND S3.10 CONCRETE STEPS WITH HANDRAILS, SEE ENLARGED PLANS G1.3 AND G1.6 FOR MORE INFORMATION. SEE ARCHITECTURAL SHEET A10.09 FOR HANDRAILS CONCRETE ADA RAMP, SEE ENLARGED PLAN G1.4 FOR MORE INFORMATION RELOCATED 8' CHAIN LINK FENCE RE-INSTALL ±60 L.F. SALVAGED GUARDRAIL TYPE 1, SEE DETAIL ON SHEET G4.2 60 L.F. OF NEW GUARDRAIL TYPE 1, SEE DETAIL ON SHEET G4.2 ASPHALT RESURFACE AREA (1 1/2" ASPHALT SURFACE) RELOCATED IRON VEHICLE GATE AND POSTS STAMPED CONCRETE CONCRETE PARKING BUMPER, SEE DETAIL ON SHEET G4.1 CONCRETE STEPS AT CANOPY WITH 2 RISERS, SEE DETAIL ON SHEET G4.2, SEE GRADING PLAN FOR ELEVATIONS. SEE ARCHITECTURAL SHEET A10.09, DETAILS 3 AND 4 FOR HANDRAILS. PLANTER WALL, SEE DETAIL ON SHEET G4.2 RETAINING WALLS PER STRUCTURAL SHEETS S1.01, S1.02 AND S1.03. HANDRAILS PER ARCHITECTURAL SHEETS. MODULAR BLOCK RETAINING WALL, SEE DETAIL ON SHEET G4.4 EXISTING CONCRETE CURB TO REMAIN IN PLACE ASPHALT SPEED CONTROL BUMP, SEE DETAIL ON SHEET G4.1 FIRE HYDRANT MARKER, BLUE RAISED PAVEMENT MARKER INDOT TYPE 2 TO BE PLACED AT CENTERLINE OF ROAD. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PROPOSED SITE LEGEND EXISTING BUILDING BUILDING ADDITION CONCRETE PAVEMENT / WALK ASPHALT PAVEMENT LANDSCAPE OR LAWN / TURF AREA APPROXIMATE LIMITS OF CONSTRUCTION 3 TAC REVIEW COMMENTS 03/15/2022 05/20/22 TBM#4 = 810.78 5.0' 9 SPA. @ 9'-0" = 81.0' 9.0' 9.0' 9.0' EDGE OF EXISTING ASPHALT PAVEMENT EXISTING TRENCH DRAIN 6 TYP. 1 TYP. 1 TYP. 9 SPA. @ 9'-0" = 81.0' 1 TYP. 1 TYP. 5 3 4 2 9.0' TYP 20.0' VARIES ±40'20.0'4 1.7' 5 6 TYP. 5 9.0' TYP7.5' 18. 0 ' EXI STI NGDRI VE R25.0'R10 .0 '25.0'7 7 5 5.0'10.0'25.0' ±10'R5. 0 'R35.0'109 G1.7 SITE PLAN MURRAY FIELD PARKING LOT COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. REFER TO SITE DETAILS ON SHEETS G4.1 AND G4.2. 7. COORDINATE PARKING LOT LAYOUT WITH PROPOSED BLEACHER LAYOUT. GENERAL NOTES SITE KEYNOTES 4" SOLID WHITE PAVEMENT MARKING 4" SOLID BLUE PAVEMENT MARKING 4" SOLID BLUE PAVEMENT MARKING @ 3'-0" O.C. @ 45° ADA PARKING SYMBOL (BLUE) 4" SOLID WHITE PAVEMENT MARKING @ 3'-0" O.C. @ 45° PRECAST PARKING BUMPER, SEE DETAIL ON SHEET G4.1 4' TALL BLACK VINYL CHAIN LINK FENCE NEW BLEACHER (NOT IN CONTRACT) RELOCATED 8' CHAIN LINK FENCE MODULAR BLOCK RETAINING WALL, SEE DETAIL ON SHEET G4.2 1 2 3 4 5 6 7 8 9 10 PROPOSED SITE LEGEND EXISTING BUILDING CONCRETE PAVEMENT / WALK ASPHALT PAVEMENT LANDSCAPE OR LAWN / TURF AREA 20 600 20 40 05/20/22 TBM#4 = 810.78 FH1 FH25.0'9 SPA. @ 9'-0" = 81.0' 9.0'9.0'9.0' EDGE OF EXISTING ASPHALT PAVEMENT EXISTING TRENCH DRAIN 6 TYP. 1 TYP. 1 TYP. 9 SPA. @ 9'-0" = 81.0' 1 TYP. 1 TYP. 5 3 4 2 9.0' TYP 20.0'VARIES ±40'20.0'4 1.7' 5 6 TYP. 5 9.0' TYP7.5' 18. 0' EXI S T I N G DRI VE R25.0'R10. 0 '25.0'7 7 5 5.0'10.0'25.0'±10'R5 .0 'R35.0'12 135°'11 R20.0'6.0'8. 0 'R20.0'11 11 13 13 R30 .0' 16 15 15 16.3' 10 EXISTING ADA RAMP EXISTING ADA RAMP (VERIFY LOCATION) MAT CHLI N E - S H E E T G 1. 7 MATC H LI N E - S H E E T G 1. 1 EXISTING SPEED BUMP 5.0'3.0'10.0'3.0 '10.0'3.0' 9 17 17 8 3 .0 ' G1.7 SITE PLAN MURRAY FIELD PARKING LOT COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. REFER TO SITE DETAILS ON SHEETS G4.1 AND G4.2. 7. COORDINATE PARKING LOT LAYOUT WITH PROPOSED BLEACHER LAYOUT. GENERAL NOTES PROPOSED SITE LEGEND EXISTING BUILDING CONCRETE PAVEMENT / WALK ASPHALT PAVEMENT LANDSCAPE OR LAWN / TURF AREA 20 600 20 40 SITE KEYNOTES 4" SOLID WHITE PAVEMENT MARKING 4" SOLID BLUE PAVEMENT MARKING 4" SOLID BLUE PAVEMENT MARKING @ 3'-0" O.C. @ 45° ADA PARKING SYMBOL (BLUE) 4" SOLID WHITE PAVEMENT MARKING @ 3'-0" O.C. @ 45° PRECAST PARKING BUMPER, SEE DETAIL ON SHEET G4.1 4' TALL BLACK VINYL CHAIN LINK FENCE NEW BLEACHER (NOT IN CONTRACT) CROSSWALK SIGN AHEAD, PER MUTCD STANDARDS CROSSWALK STRIPING, THERMOPLASTIC CONCRETE SIDEWALK, SEE DETAIL ON SHEET G4.1 PROVIDE DOWELS BETWEEN PROPOSED AND EXISTING CONCRETE SIDEWALK PROVIDE DOWELS BETWEEN PROPOSED CONCRETE SIDEWALK AND EXISTING CONCRETE CURB 6" CONCRETE CURB, SEE DETAIL ON SHEET G4.1 CONCRETE SIDEWALK CONTROL JOINT, SEE DETAIL ON SHEET G4.1 CONCRETE SIDEWALK EXPANSION JOINT, SEE DETAIL ON SHEET G4.1 CROSSWALK SIGN, PER MUTCD STANDARDS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 05/20/22 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH2 FH4 FH3 G TBM#2 = 834.95 TBM#4 = 810.78 OWGATE ADDITION2, PG. 203-205HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 PARCEL 7 PARCEL 8 G ST-401 ST-305 ST-302 ST-102 ST-201 ST-303 ST-301 ST-105 ST-202 ST-402 ST-103 ST-405 ST-404 ST-104 ST-304 ST-406 BMP ST-203 BMP ST-306 ST-501 ST-204 ST-403 ST-502 ST-500 IN ST-500 OUT 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 UNDERGROUND DETENTION BOTTOM OF CHAMBER = 812.00 TOP OF CHAMBER = 819.00 10 YEAR ELEVATION = 815.32 10 YEAR RELEASE RATE = 1.36 CFS 10 YEAR STORAGE VOLUME = 0.084 AC/FT 100 YEAR ELEVATION = 818.22 100 YEAR RELEASE RATE = 1.88 CFS 100 YEAR STORAGE VOLUME = 0.168 AC/FT 2 SAN-2 ST-101 MEG MEG MEG MEG SAN-3 SAN-1 822.50 BENCHMARKS: 40 1200 40 80 G2.0 OVERALL GRADING PLAN COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO UTILITY DETAILS ON SHEETS SU2.1, SU2.2 AND SU2.3 8. REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 9. REFER TO PLAN SHEETS G2.1 AND G2.2 FOR PROPOSED SPOT GRADE ELEVATIONS. 10. ALL STORM SEWERS ASSOCIATED WITH THIS PROJECT ARE PRIVATE AND SHALL REMAIN PRIVATE. 11. CONSTRUCTION LIMITS FOR THIS PROJECT DO NOT FALL WITHIN ANY FLOODPLAINS, FLOODWAY FRINGES OR FLOODWAYS. GENERAL NOTES GRADING PLAN LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION PROPOSED SURFACE DRAINAGE FLOW ARROW FLOOD ROUTING PATH APPROXIMATE LIMITS OF CONSTRUCTION MEG TC BC TC BC 750.65100 YEAR INLET CASTING CAPACITY ELEVATION TABLE STRUCTURE NUMBER 100 YEAR ELEVATION (INLET 50% CLOGGED) 204 R-3010 NEENAH INLET CASTING TYPE 823.19 TOP OF CASTING ELEVATION 823.38 301* 302* 303* 304* 305* 403 825.08 825.58 828.09 828.25 825.68 825.71 823.67 824.17 831.63 831.84 822.48 822.98 R-3010 R-3010 R-3010 R-3010 R-3472 R-3010 100 YEAR ELEVATION (INLET 100% CLOGGED) 823.69 825.58 828.59 826.18 824.17 832.13 822.98 * BYPASS INLET NO PONDING WILL OCCUR FLOOD ROUTING KEYNOTES 1. FLOOD ROUTING PATH FOR THE IMPROVEMENTS ON THE NORTH SIDE OF THE PROJECT WHEN 100 YEAR FLOOD IS EXCEEDED. PATH TRAVELS IN A NORTHERLY AND NORTHEASTERLY DIRECTION OVER PROPOSED AND EXISTING INLETS THEN CONTINUES IN A NORTHERLY NORTHWESTERLY DIRECTION TO STADIUM DRIVE THEN CONTINUES NORTHERLY TO EXISTING INLETS LOCATED ON THE NORTH SIDE OF THE BRIDGE OVER COOL CREEK. 2. FLOOD ROUTING PATH FOR THE IMPROVEMENTS ON THE EAST SIDE OF THE PROJECT WHEN 100 YEAR FLOOD IS EXCEEDED. PATH TRAVELS FROM THE EAST SIDE DRIVE AND THEN TRAVELS IN A NORTHERLY DIRECTION OVER MULTIPLE EXISTING CURB INLETS LOCATED ON THE EAST SIDE OF THE DRIVE. EVENTUALLY GRADE LEVELS OUT ON THE EAST DRIVE NEAR THE NORTHEAST CORNER OF THE HIGH SCHOOL BUILDING AND IF PONDING DEPTH EXCEEDS SIX INCHES FLOOD ROUTING PATH WILL OVERTOP CURB AND TRAVEL EAST TO A EXISTING SWALE AND THEN TRAVEL NORTH IN THE SWALE TO COOL CREEK. 3 TAC REVIEW COMMENTS 03/15/2022 WEST AND NORTH MLAG = 806.32, MFPG = 805.32 PAVEMENT GRADES AT COOL CREEK BRIDGE = 804.32 EAST AND SOUTH MLAG = 824.50, MFPG = 823.50 HIGHEST GRADE ALONG EAST DRIVE CURB = 822.50 05/20/22 TBM#4 = 810.78 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 FH1 FH2 FH3 TC 824.19 BC 823.69 TC 824.56 BC 824.06 TC 825.21 BC 824.71 TC 824.27 BC 823.77 825.30 831.84 824.34 824.07 823.95 823.90 822.83 MEG 822.02 831.79 831.98 828.06 830.09 822.78 821.83 MEG 820.53 MEG 820.60 MEG 828.16 MEG 832.62 EXISTING STEPS AND RAMP TO REMAIN IN PLACE TC 823.85 BC 823.35 TC 831.71 BC 831.21 TC 831.98 BC 831.48 TC 829.44 BC 828.94 MEG 832.30 MEG 832.44 MEG 832.43 TC 825.82 BC 825.32 TC 824.43 BC 823.93 MEG 822.34 MEG 822.10 MEG 820.83 823.88 823.50 823.89 824.01 824.22 MEG 829.78 TC 829.48 BC 828.98 826.00 825.77 824.54 831.84 824.34 826.00 825.00 TC 830.10 BC 829.60 TC 830.57 BC 830.07 TC 830.92 BC 830.42 TC 828.75 BC 828.25 TC 827.84 BC 827.34 829.04 831.82 831.98 831.82 828.38 828.14 831.84 826.00 TC 826.33 BC 825.83 TC 823.61 BC 823.11 824.36 ST-305 RIM. = 831.63' ST-302 RIM. = 828.09' ST-303 RIM. = 825.64' ST-301 RIM. = 825.08' ST-402 RIM. = 824.31' ST-105 RIM. = 824.26' ST-202 RIM. = 824.34' ST-405 BMP RIM. = 823.67' ST-406 RIM. = 823.51' ST-104 RIM. = 823.72' ST-304 RIM. = 823.67' ST-404 RIM. = 823.36' ST-203 BMP RIM. = 823.45' ST-306 RIM. = 823.53' ST-204 ST-501 RIM. = 823.21' ST-403 RIM. = 822.48' ST-502 RIM. = 818.88' ST-500 IN RIM. = 824.56' ST-500 OUT RIM. = 823.51' MEG 832.42 TC 829.17 BC 828.67 MEG 828.46 STORMTRAP UNDERGROUND DETENTION SYSTEM 825.07 826.00 826.00 826.00 TC 823.69 BC 823.19 TC 824.06 BC 823.56 TC 824.71 BC 824.21 TC 823.68 BC 823.18 824.65 TC 822.79 BC 822.29 TC 823.84 BC 823.34 TC 823.96 BC 823.46 824.07 TC 824.36 BC 823.86 TC 824.11 BC 823.61 824.47 831.96 831.92 831.98831.98 831.92 826.00 TC 823.40 BC 823.40 TC 823.45 BC 823.45 823.44 823.49 823.94 TC 822.69 BC 822.69 TC 822.78 BC 822.78 823.25822.74 823.17 TC 823.58 BC 823.08 TC 823.34 BC 822.84 TC 822.98 BC 822.48 TC 823.39 BC 822.89 TC 823.77 BC 823.27 823.07 TC 822.16 BC 821.66 TC 823.35 BC 822.85 TC 823.66 BC 823.16 TC 823.32 BC 822.82 823.44 MEG 820.18 MEG 821.76 TC 822.60 BC 822.10 TC 821.66 BC 821.16 TC 821.86 BC 821.36 TC 821.61 BC 821.11 TC 822.17 BC 821.67 TC 821.00 BC 820.50 TC 821.89 BC 821.39 TC 822.64 BC 822.14 MEG 821.10 MEG 820.62 822.79 825.87 827.75 827.59 827.09 828.01 827.71 827.27 TC 827.95 BC 827.95 TC 827.65 BC 827.65 TC 828.33 BC 828.33 TC 828.28 BC 828.28 MEG 830.66 MEG 832.04 826.49 827.17 828.40 826.20 TC 826.27 BC 825.77 TC 830.15 BC 829.65 TC 831.42 BC 830.92 TC 830.47 BC 829.97 TC 829.67 BC 829.17 TC 829.21 BC 828.71 TC 829.16 BC 828.66 MEG 831.99 MEG 819.49 MEG 818.92 MEG 818.33 MEG 818.00 MEG 817.32 1 1 1 2 2 2 MATCHLINE - SHEET G2.1 MATCHLINE - SHEET G2.2 BENCHMARKS: 20 600 20 40 G2.1 GRADING PLAN - NORTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO UTILITY DETAILS ON SHEETS SU2.1, SU2.2 AND SU2.3 8. REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 9. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, HYDRANTS, WATER OR GAS VALVES AND UTILITY PEDESTALS SHALL BE ADJUSTED AS REQUIRED TO MEET PROPOSED FINISH GRADE. 10. ALL STORM SEWERS ASSOCIATED WITH THIS PROJECT ARE PRIVATE AND SHALL REMAIN PRIVATE. GENERAL NOTES GRADING PLAN LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB TOP OF WALL EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION MEG TC BC TC BC 750.65 TW GRADING KEYNOTES 1. FINISHED GRADE ELEVATIONS IN MILLED ASPHALT SURFACE AREA SHALL MATCH EXISTING GRADES. 2. THE PROPOSED GRADES OF THE REPLACED CURB ALONG THE EAST SIDE OF THE PROJECT ARE CLOSE TO EXISTING GRADES. THE CONTRACTOR SHALL MINIMIZE THE EARTH DISTURBANCE EAST OF THE CURB REPLACEMENT. 05/20/22 TBM#4 = 810.78 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 FH1 FH2 FH3 TC 824.19 BC 823.69 TC 824.56 BC 824.06 TC 825.21 BC 824.71 TC 824.27 BC 823.77 825.30 831.84 824.34 824.07 823.95 823.90 822.83 MEG 822.02 831.79 831.98 828.06 830.09 822.78 821.83 MEG 820.53 MEG 820.60 MEG 828.16 MEG 832.62 EXISTING STEPS AND RAMP TO REMAIN IN PLACE TC 823.85 BC 823.35 TC 831.71 BC 831.21 TC 831.98 BC 831.48 TC 829.44 BC 828.94 MEG 832.30 MEG 832.44 MEG 832.43 TC 825.82 BC 825.32 TC 824.43 BC 823.93 MEG 822.34 MEG 822.10 MEG 820.83 823.88 823.50 823.89 824.01 824.22 MEG 829.78 TC 829.48 BC 828.98 826.00 825.77 824.54 831.84 824.34 826.00 825.00 TC 830.10 BC 829.60 TC 830.57 BC 830.07 TC 830.92 BC 830.42 TC 828.75 BC 828.25 TC 827.84 BC 827.34 829.04 831.82 831.98 831.82 828.38 828.14 831.84 826.00 TC 826.33 BC 825.83 TC 823.61 BC 823.11 824.36 ST-305 RIM. = 831.63' ST-302 RIM. = 828.09' ST-303 RIM. = 825.64' ST-301 RIM. = 825.08' ST-402 RIM. = 824.31' ST-105 RIM. = 824.26' ST-202 RIM. = 824.34' ST-405 BMP RIM. = 823.67' ST-406 RIM. = 823.51' ST-104 RIM. = 823.72' ST-304 RIM. = 823.67' ST-404 RIM. = 823.36' ST-203 BMP RIM. = 823.45' ST-306 RIM. = 823.53' ST-501 RIM. = 823.21' ST-403 RIM. = 822.48' ST-502 RIM. = 818.88' ST-500 IN RIM. = 824.56' ST-500 OUT RIM. = 823.51' MEG 832.42 TC 829.17 BC 828.67 MEG 828.46 STORMTRAP UNDERGROUND DETENTION SYSTEM 825.07 826.00 826.00 826.00 TC 823.69 BC 823.19 TC 824.06 BC 823.56 TC 824.71 BC 824.21 TC 823.68 BC 823.18 824.65 TC 822.79 BC 822.29 TC 823.84 BC 823.34 TC 823.96 BC 823.46 824.07 TC 824.36 BC 823.86 TC 824.11 BC 823.61 824.47 831.96 831.92 831.98831.98 831.92 826.00 TC 823.40 BC 823.40 TC 823.45 BC 823.45 823.44 823.49 823.94 TC 822.69 BC 822.69 TC 822.78 BC 822.78 823.25822.74 823.17 TC 823.58 BC 823.08 TC 823.34 BC 822.84 TC 822.98 BC 822.48 TC 823.39 BC 822.89 TC 823.77 BC 823.27 823.07 TC 822.16 BC 821.66 TC 823.35 BC 822.85 TC 823.66 BC 823.16 TC 823.32 BC 822.82 823.44 MEG 820.18 MEG 821.76 TC 822.60 BC 822.10 TC 821.66 BC 821.16 TC 821.86 BC 821.36 TC 821.61 BC 821.11 TC 822.17 BC 821.67 TC 821.00 BC 820.50 TC 821.89 BC 821.39 TC 822.64 BC 822.14 MEG 821.10 MEG 820.62 822.79 825.87 827.75 827.59 827.09 828.01 827.71 827.27 TC 827.95 BC 827.95 TC 827.65 BC 827.65 TC 828.33 BC 828.33 TC 828.28 BC 828.28 MEG 830.66 MEG 832.04 826.49 827.17 828.40 826.20 TC 826.27 BC 825.77 TC 830.15 BC 829.65 TC 831.42 BC 830.92 TC 830.47 BC 829.97 TC 829.67 BC 829.17 TC 829.21 BC 828.71 TC 829.16 BC 828.66 MEG 831.99 MEG 819.49 MEG 818.92 MEG 818.33 MEG 818.00 MEG 817.32 1 1 1 2 2 2 MATCHLINE - SHEET G2.1 MATCHLINE - SHEET G2.2 WEST AND NORTH MLAG = 806.32, MFPG = 805.32 PAVEMENT GRADES AT COOL CREEK BRIDGE = 804.32 BENCHMARKS: 20 600 20 40 G2.1 GRADING PLAN - NORTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDEDBY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THEUNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THEAREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THERESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIREDFOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSEDDEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THECONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THECITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTINGCONDITION OF THE RIGHT-OF-WAY. 7. REFER TO UTILITY DETAILS ON SHEETS SU2.1, SU2.2 AND SU2.3 8. REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 9. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, HYDRANTS, WATER ORGAS VALVES AND UTILITY PEDESTALS SHALL BE ADJUSTED AS REQUIRED TOMEET PROPOSED FINISH GRADE. 10. ALL STORM SEWERS ASSOCIATED WITH THIS PROJECT ARE PRIVATE AND SHALL REMAIN PRIVATE. GENERAL NOTES GRADING PLAN LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB TOP OF WALL EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION APPROXIMATE LIMITS OF CONSTRUCTION MEG TC BC TC BC 750.65 TW GRADING KEYNOTES 1. FINISHED GRADE ELEVATIONS IN MILLED ASPHALT SURFACE AREA SHALL MATCH EXISTING GRADES. 2.THE PROPOSED GRADES OF THE REPLACED CURB ALONG THE EAST SIDE OF THE PROJECT ARE CLOSE TO EXISTING GRADES. THE CONTRACTOR SHALL MINIMIZE THE EARTH DISTURBANCE EAST OF THE CURB REPLACEMENT. 3 TAC REVIEW COMMENTS 03/15/2022 05/20/22 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 PARCEL 7 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH4 GG831.96 831.96 828.55 TC 825.79 BC 825.29 TC 824.29 BC 823.79 TC 824.77 BC 824.27 TC 824.08 BC 823.58 TC 823.00 BC 822.50 TC 824.19 BC 823.69 TC 824.56 BC 824.06 825.88 826.00 831.78 833.25 831.86 831.98 834.65 834.52 831.79 MEG 832.62 EXISTING STEPS AND RAMP TO REMAIN IN PLACE TC 831.98 BC 831.48 MEG 832.30 MEG 832.44 MEG 832.43 825.00 834.65 834.52 834.63 834.63 834.63 834.52 834.35 833.45 834.35 833.45 833.41 832.00 832.44 832.40 832.44 831.98 832.62 832.51 834.52 832.18 834.22 TC 830.92 BC 830.42 828.29 831.78 TC 828.73 BC 828.23 TC 829.19 BC 828.69 829.28 828.62 828.39 TC 827.80 BC 827.30 827.88 828.04 828.81 828.12 824.86 832.72 833.34 834.65 833.00 831.85 832.85 831.81 828.55 831.83 ST-401 RIM. = 832.72' ST-305 RIM. = 831.63' ST-102 RIM. = 827.92' ST-201 RIM. = 825.75' ST-202 RIM. = 824.34' ST-103 RIM. = 823.85' RIM. = 823.72' ST-203 BMP RIM. = 823.45' ST-204 RIM. = 823.19' 833.34 834.22 832.09 831.95 MEG 832.42 825.07 826.00 826.00 MEG 829.16 MEG 829.68 MEG 829.66MEG 830.18 MEG 830.27 TC 828.53 BC 828.53 TC 828.30 BC 828.30 TC 827.47 BC 826.97 TC 825.31 BC 824.81 TC 827.45 BC 827.45 TC 827.60 BC 827.60 TW 833.50 TW 833.50 TW 832.00 TW 832.00 827.94 828.96 TC 823.58 BC 823.08 TC 822.50 BC 822.00 TC 823.69 BC 823.19 TC 824.06 BC 823.56 824.17 823.09 MEG 832.04 MEG 831.99 ST-101 RIM. = 833.87' 834.44 MATCHLINE - SHEET G2.1 MATCHLINE - SHEET G2.2 828.74 831.23 828.81 828.74 830.80 828.10 827.76 EAST AND SOUTH MLAG = 824.50, MFPG = 823.50 HIGHEST GRADE ALONG EAST DRIVE CURB = 822.50 BENCHMARKS: 20 600 20 40 G2.2 GRADING PLAN - SOUTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDEDBY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THEUNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THEAREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THERESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIREDFOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSEDDEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THECONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THECITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTINGCONDITION OF THE RIGHT-OF-WAY. 7. REFER TO UTILITY DETAILS ON SHEETS SU2.1, SU2.2 AND SU2.3 8. REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 9. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, HYDRANTS, WATER ORGAS VALVES AND UTILITY PEDESTALS SHALL BE ADJUSTED AS REQUIRED TOMEET PROPOSED FINISH GRADE. 10. ALL STORM SEWERS ASSOCIATED WITH THIS PROJECT ARE PRIVATE AND SHALL REMAIN PRIVATE. GENERAL NOTES GRADING PLAN LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB TOP OF WALL EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION APPROXIMATE LIMITS OF CONSTRUCTION MEG TC BC TC BC 750.65 TW GRADING KEYNOTES 1. FINISHED GRADE ELEVATIONS IN MILLED ASPHALT SURFACE AREA SHALL MATCH EXISTING GRADES. 2. THE PROPOSED GRADES OF THE REPLACED CURB ALONG THE EAST SIDE OF THE PROJECT ARE CLOSE TO EXISTING GRADES. THE CONTRACTOR SHALL MINIMIZE THE EARTH DISTURBANCE EAST OF THE CURB REPLACEMENT. 3 TAC REVIEW COMMENTS 03/15/2022 05/20/22 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH2 FH4 FH3 G TBM#2 = 834.95 TBM#4 = 810.78 HARROWGATE ADDITIONP.B. 2, PG. 203-205HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 PARCEL 7 PARCEL 8 SFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SFSF SF CW PT SF G STORMTRAP UNDERGROUND DETENTION SYSTEM BMP UNIT BMP UNIT 40 1200 40 80 G3.0 OVERALL EROSION CONTROL PLAN COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! EROSION CONTROL LEGEND CW PT SF EROSION CONTROL NOTES 1. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MY BE REQUIRED BY THE INSPECTOR. 2. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING THE SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. 3. ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCE WITH CHAPTER 600 OF THE CITY OF CARMEL STORMWATER TECHNICAL STANDARDS MANUAL, LATEST EDITION. DISCREPANCIES BETWEEN THE PLANS AND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTOR FROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE MANUAL. 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES 5 TAC REVIEW COMMENTS 0426/2022 05/20/22 TBM#4 = 810.78 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 FH1 FH2 FH3 SFSFSFSFSFSF SF SF SFSF SF CW PT SF 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 3 3 3 8 8 3 4 5 6 6 6 6 6 6 6 1 1 1 1 1 1 7 7 STORMTRAP UNDERGROUND DETENTION SYSTEM BMP UNIT BMP UNIT MATCHLINE - SHEET G3.1 MATCHLINE - SHEET G3.2 2 7 7 7 20 600 20 40 G3.1 EROSION CONTROL PLAN - NORTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! EROSION CONTROL LEGEND CW PT SF EROSION CONTROL NOTES 1. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MY BE REQUIRED BY THE INSPECTOR. 2. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING THE SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. 3. ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCE WITH CHAPTER 600 OF THE CITY OF CARMEL STORMWATER TECHNICAL STANDARDS MANUAL, LATEST EDITION. DISCREPANCIES BETWEEN THE PLANS AND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTOR FROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE MANUAL. 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO EROSION CONTROL DETAILS ON SHEET G3.4 GENERAL NOTES EROSION CONTROL KEYNOTES 1. SEDIMENT BAG INLET PROTECTION 2. LIMITS OF CONSTRUCTION 3. TEMPORARY SEEDING 4. CONCRETE WASHOUT 5. PORTABLE TOILETS 6. SILT FENCE 7. CONSTRUCTION ENTRANCE 8. EROSION CONTROL BLANKET 5 TAC REVIEW COMMENTS 04/26/2022 05/20/22 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 PARCEL 7 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH4 GG SFSFSFSFSFSFSFSFSFSF1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 8 3 3 3 6 6 6 6 6 6 6 6 1 1 8 BMP UNIT MATCHLINE - SHEET G3.1 MATCHLINE - SHEET G3.2 1 TYP. 20 600 20 40 G3.2 EROSION CONTROL PLAN - SOUTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! EROSION CONTROL LEGEND CW PT SF EROSION CONTROL NOTES 1. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MY BE REQUIRED BY THE INSPECTOR. 2. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING THE SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. 3. ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCE WITH CHAPTER 600 OF THE CITY OF CARMEL STORMWATER TECHNICAL STANDARDS MANUAL, LATEST EDITION. DISCREPANCIES BETWEEN THE PLANS AND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTOR FROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE MANUAL. 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO EROSION CONTROL DETAILS ON SHEET G3.4 GENERAL NOTES EROSION CONTROL KEYNOTES 1. SEDIMENT BAG INLET PROTECTION 2. LIMITS OF CONSTRUCTION 3. TEMPORARY SEEDING 4. CONCRETE WASHOUT 5. PORTABLE TOILETS 6. SILT FENCE 7. CONSTRUCTION ENTRANCE 8. EROSION CONTROL BLANKET 05/20/22 YmsC2 YmsB2Or PROJECT SITE G3.3 STORMWATER POLLUTION PREVENTION PLAN INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 AREA INLET SEDIMENT BAG DETAIL SILT FENCE DETAIL METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES WOOD OR METAL STAKES TO SECURE THE STRAW BALES (2 PER STRAW BALE) STRAW BALE (ALTERNATIVE MATERIALS OR PRODUCTS MAY BE USED TO PROVIDE STRUCTURAL CONTAINMENT. ALTERNATIVE MATERIALS OR PRODUCTS WILL REQUIRE DESIGN MODIFICATION.) PLAN VIEW NOT TO SCALE L = INSIDE LENGTH (10' MIN) W = INSIDE WIDTH (10' MIN) POLYETHYLENE LINING (10 MIL); THE LINING SHALL EXTEND OVER THE STRAW BALES. COMPACTED SOIL MATERIAL SECTION A-A NOT TO SCALE EXCAVATION SANDBAGS OR OTHER APPROPRIATE ANCHORING SYSTEM TO SECURE THE POLYETHYLENE LINING ASs = T L = TOP LENGTH OF EXCAVATION (10' MIN) B L = BOTTOM LENGTH OF EXCAVATION T W = TOP WIDTH OF EXCAVATION (10' MIN) B W = BOTTOM WIDTH OF EXCAVATION ASS = ANCHORING SYSTEM TYPE AND SPACING D = REQUIRED DEPTH TO CONTAIN WASHOUT INCLUDING 12" RAINFALL PLUS 12" FREEBOARD POLYETHYLENE LINING (10 MIL) SECTION B-B NOT TO SCALE SANDBAGS OR OTHER APPROPRIATE ANCHORING SYSTEM TO SECURE THE POLYETHYLENE LINING WOOD OR METAL STAKES TO SECURE THE STRAW BALES (2 PER STRAW BALE) L=10' STRAW BALES ENTRENCHED 4 INCHES INTO THE SOIL D = 2' A A W=10' TL=10' BW=8' TW=10' BL=8' PLAN VIEW NOT TO SCALE ABOVE GRADE SYSTEM BELOW GRADE SYSTEM STANDARD WASHOUT DETAIL B CONSTRUCTION ENTRANCE 4 2 5 1 3A 3B NOTE: REFER TO GENERAL STAPLE PATTERN GUIDE FOR CORRECT STAPLE PATTERN RECOMMENDATIONS FOR SLOPE INSTALLATIONS. 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" OVERLAP. 5. WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE, PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH APPROXIMATELY 4" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART. EROSION CONTROL BLANKET SLOPE INSTALLATION G3.4 EROSION CONTROL DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 1.5% SLOPE TOOLED CONTROL JOINT R 1 " SEE PLANS 4"6" 6"1'-6"45° MONOLITHIC CURB AND WALK DETAIL NO SCALE 4" OF COMPACTED #53 STONE COMPACTED SUBGRADE NOTES: 1. CURB SHALL HAVE 1/2" EXPANSION JOINTS AT 48'-0" MAX. AND AT ENDS OF RADII. CONTROL JOINTS AT 6'-0" MAX. UNLESS OTHERWISE NOTED ON PLANS. 2. CONTROL JOINTS SHALL BE CUT 1/4 DEPTH OF TOTAL THICKNESS OF SLAB. CURB PAVING WALK TRANSVERSE JOINTS LONGITUDINAL CONTROL JOINT TOP OF PAVEMENT 6"6" 6x6, W2.9xW2.9, WWF (EPOXY COATED) 4500 psi CONCRETE SIDEWALK 6" CONCRETE CURB (STRAIGHT) DETAIL 1" = 1'-0"1'-6"6"6"NOTES: 1. PROVIDE CONTROL JOINTS AT 10' MAX. SPACING. 2. PROVIDE EXPANSION JOINTS AT 80' MAX. SPACING AND AT ENDS OF ALL RADII. 4" COMPACTED GRANULAR MATERIAL COMPACTED SUBGRADER1 " TOP OF PAVEMENT CONCRETE SIDEWALK (WHERE APPLICABLE) 1/2" EXPANSION JOINT 4" CONCRETE SIDEWALK DETAIL 4" COMPACTED #53 STONE WIDTH VARIES (SEE PLAN SHEETS) COMPACTED SUBGRADE4"FINISH GRADE 4500 psi CONCRETE SIDEWALK 1" = 1'-0" NOTES: 6x6, W2.9xW2.9, WWF (EPOXY COATED) 1. CONTROL JOINTS, EXPANSION JOINTS AND EDGES OF SIDEWALK SHALL BE HAND-TOOLED AFTER EACH FINISHING OPERATION. 2. PROVIDE EXPANSION JOINT AT INTERSECTION WITH ANOTHER SIDEWALK, BETWEEN WALKS AND BUILDINGS AND AT SUCH OTHER POINTS AS INDICATED ON THE DRAWINGS. 3. SIDEWALK SHALL HAVE 1/2" EXP. JTS. @ 48' MAX. & CONTROL JOINTS @ 6' MAX.4"4"3"1 1/2"1'-0 1/2"COMPACTED AGGREGATE #53 MEDIUM DUTY ASPHALT PAVEMENT DETAIL COMPACTED SUBGRADE 1" = 1'-0" HMA SURFACE, TYPE A, 9.5 mm HMA BASE, TYPE A, 19.0 mm COMPACTED AGGREGATE #2 12" 6"14"TOP OF ASPHALT PAVMENT 6"6"COMPACTED SUBGRADE COMPACTED AGGREGATE #53 #5 BAR CONT. 1" = 1'-0" 6" CONCRETE PAVEMENT DETAIL 6x6, W2.9xW2.9, WWF (EPOXY COATED) NOTES: 1. CONTROL JOINTS, EXPANSION JOINTS AND EDGES OF PAVEMENT SHALL BE HAND-TOOLED AFTER EACH FINISHING OPERATION. 2. PROVIDE EXPANSION JOINT AT INTERSECTION WITH ANOTHER SIDEWALK, BETWEEN WALKS AND BUILDINGS AND AT SUCH OTHER POINTS AS INDICATED ON THE DRAWINGS. 3. SIDEWALK SHALL HAVE 1/2" EXP. JTS. @ 48' MAX. & CONTROL JOINTS @ 6' MAX. BIKE RACK DETAIL NO SCALE NOTE: INSTALLATION OF BIKE RACKS TO BE SEPARATE CONSTRUCTION CONTRACT.DEQ.EQ.1" = 1'-0" EMBED 8"8" 1" DIA. DRILLED HOLE 1/2" PREFORMED EXPANSION JOINT FILLER MATERIAL WITH 1/2" SILICONE SEALANT 1/2" DIA. SMOOTH DOWELS x 1'- 4" LONG AT 4" FROM TOP OF CURB 1/2" SEALANT EXISTING CURBNEW CURB CONCRETE CURB CONNECTION DETAIL EMBED DOWEL IN EPOXY GROUT DOWEL CAP 1/2" = 1'-0" 1/2" 1/2" PREFORMED EXPANSION JOINT FILLER WITH SEALANT VERTICAL SURFACE CONCRETE SIDEWALK OR PAVEMENT PER PLAN PAVEMENT ISOLATION JOINT DETAIL - IJ6"6"2"1 1/2"1'-5 1/2"COMPACTED AGGREGATE #53 HEAVY DUTY H.A.C. PAVEMENT DETAIL COMPACTED SUBGRADE 1" = 1'-0" HMA SURFACE, TYPE A, 9.5 mm HMA BASE, TYPE A, 19.0 mm COMPACTED AGGREGATE #2 2"2' FRO M C U R B, BUIL DI NG OR END O F S P A C E 6"EQ. 6'-0" EQ. 4" WIDE PAINTED PAVEMENT MARKING 6"PARKING BUMPER DETAIL NO SCALE BEVELED EDGE (TYP.) 3/4" DIA. HOLES FOR 1/2" DIA. x 18" PINS DRIVEN FLUSH WITH TOP. REINFORCE BUMPER WITH 2 - #3 BARS. NOTE: DIMENSIONS INDICATED ARE MINIMUMS, MANUFACTURER'S STANDARDS IN EXCESS ARE ACCEPTABLE. 4" COMPACTED GRANULAR MATERIALR1'-6"10"8"6"2'-0" 3"1'-6"4 1/2" 1" = 1'-0" NOTES: 1. PROVIDE CONTROL JOINTS AT 10' MAX. SPACING. 2. PROVIDE EXPANSION JOINTS AT 80' MAX. SPACING AND AT ENDS OF ALL RADII. FINISH GRADE TOP OF PAVEMENT ROLL CURB & GUTTER DETAIL COMPACTED SUBGRADER1'-6"R1 / 2 "DD/41/8" SAWED CONTROL JOINT GREASE & DOWEL CAP WITH BAR STOP @ BOTH ENDS 1/2" SEALANT 1/2" EXP. JT. FILLER NOTE: EXPANSION JOINT - "EJ"CONTROL JOINT - "CJ" CONCRETE PAVEMENT JOINT DETAILS NO SCALE D/2PROVIDE 1" DIA. x 1'-6" LONG EPOXY-COATED DOWEL @ 12" o.c. 1. CONSTRUCT EXPANSION JOINTS @ 40' MAX. AND CONTROL JOINTS @ 10' MAX. UNLESS OTHERWISE NOTED. 2. JOINT SEALANT SHALL BE FUEL RESISTANT, TRAFFIC GRADE, POLYSULFIDE, THIOKOL 2282 OR EQUAL SEALANT PER FEDERAL SPECIFICATION SS-S-200E 24" x 1" DIA. SMOOTH EPOXY COATED BAR @ 18" C.C.D/2D/2ASPHALT PAVEMENT TACK COAT HMA SURFACE, TYPE A, 9.5 mm ASPHALT SPEED CONTROL BUMP 12'-0" NO SCALE 3"8"6"NO SCALE CONCRETE PAVEMENT DETAIL COMPACTED AGGREGATE BASE #53 COMPACTED SUBGRADE CONCRETE PAVEMENT (4,500 PSI) COARSE BROOM FINISH 6x6, W2.9xW2.9, WWF (EPOXY COATED)DEQ.EQ.EMBED 8"8" 1" DIA. DRILLED HOLE EMBED DOWEL IN EPOXY GROUT 1/2" PREFORMED EXPANSION JOINT FILLER MATERIAL 1/2" SMOOTH DOWELS x 1'- 4" LONG @ 2'-0" o.c. 1/2" SEALANT EXISTING WALKNEW WALK 1 1/2" = 1'-0" CONCRETE SIDEWALK CONSTRUCTION JOINT DETAIL - CJ NO SCALED/41/8" SAWED CONTROL JOINT DCONSTRUCT CONTROL JOINTS AS SHOWN ON PLAN (MAX. SPACING @ 6'-0" o.c.) NOTE: 1/4" RADIUS CONCRETE SIDEWALK CONTROL JOINT DETAIL CONTROL JOINT - SJ D1'-0"1'-0" 1" DIA. DRILLED HOLE EMBED DOWEL IN EPOXY GROUT 1/2" PREFORMED EXPANSION JOINT FILLER MATERIAL 1/2" SMOOTH DOWELS x 2'- 0" LONG @ 1'-6" o.c. 1/2" SEALANT D/2D/2EXPANSION JOINT - EJ G4.1 SITE DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 5'-0" 1'-6"3'-6" 4" 3"9 1/2"3"1'-3"1/2"5'-0"4"NEW CONCRETE SIDEWALK GALVANIZED TS 6"x6"x1/4" 1/4" CAP PLATE MATCH TUBE STEEL PROFILE ASPHALT ACCESS DRIVE CONCRETE CURB HARDWOOD MULCH BED WITH GROUNDCOVER 18" DIA. CONCRETE PIER9 1/2"9 1/2"6"15'-0" 4'-0" (MAX.) 3"4 1/2"STAINLESS STEEL END CAP POST (31" HEIGHT MOUNTED TO CONCRETE AT BOTTOM) WITH A 1/2" DIA. x 6" LONG STAINLESS STEEL ANCHOR ROD, WASHER AND NUT. FACE OF CURB PLAN VIEW P 1/4"x4"x10" (GALV.) C3"x1 1/2"x3/16x10" LONG CONTINUOUS TUBE TS 3"x4"x1/4" (GALV.) L GUARDRAIL (TYPE 1) ALONG NORTH ACCESS ROAD 3/4" = 1'-0" A G4.2 SECTION A GALVANIZED TS 6"x6"x1/4" C3"x1 1/2"x3/16"x10" LONG (GALV.) CONTINUOUS TUBE TS 3"x4"x1/4" (GALV.) RELOCATED GATE POST 3/4" = 1'-0" 1'-6"± SIDEWALK AT NORTHEAST GATE CONDITION CONCRETE CURB 1'-6" HARDWOOD MULCH BED RELOCATED GATE REPAINT) ADJUST PER GATE LENGTHS 3"2'-9"4"24" DIA., 3,000 psi CONCRETE PIER WITH (6) #5 VERTICAL BARS SPACED EVENLY RELOCATED 8" DIA. STEEL GATE POST (REPAINT) #3 TIES @ 3" o.c.3'-0"#3 TIES @ 12" o.c. EXISTING HINGES 6"1.0% SLOPE 1" = 1'-0" CONCRETE STEPS AT CANOPY 10" TYP. 1'-0" TYP. R 1" (TYP.) 10"5 1/2"2'-8" (CANOPY BRICK PIER - BEYOND) SEE STRUCTURAL DRAWINGS COMPACTED SUBGRADE 1/2" EXPANSION JOINT CONCRETE SIDEWALK 1'-0" #3 EPOXY COATED NOSING BAR (TYP.) 1/2" EXPANSION JOINT 7'-3" ± 9'-0" EL. = 834.35' EL. = 833.45'TYP.EL. = 833.34'6"1.0% SLOPE 10" TYP. 1'-0" TYP. R 1" (TYP.) 10"5 1/2"2'-8" (CANOPY BRICK PIER - BEYOND) SEE STRUCTURAL DRAWINGS ABRASIVE METAL NOSINGS (TYP.)TYP.EL. = 832.44' 2" TYP. 2" TYP. 1/2" DIA. X 1'-4" LONG @ 1'-6" o.c. EPOXY COATED DOWELS EL. = 832.89' EL. = 833.90' (SEE STRUCTURAL) 4" 1/2" DIA. X 1'-4" LONG @ 1'-6" o.c. EPOXY COATED DOWELS 4' OF #53 AGGREGATE COMPACTED SUBGRADE 1'-0" 1/2" EXPANSION JOINT 1/2" DIA. X 1'-4" LONG @ 1'-6" o.c. EPOXY COATED DOWELS 4" 1/2" DIA. X 1'-4" LONG @ 1'-6" o.c. EPOXY COATED DOWELS 4' OF #53 AGGREGATE 1/2" EXPANSION JOINT CONCRETE SIDEWALK NOTE: SEE ARCHITECTURAL DETAILS 3 AND 4 ON SHEET A10.09 FOR HANDRAILS. 3/4" = 1'-0" PLANTER WALL SECTIONS AT CANOPY PIER 1 1/2" 2 1/2" CONCRETE RETAINING WALL WITH FORM LINER REFER TO ARCHITECTURAL SPECIFICATIONS 4" OF #53 AGGREGATE 4" CONCRETE 1/2" EXPANSION JOINT WITH SEALANT 2'-0"ELEVATION OF CONCRETE VARIES SEE SHEET G2.2 3'-0"FROM1'-9" (AT SOUTH)TO 4'-1" (AT NORTH)3'-4"1'-0"CAST STONE CAP w/ DRIP ANCHORED IN APPROVED MANNER 1/2" RADIUS PLANTING SOIL MIX AS SPECIFIED 1'-6" 1/2" RADIUS 1/2"WASHPROVIDE WATERPROOF MEMBRANE 4" PERFORATED HDPE PIPE FILTER FABRIC #8 AGGREGATE #5 BARS AT 12" o.c., EACH WAY #5 BENT BAR @ 12" o.c. (4) #5 BARS (CONTINUOUS) @ 10" o.c., TOP AND BOTTOM 1'-6"1'-7" 2'-11" (SEE STRUCT.) (SEE STRUCT.) EAST FACE OF WEST CANOPY PIERS WEST FACE OF EAST CANOPY PIERS 3/4" = 1'-0" PLANTER WALL SECTIONS 1 1/2" 2 1/2" CONCRETE RETAINING WALL WITH FORM LINER REFER TO ARCHITECTURAL SPECIFICATIONS 4" OF #53 AGGREGATE 4" CONCRETE 1/2" EXPANSION JOINT WITH SEALANT 2'-0"ELEVATION OF CONCRETE VARIES SEE SHEET G2.2 3'-0"FROM1'-9" (AT SOUTH)TO 4'-1" (AT NORTH)3'-4"1'-0"CAST STONE CAP w/ DRIP ANCHORED IN APPROVED MANNER 1/2" RADIUS PLANTING SOIL MIX AS SPECIFIED 1/2" RADIUS 1/2"WASHPROVIDE WATERPROOF MEMBRANE 4" PERFORATED HDPE PIPE FILTER FABRIC #8 AGGREGATE #5 BARS AT 12" o.c., EACH WAY #5 BENT BAR @ 12" o.c. (4) #5 BARS (CONTINUOUS) @ 10" o.c., TOP AND BOTTOM PROVIDE FLEXIBLE FLASHING BELOW CAST STONE CAP NOTE: PROVIDE 1/2" EXPANSION JOINT AND SEALANT BETWEEN THE PLANTER WALLS AND CANOPY PIERS. PROVIDE FLEXIBLE FLASHING BELOW CAST STONE CAP 2'-7" ± 1"W 6 x 9 STEEL FINISH GRADE W6 X 9 X 1'-2 1/4" (LONG) STEEL GALVANIZED GALVANIZED POST HIGHWAY GUARDRAIL TYPE 2 NO SCALE SEE BASE PLATE DETAIL1 1/2"1'-0"1 1/2"4 1/2"4 1/2"1 1/2"1 1/2"9" 1" DIA. (TYP.) 7/8" STEEL PLATE, A36 (GALVANIZED) 3/16" 1'-0"4"(MIN.)OUTER STRUCTURE EDGE NOTES: 1. MOUNTED POSTS SHALL BE SPACED IN ACCORDANCE WITH STANDARD MGS W-BEAM POST SPACING, PER INDOT STANDARD DRAWING E-601-MGSA-05. 2. THE ANCHOR BOLT SHALL BE 7/8" DIA. ROD, CUT OFF TO 8 1/2" LENGTH WITH WASHER AND NUT, GALVANIZED. THE MINIMUM EMBEDMENT SHALL BE 6". THE ANCHOR BOLT SHALL BE INSTALLED USING HILTI RE500 EPOXY ANCHORING SYSTEM. 3. THE CENTER OF THE ANCHOR BOLT SHALL BE INSTALLED A MINIMUM OF 4" FRO THE OUTER STRUCTURE EDGE. 1'-6" FOUR 7/8" X 8 1/2" LONG GALVANIZED ANCHOR BOLTS SEE STRUCTURAL SHEETS S1.03 FOR RETAINING WALL INFORMATION BASE PLATE DETAIL 6" GALVANIZED GUARD RAIL BEAM PER INDOT SPECIFICATIONS HANDRAIL PER ARCHITECTURAL PLANS AND SPECIFICATIONS G4.2 SITE DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 6" DETECTABLE WARNING SURFACE 1/2" WIDE x 1/8" DEEP GROOVE @ 3" O.C. ADA ACCESSIBLE CURB RAMP - TYPE "B" NO SCALE 6" CONCRETE CURB 1 G4.3 3/4" = 1'-0" ASPHALT PAVEMENT SECTION PER CITY STANDARDS 6'-6"± 6"2'-0" EXISTING SIDEWALK MATCH EXIST. GRADE GUTTER LINE NEENAH 2'X8' TACTILE WARNING PLATES (WHERE NOTED)8"6" #53 STONE (95% COMPACTION) 5" CONCRETE (4,500 PSI) #4 DOWELS @ 12" O.C. (1'-4" LONG) 8.33% MAX. SLOPE 1/2" EXPANSION JOINT MATERIAL SIDEWALK RAMP - SECTION 1 MAX. 10:1 MAX 6"6"6'-0"5'-0" 5'-0" 10:1 1/4"5'-0" 5'-0" 10:112:1 (MAX.)2'-0"5'-0" PROVIDE 1/2" DIA. EPOXY COATED DOWELS AND 1/4" EXPANSION JOINT WITH SEALANT ON ALL SIDES ADJACENT TO EXISTING CONCRETE 5'-0" PLAN ELEVATION ADA ACCESSIBLE CURB RAMP - TYPE "A" NO SCALE PER PLAN PER PLAN 1 G4.3 ADA ACCESSIBLE CURB RAMP TYPE "E" ADA ACCESSIBLE CURB RAMP TYPE "C" ADA ACCESSIBLE CURB RAMP TYPE "D" G4.3 SITE DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 NO SCALE DRAIN DETAIL DRAINAGE AGGREGATE PERF. DRAIN PIPE OPEN JOINT AT 40 FT. CENTERS NO SCALE CAPPING DETAIL - PROFILE RANDOMLY STAGGER VERTICAL JOINTS A-CAP B-CAP FOR STRAIGHT WALLS, ALTERNATE A-CAP AND B-CAP A-CAP B-CAP USE STANDARD UNIT SPLIT HALF TO FINISH STEP IN TOP OF WALL 34" OVERHANG SPLIT ENDS OF BOTH CAP UNITS STANDARD UNIT SPLIT HALF AT STEP DOWN 6" STEP SPLIT SIDES OF CAPS NO SCALE CAPPING DETAIL - PLAN VIEW B-CAP B-CAP INSIDE CURVES USE B-CAPS A-CAP A-CAP OUTSIDE CURVES USE A-CAPS NO SCALE WALL W/ PIPE PENETRATION SECTION NO SCALE WALL W/ PIPE PENETRATION PROFILE PRECAST LINTEL BEAM MIN. 18" BEARING (TYP) LINTEL NOTES: · FINAL BEAM SIZE, REINFORCEMENT, AND CONFIGURATION TO BE DESIGNED BY WALL DESIGN ENGINEER · LINTEL BEAMS SHALL BE PRECAST WITH MINIMUM 7 DAYS CURE · HEIGHT OF BEAM SHALL CORRESPOND TO HEIGHT OF MODULAR UNITS · PLACEMENT OF LINTEL BEAMS SHALL BE CONSISTENT WITH THE PLACEMENT OF OUTFALL PIPE · INSTALL OUTFALL PIPE PRIOR TO CONSTRUCTION OF WALL ABOVE · OUTFALL PIPE SHALL EXTEND BEYOND BASE COURSE OF WALL NO LESS THAN 6" · GEOTEXTILE FABRIC SHALL BE INSTALLED AROUND PIPE OPENING · LINTEL TO EXTEND MINIMUM 18" EITHER SIDE OF PIPE GRID NOT SHOWN FOR CLARITY FILTER FABRIC PRECAST LINTEL BEAM CONCRETE HEADWALL OR CUT MODULAR UNITS OUTFALL PIPE SCOUR PROTECTION AS REQUIRED FILTER FABRIC FILTER FABRIC PRECAST LINTEL BEAM CONCRETE HEADWALL OR CUT MODULAR UNITS SCOUR PROTECTION AS REQUIRED PRECAST LINTEL BEAM PROVIDE BOND BREAK AT WALL OPENING USE COBBLE UNITS OR CUT STANDARD UNITS, SEE ABUTMENT DETAIL GEOSYNTHETIC AT STRUCTURES BEHIND WALL SECTION GEOSYNTHETIC INSTALLATION DETAIL SECTION NOTE: · FOLLOW GEOSYNTHETIC GRID MANUFACTURER'S INSTALLATION INSTRUCTIONS AND SPECIFICATIONS · GEOGRID LENGTH AND ELEVATION PLACEMENT SHALL BE DETERMINED BY WALL DESIGN ENGINEER · MINIMIZE CUTTING OF MACHINE DIRECTION STRANDS (THOSE RUNNING PERPENDICULAR TO THE WALL FACE) AS MUCH AS POSSIBLE · DECREASE IN OVERALL GEOGRID STRENGTH DUE TO CUTTING SHOULD BE ACCOUNTED FOR IN THE DESIGN OF THE WALL DI RECTI O N OF STRE N G T H (ROLL DIRE C TI ON)GRID LENGTHDIRECTION OF STRENGTHDO NOT OVERLAP GRID LAYERS CUT GRID AROUND VERTICAL STRUCTURES BEHIND WALL START GRID APPROX. 1" FROM FRONT OF UNITS GEOSYNTHETIC PLACEMENT CONVEX (OUTSIDE) CURVE NO SCALEDIRECTION OF STRENGTH(ROLL DIRECTION)CUT REINFORCEMENT AROUND CURVE TO APPROXIMATELY 1" FROM FACE OF UNITS ENSURE REINFORCEMENT DOES NOT OVERLAP WITHIN THE DEPTH OF THE UNIT PLACE 3" OF SOIL FILL BETWEEN OVERLAPPING REINFORCEMENT FOR PROPER ANCHORAGE TYPICAL SECTION - REINFORCED MODULAR RETAINING WALL NO SCALE IMPERVIOUS FILL 12" DEEPCAP UNIT ADHERES TO TOP UNIT W/VERSA-LOK CONCRETE ADHESIVE VERSA-LOK ULTRA MODULAR CONCRETE UNITS UNDISTURBED SOIL GRANULAR LEVELING PAD MIN. 6" THICK IMPERVIOUS FILL 4" DIA. DRAIN PIPE OUTLET @ END OF WALL OR @ 40' CENTERS MAX SLOPE DRAIN (18"/FT) 12" THICK MIN. DRAINAGE AGGREGATE REINFORCED BACKFILL COMPACTED 95% OF MAXIMUM STANDARD PROCTOR DENSITY GEOSYNTHETIC REINFORCEMENT LENGTH, SPACING, & STRENGTH TO BE DETERMINED BY DESIGN ENGINEER PINNING DETAIL 3/4" SETBACK NO SCALE PINNING DETAIL 1/4" SETBACK NO SCALE PINHOLE VERSA-TUFF PIN 2 PER UNIT 3/4" PINHOLE 1/4" RECEIVING SLOTVERSA-TUFF PIN 2 PER UNIT DIRECT I O N O F S T R E N G T H (ROLL DIRECT I O N )3"4"MODULAR WALL SIZES TO MATCH EXISTING WALL PROVIDE STONE AT OUTLET PIPE APPROXIMATE LOCATION OF EXISTING MODULAR RETAINING WALL FACE OF EXISTING BUILDING 811.00 815.85 15'-0" 1'-10" 1'-0" 6'-0" 821.00 1'-0"1'-0" 6'-0" 824.00(W) 822.00(N) 827.00(W) 823.00(N) 8' BLACK VINYL CHAIN-LINK FENCE WASHED RIVER ROCK NEW MODULAR RETAINING WALL (SEE DETAIL THIS SHEET) HARDWOOD MULCH BED WITH GROUNDCOVER 1'-0" 6" HANDRAIL 5" CONCRETE SIDEWALK 3'-0"14'-0" HARDWOOD MULCH BED WITH GROUNDCOVER 3'-6" 1'-6" GUARDRAIL -TYPE 1 PER DETAIL ON SHEET G4.2 NEW ACCESS ROAD HARDWOOD MULCH BED WITH SHRUBS NEW MODULAR RETAINING WALL (SEE DETAIL THIS SHEET) NEW MODULAR RETAINING WALL (SEE DETAIL THIS SHEET) EXISTING ASPHALT PAVEMENT 4" OF LANDSCAPE STONE OVER WEED BARRIER (MATCH EXISTING ADJACENT STONE) MODULAR WALL SECTION 1/4" = 1'-0" NEW MODULAR RETAINING WALL TO MATCH EXISTING MODULAR RETAINING WALL 1. SEE SHEET G1.5 FOR LAYOUT 2. THE CONTRACTOR SHALL IDENTIFY THE EXISTING WALL MANUFACTURER IN ORDER TO MATCH TYPE OF WALL INSTALLED. IF MANUFACTURER CAN NOT BE IDENTIFIED, ACCEPTABLE MANUFACTURES INCLUDE VERSA-LOK AND ALLEN BLOCK 3. THE COLOR, SIZES AND SURFACE FINISH SHALL MATCH THE EXISTING WALL. 4. THE REINFORCING OF THE WALL AND TIE IN SHALL BE PER MANUFACTURER'S RECOMMENDATIONS. 5. EXISTING WALL CAN REMAIN IN PLACE IN ORDER TO RETAIN DURING CONSTRUCTION. 6. THE MODULAR RETAINING WALL SHALL BE INSTALLED PER MANUFACTURERS DESIGN AND LAYOUT PLANS, CERTIFIED BY A STRUCTURAL ENGINEER IN THE STATE OF INDIANA. 7. GEOGRID TIE-BACK SYSTEM PER MANUFACTURERS DESIGN. 1 SEE NOTE 7 SEE NOTE 7 SEE NOTE 7 COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR G4.4 SITE DETAILS 6'-0" 05/20/22 TBM#2 = 834.95 TBM#4 = 810.78 HARROWGATE ADDITIONP.B. 2, PG. 203-205HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 PARCEL 7 PARCEL 8 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH2 FH4 FH3 GG ST-401 ST-305 ST-201 ST-302 ST-102 ST-202 ST-306 ST-203 BMP ST-402 ST-303 ST-301 ST-103 ST-104 ST-304 ST-105 ST-502 ST-204 ST-403 ST-404 ST-501 ST-406 BMP ST-500 IN ST-500 OUT ST-405 STORMTRAP UNDERGROUND DETENTION SYSTEM ST-101 ST-601 ST-602 ST-603 40 1200 40 80 SU1.0 OVERALL UTILITY PLAN COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO UTILITY DETAILS ON SHEET SU2.1, SU2.2, SU2.3, SU2.4, SU2.5 AND SU2.6 8. REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 9. SEE SHEETS SU1.1 AND SU1.2 FOR SANITARY PLAN INFORMATION AND SHEET SU2.2 FOR SANITARY DETAILS 10. ALL STORM SEWERS ASSOCIATED WITH THIS PROJECT ARE PRIVATE AND SHALL REMAIN PRIVATE. GENERAL NOTES UTILITY LEGEND NEW STORM SEWER LINE NEW FIRE PROTECTION LINE NEW SANITARY LATERAL LINE NEW NATURAL GAS LINE EXISTING STORM LINE EXISTING WATER LINE EXISTING SANITARY LINE EXISTING ELECTRICAL LINE NEW UNDERDRAIN OR APPROXIMATE LIMITS OF CONSTRUCTION 05/20/22 TBM#4 = 810.78 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 FH1 FH2 FH3 TBM#4 = 810.78 ST-305 ST-302 RIM. = 828.09' INV. 823.49 (N) ST-202 RIM. = 824.34' INV. 820.34 (S) INV. 818.84 (E) INV. 820.34 (N) ST-203 RIM. = 823.45' INV. 818.74 (W) INV. 818.74 (E) ST-303 RIM. = 825.64' INV. 820.97 (E) INV. 820.57 (NE) INV. 821.97 (S) INV. 822.38 (W) ST-402 RIM. = 824.31' INV. 819.83 (S) INV. 819.73 (E) ST-301 RIM. = 825.08' INV. 821.39 (W) ST-104 RIM. = 823.72' INV. 815.32 (S) INV. 815.22 (N) ST-304 RIM. = 823.67' INV. 819.62 (E) ST-105 RIM. = 824.26' INV. 814.95 (S) INV. 814.85 (W) ST-306 RIM. = 823.53' INV. 814.10 (E) INV. 809.85 (N) INV. 818.55 (SW) INV. 819.55 (W) INV. 809.85 (S) ST-502 RIM. = 818.88' INV. 809.60 (S) INV. 809.50 (N) INV. 812.38 (E) ST-403 RIM. = 822.48' INV. 818.77 (S) 3 3 32 7 7 4 19 30 2 19 19 17 17 2 8 8 8 18 18 18 18 18 18 18 18 18 18 ST-404 RIM. = 823.36' INV. 818.64 (N) INV. 818.54 (W) 6" SAN. LATERAL INV.= 825.23 6" SAN. LATERAL INV.= 820.47 1 SAN-2 SAN. MANHOLE RIM. = 827.40' INV. 819.85 (N) INV. 820.05 (S) INV. 820.05 (E) ST-501 RIM. = 823.21' INV. 812.00 (E) INV. 812.00 (N) ST-500 OUT INV. 812.00 (W) ST-500 IN INV. 816.50 (S) ST-406 RIM. = 823.51' INV. 816.53 (S) INV. 816.53 (N)ST-405 RIM. = 823.67' INV. 819.46 (W) INV. 816.56 (N) INV. 818.36 (E) 7 7 7 2 23 STORMTRAP UNDERGROUND DETENTION SYSTEM 8 24 24 24 24 24 32 22 17 2 26 21 27 9 INV.=823.23 9 INV.=824.14 1 1 1 25 25 SAN-1 SAN. DROP MANHOLE DOGHOUSE CONNECTION RIM. = 825.26' INV. 815.69 (E) INV. 808.58 (N) INV. 808.58 (S) INV. 818.79 (S) SAN-3 SAN. MANHOLE RIM. = 825.44' INV. 816.40 (W) INV. 816.60 (S) 30 1 MATCHLINE - SHEET SU1.1 MATCHLINE - SHEET SU1.2 31 31 3 34 33 37 20 600 20 40 SU1.1 UTILITY PLAN - NORTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIESSHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDINGUNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN ACONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TORESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHINONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTIONOF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO UTILITY DETAILS ON SHEETS SU2.1, SU2.2, SU2.3, SU2.4, SU2.5 AND SU2.6 8. REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 9. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, HYDRANTS, WATER OR GAS VALVESAND UTILITY PEDESTALS SHALL BE ADJUSTED AS REQUIRED TO MEET PROPOSED FINISH GRADE. 10. ALL STORM SEWERS ASSOCIATED WITH THIS PROJECT ARE PRIVATE AND SHALL REMAINPRIVATE. GENERAL NOTES UTILITY KEYNOTES 1. 8" PVC SANITARY PIPE @ 1.50% MIN. SLOPE 2. PROPOSED CLEANOUT 3. 10" FIRE PROTECTION LINE @ 5' MIN. DEPTH 4. CONNECT 10" FIRE PROTECTION LINE TO EXISTING WATER/FIRE PROTECTION LINE 5. NOT USED 6. PROPOSED WATER VALVE 7. CONNECT EXIST. STORM SEWER PIPE(S) TO NEW STORM STRUCTURE. 8. DOWNSPOUT BOOT AND 8" DIA. DIP @ 2.0% MIN. SLOPE. CONNECT TO STORM SEWER MAINLINE WITH WYE CONNECTION. 9. 6" PVC ROOF DRAIN (COORDINATE WITH M.E.P. PLANS) 10. 10" PVC ROOF DRAIN (COORDINATE WITH M.E.P. PLANS) 11. EXISTING LIFT STATION 12. EXISTING POOL UNDERDRAIN DISCHARGE LINE FROM LIFT STATION. CONNECT NEW LINE TO EXISTING LINE AT THIS LOCATION. 13. PROPOSED NATURAL GAS LINE 14. NATURAL GAS SERVICE AND METER (COORDINATE WITH M.E.P. PLANS) 15. 4" DOMESTIC WATER SERVICE (COORDINATE WITH M.E.P. PLANS) 16. 6" FIRE PROTECTION SERVICE (COORDINATE WITH M.E.P. PLANS) 17. PROPOSED 6" FIRE HYDRANT AND VALVE ASSEMBLY 18. PROPOSED LIGHT POLE 19. PROPOSED LIGHT BOLLARD 20. 25 LF. OF NEW DUCTILE IRON PIPE @ 2.0% SLOPE FROM EXISTING LIFT STATION. MATCH EXISTING PIPE SIZE. 21. 6" HDPE STORM LINE @ 1.0% MIN. SLOPE 22. UNDERGROUND DETENTION SYSTEM, SEE DETAILS ON SHEET SU2.4 23. 10" HDPE STORM LINE @ 1.0% MIN. SLOPE 24. PAVEMENT UNDERDRAIN 25. 6" PVC SANITARY LATERAL @ 2.0% MIN. SLOPE 26. CONNECT 6" BUILDING UNDERDRAIN TO NEW 6" HDPE @ INVERT 817.98, COORDINATE WITH M.E.P. PLANS. 27. CONNECT (CORE DRILL) 6" HDPE TO NEW MANHOLE STRUCTURE @ INVERT 817.60 28. 10" PVC POOL DRAIN-DOWN LINE, INVERT = 828.98 29. 68 LF. OF NEW 10" PVC (SCHEDULE 40) @ 1.50% SLOPE 30. 6" PVC SANITARY LATERAL @ 2.92% SLOPE 31.6" ADS N-12 DUAL WALL PERFORATED HDPE UNDERDRAIN @ INVERT 812.00. CONNECT TO ST-501. 32. 8" FIRE PROTECTION LINE @ 5' MIN. DEPTH 33. 10"x 10"x 10" TEE (DIP) 34. 10" TO 8" REDUCER (DIP) 35. PROVIDE PIV ON 6" FIRE LINE 36. NEW WALL MOUNTED FIRE DEPARTMENT CONNECTION (FDC), SEE PLUMBING PLANS 37. 10" VALVE UTILITY LEGEND NEW STORM SEWER LINE NEW FIRE PROTECTION LINE NEW SANITARY LATERAL LINE NEW NATURAL GAS LINE EXISTING STORM LINE EXISTING WATER LINE EXISTING SANITARY LINE EXISTING ELECTRICAL LINE NEW UNDERDRAIN OR APPROXIMATE LIMITS OF CONSTRUCTION 3 TAC REVIEW COMMENTS 03/15/2022 6 TAC REVIEW COMMENTS 05/12/2022 05/20/22 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 PARCEL 7 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH4 G LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 PARCEL 7 G FPWPROPOSED NATURAL GAS SERVICE LINE IS FROM EXISTING GAS MAIN LOCATED WITHIN MAIN STREET RIGHT-OF-WAY (SEE SHEET SU1.3 FOR MORE INFORMATION). COORDINATE WITH CENTERPOINT ENERGY. ST-401 RIM. = 832.72' INV. 825.52 (N) INV. 827.48 (E) ST-305 RIM. = 831.63' INV. 819.99 (S) INV. 819.53 (N) INV. 827.88 (W) INV. 820.88 (SW) ST-201 RIM. = 825.75' INV. 821.08 (N) INV. 821.58 (SW) ST-102 RIM. = 827.92' INV. 823.58 (W) INV. 823.48 (NE) ST-202 RIM. = 824.34' INV. 820.34 (S) INV. 818.84 (E) INV. 820.34 (N) ST-203 RIM. = 823.45' INV. 818.74 (W) INV. 818.74 (E) ST-103 RIM. = 823.85' INV. 819.54 (SW) INV. 819.44 (N) RIM. = 823.72' INV. 815.32 (S) INV. 815.22 (N) ST-204 RIM. = 823.19' INV. 818.68 (W) INV. 816.98 (E) 4 1 3 3 13 13 15 16 6 EXISTING POOL UNDERDRAIN 11 14 19 17 8 20 8 8 8 8 6" SAN. LATERAL INV.= 825.31 8" SAN. LATERAL INV.= 819.98 7 7 7 2 21 8 8 8 24 ST-101 RIM. = 833.87' INV. 824.68 (E) INV. 827.44 (NE) INV. 827.44 (S) 12 2 INV.=825.25 9 INV.=824.14 10 INV.=827.48 9 INV.=825.14 1 30 25 2 28 29 2 INV.=819.91 2 INV.=823.93 2 INV.=819.44 30 MATCHLINE - SHEET SU1.1 MATCHLINE - SHEET SU1.2 100.0'6 35 36 SU1.2 UTILITY PLAN - SOUTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 20 600 20 40 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIESSHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDINGUNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN ACONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TORESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHINONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTIONOF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO UTILITY DETAILS ON SHEETS SU2.1, SU2.2, SU2.3, SU2.4, SU2.5 AND SU2.6 8. REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 9. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, HYDRANTS, WATER OR GAS VALVESAND UTILITY PEDESTALS SHALL BE ADJUSTED AS REQUIRED TO MEET PROPOSED FINISH GRADE. 10. ALL STORM SEWERS ASSOCIATED WITH THIS PROJECT ARE PRIVATE AND SHALL REMAINPRIVATE. GENERAL NOTES UTILITY KEYNOTES 1. 8" PVC SANITARY PIPE @ 1.50% MIN. SLOPE 2. PROPOSED CLEANOUT 3. 10" FIRE PROTECTION LINE @ 5' MIN. DEPTH 4. CONNECT 10" FIRE PROTECTION LINE TO EXISTING WATER/FIRE PROTECTION LINE 5. NOT USED 6. PROPOSED WATER VALVE 7. CONNECT EXIST. STORM SEWER PIPE(S) TO NEW STORM STRUCTURE. 8. DOWNSPOUT BOOT AND 8" DIA. DIP @ 2.0% MIN. SLOPE. CONNECT TO STORM SEWER MAINLINE WITH WYE CONNECTION. 9. 6" PVC ROOF DRAIN (COORDINATE WITH M.E.P. PLANS) 10. 10" PVC ROOF DRAIN (COORDINATE WITH M.E.P. PLANS) 11. EXISTING LIFT STATION 12. EXISTING POOL UNDERDRAIN DISCHARGE LINE FROM LIFT STATION. CONNECT NEW LINE TO EXISTING LINE AT THIS LOCATION. 13. PROPOSED NATURAL GAS LINE 14. NATURAL GAS SERVICE AND METER (COORDINATE WITH M.E.P. PLANS) 15. 4" DOMESTIC WATER SERVICE (COORDINATE WITH M.E.P. PLANS) 16. 6" FIRE PROTECTION SERVICE (COORDINATE WITH M.E.P. PLANS) 17. PROPOSED 6" FIRE HYDRANT AND VALVE ASSEMBLY 18. PROPOSED LIGHT POLE 19. PROPOSED LIGHT BOLLARD 20. 25 LF. OF NEW DUCTILE IRON PIPE @ 2.0% SLOPE FROM EXISTING LIFT STATION. MATCH EXISTING PIPE SIZE. 21. 6" HDPE STORM LINE @ 1.0% MIN. SLOPE 22. UNDERGROUND DETENTION SYSTEM, SEE DETAILS ON SHEET SU2.4 23. 10" HDPE STORM LINE @ 1.0% MIN. SLOPE 24. PAVEMENT UNDERDRAIN 25. 6" PVC SANITARY LATERAL @ 2.0% MIN. SLOPE 26. CONNECT 6" BUILDING UNDERDRAIN TO NEW 6" HDPE @ INVERT 817.98, COORDINATE WITH M.E.P. PLANS. 27. CONNECT (CORE DRILL) 6" HDPE TO NEW MANHOLE STRUCTURE @ INVERT 817.60 28. 10" PVC POOL DRAIN-DOWN LINE, INVERT = 828.98 29. 68 LF. OF NEW 10" PVC (SCHEDULE 40) @ 1.50% SLOPE 30. 6" PVC SANITARY LATERAL @ 2.92% SLOPE 31.6" ADS N-12 DUAL WALL PERFORATED HDPE UNDERDRAIN @ INVERT 812.00. CONNECT TO ST-501. 32. 8" FIRE PROTECTION LINE @ 5' MIN. DEPTH 33. 10"x 10"x 10" TEE (DIP) 34. 10" TO 8" REDUCER (DIP) 35. PROVIDE PIV ON 6" FIRE LINE 36. NEW WALL MOUNTED FIRE DEPARTMENT CONNECTION (FDC), SEE PLUMBING PLANS 37. 10" VALVE UTILITY LEGEND NEW STORM SEWER LINE NEW FIRE PROTECTION LINE NEW SANITARY LATERAL LINE NEW NATURAL GAS LINE EXISTING STORM LINE EXISTING WATER LINE EXISTING SANITARY LINE EXISTING ELECTRICAL LINE NEW UNDERDRAIN OR APPROXIMATE LIMITS OF CONSTRUCTION 3 TAC REVIEW COMMENTS 03/15/2022 6 TAC REVIEW COMMENTS 05/12/2022 05/20/22 E MAIN STREET HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 1 LOT 48 LOT 49 LOT 50 LOT 51 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 5 PARCEL 7 PARCEL 8 ADJOINER ADJOINER PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH4 FH3 GG NATURAL GAS SERVICE. COORDINATE WITH M.E.P. PLANS FOR LOCATION. PROPOSED NATURAL GAS LINE. COORDINATE LOCATION AND INSTALLATION WITH CENTERPOINT ENERGY. PROPOSED NATURAL GAS LINE. COORDINATE LOCATION AND INSTALLATION WITH CENTERPOINT ENERGY. CONNECT PROPOSED NATURAL GAS LINE TO EXISTING GAS MAIN LOCATED WITH MAIN STREET RIGHT-OF-WAY. COORDINATE WITH CENTERPOINT ENERGY. EXISTING GAS MAIN PROPOSED BUILDING ADDITION 18,240 SFT.FINISH FLOOR ELEV. = 851.55 (EAST)FINISH FLOOR ELEV. = 852.89 (WEST) FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKINGSAN SAN SANPERFORMING ARTS PROJECT NOT IN CONTRACT, FOR REFERENCE ONLY 60 1800 60 120 SU1.3 UTILITY PLAN GAS SERVICE COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES UTILITY LEGEND NEW STORM SEWER LINE NEW FIRE PROTECTION LINE NEW SANITARY LATERAL LINE NEW NATURAL GAS LINE EXISTING STORM LINE EXISTING WATER LINE EXISTING SANITARY LINE EXISTING ELECTRICAL LINE 05/20/22 SEE STRUCTURE DATA TABLE FOR CASTING TYPE AND ELEVATIONFINISH GRADE ASPHALTIC MASTIC OR BUTYL RUBBER SEAL BETWEEN JOINTS PRECAST CONCRETE ADJUSTING RINGS AS NEEDED (12" OF RINGS MAX.) ECCENTRIC CONE OR REDUCER CAP AS REQUIRED BY SITE CONDITIONS. CONE TOP TO MATCH ADJUSTING RING PROFILE. 48" DIA. 5"16"TYP.PRECAST CONCRETE SECTIONS PREFORMED HOLE TO MAX. OF PIPE O.D. + 6" W/ NON SHRINK CEMENT GROUT BENCHWALLS AT MIN. 1/2" PER FOOT SLOPE. BENCHWALLS TO BE CONSTRUCTED TO SPRING LINE OF PIPE. MANHOLE BASE SET ON 6" OF #8 OR #2 STONECOMPACTED SUBGRADE PLASTIC ENCAPSULATED STEEL MANHOLE STEPS O-RING GASKET ASPHALTIC MASTIC OR BUTYL RUBBER SEAL AT JOINTS BASE 6" OR 8" PER SECTION 3"#4 BAR @ 12" o.c. EACH WAY (STEEL MESH AREA = 0.12 SQ. IN./SQ. FT.) STORM MANHOLE TYPE "C" DETAIL 1/2" = 1'-0" 24" DIA. SEE STRUCTURE DATA TABLE FOR PIPE SIZE AND INVERT ELEV. NOTES: 1. MANHOLE CONFORMS TO ASTM C478, JOINTS CONFORM TO ASTM C443. 2. ALL STORM SEWER CASTINGS SHALL BE MARKED "DUMP NO WASTE DRAINS TO WATERWAYS". 3. SEE UTILITY PLAN FOR STORM SEWER STRUCTURE DATA TABLE.VARIES16" MIN.12" TO 15""A" PIPE SIZE 24" X 24" STRUCTURE SIZING CHART "F" 30" X 30" "M" 24" X 36" 1" = 1'-0" STORM INLET DETAIL INSIDE DIMENSIONS INLET TYPE 8"6" CLASS "A" PRECAST REINFORCED CONCRETE BOX SEE STRUCTURE DATA TABLE FOR PIPE SIZE AND INVERT ELEV. INSIDE DIMENSION * SEE SIZING CHART ABOVE SEE STRUCTURE DATA TABLE FOR CASTING TYPE AND ELEVATION BASE SET ON 6" OF #8 OR #2 STONE COMPACTED SUBGRADEINSIDE DIMENSION* SEE SIZING CHART ABOVEMAX. NUMBER OF SIDES OF THE INLET WITH PIPES 3 18" TO 24" 315" TO 18" 3 NOTES: 1. ALL STORM SEWER CASTINGS SHALL BE MARKED "DUMP NO WASTE DRAINS TO WATERWAYS". 2. SEE UTILITY PLAN FOR STORM SEWER STRUCTURE DATA TABLE. FOR PIPE LOCATED IN AND WITHIN 5' OF PAVED AREAS FOR PIPE LOCATED IN GRASSED AREAS STORM SEWER (PVC & HDPE) TRENCH DETAIL NO SCALE NOTES: 1. ALL BEDDING & INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. 2. A MIN. 9" CLEARANCE EACH SIDE OR PIPE FOR 42" DIA. AND LESS. Bc MIN.4"12"MIN. 1.25 O.D.+12" MIN. 6" TOPSOIL OUTSIDE PAVEMENT LIMITS PAVEMENT SECTION REGULAR BACKFILL - GREATER THAN 5' FROM EDGE OF PAVEMENT COMPACTED 90% REGULAR BACKFILL- GREATER THAN 5' FROM EDGE OF PAVEMENT COMPACTED TO 90% #8 CRUSHED STONE OR EQUIVALENT CLASS 1 MATERIAL HAND TAMPED OR WALKED INTO PLACE "B" BORROW (INDOT SPEC.) OR EQUIVALENT GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTER DENSITY 20 L.F. (MIN,)20 L.F. (MIN,) 20 L.F. (MIN,)2 0 L . F . (MIN , )2'-0"VARIES4" DIA. PERF. PVC SDR-35 PIPE 1'-0"4"NON WOVEN FILTER CLOTH #8 WASHED AGGREGATE COMPACTED AGGREGATE BASE PAVEMENT CURB INLET NOTES: 1. TAP STRUCTURES IN PAVEMENT AS SHOWN OR AS DIRECTED ON THE PLAN SHEET 2. ADJUST UNDERDRAIN AS REQUIRED TO AVOID SEWER LINES AND OTHER UTILITIES. 3. GROUT SOLID THE CONNECTION TO STORM STRUCTURE PAVEMENT UNDERDRAIN DETAIL NONE STORM SEWER / WATER LINE CROSSING DETAIL NONE 1/6 Bc3" 4" 6" LEGEND MATERIAL BELOW PIPE d = DEPTH OF BEDDING D = INSIDE DIAMETER Bc = OUTSIDE DIAMETER 30" TO 60" 27" & SMALLER 66" & LARGER D (d) MIN. 3/4" = 1'-0" DEPTH OF BEDDING MATERIAL BELOW PIPE NOTES: 1. ALL BEDDING & INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. 2. A MIN. 9" CLEARANCE EACH SIDE OR PIPE FOR 42" DIA. AND LESS. REGULAR BACKFILL - GREATER THAN 5' FROM EDGE OF PAVEMENT COMPACTED 90% MIN. 1.25 O.D.+12" FOR PIPE LOCATED IN AND WITHIN 5' OF PAVED AREAS FOR PIPE LOCATED IN GRASSED AREAS Bc MIN. 6" TOPSOIL IN NON-PAVED AREAS PAVEMENT SECTION "B" BORROW (INDOT SPEC.) OR EQUIVALENET GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTER DENSITY "B" BORROW (INDOT SPEC.) OR EQUIVALENET GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTER DENSITY d STORM SEWER (RCP) TRENCH DETAIL SLOPE MIN. NOTE: CLEANOUTS IN PAVED AREAS TO BE ACCESSIBLE VIA YARD BOXES OR EXTENDED FLUSH WITH THE PAVING. CO VER SHOULD BE THREADED TYPE, WATER TIGHT AND CAPPED. 1/2" = 1'-0" CLEANOUT DETAILVARIESFINISH GRADE STORM OR SANITARY SEWER (SIZE SHOWN ON PLANS) SAME SIZE AS MAIN LINE (MAX. 8" REQUIRED ON STORM SEWERS) 1'-0" 1'-0" MIN.6"1/2"HEAVY DUTY CLEANOUT CASTING - JAY R. SMITH 4253 SERIES OR EQUAL CONCRETE COLLAR (CONCRETE SHALL NOT BE IN CONTACT w/ PIPE) 30" 72" 60" 102" 108" 96" 6" 7" 9" 9" SEE SCHEDULE FOR CASTING TYPE AND ELEVATIONFINISH GRADE STORM MANHOLE TYPE "J - N" DETAIL 1/2" = 1'-0" 24" DIA. PRECAST CONCRETE ADJUSTING RING 4" MIN. - 12" MAX. SEE DETAIL PLASTIC ENCAPSULATED STEEL MANHOLE STEPS 48" DIA. STANDARD PRECAST MANHOLE CAP OR CONE 3" MIN.6'-0" MIN. 9"8"MIN.3" MIN.16"TYP.5" 5" CONCRETE REDUCER CAP 1/2" PER FOOT SLOPE BASE SET ON 6" OF #8 OR #2 STONE COMPACTED SUBGRADE DIA. "F" "H" "H"1'-0" MIN. OVER HIGHEST PIPE DI A. "G" ONE COMPLETE UNIT OF PRECAST CONC. MANHOLE BASE AND RISER. SEPARATE BASE IS OPTIONAL NOTES: MANHOLE CONFORMS TO ASTM C478. JOINTS CONFORM TO ASTM C443. NO BRICK OR BLOCK WILL BE ALLOWED IN MANHOLE. MANHOLE TYPE "J" "K" "L" "M" "N" MANHOLE DIA "F" MAX. PIPE SIZE @ 90° - DIA "G" "H" - WALL THICKNESS 36" 48" 60" 72"9" MAX. PIPE SIZE MAINLINE - DIA "G" 36" 48" 54" 72" 84" SU2.1 UTILITY DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. 05/20/22 TBM#2 = 834.95TBM#2 = 834.95 ST-601 RIM. = 844.23' INV. 839.88 (SE) INV. 839.98 (NW) ST-602 RIM. = 840.36' INV. 836.42 (NW) INV. 836.32 (SE) ST-603 RIM. = 835.71' INV. 831.46 (NW) INV. 831.36 (NE) INV. 831.36 (SW) 1 3 2 2 3 3 2 4 8 48 4 8 4 8 6 5 5 7 10 400 10 20 SU1.4 UTILITY PLAN EXISTING POOL DRAIN COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO UTILITY DETAILS ON SHEETS SU2.1, SU2.2, SU2.3, SU2.4, SU2.5 AND SU2.6 8. REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 9. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, HYDRANTS, WATER OR GAS VALVES AND UTILITY PEDESTALS SHALL BE ADJUSTED AS REQUIRED TO MEET PROPOSED FINISH GRADE. 10. ALL STORM SEWERS ASSOCIATED WITH THIS PROJECT ARE PRIVATE AND SHALL REMAIN PRIVATE. GENERAL NOTES PLAN NOTES 1. 10" PVC PIPE FOR EXISTING POOL DRAIN-DOWN, INVERT = 840.50± (COORDINATE WITH M.E.P. PLANS) 2. 10" DUCTILE IRON PIPE @ 8.07% SLOPE 3. PROPOSED STORM MANHOLE STRUCTURE 4. SAWCUT EXISTING CONCRETE PAVEMENT 5. REMOVE EXISTING CONCRETE PAVEMENT AND PATCH WITH MINIMUM OF 8" CONCRETE PAVEMENT SECTION TO MEET OR EXCEED EXISTING PAVEMENT SECTION. 6. SAWCUT EXISTING ASPHALT PAVEMENT 7. REMOVE EXISTING ASPHALT PAVEMENT AND PATCH WITH HEAVY DUTY ASPHALT PAVEMENT SECTION TO MEET OR EXCEED EXISTING PAVEMENT SECTION 8. PROVIDE 3/4" DIA. EPOXY COATED DOWELS AT 12" O.C. BETWEEN NEW AND EXISTING CONCRETE PAVEMENT UTILITY LEGEND NEW STORM SEWER LINE NEW FIRE PROTECTION LINE NEW SANITARY LATERAL LINE NEW NATURAL GAS LINE EXISTING STORM LINE EXISTING WATER LINE EXISTING SANITARY LINE EXISTING ELECTRICAL LINE NEW UNDERDRAIN OR APPROXIMATE LIMITS OF CONSTRUCTION 05/20/22 SEE STRUCTURE DATA TABLE FOR CASTING TYPE AND ELEVATIONFINISH GRADE ASPHALTIC MASTIC OR BUTYL RUBBER SEAL BETWEEN JOINTS PRECAST CONCRETE ADJUSTING RINGS AS NEEDED (12" OF RINGS MAX.) ECCENTRIC CONE OR REDUCER CAP AS REQUIRED BY SITE CONDITIONS. CONE TOP TO MATCH ADJUSTING RING PROFILE. 48" DIA. 5"16"TYP.PRECAST CONCRETE SECTIONS PREFORMED HOLE TO MAX. OF PIPE O.D. + 6" W/ NON SHRINK CEMENT GROUT BENCHWALLS AT MIN. 1/2" PER FOOT SLOPE. BENCHWALLS TO BE CONSTRUCTED TO SPRING LINE OF PIPE. MANHOLE BASE SET ON 6" OF #8 OR #2 STONECOMPACTED SUBGRADE PLASTIC ENCAPSULATED STEEL MANHOLE STEPS O-RING GASKET ASPHALTIC MASTIC OR BUTYL RUBBER SEAL AT JOINTS BASE 6" OR 8" PER SECTION 3"#4 BAR @ 12" o.c. EACH WAY (STEEL MESH AREA = 0.12 SQ. IN./SQ. FT.) STORM MANHOLE TYPE "C" DETAIL 1/2" = 1'-0" 24" DIA. SEE STRUCTURE DATA TABLE FOR PIPE SIZE AND INVERT ELEV. NOTES: 1. MANHOLE CONFORMS TO ASTM C478, JOINTS CONFORM TO ASTM C443. 2. ALL STORM SEWER CASTINGS SHALL BE MARKED "DUMP NO WASTE DRAINS TO WATERWAYS". 3. SEE UTILITY PLAN FOR STORM SEWER STRUCTURE DATA TABLE.VARIES16" MIN.12" TO 15""A" PIPE SIZE 24" X 24" STRUCTURE SIZING CHART "F" 30" X 30" "M" 24" X 36" 1" = 1'-0" STORM INLET DETAIL INSIDE DIMENSIONS INLET TYPE 8"6" CLASS "A" PRECAST REINFORCED CONCRETE BOX SEE STRUCTURE DATA TABLE FOR PIPE SIZE AND INVERT ELEV. INSIDE DIMENSION * SEE SIZING CHART ABOVE SEE STRUCTURE DATA TABLE FOR CASTING TYPE AND ELEVATION BASE SET ON 6" OF #8 OR #2 STONE COMPACTED SUBGRADEINSIDE DIMENSION* SEE SIZING CHART ABOVEMAX. NUMBER OF SIDES OF THE INLET WITH PIPES 3 18" TO 24" 315" TO 18" 3 NOTES: 1. ALL STORM SEWER CASTINGS SHALL BE MARKED "DUMP NO WASTE DRAINS TO WATERWAYS". 2. SEE UTILITY PLAN FOR STORM SEWER STRUCTURE DATA TABLE. FOR PIPE LOCATED IN AND WITHIN 5' OF PAVED AREAS FOR PIPE LOCATED IN GRASSED AREAS STORM SEWER (PVC & HDPE) TRENCH DETAIL NO SCALE NOTES: 1. ALL BEDDING & INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. 2. A MIN. 9" CLEARANCE EACH SIDE OR PIPE FOR 42" DIA. AND LESS. Bc MIN.4"12"MIN. 1.25 O.D.+12" MIN. 6" TOPSOIL OUTSIDE PAVEMENT LIMITS PAVEMENT SECTION REGULAR BACKFILL - GREATER THAN 5' FROM EDGE OF PAVEMENT COMPACTED 90% REGULAR BACKFILL- GREATER THAN 5' FROM EDGE OF PAVEMENT COMPACTED TO 90% #8 CRUSHED STONE OR EQUIVALENT CLASS 1 MATERIAL HAND TAMPED OR WALKED INTO PLACE "B" BORROW (INDOT SPEC.) OR EQUIVALENT GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTER DENSITY 20 L.F. (MIN,) 20 L.F. (MIN,) 20 L.F. (MIN,)20 L.F. (MIN,)2'-0"VARIES4" DIA. PERF. PVC SDR-35 PIPE 1'-0"4"NON WOVEN FILTER CLOTH #8 WASHED AGGREGATE COMPACTED AGGREGATE BASE PAVEMENT CURB INLET NOTES: 1. TAP STRUCTURES IN PAVEMENT AS SHOWN OR AS DIRECTED ON THE PLAN SHEET 2. ADJUST UNDERDRAIN AS REQUIRED TO AVOID SEWER LINES AND OTHER UTILITIES. 3. GROUT SOLID THE CONNECTION TO STORM STRUCTURE PAVEMENT UNDERDRAIN DETAIL NO SCALE 6" 6"6" END VIEW 6" 5' MIN. 18" MIN.SECTION VIEW WATER LINE STORM SEWER / WATER LINE CROSSING DETAIL NO SCALE STORM SEWER MUST EXTEND TO UNDISTURBED SOIL CONCRETE ENCASEMENT REQUIRED IF VERTICAL PIPE CLEARANCE IS LESS THAN 18". 5' MIN.1/6 Bc3" 4" 6" LEGEND MATERIAL BELOW PIPE d = DEPTH OF BEDDING D = INSIDE DIAMETER Bc = OUTSIDE DIAMETER 30" TO 60" 27" & SMALLER 66" & LARGER D (d) MIN. 3/4" = 1'-0" DEPTH OF BEDDING MATERIAL BELOW PIPE NOTES: 1. ALL BEDDING & INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. 2. A MIN. 9" CLEARANCE EACH SIDE OR PIPE FOR 42" DIA. AND LESS. REGULAR BACKFILL - GREATER THAN 5' FROM EDGE OF PAVEMENT COMPACTED 90% MIN. 1.25 O.D.+12" FOR PIPE LOCATED IN AND WITHIN 5' OF PAVED AREAS FOR PIPE LOCATED IN GRASSED AREAS Bc MIN. 6" TOPSOIL IN NON-PAVED AREAS PAVEMENT SECTION "B" BORROW (INDOT SPEC.) OR EQUIVALENET GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTER DENSITY "B" BORROW (INDOT SPEC.) OR EQUIVALENET GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTER DENSITY dSTORM SEWER (RCP) TRENCH DETAIL SLOPE MIN. NOTE: CLEANOUTS IN PAVED AREAS TO BE ACCESSIBLE VIA YARD BOXES OR EXTENDED FLUSH WITH THE PAVING. COVER SHOULD BE THREADED TYPE, WATER TIGHT AND CAPPED. 1/2" = 1'-0" CLEANOUT DETAILVARIESFINISH GRADE STORM OR SANITARY SEWER (SIZE SHOWN ON PLANS) SAME SIZE AS MAIN LINE (MAX. 8" REQUIRED ON STORM SEWERS) 1'-0" 1'-0" MIN.6"1/2"HEAVY DUTY CLEANOUT CASTING - JAY R. SMITH 4253 SERIES OR EQUAL CONCRETE COLLAR (CONCRETE SHALL NOT BE IN CONTACT w/ PIPE) 30" 72" 60" 102" 108" 96" 6" 7" 9" 9" SEE SCHEDULE FOR CASTING TYPE AND ELEVATIONFINISH GRADE STORM MANHOLE TYPE "J - N" DETAIL 1/2" = 1'-0" 24" DIA. PRECAST CONCRETE ADJUSTING RING 4" MIN. - 12" MAX. SEE DETAIL PLASTIC ENCAPSULATED STEEL MANHOLE STEPS 48" DIA. STANDARD PRECAST MANHOLE CAP OR CONE 3" MIN.6'-0" MIN.9"8"MIN.3" MIN.16"TYP.5" 5" CONCRETE REDUCER CAP 1/2" PER FOOT SLOPE BASE SET ON 6" OF #8 OR #2 STONE COMPACTED SUBGRADE DIA. "F" "H""H"1'-0" MIN. OVER HIGHEST PIPE DI A. "G" ONE COMPLETE UNIT OF PRECAST CONC. MANHOLE BASE AND RISER. SEPARATE BASE IS OPTIONAL NOTES: MANHOLE CONFORMS TO ASTM C478. JOINTS CONFORM TO ASTM C443. NO BRICK OR BLOCK WILL BE ALLOWED IN MANHOLE. MANHOLE TYPE "J" "K" "L" "M" "N" MANHOLE DIA "F" MAX. PIPE SIZE @ 90° - DIA "G" "H" - WALL THICKNESS 36" 48" 60" 72"9" MAX. PIPE SIZE MAINLINE - DIA "G" 36" 48" 54" 72" 84" PLAN VIEW SEE SITE UTILITY PLAN DOWNSPOUT, SIZE BY ARCHITECT/PLUMBING ENGINEER CAST IRON DOWNSPOUT SHOE (NEENAH R-4929 OFFSET OR APPROVED EQUAL) 8" DIP PIPE 90° DIP ELBOW HDPE FITTING 2% MIN. 8" DIP, SEE SITE UTILITY PLANS FOR SIZES 45° HDPE ELBOW 45° HDPE WYE FITTING 10" OR 15" HDPE PIPE PER SITE UTILITY PLANS FACE OF BUILDING NO SCALE TYPICAL ROOF DRAIN DETAIL TRANSITION COUPLING FOR DISSIMILAR MATERIALS DOWNSPOUT, SIZE BY ARCHITECT/PLUMBING ENGINEER 10" OR 15" HDPE PIPE PER SITE UTILITY PLANS 8" DIP PIPE FINISH GRADE SU2.1 UTILITY DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 SU2.2 UTILITY DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 10 YR. EL.= 815.32 100 YR. EL.= 818.22 SU2.4 UTILITY DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 1 ADDENDUM #1 01/25/2022 2 ADDENDUM #2 02/01/2022 3 TAC REVIEW COMMENTS 03/15/2022 05/20/22 PRECAST CONCRETE ADJUSTING RING AS NEEDED (4 MAX.) PRECAST CONCRETE SECTIONS STR. #501 OUTLET CONTROL STRUCTURE DETAIL NOT TO SCALE ASPHALTIC MASTIC OR BUTYL RUBBER SEAL BETWEEN JOINTS 12" THICK STEEL PLATE RESTRICTOR #4 BAR @ 12" o.c. EACH WAY (STEEL MESH AREA = 0.12 SQ. IN./SQ. FT.) 12" HDPE INFLUENT PIPE INV.= 812.0012" HDPEOUTLET PIPEINV.= 812.0012" THICK STEEL PLATE RESTRICTOR 1/2" THICK STEEL PLATE ANGLE BRACKET (TYP.) MANHOLE BASE SET ON 6" OF #8 OR #2 STONECOMPACTED SUBGRADE 24" DIA. NEENAH R-1772 T.O.R.= 823.27 FINISH GRADE TOP OF STEEL PLATE ELEV = 818.74 FRONT VIEW 4' DIA. 6" DIA. ORIFICE INV. = 812.00 GALVANIZED STEEL GRATE (APPROX. 12"x12"x4") CENTERED ON ORIFICE OPENING AND WELDED TO STEEL PLATE GALVANIZED STEEL GRATE (APPROX. 12"x12"x4") CENTERED ON EACH ORIFICE OPENING AND WELDED TO STEEL PLATE NOTE: SEE "STORM MANHOLE TYPE C DETAIL" ON SHEET SU2.1 FOR ADDITION DETAIL INFORMATION. MANHOLE BASE SET ON 6" OF #8 OR #2 STONECOMPACTED SUBGRADE 24" DIA. FINISH GRADE TOP OF STEEL PLATE 100 YR. ELEV = 818.74 SIDE VIEW 4' DIA. 6" DIA. ORIFICE INV. = 812.00 12" HDPE INFLUENT INV. = 812.00 12" HDPE OUTLET INV. = 812.00 24" SUMPBASE 6" OR 8" PER SECTION MANHOLE BOTTOM INV. = 810.0016"PLASTIC ENCAPSULATED STEEL MANHOLE STEPS O-RING GASKET ASPHALTIC MASTIC OR BUTYL RUBBER SEAL AT JOINTS MANHOLE BOTTOM INV. = 810.00 NEENAH R-1772 T.O.R.= 823.27 STORM STRUCTURE TABLE STR. NO. 101 102 103 104 105 201 202 203 204 301 302 303 304 305 306 401 402 403 404 405 406 500 OUT 500 IN 501 502 601 602 603 STRUCTURE Type "C" Manhole Type "C" Manhole Type "C" Manhole Type "C" Manhole Type "C" Manhole Type "C" Manhole Type "C" Manhole Aqual-Swirl AS-7 Type "C" Manhole Inlet Type "M" Inlet Type"A" Type "J" Manhole Type "C" Manhole Type "C" Manhole Type "J" Manhole Type "C" Manhole Type "C" Manhole Inlet Type "M" Type "C" Manhole Type "C" Manhole Aqual-Swirl AS-7 U.G. DETENTION U.G. DETENTION Outlet Control Structure EXISTING STRUCTURE Type "C" Manhole Type "C" Manhole Type "C" Manhole STRUCTURE DETAIL REFERENCE SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.2 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 SHEET SU2.2 SHEET SU2.4 SHEET SU2.4 SHEET SU2.3 SHEET SU2.1 SHEET SU2.1 SHEET SU2.1 CASTING TYPE R-1772 R-1772 R-1772 R-1772 R-1772 R-1772 R-1772 Per Manufacturer R-3010 R-3287-SB10 R-3501-TR R-3501-TR R-3287-SB10 R-3472 R-1772 R-1772 R-1772 R-3287-SB10 R-1772 R-1772 Per Manufacturer - - R-1772 R-3010 R-1772 R-1772 R-1772 RIM 833.87 827.92 823.85 823.72 824.26 825.75 824.34 823.45 823.19 825.08 828.09 825.64 823.67 831.63 823.53 832.72 824.31 822.48 823.36 823.67 823.51 823.51 824.56 823.21 818.88 844.23 840.36 835.71 INCOMING PIPE DATA (DIRECTION) [FROM STR] 10" DIP 827.44 (NE) [] 18" RCP 827.44 (S) [] 18" RCP 823.58 (W) [101] 18" RCP 819.54 (SW) [102] 18" RCP 815.32 (S) [103] 24" RCP 814.95 (S) [104] 6" HDPE Pipe 821.58 (SW) [] 15" HDPE Pipe 820.34 (S) [201] 10" HDPE Pipe 820.34 (N) [] 15" RCP 818.74 (W) [202] 15" RCP 818.68 (W) [203] 15" RCP 820.97 (E) [301] 12" HDPE Pipe 821.97 (S) [302] 18" RCP 822.38 (W) [] 18" RCP 819.99 (S) [] 6" DIP 827.88 (W) [] 12" PVC Pipe 820.88 (SW) [] 24" RCP 814.10 (E) [105] 24" RCP 818.55 (SW) [303] 12" RCP 819.55 (W) [304] 24" RCP 809.85 (S) [] 8" PVC Pipe 827.48 (E) [] 12" HDPE Pipe 819.83 (S) [401] 12" RCP 818.64 (N) [403] 15" RCP 819.46 (W) [402] 12" RCP 818.36 (E) [404] 18" RCP 816.53 (S) [405] 18" RCP 816.50 (S) [406] 12" RCP 812.00 (E) [500 OUT] 12" RCP 809.60 (S) [501] 15" RCP 812.38 (E) [] 10" DIP 839.98 (NW) [] 10" DIP 836.42 (NW) [601] 10" DIP 831.46 (NW) [602] 18" RCP 831.36 (SW) [] OUTGOING PIPE DATA (DIRECTION) [TO STR] 18" RCP 824.68 (E) [102] 18" RCP 823.48 (NE) [103] 18" RCP 819.44 (N) [104] 24" RCP 815.22 (N) [105] 24" RCP 814.85 (W) [306] 15" HDPE Pipe 821.08 (N) [202] 15" RCP 818.84 (E) [203] 15" RCP 818.74 (E) [204] 15" RCP 816.98 (E) [] 15" RCP 821.39 (W) [303] 12" HDPE Pipe 823.49 (N) [303] 24" RCP 820.57 (NE) [306] 12" RCP 819.62 (E) [306] 24" RCP 819.53 (N) [] 24" RCP 809.85 (N) [] 12" HDPE Pipe 825.52 (N) [402] 15" RCP 819.73 (E) [405] 12" RCP 818.77 (S) [404] 12" RCP 818.54 (W) [405] 18" RCP 816.56 (N) [406] 18" RCP 816.53 (N) [500 IN] 12" RCP 812.00 (W) [501] 12" RCP 812.00 (N) [502] 18" RCP 809.50 (N) [] 10" DIP 839.88 (SE) [602] 10" DIP 836.32 (SE) [603] 18" RCP 831.36 (NE) [] OUTGOING PIPE L.F. 48' 171' 179' 92' 249' 211' 17' 13' 3' 47' 61' 52' 22' 3' 3' 227' 77' 43' 60' 10' 10' 10' 157' 3' 43' 60' 3' OUTGOING PIPE SIZE 18" 18" 18" 24" 24" 15" 15" 15" 15" 15" 12" 24" 12" 24" 24" 12" 15" 12" 12" 18" 18" 12" 12" 18" 10" 10" 18" OUTGOING GRADE 2.30% 2.30% 2.30% 0.30% 0.30% 0.35% 0.54% 0.54% 16.21% 0.90% 2.50% 3.86% 0.30% 4.46% 3.50% 2.50% 0.35% 0.30% 0.30% 0.30% 0.30% 0.00% 1.53% 1.84% 8.07% 8.07% 1.87% CONNECT TO STR. 102 103 104 105 306 202 203 204 303 303 306 306 402 405 404 405 406 500 IN 501 502 602 603 REMARKS - - - - - CONNECT 10" ROOF DRAIN CONNECT 10" ROOF DRAIN - CONNECT EXISTING 15" RCP - - CONNECT EXISTING 18" RCP - CONNECT EXISTING 6" DIP, 12" VCP, 2 - 18" RCP'S AND 24" RCP CONNECT EXISTING 24" RCP CONNECT 2 - 8" PVC ROOF DRAINS - - - - - - - - CONNECT EXISTING 15" AND 18" RCP'S - - CONNECT EXISTING 18" RCP STORM WATER QUALITY BMP STRUCTURE (ST-203) STORM WATER QUALITY BMP STRUCTURE (ST-406)SU2.3 UTILITY DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 SU2.5 UTILITY DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. 05/20/22 SU2.6 UTILITY DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. 05/20/22 SU2.5 UTILITY DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22 SU2.6 UTILITY DETAILS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 12.17.2021 CONSTRUCTION DOCUMENTS DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. PROJECT MANAGER: PMR 05/20/22