Loading...
HomeMy WebLinkAboutC4 - EROSION CONTROL PLAN - CIVIL104'48' 97'23'7'104'153' 64'72'PORCH 9'32' 10'COVERED PORCH42'67.2'80'70.0' R.O.W. 20.8' c.o. c.o.PHASE 2 1-STORYBUILDING ADDITIONPHASE 3 REMODELED OFFICE & MEETING SPACE PHASE 2 REMODELED THERAPY / CLINIC SPACE 8' ASPHALT BIKE PATH40.0' PROPOSED 12 R/W EX.- F.H. PIV c.o. EX. 6" SAN. C.O. INV. 866.44'86986886 5 86 1 868 869 869868868867869866 C4 EROSION CONTROL PLAN “”KEELER-WEBB ASSOCIATESCHILDRENS THER-A-PLAY1803-021 THIS PLAN IS FOR CONCEPTUAL EROSION CONTROL PURPOSES ONLY. DO NOT SCALE CONCRETE WASHOUT DUMPSTER SEE DETAIL 10/C5 SWPPP SIGN PHASE 2REMODEL & ADDITIONSOWNER REVIEW07-11-2018PHASE 2 OWNER REVIEW07-27-2018STATE RELEASE3-25-2019FOR CARMEL PERMITS5-31-2019UNTRENCHED TRENCHEDOR Filter Sock 18"Ø Min.Stake Stake Flo w Flo w 18" Min . Lap Filter Sock (Typ.) 4' Max. Spa. Stake (Typ.) SECTION A-A Filter Sock 18"Ø Min. Wood Mulch or Compost To Half Height of Log FlowArea To Be Protected Work Area A A NOTE: All Filter Sock ends need to be tied into slope to force water to go through the middle of device.6"Min.6"Min.PROPOSED LEGEND ENGINEERING REVISIONS6-27-20191 1 1