Loading...
HomeMy WebLinkAboutCarmel Rohrer Rd_Stormwater Release Rate Variance1000 E. Main St. Plainfield, Indiana 46168 29 July 2020 City of Carmel Engineering Department Attn: Mr. Alex Jordan Carmel City Hall One Civic Square Carmel, Indiana 46032 Dear Mr. Jordan: Duke Energy has is formally requesting a variance related to the City of Carmel storm water release rate for a new proposed substation located at 925 Rohrer Road in Carmel, Hamilton County, Indiana. Duke Energy would like to request approval of storm water release rates as proposed on the current plan submittal. Post-development runoff flow rates are designed as equal to or less than the pre-development runoff rates. This request is submitted in an effort to save several existing mature trees that currently act as buffer between the proposed substation site and US 31. In order to meet the re-development requirements, set forth by the City of Carmel, the proposed detention basin would need to be expanded which would result in the removal of all visually beneficial vegetation on site. Please contact me at (317) 605-8922 or at Brian.Catt@Duke-Energy.com if you have any questions or you can send correspondence to the address below. Thank you, Brian Catt Senior Permitting Specialist Duke Energy Transmission SPE – WP944 1000 E. Main Street Plainfield, IN 46168