HomeMy WebLinkAbout02_GD0.1.GNGENERAL 1.ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL FEDERAL, STATE, COUNTY, CITY, AND LOCAL PERMITS FOR ANY AND ALL WORK REQUIRED UNLESS OTHERWISE NOTED. THIS SHALL INCLUDE ALL SUBMITTALS AS REQUIRED INCLUDING STORMWATER RUNOFF CONTROL (RULE 5). THE CONTRACTOR IS RESPONSIBLE FOR PAYING FOR ALL REQUIRED PERMITS BY ANY OR ALL AGENCIES MENTIONED ABOVE UNLESS OTHERWISE NOTED BY THE CONTRACT OR SPECIFICATIONS. 3.CONTRACTOR SHALL VERIFY DATE OF PLANS WITH ENGINEER PRIOR TO CONSTRUCTION TO ENSURE USE OF CURRENT PLANS. 4.ALL QUANTITIES PROVIDED ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 5.PROTECT AND MAINTAIN BENCHMARKS AND SURVEY CONTROL POINTS FROM DISTURBANCE DURING CONSTRUCTION. SITE LAYOUT 1.DIMENSIONS SHOWN ARE TO FACE OF CURB AND TO FACE OF BUILDING UNLESS NOTED OTHERWISE. 2.RADII NOT DIMENSIONED ARE TO BE 5'. 3.ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. 4.REFER TO APPROPRIATE SITE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. 5.TAPER CURB HEIGHT TO 1" IN FINAL 2' OF ALL CURB ENDINGS OR AS NOTED ON PLANS. 6.EXACT LOCATION OF SIGNS TO BE COORDINATED WITH OWNER AND APPROVED PRIOR TO INSTALLATION. 7.SITE BOUNDARY, TOPOGRAPHY, UTILITY, STRUCTURES AND ROAD INFORMATION TAKEN FROM A SURVEY PREPARED BY CEC. GRADING AND EARTHWORK 1.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA. EXISTING UTILITY STRUCTURES ARE SHOWN IN ACCORDANCE WITH AVAILABLE INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH THE APPLICABLE UTILITY COMPANY) IS THE RESPONSIBILITY OF THE CONTRACTOR. 2.ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 3.PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, WASHOUT, AND OTHER HAZARDS CREATED BY EARTH MOVING OPERATIONS. 4.IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACQUAINT HIMSELF WITH SUBSOIL CONDITIONS PRIOR TO BIDDING. 5.CONTRACTOR SHALL VERIFY WITH OWNER EXACT LOCATION AND DEPTH OF ALL PRIVATE/OWNER INSTALLED UTILITIES PRIOR TO CONSTRUCTION. 6.DETERMINE LOCATION OF UNDERGROUND UTILITIES AND PERFORM WORK IN A MANNER WHICH WILL AVOID POSSIBLE DAMAGE. HAND EXCAVATE AS REQUIRED. 7.THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 8.THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (LOCATIONS, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 9.EXCAVATE TO SUBGRADE ELEVATIONS REGARDLESS OF THE CHARACTER OF SURFACE AND SUBSURFACE CONDITIONS ENCOUNTERED. UNCLASSIFIED EXCAVATED MATERIALS MAY INCLUDE ROCK, SOIL MATERIALS, AND OBSTRUCTIONS. 10.PREVENT SURFACE WATER AND GROUND WATER FROM ENTERING EXCAVATIONS, FROM PONDING ON PREPARED SUBGRADES, AND FROM FLOODING THE PROJECT SITE AND SURROUNDING AREA. REROUTE SURFACE WATER RUNOFF AWAY FROM EXCAVATED AREAS. DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. DO NOT USE EXCAVATED TRENCHES AS TEMPORARY DRAINAGE DITCHES. 11.STOCKPILE BULK MATERIALS AWAY FROM EDGE OF EXCAVATIONS WITHOUT INTERMIXING WITH SUBSOIL. GRADE AND SHAPE STOCKPILES TO DRAIN SURFACE WATER. COVER TO PREVENT WINDBLOWN DUST AND EROSION BY WATER. DO NOT STORE WITHIN DRIP LINE OF TREES THAT WILL REMAIN. 12.CONTRACTOR SHALL INSTALL ALL SLEEVES/CONDUITS AS REQUIRED BY THE UTILITY COMPANIES. COORDINATE FINAL LOCATIONS WITH THE UTILITY COMPANIES. 13.THE CONTRACTOR SHALL PROVIDE AT LEAST 18"' OF COVER OVER ALL STORM SEWERS, UNLESS OTHERWISE INDICATED BY PLANS. 14.PROVIDE COMPACTED "B" BORROW BACKFILL OVER ALL UTILITIES IN PAVED AREAS. 15.PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW GRADES. 16.MAINTAIN GRADE STAKES SET BY OTHERS UNTIL REMOVAL IS MUTUALLY AGREED UPON BY PARTIES CONCERNED. 17.ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, WATER OR GAS VALVE BOXES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATION. 18.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, "BIRD BATH" CONDITIONS. 19.MAXIMUM LAWN SLOPE SHALL BE 3:1. 20.DURING FINISH GRADING, ELIMINATE RILLS AND GULLIES. REMOVE ALL STONES, RUBBLE, STICKS, WIRE, PLANT MASS AND DEBRIS OVER 1 INCH IN ANY DIMENSION, AS WELL AS OBVIOUS QUANTITIES OF SMALL STONE. 21.REPAIR AND REESTABLISH GRADES TO SPECIFIED TOLERANCES WHERE COMPLETED OR PARTIALLY COMPLETED SURFACES BECOME ERODED, RUTTED, SETTLED, OR WHERE COMPACTION IS LOST DUE TO SUBSEQUENT CONSTRUCTION OPERATIONS OR WEATHER CONDITIONS. 22.ADD ADDITIONAL TOPSOIL AND GRADE AS NECESSARY IN AREAS OF SETTLEMENT AND EROSION, AND AS REQUIRED TO MEET FINISH GRADE. 1.ALL EROSION CONTROL PLANNING AND IMPLEMENTATION OF PROTECTIVE MEASURES SHALL BE IN ACCORDANCE WITH THE STANDARDS AND PROCEDURES OUTLINED IN THE IDEM "INDIANA STORM WATER QUALITY MANUAL". 2.THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE AND REPAIR OF ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES DURING EARTHMOVING OPERATIONS. 3.DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. 4.IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL AND LIMIT THE TRACKING OF SILT AND SEDIMENT OFFSITE. THE CONTRACTOR SHALL BROOM AND COLLECT TRACKED SILT AND SEDIMENT IMMEDIATELY UPON DISCOVERY THE MATERIAL. 5.DO NOT COMMENCE SITE CLEARING OR EARTH MOVING OPERATIONS UNTIL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES ARE IN PLACE. 6.DUST CONTROL IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL INCLUDE CONSTANT AND REPETITIVE APPLICATION OF WATERING AND STREET SWEEPING. 7.THE CONTRACTOR SHALL TEMPORARILY SEED ALL DISTURBED AREAS PLANNED FOR A PERIOD OF INACTIVITY EXCEEDING 15 DAYS. EROSION CONTROL SITE UTILITIES 1.THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THE ENGINEER DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION MADE AVAILABLE. THE ENGINEER HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL VERIFY EXISTING STORM SEWER CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION TO ENSURE THAT THE NEW SEWERS CAN BE CONSTRUCTED AS SHOWN ON THESE PLANS. REPORT ANY DISCREPANCIES TO THE ENGINEER. 3.CONSTRUCTION OF ALL STORM SEWER LINES AND STRUCTURES SHALL BE IN ACCORDANCE WITH LOCAL AND STATE CODES, RULES AND REGULATIONS. 4.IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION WITH ALL RESPECTIVE UTILITIES. 5.EXISTING UTILITY STRUCTURES ARE SHOWN IN ACCORDANCE WITH AVAILABLE INFORMATION. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. IN THE AFFECTED CONSTRUCTION AREA. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR. 6.CONTRACTOR SHALL INSTALL ALL SLEEVES/CONDUITS AS REQUIRED BY THE UTILITY COMPANIES. COORDINATE FINAL LOCATIONS WITH THE UTILITY COMPANIES. CONTRACTOR SHALL SLEEVE ALL PIPING AT FOOTINGS AND BELOW GRADE WALLS. SLEEVES SHALL BE WATER TIGHT. COORDINATE ALL WALL PENETRATIONS WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING PLANS. 7.CONTRACTOR SHALL VERIFY WITH OWNER THE EXACT LOCATION AND DEPTH OF ALL PRIVATE/OWNER-INSTALLED UTILITIES PRIOR TO CONSTRUCTION. 8.CONTRACTORS SHALL CONSULT ARCHITECTURAL, MECHANICAL, PLUMBING AND ELECTRICAL PLANS FOR INVERT ELEVATIONS AND EXACT LOCATION OF DOWNSPOUTS, WATER LINES, STORM LINES, SANITARY LINES, GAS LINES, ELECTRICAL LINES, TELECOM LINES, TRANSFORMER PADS OR POLES, ETC. 9.SEE SITE ELECTRICAL PLANS FOR SITE LIGHTING, POWER AND TELECOM. 10.INSTALL PIPING BEGINNING AT LOW POINT, TRUE TO GRADES AND ALIGNMENT INDICATED WITH UNBROKEN CONTINUITY OF INVERT. PLACE BELL ENDS OF PIPING FACING UPSTREAM. INSTALL GASKETS, SEALS, SLEEVES, AND COUPLINGS ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS. REFER TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR USE OF LUBRICANTS, CEMENTS, AND OTHER INSTALLATION REQUIREMENTS. 11.INSTALL MANHOLES FOR CHANGES IN DIRECTION UNLESS FITTINGS ARE INDICATED. USE FITTINGS FOR BRANCH CONNECTIONS UNLESS DIRECT TAP INTO EXISTING SEWER IS INDICATED. 12.PVC AND HDPE STORM SEWER PIPE TO BE INSTALLED ONLY AT LOCATIONS INDICATED AND SHALL NOT BE SUBSTITUTED FOR LOCATIONS WHERE RCP PIPE IS SPECIFIED. 13.THE CONTRACTOR SHALL PROVIDE AT LEAST 18" OF COVER OVER ALL STORM SEWERS, UNLESS OTHERWISE INDICATED BY PLANS. 14.WHERE WATER LINES AND SEWERS CROSS AND THE WATER LINE CANNOT BE PLACED ABOVE OR BELOW THE SEWER WITH A MINIMUM OF 18" VERTICAL CLEARANCE, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PLASTIC PRESSURE (SDR 21) SEWER PIPE WITH GASKETED, COMPRESSION TYPE JOINTS WITHIN 10' OF THE WATER LINE. THE WATER LINES SHALL BE INSTALLED ABOVE THE SEWER WHEREVER POSSIBLE. 15.WHERE WATER LINES AND SEWERS RUN PARALLEL AND A MINIMUM SEPARATION DISTANCE OF 10' CANNOT BE MAINTAINED, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PLASTIC PRESSURE SEWER PIPE WITH GASKETED, COMPRESSION TYPE JOINTS. 16.ALL EXISTING MANHOLE AND CATCH BASIN CASTINGS, WATER OR GAS VALVE BOXES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATION. 17.ANY STORM DRAIN, FIELD TILE, OR UTILITY ENCOUNTERED DURING CONSTRUCTION SHALL BE RELOCATED AND POSITIVE DRAINAGE MAINTAINED UNLESS OTHERWISE NOTED TO REMAIN. NOTIFY ENGINEER IF ANY DRAINS ARE ENCOUNTERED. 18.ALL PAVEMENT CUT DUE TO UTILITY INSTALLATION, CONSTRUCTION OF CURBS, ETC., OR DAMAGE TO EXISTING PAVEMENT DURING CONSTRUCTION SHALL BE PATCHED WITH A PAVEMENT SECTION WHICH MEETS OR EXCEEDS THE EXISTING SECTION. MAINTENANCE OF TRAFFIC 1.THE MAINTENANCE OF TRAFFIC (MOT) EFFORTS CONDUCTED BY THE CONTRACTOR WILL INCLUDE PROVIDING, MANAGING AND MAINTAINING EQUIPMENT AND PERSONNEL NECESSARY FOR MAINTAINING SAFE TRAFFIC CONDITIONS AT ALL TIMES DURING THE PROJECT. TRAFFIC MAINTENANCE INCLUDES BOTH PROTECTING THE TRAVELING PUBLIC APPROACHING THE SITE AND INCORPORATING SAFE AND EFFICIENT CIRCULATION WITHIN THE CONSTRUCTION AREA. 2.THE CONTRACTOR SHALL FURNISH, ERECT, PLACE AND MAINTAIN TRAFFIC CONTROL SIGNS AND DEVICES DURING THE HOURS OF CONSTRUCTION OPERATIONS AND AT ALL OTHER TIMES IN ACCORDANCE WITH LOCAL AND INDOT STANDARDS. IN ADDITION TO THE LOCAL AND STATE STANDARDS, THE CONTRACTOR SHALL CONSULT THE U.S. DOT, FHA, AND MUTCD REGULATIONS REGARDING THE TYPE AND PLACEMENT OF TRAFFIC CONTROL DEVICES. 3.THE CONTRACTOR SHALL PROVIDE ALL DEVICES NECESSARY AND INSTALL TEMPORARY VEHICLE ROUTES, DETOURS AND RUNAROUNDS TO MAINTAIN THE OWNER'S ONGOING ACTIVITIES. MODIFICATIONS AND TEMPORARY SHUTDOWNS FOR THESE TRAFFIC ROUTES SHALL FIRST BE COORDINATED WITH THE OWNER. 4.DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM OWNER AND AUTHORITIES HAVING JURISDICTION. 5.PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY OWNER OR AUTHORITIES HAVING JURISDICTION. 6.ALL SIDEWALK CLOSURES REQUIRE A SIGNED ALTERNATIVE ROUTE FOR PEDESTRIANS. 7.MAINTAIN FIRE, AMBULANCE AND POLICE VEHICLE ACCESS TO THE BUILDINGS AT ALL TIMES DURING CONSTRUCTION. 8.ALL REQUIRED COMMUNICATION, PERMITS OR NOTICES NEEDED BY THE LOCAL FIRE, POLICE AND CITY OFFICES WILL REMAIN THE CONTRACTOR'S RESPONSIBILITY. THE CONTRACTOR SHALL DETERMINE IF ANY LOCAL ROAD RESTRICTIONS ON WEIGHT OR OTHERWISE EXISTS BEFORE DIRECTING INCOMING AND OUTGOING CONSTRUCTION TRAFFIC. 9.SIGNS AND DEVICES SHOWN ON THE MAINTENANCE OF TRAFFIC PLAN REPRESENT THE MINIMUM STANDARDS. ADDITIONAL SIGNS AND ADJUSTMENTS TO LOCATION MAY BE REQUIRED TO ADDRESS CHANGING FIELD CONDITIONS. 10.PROMPTLY REMOVE TEMPORARY TRAFFIC CONTROL WHEN SIGNS AND DEVICES NO LONGER SERVE ANY PURPOSE. 11.TEMPORARY FACILITIES, INCLUDING REROUTING PEDESTRIAN PATHS AROUND THE WORK SITE ARE THE CONTRACTOR'S RESPONSIBILITY AND WILL BE BASED ON THE OWNER'S NEEDS. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING SITE ACCESS AND PEDESTRIAN MOVEMENT AROUND THE CONSTRUCTION SITE PRIOR TO PLACING CONSTRUCTION FENCING, GATES AND EQUIPMENT OR MATERIALS ON SITE. 12.THE LOCATION OF CONSTRUCTION LAYDOWN AREAS MUST FIRST BE APPROVED BY THE OWNER. LAYDOWN AREAS SHALL BE FENCED AND PROTECTED FROM THE SURROUNDING PROPERTIES. 13.CONSTRUCTION ONSITE JOB TRAILERS SHALL BE COORDINATED WITH THE OWNER. FOR TRAILERS WITH PLUMBING, THE UNITS SHALL BE SERVED BY EITHER A PROPERLY PERMITTED SANITARY SEWER LATERAL OR TEMPORARY WASTE STORAGE REVIEWED AND APPROVED BY BOTH THE OWNER AND THE LOCAL AUTHORITIES. GENERAL NOTES TOPOGRAPHIC LEGEND GD0.01 GENERAL NOTES AND LEGEND CONSULTANT CARMEL CLAY SCHOOLS WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. 5201 EAST MAIN STREET CARMEL, INDIANA TAC SUBMITTAL REV. NO.DESCRIPTION DATE ISSUE FOR BID/TAC REVIEW 03/15/20210 PROJECT NUMBER: 220144.00 PROJECT ISSUE DATE: MARCH 15, 2021 DRAWN BY: DBS WWW.TLF-ENGINEERS.COM317-334-1500 3901 W 86TH ST #200, INDIANAPOLIS, IN 46268 EDUCATIONAL SERVICES CENTER ADDITION AND REMODELING ADDENDUM #1 04/19/20211 CITY COMMENTS 08/19/20212