HomeMy WebLinkAboutC2 - PROPOSED SITE PLAN - CIVILEXISTING
PHASE 1 THERAPLAY
STABLE 4892 SQ.FT.11.2
'104'48'23'97'23'7'104'153'
64'72'PORCH 9'32'
10'COVERED PORCH42'
FINISH FLOOR ELEVATION
870.14' or 100'-0"67.2'80'RELOCATE, FDC, DOMESTIC WATER VALVE
& P.I.V. VERIFY TYPE, SIZE AND LOCATION
W/ UTILITY & FIRE DEPT.
"THERAPLAY PHASE 2 ROAD"
24' WIDE WITH 6" BARRIER CURB
PHASE 2 ENTRANCE25.0'20.0'70.0' R.O.W.
20.8'DU&SEc.o.
c.o.17 - 9'x20' PARKING SPACES178.5'
137.7'
33.4'
PHASE 2 EXIT
8'135.3'8.0'PHASE 2 1-STORYBUILDING ADDITIONPHASE 3
REMODELED OFFICE & MEETING SPACE
10 - 9'x20' SPACES4 -
9
'
x
2
0
'
S
P
A
C
E
S
PHASE 2
REMODELED THERAPY / CLINIC SPACE
FDC
RELOCATE
5' CONC. TURN-DOWN
25.0'25.0'R30'R30'R100.0
'
6" BARRIER CURB (TYP), SEE DTL.
10-16/C6 & CARMEL CURB
INSTALLATION NOTES
(2)36' - 12" CONCRETE
RETAINING WALLS @ RAMP
TO O.H. DOOR TO ARENA,
SEE DTL. ON C5.214.8'13.7'CONTRACTOR TO VERIFY NUMBER TYPE AND
SIZE OF WIRE FOR EXISTING UNDERGROUND
ELECTRIC SERVICE FROM POLE MOUNTED
TRANSFORMER TO NEW METER/CT CABINETCONTRACTOR TO VERIFY TYPE ANDSIZE OF WATER METER FOR EXISTINGDOMESTIC SERVICE FOR PHASE 2CONTRUCTIONCONTRACTOR TO VERIFY TYPE ANDSIZE OF GAS METER FOR FOR PHASE 2CONTRUCTIONCONTRACTOR TO VERIFY
LOCATION OF SANITARY IN STABLEBUILDING FOR CONNECTION TO
PHASE 2 CONSTRUCTION
HEAVY-DUTY ASPHALT,
SEE DTL. 1/C5
SAW CUT PAVEMENT
NEAT LINE AS SHOWN,
REMOVE EXISTING DRIVE PIPE
341' - 5' CONC. WALK, SEE DTL. 8/C5.1
ADA RAMP (TYP),SEE DTL's. ON C5.2 21.6'205.4'
3-BICYCLE PARKING
SPACES SEE DTL. 11/C5
FUTURE
SENSORY
GARDEN
INSTALL 294' - NEW FENCE. MATCH
STYLE AND COLOR ON NORTH SIDE OF
NEW DRIVEWAY (BY OWNER)25.0
'8' ASPHALT BIKE PATHEXISTING
ARENA BUILDING
18,018 sq.ft.
40.0'
PROPOSED 12 R/W
10' x 53.3' CONC. PATIO
EX.- F.H.
WALK FLUSH W/ ASPH.
WALK SEE DTL. 8/C5
TAPER REVEAL
PLAYGROUND
54' x 5' CONC. WALK
SEE DTL. 8/C5 91' x 5' CONC. TURN-DOWNWALK SEE DTL. 8/C5ADA RAMP ON BIKE PATH,
SEE DTL. E604* ON C6
6" BARRIER CONCRETE
CURB, SEE DTL. 10-16/C6
MILL & OVERLAY EXISTING
ASPHALT, SITE ALTERNATE No. 1
CONCRETE STEPS, HANRAIL,
AND RETAINING WALLS PER
ARCH. SHEETS (TYP)
PROVIDE A/C UNIT CONC. PAD
VERIFY TYPE, SIZE, LOCATION &
REINFORCING WITH MECH. SHT's.
CONCRETE RAMP 13.7' x 36', W/
12" CONC. RETAINING WALLS, SEE
DTL. 6/C5.2
LIGHT-DUTY ASPHALT IN
PARKING SPACES, SEE
DTL. 2/C5
PH. 3 CONCRETE PATIO 12' x 24', W/ 50' x
8" CONC. WALL, SEE DTL. 3A/C5.2
ADA SPACE FOR PH.3
PROVIDE RAMP @ DOOR
PIV
INSTALL 72' - (3) 4" PVC
CONDUITS TO NEW ELECTRICSERVICE FROM TRANSFORMER
CONTRACTOR TO VERIFY TYPE,
SIZE, & LOCATION FOR NEW
ELECTRICAL PRIMARY SERVICE
BY UTILITY
CONTRACTOR TO VERIFY
TRANSFORMER LOCATION FOR
TEMPORARY ELECTRIC SERVICER25.0'R20.0'R
4
5
.
0
'
R40.0'
25.0'25.0'PH.3 5' WIDE CONCRETE STEPS/WALK
W/ HANDRAIL, SEE DTL. 7/C5.2
NEW 3 PHASE 120/208 GROUND MOUNTED
ELECTRICAL TRANSFORMER, INSTALL PAD
PER DUKE ENERGY DETAIL ON SHEET C8
196' - (3) 4" PVC CONDUITS TO
TRANSFORMER FROM POLE
DROP BY UTILITY
R
2
0
.
0
'
R4
5
.
0
'
R25.
0
'
PHASE 3
PHASE 2
c.o.
EX. 6" SAN. C.O.
INV. 866.44'
TYPE 2 CLEAN OUT 6" SAN.LAT. INV. - 866.84'PER TRICO DTL. ON C8
PROVDE 39' - 6" PVC @1.04% (min) PER TRICODTL. ON C8
INSTALL SANITARYCROSSING WATER LINESPER DETAIL ON C8268' - 10' ASPHALT BIKE PATH, SEE DTL. ON C6ADA RAMP ON BIKE PATH,
SEE DTL. E604* ON C6
EX. WELL TO BEABANDONED, CONTRACTOR
TO GROUT SOLID PER HAM.CO. BOARD OF HEALTH
REQUIREMENTS & PERMITS,ALSO COORDINATE WITH
OWNER FOR CONNECTIONTO CARMEL WATER BY
LUCKY FARMS
INSTALL 208' - NEW FENCE. MATCH
STYLE AND COLOR OF EXISTING
HORSE FENCE (BY OWNER)
CONTRACTOR TO INSTALL ALL
PAVEMENT & CURBS WITHIN THE
TOWNE ROAD R/W IN
ACCORDANCE WITH CARMEL
STREET STANDARDS AND DETAILS
SEE DETAILS ON C2A & C6
28.8'
C2
1803-021KEELER-WEBB ASSOCIATESPROPOSED SITE PLAN Children's TherAplayPHASE 2REMODEL & ADDITIONSOWNER REVIEW07-11-2018T(U)
LEGEND BZA REVIEW9-12-2018STATE RELEASE3-25-2019ENGINEERING REVISIONS6-27-20191
ENGINEERING REVISIONS8-23-20192
3
2
2 ENGINEERING REVISIONS9-20-20193