Loading...
HomeMy WebLinkAboutCarmel High School Performing Arts Center Addition and Renovation Full SetPROJECT INFORMATION FRONT YARD SETBACK 35' ZONING DISTRICT SIDE YARD SETBACK 5' R-2 REAR YARD SETBACK 15' 30'BUFFER YARD 0.86 AC.DISTURBED AREA JUNE, 2021ANTICIPATED START OF CONSTRUCTION 0.90 AC.PROJECT AREALAKEPORTERLAPORTEST. JOSEPHELKHARTLAGRANGESTEUBENDEKALBNOBLEKOSCIUSKOMARSHALL STARKEJASPERNEWTONPULASKIFULTON WHITLEYALLENADAMSWELLSHUNTINGTONWABASH MIAMICASSWHITEBENTON CARROLTIPPECANOEWARRENHOWARDGRANTBLACKFORD JAYRANDOLPHDELAWAREMADISON TIPTONCLINTONBOONEHAMILTONHANCOCKHENRYWAYNEUNIONFAYETTERUSHMONTGOMERYFOUNTAIN PARKEVERMILLIONVIGOCLAY PUTNAMMORGANHENDRICKS MARION JOHNSON SHELBY FRANKLINDECATURBARTHOLOMEW BROWN MONROEOWENGREENESULLIVANDEARBORNRIPLEYJENNINGSLAWRENCE MARTINORANGE WASHINGTONSCOTTJEFFERSONSWIT Z ERLANDOHIOCLARKFLOYD HARRISONCRAWFORD PERRYDUBOISDAVIESS KNOX PIKE GIBSONSPENCERWARRICK POSEY JACKSON VANDER-BURGHSTATE OF INDIANA SITE LOCATION NORTHVICINITY MAP LOCATION MAP PROJECT SITE NORTHNORTHCIVIL SHEET INDEX CS COVER SHEET GD0.1 GENERAL NOTES AND LEGEND SV-1 PARTIAL RETRACEMENT BOUNDARY SURVEY SV-2 PARTIAL RETRACEMENT BOUNDARY SURVEY SV-3 TOPOGRAPHIC SURVEY SV-4 TOPOGRAPHIC SURVEY GD1.3 SITE DEMOLITION PLAN GD1.4 SITE DEMOLITION PLAN G1.0 OVERALL SITE PLAN G1.3 SITE PLAN G1.4 SITE PLAN G2.3 GRADING PLAN G3.3 GRADING PLAN ENLARGEMENTS G4.3 EROSION CONTROL PLAN G4.4 STORMWATER POLLUTION PREVENTION PLAN G4.5 EROSION CONTROL DETAILS G5.1 SITE DETAILS SU1.3 UTILITY PLAN SU2.1 UTILITY DETAILS L1.3 LANDSCAPE PLAN L2.3 LANDSCAPE DETAILS A1.06 UNIT P2 - FIRST FLOOR ARCHITECTURAL PLAN A3.01 BUILDING ELEVATIONS A3.02 BUILDING ELEVATIONS TLF ENGINEERS 3901 W 86TH,. SUITE 200 INDIANAPOLIS, IN 46268 CONTACT: PETE RANKOVICH, P.E. PHONE: (317) 334-1500 EMAIL: prankovich@tlf-engineers.com THE SKILLMAN CORPORATION 3834 S. EMERSON AVE., BLDG A INDIANAPOLIS, IN 46203 CONTACT: ELI MILLER, MBA PHONE: (317) 788-5149 EMAIL: emiller@skillman.com FANNING HOWEY ASSOCIATES INC. SITE/CIVIL ENGINEER CONSTRUCTION MANAGER OWNER ARCHITECT CARMEL CLAY SCHOOLS 520 E. MAIN ST. CARMEL, INDIANA 46032 CONTACT: RON FARRAND JR., RA PHONE: (317) 815-3962 EMAIL: rfarrand@ccs.k12.in.us REV. NO. DESCRIPTION DATE 350 E NEW YORK ST #300 INDIANAPOLIS, IN 46204 CONTACT: CHUCK TYLER, AIA, NCARB, LEED AP B+C PHONE: (317) 848-0966 EMAIL: ctyler@fhai.com CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS DRAWN BY:TPV TAC Cover Sheet PROJECT ISSUE DATE: 01/13/2021 TAC SUBMITTAL 520 E MAIN STREET CARMEL, IN 46032 TAC SUBMITTAL 01/13/2021 A CARMEL TAC REVIEW 01/13/2021 07/02/21 TBM#1 = 856.00 E MAIN STREET LOT 48 CONSTRUCTION LIMITS (TYP.) SF SF SF SF 1 1 1 2 9 9 2 2 2 3 3 4 29 3 3 4 4 3 4 5 5 5 6 6 6 7 7 8 10 11 11 11 11 11 12 13 13 1212 14 14 14 14 14 14 14 14 1515 15 14 14 16 18 18 19 19 19 17 7 3 19 2 4 7 26 2 4 7 7 26 25 7 18 18 18 28 28 24 2 4 6 4 47 6 27 27 27 27 14 3 28 1826 26 28 18 26 2626 29 27 24 25 24 25 23 30 7 4 3 2 4 6 1 6 3 31 31 1 6 14 CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) 20 600 20 40 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. GENERAL NOTES CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS RESPONSE TAC COMMENTS 04/19/2021B DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE WALK REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF CONCRETE PAVEMENT REMOVAL APPROXIMATE LIMITS OF TREE PROTECTION FENCING DEMOLITION KEYNOTES 1. REMOVE ASPHALT PAVEMENT FULL DEPTH 2. REMOVE CONCRETE SIDEWALK (REMOVE TO NEAREST JOINT) 3. REMOVE CONCRETE CURB AND GUTTER (REMOVE TO NEAREST JOINT) 4. REMOVE CONCRETE CURB 5. REMOVE CONCRETE PAVEMENT 6. PAVEMENT SAWCUT LINE 7. SIDEWALK SAWCUT LINE 8. REMOVE TRASH ENCLOSURE WALLS AND SUPPORTS. SALVAGE SWING GATES AND POST FOR LATER USE. 9. REMOVE BRICK PAVERS AND RELATED BASE 10. REMOVE ALL BOLLARDS AND RELATED FOUNDATION WITHIN TRASH ENCLOSURE. 11. REMOVE LIGHT POLE FOUNDATION AND RELATED CONDUITS / WIRING. 12. REMOVE 24" RCP STORM SEWER. COORDINATE REMOVAL LIMITS WITH PROPOSED STORM SEWER INSTALLATION. SEE SHEET SU1.3 13. REMOVE 12" RCP STORM SEWER. COORDINATE REMOVAL LIMITS WITH PROPOSED SEWER SEWER INSTALLATION. SEE SHEET SU1.3 14. REMOVE EXISTING TREE 15. PROTECT EXISTING TREE 16. PROTECT EXISTING CANOPY AND RELATED SUPPORTS. SHORE FOUNDATIONS AS REQUIRED. 17. REMOVE CONCRETE STOOP 18. REMOVE CONCRETE RAMPS 19. REMOVE PARKING SIGN AND RELATED FOUNDATION 20. REMOVE ABANDONED 4" PIPE UNDER NEW PROJECT AREA 21. PROTECT EXISTING 6" STORM LINE DURING CONSTRUCTION 22. CONTRACTOR TO FIELD VERIFY EXISTING PIPE LOCATION, MATERIAL AND CONDITION PRIOR TO CONSTRUCTION. 23. PROTECT EXISTING 4" FDC LINE AND 8" FIRE PROTECTION LATERAL DURING CONSTRUCTION. 24. REMOVE PORTION OF 4" DUCTILE IRON PIPE FDC LINE. SEE SHEET SU1.3 FOR RELOCATED LINE. 25. REMOVE PORTION OF 8" DUCTILE IRON PIPE FIRE PROTECTION LINE. SEE SHEET SU1.3 FOR RELOCATED LINE. 26. PROTECT EXISTING CONCRETE WALK AND OR CURB & GUTTER TO REMAIN IN PLACE. 27. REMOVE AND REPLACE EXISTING 8" STORM PIPE (PER RECORD DRAWINGS). COORDINATE REMOVAL LIMITS WITH SHEET P2.05 28. REMOVE ADA TACTILE WARNING PLATES (± 4'x 8') 29. TREE PROTECTION FENCING 30. REMOVE EXISTING ABANDONED WATER LINE WITHIN LIMITS OF NEW CONSTRUCTION. 31. PROTECT EXISTING CURB INLET TO REMAIN IN PLACE. CONNECT EXISTING 12" RCP TO NEW MANHOLE, SEE UTILITY PLAN SHEET SU1.3 GD1.3 SITE DEMOLITION PLANMATCH LINE (SEE SHEET G1.4)EROSION CONTROL LEGEND SF 07/02/21 E MAIN STREET V V V V V V V V V V V V V R4 R4R1P R3 R2 R2 R2 P P LOT NO. 3 LOT NO. 2 1 1 1 2 22 4 CONSTRUCTION LIMITS (TYP.) 5 5 CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) 30 900 30 60 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS GD1.4 SITE DEMOLITION PLANMATCH LINE (SEE SHEET GD1.3) DEMOLITION KEYNOTES (SHEET GD1.4) 1. STRIP GRASS AND VEGETATION, REMOVE TOPSOIL AND SOIL TO PROPOSED SUBGRADE ELEVATION IN AREA OF PROPOSED CONCRETE SIDEWALK. 2. REMOVE EXISTING PAVEMENT MARKING 3. REPLACE EXISTING SIGN WITH RELOCATED SIGN 4. REMOVE EXISTING PAVEMENT MARKING (ADA PARKING SYMBOL) 5. SEE SHEET GD1.3 FOR ADDITIONAL DEMOLITION INFORMATION IN THIS AREA. 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. GENERAL NOTES LEGEND ADA PARKING SPACE VISITOR PARKING SPACE RESERVED PARKING SPACE - PRINCIPAL RESERVED PARKING SPACE - ASSISTANT PRINCIPAL POLICE (24 HOUR) PARKING SPACE RESERVED PARKING SPACE - ATHLETIC DIRECTOR RESERVED PARKING SPACE (GENERAL) V P R1 R2 R3 R4 07/02/21 PARKING LOT ADDITION (NOT IN SCOPE OF THIS PROJECT) PERFORMING ARTS BUILDING ADDITION SMOKEY ROW ROAD / E 136TH STREET E MAIN STREET 2 6 6 6 5 6 28 31 PAVING AT MURRAY FIELD (NOT IN SCOPE OF THIS PROJECT) 12 5 5 15 3 STORAGE ADDITION (NOT IN SCOPE OF THIS PROJECT) FUTURE NATATORIUM BUILDING ADDITION (NOT IN SCOPE OF THIS PROJECT) SEE SHEET G1.3SEE SHEET G1.4 MATCH LINE15 12 14 13 10 10 9 8 7 6 5 4 3 2 1 200 6000 200 400 G1.0 OVERALL SITE PLAN 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. GENERAL NOTES KEYNOTES PROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS 1 1 THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OF BICYCLE RACKS PROPOSED IN A PARTICULAR AREA. 1 THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATED PARKING LOT IDENTIFICATION. PARKING LOT IDENTIFICATION NUMBER BICYCLE RACK LOCATION SUMMARY TABLE LOCATION BICYCLE RACKS MAIN BUILDING 90 FOOTBALL STADIUM 28 12 3 4 137 TENNIS COURTS MURRAY STADIUM CLLC TOTAL BICYCLE RACKS 274TOTAL BICYCLE PARKING SPACES THE ABOVE BICYCLE RACKS ACCOMMODATE 5,480 STUDENTS BICYCLE SPACES REQUIRED = 1 PER 20 STUDENTS CONSULTANT PROJECT NUMBER: 220114.00 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 12.15.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC SUBMITTAL WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS 520 E MAIN STREET CARMEL, IN 46032 CARMEL TAC REVIEW 01/13/2021A 19700317 No. BUILDING AREA SUMMARY YEAR (2002 THROUGH 2021) PROJECT EXIST. AREA SF. NEW AREA SF. TOTAL AREA SF. % ADDED REMARKS 2002 FRESHMAN CENTER 2004 LOCKER ROOM 2012 PHYSICAL EDUCATION 2019 POOL ENTRANCE #21 2021 DOCK STORAGE 2021 PERFORMING ARTS 776647 950591 953243 980852 981547 982955 173944 2652 27609 695 1408 25464 950591 953243 980852 981547 982955 1008419 22.40 0.28 2.90 0.07 0.14 2.59 BZA APPROVAL WITH VARIANCES NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION 2007 TENNIS BUILDING 1700 SEPARATE BUILDING AT STADIUM SITE 2011 SECURE ENTRANCE 0 NO NEW CONSTRUCTION OVERALL PARKING SUMMARY LOT NO. LOT NAME STANDARD SPACE OLD SENIOR LOT 65 1 EXIST. PROPOSED 65 ADA SPACE 0 EXIST. 0 POLICE SPACE 0 EXIST. 0 BUS SPACE 0 EXIST. 0 TOTAL SPACES 65 EXIST. PROPOSED 65 2 3 4 5 6 7 8 9 10 12 13 14 15 DOOR 7 19 19 4 4 0 0 0 0 23 23 FRONT LOT 109 104 3 7 3 3 0 0 115 114 AUDITORIUM LOT 52 0 4 0 0 0 0 0 56 0 WEST LOT 69 69 0 0 0 0 0 0 69 69 FRESHMAN CENTER LOT 142 142 6 6 1 1 0 0 149 149 FIELDHOUSE LOT 29 29 FITNESS CENTER LOT 20 2 22 POOL LOT 109 0 8 0 1 0 0 0 118 TRAIL LOT 152 231 0 0 0 1 0 4 152 232 SUBTOTAL 766 659 27 17 5 5 0 0 798 681 FOOTBALL HOME LOT 948 948 11 11 0 0 0 0 959 959 FOOTBALL SOUTH LOT 143 143 0 0 0 0 21 = 42 21 = 42 185 185 FOOTBALL VISITOR LOT 516 516 9 9 0 0 0 0 525 525 FOOTBALL NORTH LOT 79 79 0 0 0 0 0 0 79 79 29 0 0 0 0 0 0 29 0 0 0 0 0 0 0 0 PROPOSED PROPOSED PROPOSED 24292546 TOTAL CITY OF CARMEL REQUIRED PARKING SPACES (235 CLASSROOMS x 10) + (538 EMPLOYEES) = 2888 (UPON COMPLETION OF THE NATATORIUM PROJECT) SUBTOTAL 1686 1686 20 20 0 0 1748 174821 = 42 21 = 42 AVAILABLE PARKING SPACES UNTIL JUNE 2022 (LOTS 8 & 9) = 2569 PERMIT PARKING SPACES = 1690 (STUDENTS) + 538 (EMPLOYEES) = 2228 NOTES: 1. THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE APPROXIMATELY 2228 PERMITS ISSUED. 2. BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT 2 STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES. 3. THE NATATORIUM PROJECT IS SCHEDULED FOR CONSTRUCTION IN JUNE OF 2022. LOTS 8 & 9 WITH 140 SPACES WILL BE AVAILABLE UNTIL THEN. PROJECT PARKING SUMMARY LOT NO. (PERFORMING ARTS AND TRAIL LOT NORTH ADDITION) LOT NAME STANDARD SPACE FRONT LOT 109 3 EXIST. PROPOSED 104 ADA SPACE 3 EXIST. 7 POLICE SPACE 3 EXIST. 3 BUS SPACE 0 EXIST. 0 TOTAL SPACES 115 EXIST. 114 AUDITORIUM LOT 52 4 0 4 0 0 0 0 0 56 0 TRAIL LOT N. ADDITION 0 10 155 0 0 0 0 0 0 0 155 PROJECT TOTAL 161 259 7 7 3 3 0 0 171 269 NET GAIN = 98 SPACES PROPOSED PROPOSED PROPOSED PROPOSED 07/02/21 E MAIN STREET LOT 1 LOT 48 PROPOSED BUILDING ADDITION 18,240 SFT. FINISH FLOOR ELEV. = 851.55 (EAST) FINISH FLOOR ELEV. = 852.89 (WEST) FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKING1 11 4 4 4 5 5 5 5 6 6 4 8 8 7 7 7 20.0'5.7' 20.0'5.6' R1 0 . 0 ' R30.0 'R30.0'R50.0'20.0'5.7'24.0' 7 3 4 7 74 1 1 7 5 2 5.9' 7 4 9 10.0'10.0'43.9' 53.3'30.8'30.6'SETBACK LINE 35.0'BUFFER YARD 30.0' SETBACK LINE 5.0' 24.0' 7 7 6 4 SEE ENLARGEMENT 1 ON SHEET G3.3 SEE ENLARGEMENT 2 ON SHEET G3.3 SEE ENLARGEMENT 3 ON SHEET G3.3 3 3 7 7 7 7 7 6 1 2 CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) R10.0' 20 600 20 40 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO SITE DETAILS ON SHEETS G5.1 AND G5.2 GENERAL NOTES CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS RESPONSE TAC COMMENTS 04/19/2021B RESPONSE TAC COMMENTS 05/17/2021C SITE KEYNOTES ASPHALT PAVEMENT (1.5" SURFACE ON 3" BASE ON 8" STONE) 6" CONCRETE PAVEMENT, SEE SHEET G1.5 FOR JOINTING PLAN CROSSWALK 4" CONCRETE SIDEWALK, SEE SHEET G1.5 FOR JOINTING PLAN 6" CONCRETE CURB (STRAIGHT) CONCRETE CURB AND GUTTER ADA RAMP, SEE SHEETS G3.3 AND G5.2 FOR MORE INFORMATION SOD DISTURBED AREAS (PROVIDE 6" OF TOPSOIL) NEW TRASH DUMPSTER ENCLOSURE (SEE ARCHITECTURAL PLANS) 1 2 3 4 5 6 7 8 9 PROPOSED SITE LEGEND EXISTING BUILDING BUILDING ADDITION CONCRETE PAVEMENT / WALK ASPHALT PAVEMENT LANDSCAPE AREA G1.3 SITE PLANMATCH LINE (SEE SHEET G1.4)PROJECT PARKING SUMMARY LOT NO. (PERFORMING ARTS AND TRAIL LOT NORTH ADDITION) LOT NAME STANDARD SPACE FRONT LOT 109 3 EXIST. PROPOSED 103 ADA SPACE 3 EXIST. 7 POLICE SPACE 3 EXIST. 3 BUS SPACE 0 EXIST. 0 TOTAL SPACES 115 EXIST. 113 AUDITORIUM LOT 52 4 0 4 0 0 0 0 0 56 0 TRAIL LOT N. ADDITION 0 10 155 0 0 0 0 0 0 0 155 PROJECT TOTAL 161 258 7 7 3 3 0 0 171 268 NET GAIN = 97 SPACES PROPOSED PROPOSED PROPOSED PROPOSED 07/02/21 13 2 E MAIN STREET 80.0' 31 BIKE RACKS 72.0' 28 BIKE RACKS 17.0'6 BIKE RACKS2 2 6.0'6.0'V V V V V V V V P P PR4 R4 R2 R2 R1R2R3 11 10 9 8 7 7 7 12 3 3 3 3 3 8' 8' 8' 8' 8'5' 5' 5'6 6 4 4 5 5 4 6 15.0' 15'± 15'± 1 1 1 LOT NO. 3 LOT NO. 2 14 14 145.0'6.0' CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) 30 900 30 60 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS RESPONSE TAC COMMENTS 04/19/2021B G1.4 SITE PLANMATCH LINE (SEE SHEET G1.3)SITE KEYNOTES (SHEET G1.4) CONCRETE SIDEWALK FOR BIKE RACKS, SEE DETAIL ON SHEET G5.1 BIKE RACKS, SPACED @ 30" O.C., SEE DETAIL ON SHEET G5.1 SOD DISTURBED AREAS (PROVIDED 6" OF TOPSOIL) 4" WIDE SOLID BLUE PAVEMENT MARKING 4" WIDE SOLID BLUE PAVEMENT MARKING AT 45° AT 36" O.C. ADA PARKING SYMBOL, MATCH EXISTING ON-SITE SYMBOLS REPLACE EXISTING SIGN WITH NEW ADA PARKING SIGN REPLACE EXISTING SIGN WITH RELOCATED "RESERVED PARKING FOR PRINCIPAL" SIGN ONTO EXISTING POST. REPLACE EXISTING SIGN WITH RELOCATED "RESERVED PARKING FOR ASSISTANT PRINCIPAL" SIGN ONTO EXISTING POST. PROVIDE EXISTING RELOCATED "RESERVED PARKING FOR ASSISTANT PRINCIPAL" SIGN ONTO NEW POST PROVIDE EXISTING RELOCATED "RESERVED PARKING FOR ATHLETIC DIRECTOR" SIGN ONTO NEW POST REPLACE EXISTING ADA SIGN WITH EXISTING RELOCATED "POLICE PARKING - 24 HOURS" SIGN ONTO EXISTING POST REPLACE EXISTING "VISITOR PARKING (BOTH DIRECTIONS)" SIGN WITH EXISTING RELOCATED "VISITOR PARKING (TO THE LEFT) SIGN SEE SHEETS G1.3 AND G3.3 FOR MODIFICATIONS IN THESE AREAS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 LEGEND ADA PARKING SPACE VISITOR PARKING SPACE RESERVED PARKING SPACE - PRINCIPAL RESERVED PARKING SPACE - ASSISTANT PRINCIPAL POLICE (24 HOUR) PARKING SPACE RESERVED PARKING SPACE - ATHLETIC DIRECTOR RESERVED PARKING SPACE (GENERAL) V P R1 R2 R3 R4 PROJECT PARKING SUMMARY LOT NO. (PERFORMING ARTS AND TRAIL LOT NORTH ADDITION) LOT NAME STANDARD SPACE FRONT LOT 109 3 EXIST. PROPOSED 103 ADA SPACE 3 EXIST. 7 POLICE SPACE 3 EXIST. 3 BUS SPACE 0 EXIST. 0 TOTAL SPACES 115 EXIST. 113 AUDITORIUM LOT 52 4 0 4 0 0 0 0 0 56 0 TRAIL LOT N. ADDITION 0 10 155 0 0 0 0 0 0 0 155 PROJECT TOTAL 161 259 7 7 3 3 0 0 171 268 NET GAIN = 97 SPACES PROPOSED PROPOSED PROPOSED PROPOSED 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. REFER TO SITE DETAILS ON SHEETS G5.1 AND G5.2 GENERAL NOTES 07/02/21 TBM#1 = 856.00 E MAIN STREET LOT 1 LOT 48 PROPOSED BUILDING ADDITION 18,240 SFT. FINISH FLOOR ELEV. = 851.55 (EAST) FINISH FLOOR ELEV. = 852.89 (WEST) FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKINGSANSAN SANFFE: 851.55 FFE: 852.89 FFE: 851.55 FFE: 851.55 FFE: 851.55 SEE ENLARGEMENT 1 ON SHEET G3.3 SEE ENLARGEMENT 2 ON SHEET G3.3 SEE ENLARGEMENT 3 ON SHEET G3.3 ST-204 RIM = 850.69 ST-206 RIM = 850.51 ST-201 RIM = 851.41 ST-209 RIM = 849.82 ST-208 RIM = 850.60 ST-207 RIM = 850.52 ST-203 RIM = 850.42 ST-205 RIM = 850.23 852.20 TC 851.88 BC 851.38 TC 852.08 BC 851.58 TC 852.12 BC 851.62 TC 851.53 BC 851.03 MEG 850.97 MEG 850.71 MEG 850.61 MEG 851.03 MEG 850.58 MEG 850.73 MEG 851.58 MEG 851.36 MEG 851.22 MEG 851.66 MEG 851.19 MEG 851.32 TC 852.08 BC 851.58 TC 851.79 BC 851.29 TC 851.42 BC 850.92 TC 851.42 BC 850.92 TC 851.63 BC 851.13 TC 851.42 BC 850.92 TC 851.30 BC 850.80 TC 851.43 BC 850.93 TC 851.35 BC 850.85 TC 851.17 BC 850.67 852.15 851.86 851.50 851.50 851.50 851.70 851.50 851.37 851.50 851.43 MEG 851.60 MEG 852.09 MEG 851.03 TC 851.86 BC 851.36 852.43 852.89 MEG 852.29 BC 851.26 BC 851.31 BC 851.46 BC 851.51 MEG 850.68 MEG 850.52 MEG 850.52 BC 850.34 BC 850.61 BC 850.54 BC 850.40 BC 850.12 BC 849.53 BC 849.16 MEG 850.51 BC 850.06 BC 850.06 MEG 850.86 MEG 851.11 MEG 850.80 MEG 850.44 MEG 849.98 MEG 849.66 BC 850.79 851.43 TC 851.29 BC 850.79 TC 851.33 BC 850.83 TC 851.42 BC 850.92 TC 851.47 BC 850.97 TC 851.42 BC 850.92 TC 851.42 BC 850.92 851.43 851.50 851.50 851.55 851.50 851.50 851.55 TC 851.12 BC 850.62 MEG 850.58 BC 850.40 MEG 850.99 MEG 850.21 MEG 849.20MEG 849.70 MEG 850.12 851.40851.45 851.45 851.35 851.20 850.30 850.70 851.32 851.37 851.53 TC 851.41 BC 850.91 BC 850.65 TC 850.65 MEG 850.67 MEG 850.66 MEG 851.41 MEG 851.40 MEG 851.60 MEG 851.59 MEG 851.31 MEG 853.80 MEG 853.81 MEG 853.43 MEG 851.08 MEG 850.92 MEG 850.43 BC 850.85 MEG 851.37 MEG 851.43 MEG 851.01 MEG 851.07 MEG 850.99 MEG 850.85 MEG 850.80 MEG 850.30 BC 850.15 MEG 850.92 MEG 850.29 MEG 851.25 CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) 1 1 1 1 1 1 1 1 2 2 2 2 ST-202A RIM = 852.00 ST-202 RIM = 851.41 BENCHMARKS: 20 600 20 40 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. SEE TOPOGRAPHIC SURVEY FOR BENCHMARK INFORMATION. GENERAL NOTES CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS RESPONSE TAC COMMENTS 04/19/2021B G2.3 GRADING PLAN GRADING PLAN LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION PROPOSED SURFACE DRAINAGE FLOW ARROW FLOOD ROUTING PATH MEG TC BC TC BC 750.65 PROPOSED DRAINAGE SUMMARY PROJECT AREA 10 YEAR RUNOFF 100 YEAR RUNOFF 0.98 ACRES 4.61 CFS 6.88 CFS 100 YEAR INLET CASTING CAPACITY ELEVATION TABLE STRUCTURE NUMBER 100 YEAR ELEVATION (INLET 50% CLOGGED) 203 R-3010 NEENAH INLET CASTING TYPE 850.42 TOP OF CASTING ELEVATION 850.65 205 R-3010 850.23 850.43 ALL OF THE 100 YEAR ELEVATIONS SHOWN IN THIS TABLE ARE BELOW THE ADJACENT TOP OF CURB ELEVATIONS AND BELOW THE FINISH FLOOR ELEVATION. ADDITIONAL DETENTION WAS PROVIDED BY THE PREVIOUSLY SUBMITTED CARMEL HIGH SCHOOL PARKING LOT PROJECT (PZ-2020-00170 TAC). AN ADDITIONAL 0.12 ACRES OF IMPERVIOUS AREA WAS ADDED TO THE PREVIOUSLY APPROVED HYDROCAD MODEL TO ACCOUNT FOR THIS AND OTHER FUTURE UPCOMING PROJECTS. THIS PROJECT IS ADDING 0.08 ACRES. INDICATES APPROXIMATE LIMITS OF 100 YEAR ELEVATION OF INLET 50% CLOGGED GRADING KEYNOTES 1. FLOOD ROUTING PATH FOR THE IMPROVEMENTS ON THE SOUTH SIDE OF THE PROJECT WHEN 100 YEAR FLOOD IS EXCEEDED. PATH TRAVELS FROM MAIN STREET RIGHT OF WAY ONTO THE PROJECT SITE THEN TRAVELS IN A EASTERLY DIRECTION OVER TWO EXISTING INLETS THAT WILL REMAIN IN PLACE THEN CONTINUES EASTERLY TO WEST SIDE OF EXISTING DRIVE ENTRANCE THEN TRAVELS SOUTH AND THEN WEST TO A EXISTING CURB INLET LOCATED ON THE NORTH SIDE OF MAIN STREET. 2. FLOOD ROUTING PATH FOR THE IMPROVEMENTS ON THE EAST SIDE OF THE PROJECT WHEN 100 YEAR FLOOD IS EXCEEDED. PATH TRAVELS FROM THE EAST SIDE DRIVE AND THEN TRAVELS IN A NORTHERLY DIRECTION OVER MULTIPLE EXISTING CURB INLETS LOCATED ON THE EAST SIDE OF THE DRIVE. EVENTUALLY GRADE LEVELS OUT ON THE EAST DRIVE NEAR THE NORTHEAST CORNER OF THE HIGH SCHOOL BUILDING AND IF PONDING DEPTH EXCEEDS SIX INCHES FLOOD ROUTING PATH WILL OVERTOP CURB AND TRAVEL EAST TO A EXISTING SWALE AND THEN TRAVEL NORTH IN THE SWALE TO COOL CREEK. 07/02/21 1 NO PARKINGFFE: 851.55 851.20 TC 851.41 BC 850.91 851.50 851.53 851.55 851.55 TC 851.42 BC 850.92 BC 850.65 TC 850.65851.40851.45 851.45 851.35 851.32 851.37 851.00 851.00 BC 850.80 BC 850.80 TC 851.20 TC 851.20 MEG 850.21 TC 850.80 BC 850.30 TC 851.20 BC 850.70 850.76 850.91 851.40 TC 850.70 BC 850.70 851.07 MEG 850.64 MEG 850.66 MEG 850.67 MEG 850.67 MEG 851.40 MEG 851.41 MEG 851.29 MEG 851.28 BC 850.29 MEG 850.99 BC 850.14 TC 850.14 BC 850.13 TC 850.13 TC 850.74 BC 850.24 BC 850.30MEG 850.85 MEG 850.92 MEG 850.80 10.00'12.00'12.00'5.00'R2.50'5.00'6.33' 6.33'9.50' 10.00' MEG 850.22 9.00'MEG 849.82 BC 850.12 BC 849.53 MEG 849.20 MEG 849.16 2 2 5 5 2 5 6 6 8 6 6 6 8 SANSAN SAN 6 5 5 3 7 9 9 1 8 4 5 6 4 8 5 10 10 TC 851.90 BC 851.40 TC 851.85 BC 851.35 BC 851.79 TC 851.79 5.0 0 ' 6. 0 0 ' 6 . 0 0 ' 13. 0 0 ' 7.00' BC 853.35 TC 853.35 BC 852.86 TC 852.86 BC 852.70 TC 853.20 BC 852.40 TC 852.80 BC 853.43 BC 852.98 BC 852.73 BC 852.30 TC 852.75 TC 852.73 TC 852.98 TC 853.81 BC 853.80 TC 853.54 BC 853.04 TC 853.33 BC 852.83 TC 853.80 TC 852.75 BC 852.75 TC 851.54 BC 851.04 851.64 16.00' 5.00'MEG 852.62 MEG 852.68 MEG 851.23 851.25 ± TC 851.75 ± BC 851.35 ± TC 851.85 ±851.35 ± 6 9 5 25.50' 6.00'2 5 TC MEG BC MEGMEG BC MEG BC MEG 6 9 TC 851.81 BC 851.31 BC 851.26 TC 851.26 TC 851.70 BC 851.20 11 11 11 11 12 12 5.0 0 ' 5.00' MAIN STREET 7 8 16 5.00' 8 9 16 16 17 15 15 14 14 17 16 6.50 '6.50'13 851.96 852.01 BC 851.46 BC 851.51 TC 852.06 BC 851.56 TC 851.90 BC 851.40 NO PARKING 5 5 2 4 5 5 5 8 8 7 4 5 4 6 6 7 8 TC 851.30 BC 850.80 851.43 TC 851.29 BC 850.79 851.50 TC 851.43 BC 850.93 TC 851.35 BC 850.85 851.43 TC 851.35 BC 850.85 TC 851.43 BC 850.96 TC 851.43 BC 850.93 BC 850.79 TC 850.79 TC 851.17 BC 850.67 TC 851.15 BC 850.65 TC 851.28 BC 850.78 BC 851.43 TC 851.43 BC 851.43 TC 851.43 TC 851.23 BC 850.73 850.52 MEG 850.01 TC 851.08 BC 850.58 TC 851.11 BC 850.61TC 851.16 BC 850.66 TC 851.14 BC 850.64 TC 851.08 BC 851.08 TC 850.93 BC 850.43 BC 850.55 TC 850.55 MEG 850.51 MEG 850.40 MEG 850.99 MEG 851.07 TC 851.35 BC 850.85 TC 851.42 BC 850.92 TC 851.43 MEG 851.37 BC 851.01 TC 851.37 MEG 851.43 BC 850.87 TC 850.87 6.00'5.00' 6.50'6.00' 5.00'10.50'13 11 1112 2 BC 850.85 TC 850.85 5.00' 8 850.69 850.67 6 6 6 14 15 14 6.50' 10 14 5.15'6.37'14 MAIN STREET 10 851.14 TC 851.14 851.43 BC 850.75 TC 850.75 TC 851.05 BC 850.55 10 400 10 20 CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS RESPONSE TAC COMMENTS 04/19/2021B RESPONSE TAC COMMENTS 05/17/2021C G3.3 GRADING PLAN ENLARGEMENTS ENLARGEMENT 3 ENLARGEMENT 1 ENLARGEMENT 2 LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB EDGE OF PAVEMENT EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION MEG TC BC EP 750.65 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. SEE TOPOGRAPHIC SURVEY AND GRADING PLAN SHEET G2.3 FOR BENCHMARK INFORMATION. GENERAL NOTES INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! KEYNOTES 1. NEW TYPE "A" CONCRETE ADA RAMP, PER DETAIL ON SHEET G5.2 2. NEW TYPE "B" CONCRETE ADA RAMP, PER DETAIL ON SHEET G5.2 3. NEW TYPE "C" CONCRETE ADA RAMP, PER DETAIL ON SHEET G5.2 4. NEW TYPE "D" CONCRETE ADA RAMP, PER DETAIL ON SHEET G5.2 5. 6" WIDE CONCRETE CURB INTEGRAL WITH SIDEWALK ALONG RAMP. SEE TYPE "D" ADA RAMP ON SHEET G5.2 6. PROVIDE 1/2" DIA. EPOXY COATED DOWELS x 1'-4" LONG @ 12" O.C. BETWEEN NEW AND EXISTING CONCRETE. 7. 2' WIDE DETECTABLE WARNING SURFACE PLATES PER ADA STANDARDS AND PER INDOT DETAIL ON SHEET G5.2 8. 5" THICK CONCRETE SIDEWALK AT 1.5% MAX. CROSS SLOPE 9. PROVIDE 1/2" DIA. EPOXY COATED DOWELS x 1'-0" LONG BETWEEN NEW AND EXISTING CURBS. PROVIDE 1/2" EXPANSION JOINT MATERIAL WITH SEALANT. 10. NEW 4" THICK CONCRETE SIDEWALK 11. NEW 8" WIDE WHITE SOLID THERMOPLASTIC PAVEMENT MARKING (WITH SHARK GRIP ANTI-SLIP ADDITIVE). 12. NEW 18" WIDE WHITE SOLID THERMOPLASTIC PAVEMENT MARKING (WITH SHARK GRIP ANTI-SLIP ADDITIVE) SPACED AT 30" O.C. 13. RELOCATED SIGN 14. CONCRETE CONTROL JOINT. CONTROL JOINTS ARE EQUALLY SPACED @ 6' MAX. (TYPICAL) 15. CONCRETE EXPANSION JOINT 16. NEW 24" WIDE CONCRETE CURB AND GUTTER 17. ASPHALT PATCH AT NEW CONCRETE GUTTER 07/02/21 1 NO PARKINGFFE: 851.55 851.20 TC 851.41 BC 850.91 851.50 851.53 851.55 851.55 TC 851.42 BC 850.92 BC 850.65 TC 850.65851.40851.45 851.45 851.35 851.32 851.37 851.00 851.00 BC 850.80 BC 850.80 TC 851.20 TC 851.20 MEG 850.21 TC 850.80 BC 850.30 TC 851.20 BC 850.70 850.76 850.91 851.40 TC 850.70 BC 850.70 851.07 MEG 850.64 MEG 850.66 MEG 850.67 MEG 850.67 MEG 851.40 MEG 851.41 MEG 851.29 MEG 851.28 BC 850.29 MEG 850.99 BC 850.14 TC 850.14 BC 850.13 TC 850.13 TC 850.74 BC 850.24 BC 850.30MEG 850.85 MEG 850.92 MEG 850.80 10.00'12.00' 12.00'5.00'R2.50'5.00'6.33' 6.33'9.50' 10.00' MEG 850.22 9.00'MEG 849.82 BC 850.12 BC 849.53 MEG 849.20 MEG 849.16 2 2 5 5 2 5 6 6 8 6 6 6 8 NO PARKING 5 5 2 4 5 5 5 8 8 7 4 5 5 4 6 6 7 8 TC 851.30 BC 850.80 851.43 TC 851.29 BC 850.79 851.50 TC 851.43 BC 850.93 TC 851.35 BC 850.85 851.43 TC 851.35 BC 850.85 TC 851.43 BC 850.96 TC 851.43 BC 850.93 BC 850.79 TC 850.79 TC 851.17 BC 850.67 TC 851.15 BC 850.65 TC 851.28 BC 850.78 BC 851.43 TC 851.43 BC 851.43 TC 851.43 TC 851.23 BC 850.73 850.52 MEG 850.01 TC 851.08 BC 850.58 TC 851.11 BC 850.61TC 851.16 BC 850.66 TC 851.14 BC 850.64 TC 851.08 BC 851.08 TC 850.93 BC 850.43 BC 850.55 TC 850.55 MEG 850.51 MEG 850.40 MEG 850.99 MEG 851.07 TC 850.98 BC 850.48 BC 851.06 TC 851.06 TC 851.16 BC 850.66 TC 851.42 BC 850.92 BC 851.43 TC 851.43 MEG 851.37 BC 851.01 TC 851.37 MEG 851.43 BC 850.87 TC 850.87 BC 850.57 TC 850.57 6.00'5.00' 6.50'6.00' 5.00'5.50'6.00' 13 11 1112 2 BC 850.85 TC 850.85 5.00' 8 850.69 850.67 6 6 6 14 15 14 6.50 ' 10 14 5.15'6.37'14 MAIN STREET 10 SANSAN SAN6 5 5 3 7 9 9 1 8 4 5 6 4 8 5 10 10 TC 851.90 BC 851.40 TC 851.85 BC 851.35 BC 851.79 TC 851.79 5.0 0 ' 6. 0 0 '6. 0 0 ' 13. 00' 7.00' BC 853.35 TC 853.35 BC 852.86 TC 852.86 BC 852.70 TC 853.20 BC 852.40 TC 852.80 BC 853.43 BC 852.98 BC 852.73 BC 852.30 TC 852.75 TC 852.73 TC 852.98 TC 853.81 BC 853.80 TC 853.54 BC 853.04 TC 853.33 BC 852.83 TC 853.80 TC 852.75 BC 852.75 TC 851.54 BC 851.04 851.64 16.00' 5.00'MEG 852.62 MEG 852.68 MEG 851.23 851.25 ± TC 851.75 ± BC 851.35 ± TC 851.85 ±851.35 ± 6 9 5 2 5.50'6.00'2 5 TC MEG BC MEGMEG BC MEG BC MEG 6 9 TC 851.81 BC 851.31 BC 851.26 TC 851.26 TC 851.70 BC 851.20 11 11 11 11 12 12 5.0 0 ' 5.00' MAIN STREET 7 8 16 5.00' 8 9 16 16 17 15 15 14 14 17 16 6.50 '6.50'13 851.96 852.01 BC 851.46 BC 851.51 TC 852.06 BC 851.56 TC 851.90 BC 851.40 G3.3 GRADING PLAN ENLARGEMENTS COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS 19700317 No. ENLARGEMENT 1 ENLARGEMENT 2 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 10 400 10 20 LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB EDGE OF PAVEMENT EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION MEG TC BC EP 750.65 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. SEE TOPOGRAPHIC SURVEY AND GRADING PLAN SHEET G2.3 FOR BENCHMARK INFORMATION. GENERAL NOTES KEYNOTES 1. NEW TYPE "A" CONCRETE ADA RAMP, PER DETAIL ON SHEET G5.2 2. NEW TYPE "B" CONCRETE ADA RAMP, PER DETAIL ON SHEET G5.2 3. NEW TYPE "C" CONCRETE ADA RAMP, PER DETAIL ON SHEET G5.2 4. NEW TYPE "D" CONCRETE ADA RAMP, PER DETAIL ON SHEET G5.2 5. 6" WIDE CONCRETE CURB INTEGRAL WITH SIDEWALK ALONG RAMP. SEE TYPE "D" ADA RAMP ON SHEET G5.2 6. PROVIDE 1/2" DIA. EPOXY COATED DOWELS x 1'-4" LONG @ 12" O.C. BETWEEN NEW AND EXISTING CONCRETE. 7. 2' WIDE DETECTABLE WARNING SURFACE PLATES PER ADA STANDARDS AND PER INDOT DETAIL ON SHEET G5.2 8. 5" THICK CONCRETE SIDEWALK AT 1.5% MAX. CROSS SLOPE 9. PROVIDE 1/2" DIA. EPOXY COATED DOWELS x 1'-0" LONG BETWEEN NEW AND EXISTING CURBS. PROVIDE 1/2" EXPANSION JOINT MATERIAL WITH SEALANT. 10. NEW 4" THICK CONCRETE SIDEWALK 11. NEW 8" WIDE WHITE SOLID THERMOPLASTIC PAVEMENT MARKING (WITH SHARK GRIP ANTI-SLIP ADDITIVE). 12. NEW 18" WIDE WHITE SOLID THERMOPLASTIC PAVEMENT MARKING (WITH SHARK GRIP ANTI-SLIP ADDITIVE) SPACED AT 30" O.C. 13. RELOCATED SIGN 14. CONCRETE CONTROL JOINT. CONTROL JOINTS ARE EQUALLY SPACED @ 6' MAX. (TYPICAL) 15. CONCRETE EXPANSION JOINT 16. NEW 24" WIDE CONCRETE CURB AND GUTTER 17. ASPHALT PATCH AT NEW CONCRETE GUTTER ENLARGEMENT 3ENLARGEMENT 3 07/02/21 1 TBM#1 = 856.00 E MAIN STREET LOT 48 PROPOSED BUILDING ADDITION 18,240 SFT. FINISH FLOOR ELEV. = 851.55 (EAST) FINISH FLOOR ELEV. = 852.89 (WEST) FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKINGSANSAN SAN FFE: 851.55 FFE: 852.89 FFE: 851.55 FFE: 851.55 FFE: 851.55 CW PT SF SF SF SF ST-202 ST-201 ST-204 ST-206 ST-207 ST-208 ST-209 1 1 1 1 1 1 1 1 1 2 2 2 2 2 ST-203 ST-205ST-202A WQ - BMP UNIT 2 23 4 5 6 6 7 8 8 8 8 8 2 2 20 600 20 40 CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS RESPONSE TAC COMMENTS 04/19/2021B G4.3 EROSION CONTROL PLANINLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! EROSION CONTROL LEGEND CW PT SF EROSION CONTROL NOTES 1. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MY BE REQUIRED BY THE INSPECTOR. 2. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING THE SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. 3. ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCE WITH CHAPTER 600 OF THE CITY OF CARMEL STORMWATER TECHNICAL STANDARDS MANUAL, LATEST EDITION. DISCREPANCIES BETWEEN THE PLANS AND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTOR FROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE MANUAL. 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES EROSION CONTROL KEYNOTES 1. SEDIMENT BAG INLET PROTECTION 2. LIMITS OF CONSTRUCTION 3. TEMPORARY SEEDING 4. CONCRETE WASHOUT 5. PORTABLE TOILETS 6. SILT FENCE 7. CONSTRUCTION ENTRANCE 8. SEDIMENT LOG ROLL 07/02/21 PROJECT SITE YclA YmsC2 PROJECT SITE G4.4 STORMWATER POLLUTION PREVENTION PLANINLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS 07/02/21 AREA INLET SEDIMENT BAG DETAIL SILT FENCE DETAIL METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES WOOD OR METAL STAKES TO SECURE THE STRAW BALES (2 PER STRAW BALE) STRAW BALE (ALTERNATIVE MATERIALS OR PRODUCTS MAY BE USED TO PROVIDE STRUCTURAL CONTAINMENT. ALTERNATIVE MATERIALS OR PRODUCTS WILL REQUIRE DESIGN MODIFICATION.) PLAN VIEW NOT TO SCALE L = INSIDE LENGTH (10' MIN) W = INSIDE WIDTH (10' MIN) POLYETHYLENE LINING (10 MIL); THE LINING SHALL EXTEND OVER THE STRAW BALES. COMPACTED SOIL MATERIAL SECTION A-A NOT TO SCALE EXCAVATION SANDBAGS OR OTHER APPROPRIATE ANCHORING SYSTEM TO SECURE THE POLYETHYLENE LINING ASs = T L = TOP LENGTH OF EXCAVATION (10' MIN) B L = BOTTOM LENGTH OF EXCAVATION T W = TOP WIDTH OF EXCAVATION (10' MIN) B W = BOTTOM WIDTH OF EXCAVATION ASS = ANCHORING SYSTEM TYPE AND SPACING D = REQUIRED DEPTH TO CONTAIN WASHOUT INCLUDING 12" RAINFALL PLUS 12" FREEBOARD POLYETHYLENE LINING (10 MIL) SECTION B-B NOT TO SCALE SANDBAGS OR OTHER APPROPRIATE ANCHORING SYSTEM TO SECURE THE POLYETHYLENE LINING WOOD OR METAL STAKES TO SECURE THE STRAW BALES (2 PER STRAW BALE) L=10' STRAW BALES ENTRENCHED 4 INCHES INTO THE SOIL D = 2' A A W=10' TL=10' BW=8' TW=10' BL=8' PLAN VIEW NOT TO SCALE ABOVE GRADE SYSTEM BELOW GRADE SYSTEM STANDARD WASHOUT DETAIL B CONSTRUCTION ENTRANCE 4 2 5 1 3A 3B NOTE: REFER TO GENERAL STAPLE PATTERN GUIDE FOR CORRECT STAPLE PATTERN RECOMMENDATIONS FOR SLOPE INSTALLATIONS. 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" OVERLAP. 5. WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE, PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH APPROXIMATELY 4" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART. EROSION CONTROL BLANKET SLOPE INSTALLATION G4.5 EROSION CONTROL DETAILS CONSULTANT PROJECT NUMBER: 220114.00 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 12.15.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC SUBMITTAL WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS 520 E MAIN STREET CARMEL, IN 46032 CARMEL TAC REVIEW 01/13/2021A 19700317 No. 07/02/21 1/4" / FT. SLOPE TOOLED CONTROL JOINT R 1 " SEE PLANS 4"6" 6"1'-6" 45° MONOLITHIC CURB AND WALK DETAIL NO SCALE 4" OF COMPACTED AGGREGATE SIZE #53 COMPACTED SUBGRADE NOTES: 1. CURB SHALL HAVE 1/2" EXPANSION JOINTS AT 48'-0" MAX. AND AT ENDS OF RADII. CONTROL JOINTS AT 10'-0" MAX. UNLESS OTHERWISE NOTED. 2. CONTROL JOINTS SHALL BE CUT 1/4 DEPTH OF TOTAL THICKNESS OF SLAB. 3. FIBER ADDITIVE: VIRGIN NYLON FIBERS. 3/4" LENGTH, NYCON BY NYCON, INC., OR FORTA NYLON BY FORTA CORPORATION, ADDED AT THE BATCH PLANT AT 1 LB. PER CU. YD. OF CONCRETE. CURB PAVING WALK TRANSVERSE JOINTS LONGITUDINAL CONTROL JOINT TOP OF PAVEMENT 6"6" 6" CONCRETE CURB (STRAIGHT) DETAIL 1" = 1'-0"1'-6" 6" 6"NOTES: 1. PROVIDE CONTROL JOINTS AT 10' MAX. SPACING. 2. PROVIDE EXPANSION JOINTS AT 80' MAX. SPACING AND AT ENDS OF ALL RADII. 4" COMPACTED GRANULAR MATERIAL COMPACTED SUBGRADER1 " TOP OF PAVEMENT CONCRETE SIDEWALK (WHERE APPLICABLE) 1/2" EXPANSION JOINT 4" CONCRETE SIDEWALK DETAIL 4" COMPACTED GRANULAR MATERIAL WIDTH VARIES (SEE PLAN SHEETS) COMPACTED SUBGRADE4"FINISH GRADE CONCRETE SIDEWALK 1" = 1'-0" NOTES: 6x6, W2.9xW2.9, WWF (EPOXY COATED) 1. CONTROL JOINTS, EXPANSION JOINTS AND EDGES OF SIDEWALK SHALL BE HAND-TOOLED AFTER EACH FINISHING OPERATION. 2. PROVIDE EXPANSION JOINT AT INTERSECTION WITH ANOTHER SIDEWALK, BETWEEN WALKS AND BUILDINGS AND AT SUCH OTHER POINTS AS INDICATED ON THE DRAWINGS. 3. SIDEWALK SHALL HAVE 1/2" EXP. JTS. @ 48' MAX. & CONTROL JOINTS @ 6' MAX.4" 4" 3" 1.5"12.5"COMPACTED AGGREGATE #53 ASPHALT PAVEMENT DETAIL COMPACTED SUBGRADE 1" = 1'-0" HMA SURFACE, TYPE A, 9.5 mm HMA BASE, TYPE A, 19.0 mm COMPACTED AGGREGATE #2 ADA ACCESSIBLE CURB RAMP TYPE "H" NO SCALE ADA ACCESSIBLE CURB RAMP TYPE "G" NO SCALE EXPANSION JOINT DETAIL 1" = 1'-0"DCONCRETE PAVEMENT 1/2" SUBBASE 1/2" PREFORMED EXPANSION JOINT FILLER WITH SEALANT D 1/8" SAWED OR TOOLED CONTROL JOINT D/4NO SCALE CONTROL JOINT DETAIL 12" 6"14"TOP OF ASPHALT PAVMENT 6" 6"COMPACTED SUBGRADE COMPACTED AGGREGATE #53 #5 BAR CONT. 1" = 1'-0" 6" CONCRETE PAVEMENT DETAIL 6x6, W2.9xW2.9, WWF (EPOXY COATED) NOTES: 1. CONTROL JOINTS, EXPANSION JOINTS AND EDGES OF SIDEWALK SHALL BE HAND-TOOLED AFTER EACH FINISHING OPERATION. 2. PROVIDE EXPANSION JOINT AT INTERSECTION WITH ANOTHER SIDEWALK, BETWEEN WALKS AND BUILDINGS AND AT SUCH OTHER POINTS AS INDICATED ON THE DRAWINGS. 3. SIDEWALK SHALL HAVE 1/2" EXP. JTS. @ 48' MAX. & CONTROL JOINTS @ 6' MAX. BIKE RACK DETAIL NO SCALE NOTE: INSTALLATION OF BIKE RACKS TO BE SEPARATE CONSTRUCTION CONTRACT.6 3/4"1'-0 3/4"6"6"4" COMPACTED GRANULAR MATERIAL 2'-0" COMPACTED SUBGRADE 1" = 1'-0" NOTES: 1. PROVIDE CONTROL JOINTS AT 10' MAX. SPACING. 2. PROVIDE EXPANSION JOINTS AT 80' MAX. SPACING AND AT ENDS OF ALL RADII. CONCRETE CURB AND GUTTER DETAIL FINISH GRADE R 1" R 2" SLOPE R 1/4" TOP OF PAVEMENT G5.1 SITE DETAILS CONSULTANT PROJECT NUMBER: 220114.00 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 12.15.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC SUBMITTAL WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS 520 E MAIN STREET CARMEL, IN 46032 CARMEL TAC REVIEW 01/13/2021A 19700317 No. 07/02/21 TBM#1 = 856.00 E MAIN STREET LOT 1 LOT 48 PROPOSED BUILDING ADDITION 18,240 SFT. FINISH FLOOR ELEV. = 851.55 (EAST) FINISH FLOOR ELEV. = 852.89 (WEST) FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKINGSANSAN SAN ST-204 ST-206 ST-201 ST-209 ST-208 ST-207 ST-203 ST-205 4 3 5 555 36 L.F. 8 9 10 11 2 12 CONNECT TO EXISTING MANHOLE @ INVERT ELEV. 845.61 5 5 1 1 4 3 5 4 3 5 11 L.F. 12 L.F. 22 L.F. 4 L.F. 19 L.F. 57 L.F. 27 L.F. 6 7 13 14 15 14 15 16 17 12 CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) ST-202A ST-202 20 600 20 40 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS RESPONSE TAC COMMENTS 04/19/2021B UTILITY KEYNOTES 1. PROPOSED 6" PVC SANITARY LATERAL @ 1.04% MIN. SLOPE 2. CAP EXISTING 24" RCP STORM PIPE 3. PROPOSED 6" PVC @ 2.00% MIN. SLOPE 4. PROPOSED 8" PVC PIPE @ 2.00% MIN. SLOPE 5. PROPOSED CLEANOUT 6. RE-ROUTED 6" FIRE LATERAL TO NEW SPRINKLER / RISER ROOM. MATCH EXISTING PIPE SIZE AND MATERIAL. COORDINATE NEW RISER LOCATIONS AND PIPE ELEVATIONS WITH SHEET P2.05. PROVIDE NEW FITTINGS TO ADJUST TRANSITION IN ALIGNMENT AS REQUIRED. PROVIDE FERNCO COUPLING BETWEEN NEW AND EXISTING PIPES. 7. RE-ROUTED 4" FIRE DEPARTMENT CONNECTION TO NEW SPRINKLER / RISER ROOM. MATCH EXISTING PIPE SIZE AND MATERIAL. COORDINATE NEW RISER LOCATIONS AND PIPE ELEVATIONS WITH SHEET P2.05. PROVIDE NEW FITTINGS TO ADJUST TRANSITION IN ALIGNMENT AS REQUIRED. PROVIDE FERNCO COUPLING BETWEEN NEW AND EXISTING PIPES. 8. CONNECT NEW (RE-ROUTED) FIRE PROTECTION LINES AT THIS LOCATION (WEST OF ELECTRICAL LINES). PROTECT / SHORE EXISTING ELECTRICAL LINES DURING CONSTRUCTION. 9. NEW BUILDING STORM LATERAL, 6" PVC PIPE INVERT 848.22. COORDINATE PIPE LOCATION AND ELEVATION WITH SHEET P2.05. 10. NEW BUILDING STORM LATERAL, 6" PVC PIPE INVERT 848.22. COORDINATE PIPE LOCATION AND ELEVATION WITH SHEET P2.05. 11. NEW BUILDING STORM LATERAL, 6" PVC PIPE INVERT 849.89 COORDINATE PIPE LOCATION AND ELEVATION WITH SHEET P2.05. 12. FIELD VERIFY EXISTING PIPE PIPE SIZE, MATERIAL AND ELEVATION PRIOR TO CONSTRUCTION. CONNECT EXISTING PIPE TO NEW MANHOLE STRUCTURE. 13. NEW STORMWATER QUALITY BMP UNIT (CONTECH CASCADE MODEL CS-5) 14. PROVIDE A WYE CONNECTION 6"x 8"x 8". 15. EXISTING 12" RCP TO BE CONNECTED TO NEW MANHOLE STRUCTURES. 16. SANITARY LATERAL INVERT = 847.89. COORDINATE LOCATION AND ELEVATION WITH SHEET P2.05. 17. COORDINATE WORK ON EXISTING 8" STORM LATERAL TO REMAIN WITH SHEET P2.05. SU1.3 UTILITY PLAN 07/02/21 SEE STRUCTURE DATA TABLE FOR CASTING TYPE AND ELEVATIONFINISH GRADE ASPHALTIC MASTIC OR BUTYL RUBBER SEAL BETWEEN JOINTS PRECAST CONCRETE ADJUSTING RINGS AS NEEDED (12" OF RINGS MAX.) ECCENTRIC CONE OR REDUCER CAP AS REQUIRED BY SITE CONDITIONS. CONE TOP TO MATCH ADJUSTING RING PROFILE. 48" DIA. 5"16"TYP.PRECAST CONCRETE SECTIONS PREFORMED HOLE TO MAX. OF PIPE O.D. + 6" W/ NON SHRINK CEMENT GROUT BENCHWALLS AT MIN. 1/2" PER FOOT SLOPE. BENCHWALLS TO BE CONSTRUCTED TO SPRING LINE OF PIPE. MANHOLE BASE SET ON 6" OF #8 OR #2 STONECOMPACTED SUBGRADE PLASTIC ENCAPSULATED STEEL MANHOLE STEPS O-RING GASKET ASPHALTIC MASTIC OR BUTYL RUBBER SEAL AT JOINTS BASE 6" OR 8" PER SECTION 3"#4 BAR @ 12" o.c. EACH WAY (STEEL MESH AREA = 0.12 SQ. IN./SQ. FT.) STORM MANHOLE TYPE "C" DETAIL 1/2" = 1'-0" 24" DIA. SEE STRUCTURE DATA TABLE FOR PIPE SIZE AND INVERT ELEV. NOTES: 1. MANHOLE CONFORMS TO ASTM C478, JOINTS CONFORM TO ASTM C443. 2. ALL STORM SEWER CASTINGS SHALL BE MARKED "DUMP NO WASTE DRAINS TO WATERWAYS". 3. SEE UTILITY PLAN FOR STORM SEWER STRUCTURE DATA TABLE.VARIES16" MIN.12" TO 15""A" PIPE SIZE 24" X 24" STRUCTURE SIZING CHART "F" 30" X 30" "M" 24" X 36" 1" = 1'-0" STORM INLET DETAIL INSIDE DIMENSIONS INLET TYPE 8"6" CLASS "A" PRECAST REINFORCED CONCRETE BOX SEE STRUCTURE DATA TABLE FOR PIPE SIZE AND INVERT ELEV. INSIDE DIMENSION * SEE SIZING CHART ABOVE SEE STRUCTURE DATA TABLE FOR CASTING TYPE AND ELEVATION BASE SET ON 6" OF #8 OR #2 STONE COMPACTED SUBGRADEINSIDE DIMENSION* SEE SIZING CHART ABOVEMAX. NUMBER OF SIDES OF THE INLET WITH PIPES 3 18" TO 24" 315" TO 18" 3 NOTES: 1. ALL STORM SEWER CASTINGS SHALL BE MARKED "DUMP NO WASTE DRAINS TO WATERWAYS". 2. SEE UTILITY PLAN FOR STORM SEWER STRUCTURE DATA TABLE. FOR PIPE LOCATED IN AND WITHIN 5' OF PAVED AREAS FOR PIPE LOCATED IN GRASSED AREAS STORM SEWER (PVC & HDPE) TRENCH DETAIL NO SCALE NOTES: 1. ALL BEDDING & INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. 2. A MIN. 9" CLEARANCE EACH SIDE OR PIPE FOR 42" DIA. AND LESS. Bc MIN.4"12"MIN. 1.25 O.D.+12" MIN. 6" TOPSOIL OUTSIDE PAVEMENT LIMITS PAVEMENT SECTION REGULAR BACKFILL - GREATER THAN 5' FROM EDGE OF PAVEMENT COMPACTED 90% REGULAR BACKFILL- GREATER THAN 5' FROM EDGE OF PAVEMENT COMPACTED TO 90% #8 CRUSHED STONE OR EQUIVALENT CLASS 1 MATERIAL HAND TAMPED OR WALKED INTO PLACE "B" BORROW (INDOT SPEC.) OR EQUIVALENT GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTER DENSITY 20 L.F. (MIN,)20 L.F. (MIN,) 20 L.F. (MIN,) 20 L.F. (MIN,)20 L.F. (MIN,)20 L.F. (MIN,) 20 L.F. (MIN,)2 0 L . F . (M I N , )2'-0"VARIES4" DIA. PERF. PVC SDR-35 PIPE 1'-0" 4"NON WOVEN FILTER CLOTH #8 WASHED AGGREGATE COMPACTED AGGREGATE BASE PAVEMENT CURB INLET NOTES: 1. TAP STRUCTURES IN PAVEMENT AS SHOWN OR AS DIRECTED ON THE PLAN SHEET 2. ADJUST UNDERDRAIN AS REQUIRED TO AVOID SEWER LINES AND OTHER UTILITIES. 3. GROUT SOLID THE CONNECTION TO STORM STRUCTURE PAVEMENT UNDERDRAIN DETAIL NONE STORM SEWER / WATER LINE CROSSING DETAIL NONE1/6 Bc3" 4" 6" LEGEND MATERIAL BELOW PIPE d = DEPTH OF BEDDING D = INSIDE DIAMETER Bc = OUTSIDE DIAMETER 30" TO 60" 27" & SMALLER 66" & LARGER D (d) MIN. 3/4" = 1'-0" DEPTH OF BEDDING MATERIAL BELOW PIPE NOTES: 1. ALL BEDDING & INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. 2. A MIN. 9" CLEARANCE EACH SIDE OR PIPE FOR 42" DIA. AND LESS. REGULAR BACKFILL - GREATER THAN 5' FROM EDGE OF PAVEMENT COMPACTED 90% MIN. 1.25 O.D.+12" FOR PIPE LOCATED IN AND WITHIN 5' OF PAVED AREAS FOR PIPE LOCATED IN GRASSED AREAS Bc MIN. 6" TOPSOIL IN NON-PAVED AREAS PAVEMENT SECTION "B" BORROW (INDOT SPEC.) OR EQUIVALENET GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTER DENSITY "B" BORROW (INDOT SPEC.) OR EQUIVALENET GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTER DENSITY d STORM SEWER (RCP) TRENCH DETAIL SLOPE MIN. NOTE: CLEANOUTS IN PAVED AREAS TO BE ACCESSIBLE VIA YARD BOXES OR EXTENDED FLUSH WITH THE PAVING. CO VER SHOULD BE THREADED TYPE, WATER TIGHT AND CAPPED. 1/2" = 1'-0" CLEANOUT DETAILVARIESFINISH GRADE STORM OR SANITARY SEWER (SIZE SHOWN ON PLANS) SAME SIZE AS MAIN LINE (MAX. 8" REQUIRED ON STORM SEWERS) 1'-0" 1'-0" MIN.6"1/2"HEAVY DUTY CLEANOUT CASTING - JAY R. SMITH 4253 SERIES OR EQUAL CONCRETE COLLAR (CONCRETE SHALL NOT BE IN CONTACT w/ PIPE) 30" 72" 60" 102" 108" 96" 6" 7" 9" 9" SEE SCHEDULE FOR CASTING TYPE AND ELEVATIONFINISH GRADE STORM MANHOLE TYPE "J - N" DETAIL 1/2" = 1'-0" 24" DIA. PRECAST CONCRETE ADJUSTING RING 4" MIN. - 12" MAX. SEE DETAIL PLASTIC ENCAPSULATED STEEL MANHOLE STEPS 48" DIA. STANDARD PRECAST MANHOLE CAP OR CONE 3" MIN.6'-0" MIN. 9"8"MIN.3" MIN.16"TYP.5" 5" CONCRETE REDUCER CAP 1/2" PER FOOT SLOPE BASE SET ON 6" OF #8 OR #2 STONE COMPACTED SUBGRADE DIA. "F" "H" "H"1'-0" MIN. OVER HIGHEST PIPE DIA. " G" ONE COMPLETE UNIT OF PRECAST CONC. MANHOLE BASE AND RISER. SEPARATE BASE IS OPTIONAL NOTES: MANHOLE CONFORMS TO ASTM C478. JOINTS CONFORM TO ASTM C443. NO BRICK OR BLOCK WILL BE ALLOWED IN MANHOLE. MANHOLE TYPE "J" "K" "L" "M" "N" MANHOLE DIA "F" MAX. PIPE SIZE @ 90° - DIA "G" "H" - WALL THICKNESS 36" 48" 60" 72"9" MAX. PIPE SIZE MAINLINE - DIA "G" 36" 48" 54" 72" 84" SU2.1 UTILITY DETAILS CONSULTANT PROJECT NUMBER: 220114.00 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 12.15.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC SUBMITTAL WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS 520 E MAIN STREET CARMEL, IN 46032 CARMEL TAC REVIEW 01/13/2021A 19700317 No. 07/02/21 TBM#1 = 856.00 E MAIN STREET LOT 1 LOT 48 PROPOSED BUILDING ADDITION 18,240 SFT. FINISH FLOOR ELEV. = 851.55 (EAST) FINISH FLOOR ELEV. = 852.89 (WEST) FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKINGSANSAN SANFFE: 851.55 FFE: 852.89 FFE: 851.55 FFE: 851.55 FFE: 851.55 SEE ENLARGEMENT 1 ON SHEET G3.3 SEE ENLARGEMENT 2 ON SHEET G3.3 SEE ENLARGEMENT 3 ON SHEET G3.3 ST-202 RIM = 851.41 ST-204 RIM = 850.69 ST-206 RIM = 850.51 ST-201 RIM = 851.41 ST-209 RIM = 849.82 ST-208 RIM = 850.60 ST-207 RIM = 850.52 ST-203 RIM = 850.42 ST-205 RIM = 850.23 852.20 TC 851.88 BC 851.38 TC 852.08 BC 851.58 TC 852.12 BC 851.62 TC 851.53 BC 851.03 MEG 850.97 MEG 850.71 MEG 850.61 MEG 851.03 MEG 850.58 MEG 850.73 MEG 851.58 MEG 851.36 MEG 851.22 MEG 851.66 MEG 851.19 MEG 851.32 TC 852.08 BC 851.58 TC 851.79 BC 851.29 TC 851.42 BC 850.92 TC 851.42 BC 850.92 TC 851.63 BC 851.13 TC 851.42 BC 850.92 TC 851.30 BC 850.80 TC 851.43 BC 850.93 TC 851.35 BC 850.85 TC 851.17 BC 850.67 852.15 851.86 851.50 851.50 851.50 851.70 851.50 851.37 851.50 851.43 MEG 851.60 MEG 852.09 MEG 851.03 TC 851.86 BC 851.36 852.43 852.89 MEG 852.29 BC 851.26 BC 851.31 BC 851.46 BC 851.51 MEG 850.68 MEG 850.52 MEG 850.52 BC 850.34 BC 850.61 BC 850.54 BC 850.40 BC 850.12 BC 849.53 BC 849.16 MEG 850.51 BC 850.06 BC 850.06 MEG 850.86 MEG 851.11 MEG 850.80 MEG 850.44 MEG 849.98 MEG 849.66 BC 850.79 851.43 TC 851.29 BC 850.79 TC 851.33 BC 850.83 TC 851.42 BC 850.92 TC 851.47 BC 850.97 TC 851.42 BC 850.92 TC 851.42 BC 850.92 851.43 851.50 851.50 851.55 851.50 851.50 851.55 TC 851.12 BC 850.62 MEG 850.58 BC 850.40 MEG 850.99 MEG 850.21 MEG 849.20MEG 849.70 MEG 850.12 851.40851.45 851.45 851.35 851.20 850.30 850.70 851.32 851.37 851.53 TC 851.41 BC 850.91 BC 850.65 TC 850.65 MEG 850.67 MEG 850.66 MEG 851.41 MEG 851.40 MEG 851.60 MEG 851.59 MEG 851.31 MEG 853.80 MEG 853.81 MEG 853.43 MEG 851.08 MEG 850.92 MEG 850.43 BC 850.85 MEG 851.37 MEG 851.43 MEG 851.01 MEG 851.07 MEG 850.99 MEG 850.85 MEG 850.80 MEG 850.30 BC 850.15 MEG 850.92 MEG 850.29 MEG 851.25 CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) 1 1 1 1 1 1 1 1 2 2 2 2 BENCHMARKS: 20 600 20 40 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. SEE TOPOGRAPHIC SURVEY FOR BENCHMARK INFORMATION. GENERAL NOTES CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS G2.3 GRADING PLAN GRADING PLAN LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION PROPOSED SURFACE DRAINAGE FLOW ARROW FLOOD ROUTING PATH MEG TC BC TC BC 750.65 PROPOSED DRAINAGE SUMMARY PROJECT AREA 10 YEAR RUNOFF 100 YEAR RUNOFF 0.98 ACRES 4.61 CFS 6.88 CFS 100 YEAR INLET CASTING CAPACITY ELEVATION TABLE STRUCTURE NUMBER 100 YEAR ELEVATION (INLET 50% CLOGGED) 203 R-3010 NEENAH INLET CASTING TYPE 850.42 TOP OF CASTING ELEVATION 850.65 205 R-3010 850.23 850.43 ALL OF THE 100 YEAR ELEVATIONS SHOWN IN THIS TABLE ARE BELOW THE ADJACENT TOP OF CURB ELEVATIONS AND BELOW THE FINISH FLOOR ELEVATION. ADDITIONAL DETENTION WAS PROVIDED BY THE PREVIOUSLY SUBMITTED CARMEL HIGH SCHOOL PARKING LOT PROJECT (PZ-2020-00170 TAC). AN ADDITIONAL 0.12 ACRES OF IMPERVIOUS AREA WAS ADDED TO THE PREVIOUSLY APPROVED HYDROCAD MODEL TO ACCOUNT FOR THIS AND OTHER FUTURE UPCOMING PROJECTS. THIS PROJECT IS ADDING 0.08 ACRES. INDICATES APPROXIMATE LIMITS OF 100 YEAR ELEVATION OF INLET 50% CLOGGED GRADING KEYNOTES 1. FLOOD ROUTING PATH FOR THE IMPROVEMENTS ON THE SOUTH SIDE OF THE PROJECT WHEN 100 YEAR FLOOD IS EXCEEDED. PATH TRAVELS FROM MAIN STREET RIGHT OF WAY ONTO THE PROJECT SITE THEN TRAVELS IN A EASTERLY DIRECTION OVER TWO EXISTING INLETS THAT WILL REMAIN IN PLACE THEN CONTINUES EASTERLY TO WEST SIDE OF EXISTING DRIVE ENTRANCE THEN TRAVELS SOUTH AND THEN WEST TO A EXISTING CURB INLET LOCATED ON THE NORTH SIDE OF MAIN STREET. 2. FLOOD ROUTING PATH FOR THE IMPROVEMENTS ON THE EAST SIDE OF THE PROJECT WHEN 100 YEAR FLOOD IS EXCEEDED. PATH TRAVELS FROM THE EAST SIDE DRIVE AND THEN TRAVELS IN A NORTHERLY DIRECTION OVER MULTIPLE EXISTING CURB INLETS LOCATED ON THE EAST SIDE OF THE DRIVE. EVENTUALLY GRADE LEVELS OUT ON THE EAST DRIVE NEAR THE NORTHEAST CORNER OF THE HIGH SCHOOL BUILDING AND IF PONDING DEPTH EXCEEDS SIX INCHES FLOOD ROUTING PATH WILL OVERTOP CURB AND TRAVEL EAST TO A EXISTING SWALE AND THEN TRAVEL NORTH IN THE SWALE TO COOL CREEK. 100 YEAR INLET CASTING CAPACITY ELEVATION TABLE STRUCTURE NUMBER 100 YEAR ELEVATION (INLET CLOGGED) 203 R-3010 NEENAH INLET CASTING TYPE 850.42 TOP OF CASTING ELEVATION 205 R-3010 850.23 INDICATES APPROXIMATE LIMITS OF 100 YEAR ELEVATION OF INLET 100% CLOGGED 100% 851.03 850.61 B TAC RESPONSE 06/08/2021 MLAG = 853.03' , MFPG = 852.03' 07/02/21 GENERAL 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL FEDERAL, STATE, COUNTY, CITY, AND LOCAL PERMITS FOR ANY AND ALL WORK REQUIRED UNLESS OTHERWISE NOTED. THIS SHALL INCLUDE ALL SUBMITTALS AS REQUIRED INCLUDING STORMWATER RUNOFF CONTROL (RULE 5). THE CONTRACTOR IS RESPONSIBLE FOR PAYING FOR ALL REQUIRED PERMITS BY ANY OR ALL AGENCIES MENTIONED ABOVE UNLESS OTHERWISE NOTED BY THE CONTRACT OR SPECIFICATIONS. 3. CONTRACTOR SHALL VERIFY DATE OF PLANS WITH ENGINEER PRIOR TO CONSTRUCTION TO ENSURE USE OF CURRENT PLANS. 4. ALL QUANTITIES PROVIDED ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 5. PROTECT AND MAINTAIN BENCHMARKS AND SURVEY CONTROL POINTS FROM DISTURBANCE DURING CONSTRUCTION. SITE LAYOUT 1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 2. DIMENSIONS SHOWN ARE TO FACE OF CURB AND TO FACE OF BUILDING UNLESS NOTED OTHERWISE. 3. RADII NOT DIMENSIONED ARE TO BE 5'. 4. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. 5. REFER TO APPROPRIATE SITE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. 6. TAPER CURB HEIGHT TO 1" IN FINAL 2' OF ALL CURB ENDINGS OR AS NOTED ON PLANS. 7. EXACT LOCATION OF SIGNS TO BE COORDINATED WITH OWNER AND APPROVED PRIOR TO INSTALLATION. 8. SITE BOUNDARY, TOPOGRAPHY, UTILITY, STRUCTURES AND ROAD INFORMATION TAKEN FROM A SURVEY PREPARED BY CEC, DATED AUGUST 3, 2020, AND IS INCLUDED ON SHEETS SV-1 THRU SV-4. GRADING AND EARTHWORK 1. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA. EXISTING UTILITY STRUCTURES ARE SHOWN IN ACCORDANCE WITH AVAILABLE INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH THE APPLICABLE UTILITY COMPANY) IS THE RESPONSIBILITY OF THE CONTRACTOR. 2. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 3. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, WASHOUT, AND OTHER HAZARDS CREATED BY EARTH MOVING OPERATIONS. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACQUAINT HIMSELF WITH SUBSOIL CONDITIONS PRIOR TO BIDDING. 5. CONTRACTOR SHALL VERIFY WITH OWNER EXACT LOCATION AND DEPTH OF ALL PRIVATE/OWNER INSTALLED UTILITIES PRIOR TO CONSTRUCTION. 6. DETERMINE LOCATION OF UNDERGROUND UTILITIES AND PERFORM WORK IN A MANNER WHICH WILL AVOID POSSIBLE DAMAGE. HAND EXCAVATE AS REQUIRED. 7. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 8. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (LOCATIONS, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 9. EXCAVATE TO SUBGRADE ELEVATIONS REGARDLESS OF THE CHARACTER OF SURFACE AND SUBSURFACE CONDITIONS ENCOUNTERED. UNCLASSIFIED EXCAVATED MATERIALS MAY INCLUDE ROCK, SOIL MATERIALS, AND OBSTRUCTIONS. 10. PREVENT SURFACE WATER AND GROUND WATER FROM ENTERING EXCAVATIONS, FROM PONDING ON PREPARED SUBGRADES, AND FROM FLOODING THE PROJECT SITE AND SURROUNDING AREA. REROUTE SURFACE WATER RUNOFF AWAY FROM EXCAVATED AREAS. DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. DO NOT USE EXCAVATED TRENCHES AS TEMPORARY DRAINAGE DITCHES. 11. STOCKPILE BULK MATERIALS AWAY FROM EDGE OF EXCAVATIONS WITHOUT INTERMIXING WITH SUBSOIL. GRADE AND SHAPE STOCKPILES TO DRAIN SURFACE WATER. COVER TO PREVENT WINDBLOWN DUST AND EROSION BY WATER. DO NOT STORE WITHIN DRIP LINE OF TREES THAT WILL REMAIN. 12. CONTRACTOR SHALL INSTALL ALL SLEEVES/CONDUITS AS REQUIRED BY THE UTILITY COMPANIES. COORDINATE FINAL LOCATIONS WITH THE UTILITY COMPANIES. 13. THE CONTRACTOR SHALL PROVIDE AT LEAST 18"' OF COVER OVER ALL STORM SEWERS, UNLESS OTHERWISE INDICATED BY PLANS. 14. PROVIDE COMPACTED "B" BORROW BACKFILL OVER ALL UTILITIES IN PAVED AREAS. 15. PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW GRADES. 16. MAINTAIN GRADE STAKES SET BY OTHERS UNTIL REMOVAL IS MUTUALLY AGREED UPON BY PARTIES CONCERNED. 17. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, WATER OR GAS VALVE BOXES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATION. 18. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, "BIRD BATH" CONDITIONS. 19. MAXIMUM LAWN SLOPE SHALL BE 4:1. 20. DURING FINISH GRADING, ELIMINATE RILLS AND GULLIES. REMOVE ALL STONES, RUBBLE, STICKS, WIRE, PLANT MASS AND DEBRIS OVER 1 INCH IN ANY DIMENSION, AS WELL AS OBVIOUS QUANTITIES OF SMALL STONE. 21. REPAIR AND REESTABLISH GRADES TO SPECIFIED TOLERANCES WHERE COMPLETED OR PARTIALLY COMPLETED SURFACES BECOME ERODED, RUTTED, SETTLED, OR WHERE COMPACTION IS LOST DUE TO SUBSEQUENT CONSTRUCTION OPERATIONS OR WEATHER CONDITIONS. 22. ADD ADDITIONAL TOPSOIL AND GRADE AS NECESSARY IN AREAS OF SETTLEMENT AND EROSION, AND AS REQUIRED TO MEET FINISH GRADE. DEMOLITION 1. DEMOLITION PERMIT WILL BE PROCURED BY THE SUBCONTRACTOR AND COST SHALL BE INCLUDED AS PART OF THEIR WORK. 2. DURING DEMOLITION PROCESS, EROSION CONTROL MEASURES SHALL BE ESTABLISHED. THESE SHALL INCLUDE TREATMENT OF DUST AND POTENTIAL STORMWATER DISCHARGE. REFER TO EROSION CONTROL DRAWINGS. 3. REMOVAL OF THE EXISTING IMPROVEMENTS ARE AS NOTED ON THE PLANS OR AS REQUIRED BY THE PROJECT. THE MATERIALS REMOVED FROM THE SITE SHALL BE DISPOSED OF IN A PROPER AND LEGAL MANNER PER FEDERAL, STATE, AND OR LOCAL LAWS AND ORDINANCES. 4. EXISTING ITEMS TO REMAIN SHALL BE PROTECTED FROM DAMAGE BY THE CONTRACTOR. ANY DAMAGE DURING CONSTRUCTION SHALL BE RESTORED, RECONSTRUCTED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE. ALL DAMAGES SHALL BE RESTORED OR REPLACED TO AT LEAST THEIR ORIGINAL CONDITION OR AS REQUIRED OR DICTATED BY FEDERAL, STATE, COUNTY, CITY OR LOCAL REGULATIONS. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL THE UTILITY COMPANIES AND DEPARTMENTS 72 HOURS BEFORE DEMOLITION IS TO START TO VERIFY ANY UTILITIES THAT MAY BE PRESENT ON SITE. ALL VERIFICATIONS, LOCATIONS, SIZE AND DEPTHS SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES OR DEPARTMENTS. WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THE UTILITY MAY BE PRESENT DURING THE EXCAVATION TO INSTRUCT AND OBSERVE DURING THE EXCAVATION. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH EACH UTILITY COMPANY AND OR AGENT WHO IS RESPONSIBLE TO REMOVE OR RELOCATE EACH EXISTING UTILITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BEAR THE COST FOR THE REMOVAL, TERMINATION OR RELOCATION OF UTILITIES IF THE RESPONSIBILITY IS NOT COVERED BY THE UTILITY COMPANY. 7. LOCATE, IDENTIFY, DISCONNECT, AND SEAL OR CAP UTILITIES INDICATED TO BE REMOVED OR ABANDONED IN PLACE. 8. REMOVAL OF EXISTING CONCRETE OR OTHER PAVED AREAS INDICATED ON THE PLANS SHALL INCLUDE ALL AGGREGATE BASE MATERIALS. AREAS TO BE REMOVED SHALL BE SAW CUT CLEAN, NEAT AND TRUE TO LINE. REMOVE ALL NON-ORGANIC MATTER THAT WOULD INTERFERE WITH THE GROWTH OF TURF OR PLANT MATERIAL. 9. ALL CONTRACTORS MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. ACTUAL FIELD LOCATIONS OF ALL EXISTING UTILITIES ARE THE CONTRACTORS RESPONSIBILITY AND MUST BE LOCATED EITHER BY THE REPRESENTATIVE OF THE UTILITY COMPANY OR BY A PRIVATE UNDERGROUND UTILITY LOCATING COMPANY PRIOR TO THE START OF DEMOLITION ACTIVITIES. 10. SAW CUT THE EDGES OF PAVED AREAS CLEAN, NEAT AND TRUE TO LINE SO NO UNWANTED CHIPPING OR BREAKING OF EXISTING PAVEMENT TO REMAIN WILL OCCUR. 11. UNLESS EXISTING FULL-DEPTH JOINTS COINCIDE WITH LINE OF DEMOLITION, NEATLY SAW-CUT ALONG LINE OF EXISTING PAVEMENT TO REMAIN BEFORE REMOVING ADJACENT EXISTING PAVEMENT. SAW-CUT FACES VERTICALLY. 12. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION TO ACCUMULATE ON THE JOB SITE FOR MORE THAN 48 HOURS. REMOVE AND DISPOSE OF IN A LEGAL MANNER. 13. GRIND DOWN STUMPS AND REMOVE ROOTS, OBSTRUCTIONS, AND DEBRIS TO A DEPTH OF 18 INCHES BELOW EXPOSED SUBGRADE. 14. FILL DEPRESSIONS CAUSED BY CLEARING AND GRUBBING OPERATIONS WITH SATISFACTORY SOIL MATERIAL UNLESS FURTHER EXCAVATION OR EARTHWORK IS INDICATED. 15. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT EACH DAY AND REMOVE ALL MUD, DIRT, GRAVEL AND LOOSE MATERIALS TRACKED, DUMPED, SPILLED OR WIND BLOWN FROM THIS SITE ONTO OTHER SITES, RIGHT OF WAYS, PUBLIC OR PRIVATE STREETS OR ROADS, DRIVEWAYS, YARDS OR SIDEWALKS. THE CONTRACTOR MUST CLEAN OR PICK UP DAILY IF NECESSARY. THE CONTRACTOR SHALL REDUCE THE AIRBORNE DUST DURING THE ENTIRE DEMOLITION SCHEDULE. WATER MAY BE USED AS A REDUCER. 16. THE CONTRACTOR SHALL DOCUMENT THE FINAL DISPOSITION OF ALL MATERIALS REMOVED FROM THE SITE. 17. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THESE DRAWINGS. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ITEMS WHICH INTERFERE WITH NEW CONSTRUCTION. 1. ALL EROSION CONTROL PLANNING AND IMPLEMENTATION OF PROTECTIVE MEASURES SHALL BE IN ACCORDANCE WITH THE STANDARDS AND PROCEDURES OUTLINED IN THE IDEM "INDIANA STORM WATER QUALITY MANUAL". 2. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE AND REPAIR OF ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES DURING EARTHMOVING OPERATIONS. 3. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL AND LIMIT THE TRACKING OF SILT AND SEDIMENT OFFSITE. THE CONTRACTOR SHALL BROOM AND COLLECT TRACKED SILT AND SEDIMENT IMMEDIATELY UPON DISCOVERY THE MATERIAL. 5. DO NOT COMMENCE SITE CLEARING OR EARTH MOVING OPERATIONS UNTIL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES ARE IN PLACE. 6. DUST CONTROL IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL INCLUDE CONSTANT AND REPETITIVE APPLICATION OF WATERING AND STREET SWEEPING. 7. THE CONTRACTOR SHALL TEMPORARILY SEED ALL DISTURBED AREAS PLANNED FOR A PERIOD OF INACTIVITY EXCEEDING 15 DAYS. EROSION CONTROL SITE UTILITIES 1. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION, EXISTING DRAWINGS AND PRIVATE UNDERGROUND UTILITY LOCATING SERVICES. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THE ENGINEER DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION MADE AVAILABLE. THE ENGINEER HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. AN UNDERGROUND UTILITY REPORT IS INCLUDED IN THE CONSTRUCTION DOCUMENTS. 2. CONTRACTOR SHALL VERIFY EXISTING STORM AND SANITARY SEWER CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION TO ENSURE THAT THE NEW SEWERS CAN BE CONSTRUCTED AS SHOWN ON THESE PLANS. REPORT ANY DISCREPANCIES TO THE ENGINEER. 3. CONSTRUCTION OF ALL STORM AND SANITARY SEWER LINES AND STRUCTURES SHALL BE IN ACCORDANCE WITH LOCAL AND STATE CODES, RULES AND REGULATIONS. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION WITH ALL RESPECTIVE UTILITIES. 5. EXISTING UTILITY STRUCTURES ARE SHOWN IN ACCORDANCE WITH AVAILABLE INFORMATION. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR. 6. CONTRACTOR SHALL INSTALL ALL SLEEVES/CONDUITS AS REQUIRED BY THE UTILITY COMPANIES. COORDINATE FINAL LOCATIONS WITH THE UTILITY COMPANIES. CONTRACTOR SHALL SLEEVE ALL PIPING AT FOOTINGS AND BELOW GRADE WALLS. SLEEVES SHALL BE WATER TIGHT. COORDINATE ALL WALL PENETRATIONS WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING PLANS. 7. CONTRACTOR SHALL VERIFY WITH OWNER THE EXACT LOCATION AND DEPTH OF ALL PRIVATE/OWNER-INSTALLED UTILITIES PRIOR TO CONSTRUCTION. 8. CONTRACTORS SHALL CONSULT ARCHITECTURAL, MECHANICAL, PLUMBING AND ELECTRICAL PLANS FOR INVERT ELEVATIONS AND EXACT LOCATION OF DOWNSPOUTS, WATER LINES, STORM LINES, SANITARY LINES, GAS LINES, ELECTRICAL LINES, TELECOM LINES, TRANSFORMER PADS OR POLES, ETC. 9. SEE SITE ELECTRICAL PLANS FOR SITE LIGHTING, POWER AND TELECOM. 10. INSTALL PIPING BEGINNING AT LOW POINT, TRUE TO GRADES AND ALIGNMENT INDICATED WITH UNBROKEN CONTINUITY OF INVERT. PLACE BELL ENDS OF PIPING FACING UPSTREAM. INSTALL GASKETS, SEALS, SLEEVES, AND COUPLINGS ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS. REFER TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR USE OF LUBRICANTS, CEMENTS, AND OTHER INSTALLATION REQUIREMENTS. 11. INSTALL MANHOLES FOR CHANGES IN DIRECTION UNLESS FITTINGS ARE INDICATED. USE FITTINGS FOR BRANCH CONNECTIONS UNLESS DIRECT TAP INTO EXISTING SEWER IS INDICATED. 12. PVC AND HDPE STORM SEWER PIPE TO BE INSTALLED ONLY AT LOCATIONS INDICATED AND SHALL NOT BE SUBSTITUTED FOR LOCATIONS WHERE RCP PIPE IS SPECIFIED. 13. THE CONTRACTOR SHALL PROVIDE AT LEAST 18" OF COVER OVER ALL STORM SEWERS, UNLESS OTHERWISE INDICATED BY PLANS. 14. WHERE WATER LINES AND SEWERS CROSS AND THE WATER LINE CANNOT BE PLACED ABOVE OR BELOW THE SEWER WITH A MINIMUM OF 18" VERTICAL CLEARANCE, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PLASTIC PRESSURE (SDR 21) SEWER PIPE WITH GASKETED, COMPRESSION TYPE JOINTS WITHIN 10' OF THE WATER LINE. THE WATER LINES SHALL BE INSTALLED ABOVE THE SEWER WHEREVER POSSIBLE. 15. WHERE WATER LINES AND SEWERS RUN PARALLEL AND A MINIMUM SEPARATION DISTANCE OF 10' CANNOT BE MAINTAINED, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PLASTIC PRESSURE SEWER PIPE WITH GASKETED, COMPRESSION TYPE JOINTS. 16. ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, WATER OR GAS VALVE BOXES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATION. 17. ANY STORM DRAIN, FIELD TILE, OR UTILITY ENCOUNTERED DURING CONSTRUCTION SHALL BE RELOCATED AND POSITIVE DRAINAGE MAINTAINED UNLESS OTHERWISE NOTED TO REMAIN. NOTIFY ENGINEER IF ANY DRAINS ARE ENCOUNTERED. 18. ALL PAVEMENT CUT DUE TO UTILITY INSTALLATION, CONSTRUCTION OF CURBS, ETC., OR DAMAGE TO EXISTING PAVEMENT DURING CONSTRUCTION SHALL BE PATCHED WITH A PAVEMENT SECTION WHICH MEETS OR EXCEEDS THE EXISTING SECTION. LANDSCAPING 1. PRIOR TO CONSTRUCTION, THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES & SHALL AVOID DAMAGE TO ALL UTILITIES DURING THE COURSE OF THE WORK. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY & ALL DAMAGE TO THE UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH OCCURS AS A RESULT OF THE LANDSCAPE CONSTRUCTION. 2. LANDSCAPE CONTRACTOR TO VERIFY EXISTING FIELD CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. 3. THE PLANT COUNTS INDICATED ON DRAWINGS ARE FOR LANDSCAPE ARCHITECT'S USE ONLY. LANDSCAPE CONTRACTOR SHALL MAKE THEIR OWN PLANT QUANTITY TAKEOFFS USING DRAWINGS, SPECIFICATIONS, AND PLANT SCHEDULE REQUIREMENTS (I.E., SPACING), UNLESS OTHERWISE DIRECTED BY LANDSCAPE ARCHITECT. CONTRACTOR TO VERIFY BED MEASUREMENTS AND INSTALL APPROPRIATE QUANTITIES AS GOVERNED BY PLANT SPACING PER SCHEDULE. PLANT MATERIAL QUANTITIES SHOWN ON PLAN ARE MINIMUM QUANTITIES. ADDITIONAL MATERIAL MAY BE NEEDED TO MEET SPACING REQUIREMENTS AND FIELD CONDITIONS. IN CASE OF DISCREPANCIES BETWEEN PLAN AND PLANT LIST, THE PLAN SHALL DICTATE. 4. NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID DATE IN WRITING. 5. DO NOT DUMP OR STORE BULK MATERIALS NEAR STRUCTURES, UTILITIES, WALKWAYS AND PAVEMENTS, OR ON EXISTING TURF AREAS OR PLANTS. 6. PROCEED WITH PLANTING ONLY WHEN EXISTING AND FORECASTED WEATHER CONDITIONS PERMIT PLANTING TO BE PERFORMED WHEN BENEFICIAL AND OPTIMUM RESULTS MAY BE OBTAINED. 7. SUSPEND PLANTING OPERATIONS DURING PERIODS OF EXCESSIVE SOIL MOISTURE UNTIL THE MOISTURE CONTENT REACHES ACCEPTABLE LEVELS TO ATTAIN THE REQUIRED RESULTS. 8. UNIFORMLY MOISTEN EXCESSIVELY DRY SOIL THAT IS NOT WORKABLE OR WHICH IS DUSTY. 9. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREA IN AN ORDERLY CONDITION. 10. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES, TREES, SHRUBS, AND PLANTINGS FROM DAMAGE CAUSED BY PLANTING OPERATIONS AND FROM HYDROSEEDING AND HYDROMULCHING OVERSPRAY. PROMPTLY REPAIR ANY DAMAGE CAUSED BY PLANTING OPERATIONS. 11. ESTABLISH TREE PROTECTIONS ZONES AS REQUIRED BY SPECIFICATIONS. 12. EARTHWORK CONTRACTOR SHALL INSTALL 12" OF TOPSOIL IN ALL PROPOSED BED AREAS. CONTRACTOR SHALL COORDINATE QUANTITY AND PLACEMENT OF TOPSOIL. SUBCONTRACTOR SHALL VERIFY DEPTH OF TOPSOIL PRIOR TO PLANT INSTALLATION. REFER TO SPECIFICATIONS FOR TOPSOIL TESTING AND PLACEMENT REQUIREMENTS. REPLACEMENT SOIL SHALL BE COMPRISED OF 1 PART ORIGINAL, 2 PARTS HUMUS, 1 PART COMPOSTED CATTLE MANURE, 1 PART CLEAN COARSE CUT SAND, AND 1 POUND OF FERTILIZER (12-12-12 NPK BALANCED) PER 10 SQ. FT. - WORKED WELL INTO SOIL. 13. RECONDITION SOIL AND SEED/RE-SEED ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES THAT ARE NOT TO RECEIVE OTHER SURFACE TREATMENT (I.E., ASPHALT PAVEMENT, CONCRETE SLAB, PLANTING BED ETC.). ALL DISTURBED LAWN AREAS TO RECEIVE 4" OF TOPSOIL IN ADDITION TO SOIL AMENDMENTS AS PART OF RECONDITIONING. 14. ALL PLANTS & PLANTING AREAS TO RECEIVE 3" MINIMUM OF SHREDDED HARDWOOD BARK MULCH (UNLESS OTHERWISE NOTED). MULCH SHALL BE UNIFORM IN TEXTURE AND COLOR. NO PROCESSED TREE TRIMMINGS WILL BE ALLOWED. 15. ALL DISTURBED AREAS SHALL BE SEEDED PER SPECIFICATIONS. 16. ALL GRASS AND/OR LANDSCAPING DISTURBED BY NEW CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION. MAINTENANCE OF TRAFFIC 1. THE MAINTENANCE OF TRAFFIC (MOT) EFFORTS CONDUCTED BY THE CONTRACTOR WILL INCLUDE PROVIDING, MANAGING AND MAINTAINING EQUIPMENT AND PERSONNEL NECESSARY FOR MAINTAINING SAFE TRAFFIC CONDITIONS AT ALL TIMES DURING THE PROJECT. TRAFFIC MAINTENANCE INCLUDES BOTH PROTECTING THE TRAVELING PUBLIC APPROACHING THE SITE AND INCORPORATING SAFE AND EFFICIENT CIRCULATION WITHIN THE CONSTRUCTION AREA. 2. THE CONTRACTOR SHALL FURNISH, ERECT, PLACE AND MAINTAIN TRAFFIC CONTROL SIGNS AND DEVICES DURING THE HOURS OF CONSTRUCTION OPERATIONS AND AT ALL OTHER TIMES IN ACCORDANCE WITH LOCAL AND INDOT STANDARDS. IN ADDITION TO THE LOCAL AND STATE STANDARDS, THE CONTRACTOR SHALL CONSULT THE U.S. DOT, FHA, AND MUTCD REGULATIONS REGARDING THE TYPE AND PLACEMENT OF TRAFFIC CONTROL DEVICES. 3. THE CONTRACTOR SHALL PROVIDE ALL DEVICES NECESSARY AND INSTALL TEMPORARY VEHICLE ROUTES, DETOURS AND RUNAROUNDS TO MAINTAIN THE OWNER'S ONGOING ACTIVITIES. MODIFICATIONS AND TEMPORARY SHUTDOWNS FOR THESE TRAFFIC ROUTES SHALL FIRST BE COORDINATED WITH THE OWNER. 4. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM OWNER AND AUTHORITIES HAVING JURISDICTION. 5. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY OWNER OR AUTHORITIES HAVING JURISDICTION. 6. ALL SIDEWALK CLOSURES REQUIRE A SIGNED ALTERNATIVE ROUTE FOR PEDESTRIANS. 7. MAINTAIN FIRE, AMBULANCE AND POLICE VEHICLE ACCESS TO THE BUILDINGS AT ALL TIMES DURING CONSTRUCTION. 8. ALL REQUIRED COMMUNICATION, PERMITS OR NOTICES NEEDED BY THE LOCAL FIRE, POLICE AND CITY OFFICES WILL REMAIN THE CONTRACTOR'S RESPONSIBILITY. THE CONTRACTOR SHALL DETERMINE IF ANY LOCAL ROAD RESTRICTIONS ON WEIGHT OR OTHERWISE EXISTS BEFORE DIRECTING INCOMING AND OUTGOING CONSTRUCTION TRAFFIC. 9. SIGNS AND DEVICES SHOWN ON THE MAINTENANCE OF TRAFFIC PLAN REPRESENT THE MINIMUM STANDARDS. ADDITIONAL SIGNS AND ADJUSTMENTS TO LOCATION MAY BE REQUIRED TO ADDRESS CHANGING FIELD CONDITIONS. 10. PROMPTLY REMOVE TEMPORARY TRAFFIC CONTROL WHEN SIGNS AND DEVICES NO LONGER SERVE ANY PURPOSE. 11. TEMPORARY FACILITIES, INCLUDING REROUTING PEDESTRIAN PATHS AROUND THE WORK SITE ARE THE CONTRACTOR'S RESPONSIBILITY AND WILL BE BASED ON THE OWNER'S NEEDS. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING SITE ACCESS AND PEDESTRIAN MOVEMENT AROUND THE CONSTRUCTION SITE PRIOR TO PLACING CONSTRUCTION FENCING, GATES AND EQUIPMENT OR MATERIALS ON SITE. 12. THE LOCATION OF CONSTRUCTION LAYDOWN AREAS MUST FIRST BE APPROVED BY THE OWNER. LAYDOWN AREAS SHALL BE FENCED AND PROTECTED FROM THE SURROUNDING PROPERTIES. 13. CONSTRUCTION ONSITE JOB TRAILERS SHALL BE COORDINATED WITH THE OWNER. FOR TRAILERS WITH PLUMBING, THE UNITS SHALL BE SERVED BY EITHER A PROPERLY PERMITTED SANITARY SEWER LATERAL OR TEMPORARY WASTE STORAGE REVIEWED AND APPROVED BY BOTH THE OWNER AND THE LOCAL AUTHORITIES. GENERAL NOTES GD0.1 GENERAL NOTES CONSULTANT PROJECT NUMBER: 220114.00 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 12.15.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC SUBMITTAL WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS 520 E MAIN STREET CARMEL, IN 46032 CARMEL TAC REVIEW 01/13/2021A 19700317 No. 07/02/21 TBM#1 = 856.00 E MAIN STREET LOT 1 LOT 48 PROPOSED BUILDING ADDITION 18,240 SFT. FINISH FLOOR ELEV. = 851.55 (EAST) FINISH FLOOR ELEV. = 852.89 (WEST) FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKING1 2 1 3 3 4 5 2 2 4 6 6 6 6 7 7 7 7 7 77 8 8 1 1 9 6 2 3 CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) CONSTRUCTION LIMITS (TYP.) 20 600 20 40 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS A & B ON SHEET L2.3. WIRE BASKET, BURLAP AND TWINE MUST BE REMOVED FROM ROOTBALL. 5. WHERE SHREDDED HARDWOOD MULCH LANDSCAPE BEDS ABUT LAWN INSTALL TRENCH BED EDGE PER DETAIL C/L2.3. GENERAL NOTES CARMEL TAC REVIEW 01/13/2021A 19700317 No. COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220114.00 CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 03/08/2021 DRAWN BY: HHW 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT CONSTRUCTION DOCUMENTS LANDSCAPE PLAN L1.3 KEYNOTES SODDED DISTURBED LAWN AREAS, PER SPECIFICATIONS 4" SHREDDED HARDWOOD MULCH PLANTING BED - PER DETAIL C/L2.3 INSTALL SHADE TREES IN LOCATIONS OF MISSING TREES (5 TREES, 2.5" CAL. QUERCUS RUBRA - RED OAK) - PER DETAIL A/L2.3 INSTALL SHRUBS IN LOCATIONS OF MISSING SHRUBS (APPROX. 15 SHRUBS, MATCH EXISTING SHRUBS) - PER DEATIL B/L2.3 4" SHREDDED HARDWOOD MULCH LANDSCAPE BED WITH APPROX. 19 SHRUBS (MATCH EXISTING SHRUBS) - PER DETAIL B & C/L2.3 PROTECT EXISTING TREE PER DETAIL D/L2.3 PROTECT EXISTING SHRUBS TO REMAIN PROTECT EXISTING GROUNDCOVER TO REMAIN, IF DISTURBED FILL IN WITH GROUNDCOVER TO MATCH EXISTING 4" SHREDDED HARDWOOD MULCH LANDSCAPE BED WITH GROUNDCOVER - 275 VINCA MINOR BOWLES (BOWLES MYRTLE) 1 GAL. CONTAINER - PER DETAIL E/L2.3 PROPOSED LANDSCAPE LEGEND EXISTING SHADE TREE TO REMAIN PROPOSED 2 1/2" CAL. DECIDUOUS TREE EXISTING SHRUB TO REMAIN PROPOSED SHRUB (3 GAL. CONT./24" HT. B&B) SODDED LAWN EXISTING GROUNDCOVER PROPOSED GROUNDCOVER 07/02/21 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! L2.3 LANDSCAPE DETAILS NOTES: 1. TRENCH EDGE SHALL CREATE A CLEAN SEPARATION BETWEEN MULCHED PLANTING BEDS & LAWN AREAS. THE EDGE SHALL CREATE A SMOOTH AND EVEN LINE AS SHOWN ON PLANS. 2. PLACE SOIL FROM TRENCH EDGE WITHIN BED. 3. TRENCH BED EDGE SHALL BE USED AT THE EDGES OF ALL MULCHED PLANTING BEDS THAT ABUT LAWN AREAS FOR CONTAINMENT. VERTICAL EDGE 4" SHREDDED HARDWOOD MULCH FINISH GRADE OF PLANTING BED MULCHED PLANTING BEDLAWN AREA 3"4"KEEP OUT TREE PROTECTION ZONE NOTES: 1. FENCE AROUND TREES AS SHOWN ABOVE TO KEEP EQUIPMENT OFF THE ROOT AREA. 2. WHEN REQUIRED TO CROSS THE PROTECTION-ZONE CUSHION THE AREA WITHIN THE TREE PROTECTION ZONE WITH 6 INCHES OF WOOD CHIPS OR HARDWOOD MULCH. 3. CREATE TRAFFIC PATTERNS SUCH AS TO KEEP SOIL COMPACTION TO A MINIMUM ADJACENT TO THE TREE PROTECTION ZONE. 4. STORE SUPPLIES AND EQUIPMENT AWAY FROM TREES. 5. DESIGNATE SITES WELL AWAY FROM TREES FOR WASHING OUT CONCRETE TRUCKS. REFER TO EROSION CONTROL PLANS FOR LOCATION OF CONCRETE WASHOUT AREAS. 6. INSTALL ONE ACCESS GATE PER TREE PROTECTION ZONE. 7. MAINTAIN TREE PROTECTION ZONES FREE OF WEEDS AND TRASH. TREE DRIP LINE EXISTING TREE DRIP LINE FENCE LOCATION (1-1/2 TIMES DIA. OF DRIPLINE) ORANGE SAFETY FENCE OR EQUIVALENT STEEL T-POSTINSTALL SIGN ±20' O.C., MINIMUM OF 4 SIGNS, EACH SIGN FACING A DIFFERENT DIRECTION FENCE LOCATION 1 1/2 TIMES DIAMETER OF TREE DRIP LINE 8'-0"4'-0"2'-0" PLAN 1-1/2 X DRIP LI N E DRI P LI NE TREE PROTECTION - DETAIL D NO SCALE CONSULTANT PROJECT NUMBER: 220114.00 CARMEL CLAY SCHOOLS PROJECT ISSUE DATE: 12.15.2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE TAC SUBMITTAL WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL PERFORMING ARTS ADDITION AND RENOVATIONS 520 E MAIN STREET CARMEL, IN 46032 CARMEL TAC REVIEW 01/13/2021A 19700317 No. NOTES: 1. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. 2. IMMEDIATELY SOAK WITH WATER. 3. DO NOT USE PLANTS WITH BROKEN OR CRACKED ROOTBALL. 4. PERENNIALS OF THE SAME SPECIES SHALL BE MATCHED IN GROWTH CHARACTER AND UNIFORMITY. 5. IF HEAVY CLAY OR A RESTRICTIVE HARD PAN IS ENCOUNTERED AUGER 6" DIAMETER DRAINAGE HOLES,2'-0"APART, INTO FREE-DRAINING STRATA OR TO A DEPTH OF 3' WHICHEVER IS LESS TO PROVIDE FOR GOOD DRAINAGE. 4" SHREDDED HARDWOOD MULCH UNDISTURBED SUBGRADE PLAN REMOVE CONTAINER & DISPOSE OF OFF SITE PERENNIAL PERENNIALS SHALL BE PLANTED USING A TRIANGULAR PLANTING SCHEME. REFER TO THE PLANTING SCHEDULE FOR THE ON-CENTER PLANTING DIMENSION. EQUAL EQUALPERENNIAL PLANTING - DETAIL E 3/4" = 1'-0" ROTOTILL OR BREAK UP TO 8" DEPTH, SPREAD 2" LAYER OF COMPOST, ROTOTILL COMPOST INTO TOP 8" OF BED 07/02/21 HARROWGATE ADDI TI ONP.B. 2, PG. 203-205 LOT 1 LOT 48 LOT 49 LOT 50 LOT 51 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 5 PARCEL 7PARCEL 8 ADJOINER ADJOINER LEGEND: SITE FLOOD NOTE: E MAI N STREET 8 A B 3 4 5 6 7 12 C D E F G H 8 34 5 6 7 12 A B C D E F G H FANNING HOWEY ASSOCIATES, INC.CARMEL HIGH SCHOOL502 E. MAIN STREETCARMEL, INDIANA DESCRIPTIONDATE NO REVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY: APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:PARTIAL RETRACEMENT BOUNDARY SURVEY303-1031"=50' AUGUST 3, 2020 TJTABSABS1 4 SV-1 NORTH 530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comVICINITY MAP PARCEL 1 PARCEL 2 PARCEL 3 PARCEL 4 PARCEL 5 PARCEL 6 PARCEL 7 PARCEL 8 MATCH LINE SEE SHEET SV-2 MATCH LINE SEE SHEET SV-2 NORTHWEST QUARTER SECTION 30 E 136TH STREET MAIN STREETRANGELINE ROADSURVEYOR'S REPORT Reference Surveys and Plats Reference Monuments Record Descriptions Evidence of Occupation SURVEYED PARCEL CARMELWOOD SUBDIVI SI OND.R. 136, PG. 365- 36607/02/21 ADJOINER ADJOINER ADJOINER ADJOINER HARROWGATE ADDITIONP.B. 2, PG. 203-205 LOT 59 LOT 60 LOT 61 LOT 62 ADJOINERCARMELWOOD SUBDIVISIOND.R. 136, PG. 365-366LOT 6 LOT 7 ADJOINER ADJOINER ADJOINER PARCEL 1 PARCEL 2 PARCEL 3 PARCEL 4 ADJOINER PARCEL 5 PARCEL 7 PARCEL 8 PARCEL 6 LEGEND: 8 A B 3 4 5 6 7 12 C D E F G H 8 34 5 6 7 12 A B C D E F G H FANNING HOWEY ASSOCIATES, INC.CARMEL HIGH SCHOOL502 E. MAIN STREETCARMEL, INDIANA DESCRIPTIONDATE NO REVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY: APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:PARTIAL RETRACEMENT BOUNDARY SURVEY303-1031"=50' AUGUST 3, 2020 TJTABSABS2 4 SV-2 NORTH 530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comSMOKEY ROW ROAD / E 136TH STREET COOL CRE E K MATCH LINE SEE SHEET SV-1 MATCH LINE SEE SHEET SV-1 07/02/21 TBM#4 = 810.78 MATCH LINE SEE SHEET SV-3 MATCH LINE SEE SHEET SV-4 BENCHMARKS: UTILITY NOTE: LEGEND: 8 A B 3 4 5 6 7 12 C D E F G H 8 34 5 6 7 12 A B C D E F G H FANNING HOWEY ASSOCIATES, INC.CARMEL HIGH SCHOOL502 E. MAIN STREETCARMEL, INDIANA DESCRIPTIONDATENO REVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY: APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:TOPOGRAPHIC SURVEY303-1031"=30' AUGUST 3, 2020 TJTABSABS3 4 SV-3 NORTH 530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.com07/02/21 TBM#1 = 856.00 E MAIN STREET SMOKEY ROW ROAD / E 136TH STREET TBM#2 = 834.95 MATCH LINE SEE SHEET SV-3 MATCH LINE SEE SHEET SV-4 BENCHMARKS: UTILITY NOTE: LEGEND: 8 A B 3 4 5 6 7 12 C D E F G H 8 34 5 6 7 12 A B C D E F G H FANNING HOWEY ASSOCIATES, INC.CARMEL HIGH SCHOOL502 E. MAIN STREETCARMEL, INDIANA DESCRIPTIONDATENO REVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY: APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:TOPOGRAPHIC SURVEY303-1031"=30' AUGUST 3, 2020 TJTABSABS4 4 SV-4 NORTH 530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.com07/02/21