HomeMy WebLinkAboutCorrespondence July 2, 2024 Mr. Alex Jordan Engineering Department City of Carmel One Civic Square Carmel, Indiana 46032 Re: Request for Variance – Minimum Flood Protection Grade (MFPG) Docket No. #PZ-2024-00070 ADLS – Tru Hotel Dear Mr. Jordan: American Structurepoint, Inc., on behalf of our client, Dor a Hospitality, respectfully requests the following variance from The City of Carmel Stormwater Technical Standards. We are requesting a variance from standard 104.02, which requires the building finished floor to be a minimum two (2) feet above the Minimum Flood Protection Grade (MFPG ) and the Minimum Lowest Adjacent Grade (MLAG) to be 12 inches above the local flood route. Further more, the Minimum Finished Floor Elevation (MFFE) is to be a minimum 6 inches above the finished gr ade around the building and two (2) feet above the local flood elevations. The site was master planned, leaving no thing more than a building pad to be constructed, and allowing minimal adjustability in grades to preserve ADA accessibility throughout the site. The proposed building has maximized elevations as much as possible to raise the finish floor to the highest extent possible (0.90’ higher than was contemplated in the master plan). Th e proposed flood routing through the site will direct runoff away from the building and towards adjacent public w ays that are significantly lower than the site and fully in compliance. The emergency spillway for the adjacent po nd is almost 3’ lower than the proposed finish floor and similarly, overflows into the public way. The site has been graded to perpetuate all drainage away from the building, primarily to the east and Frontage Road which continue to drain southward, away from the property. The building will not be inundated by overflow during emergency situations. We appreciate your time and consideration of our request. Please call me at (317) 547-5580 if you have any questions. Sincerely, American Structurepoint, Inc. Nathan Winslow, PE Project Manager NFW Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Urban Forestry Daren Mindham 4/22/24 3:07 PM Changemark existing landscaping to show and label Please add by showing and labeling the landscaping along this eastern perimeter that has been previously approved. I have uploaded the stamped approved landscape plan that shows the plant material in this area in the correspondence folder. L100 LANDSCAPE PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Existing landscaping has been added to the plans per previous approved documents Resolved 2 1 Urban Forestry Daren Mindham 4/22/24 3:07 PM Changemark existing landscaping Please show and label the existing landscaping and any additional landscaping as needed. L100 LANDSCAPE PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Existing and proposed landscaping have been included in the plan updates as applicable Resolved 3 1 Urban Forestry Daren Mindham 4/22/24 3:07 PM Changemark 5 foot perimeter bufferyard setback with landscaping In addition to the 5' foundation planting bed please provide a 5' perimeter bufferyard setback with landscaping. The plant material required in this 5' perimeter setback is 4 shade trees and 10 shrubs per 100 linear feet. L100 LANDSCAPE PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Buffer yard planting has been added Resolved 4 1 Urban Forestry Daren Mindham 4/22/24 3:07 PM Changemark Additional landscaping Please provide the landscaping or the equivalent landscaping of the Tru Hotel LP document in the correspondence folder within this western perimeter parking lot island. L100 LANDSCAPE PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Landscaping has been provided as required in the western perimeter parking lot island Resolved 5 1 Urban Forestry Daren Mindham 4/22/24 3:07 PM Changemark lindens Please move the one tree to the larger soil volume area to the west. Also, please change the species to honeylocust, Japanese zelkova or another shade tree as lindens tend to grow too wide for this area and are prone to Japanese beetles. L100 LANDSCAPE PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Requested tree has been shifted and changed to a honey locust. Resolved 6 1 Engineering Alex Jordan 4/22/24 3:21 PM Library Comment Please provide a professional engineer's stamp on the plans Responded by: Mark Leach - 5/30/24 3:54 PM Plans will be signed/sealed once ready for final approval Info Only 7 1 TriCo Regional Sewer Utility Ryan Hartman 4/24/24 11:25 AM Comment Please let me know what type of hotel (Ex. conference facility, efficiencies, restaurant, pool, breakfast, etc.) and execute a project application. We will also request that you submit MEP plans for final review. Responded by: Mark Leach - 5/30/24 3:54 PM Tru is a transient select service hotel that caters to short term guest stays. The hotel serves a complimentary breakfast and market for packaged snacks.There is no pool. MEP is being managed as a design/build component and plans will be submitted by the selected general contractor when available. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 8 1 Fire Carmel Fire 4/25/24 6:51 AM Comment Section 3312.1 Fire Hydrants shall be fully functional tested and approved prior to any combustible materials arriving on the construction site. Responded by: Mark Leach - 5/30/24 3:54 PM Comment acknowledged and information will be conveyed to selected contractor Info Only 9 1 Fire Carmel Fire 4/25/24 6:52 AM Comment Section 3310.1 Required Fire Department Vehicle Access. Approved Asphalt fire apparatus access roads shall be provided to and through the construction site during construction. Fire Apparatus access road must be capable of supporting the weight of fire apparatus and maintained clear at all times. Responded by: Mark Leach - 5/30/24 3:54 PM Comment acknowledged and information will be conveyed to selected contractor Info Only 10 1 Fire Carmel Fire 4/25/24 6:52 AM Comment 3313.1 Where required. In buildings required to have standpipes by Section 905.3.1, not less than one standpipe shall be provided for use during construction. Responded by: Mark Leach - 5/30/24 3:54 PM Comment acknowledged and information will be conveyed to selected contractor Info Only 11 1 Vectren Energy Chad Miller 4/26/24 10:15 AM Changemark CenterPoint Energy Please have the owner or developer call our new service center at 1-800-990 -1930 if they would like gas service. Also, we will need load information on the building to size the gas meter and an AutoCAD file. C400 UTILITY PLAN.pdf Info Only 12 1 Building & Code Services Mike Sheeks 4/29/24 8:06 PM Comment Please provide engineer stamped plans. Thank you! Responded by: Mark Leach - 5/30/24 3:54 PM Plans will be signed/sealed once ready for final approval Resolved 13 1 Engineering Alex Jordan 5/1/24 12:42 PM Changemark Was there a previous waiver for the MFPG? The MFPG is set at the same elevation of the 100-year ponding in the parking lot to the north. Was there a waiver approved with the original project submittal to allow this? If not, the MFPG will need to be raised 1' above the ponding or a waiver will need to be requested. C300 GRADING PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM This was a typo. The MFPG has been revised to be 1' above the ponding elevation and set at 864.88 Resolved 14 1 Engineering Alex Jordan 5/1/24 12:42 PM Changemark Please provide the minimum lowest adjacent grade for the proposed hotel C300 GRADING PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM The MLAG has been added to the plans Resolved 15 1 Engineering Alex Jordan 5/1/24 1:57 PM Changemark Please extend the silt fence to the north to protect the basin from the parking removal C120 PRE-CONSTRUCTION EROSION CONTROL PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Silt fence has been extended north Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 16 1 Engineering Alex Jordan 5/1/24 2:05 PM Changemark Please note where the site will be accessed Please show where construction equipment is to enter the site. C500 EROSION CONTROL PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM A note has been added to specify where the construction entrance is. This is where the site will be accessed and the construction equipment will enter. Resolved 17 1 Engineering Alex Jordan 5/1/24 2:20 PM Changemark The water quality unit provided with the office building is located within this projects parcel Will the ownership of the water quality unit be transferred to this property owner? The unit should be included in the O&M manual if so. Tru Hotel O&M Manual.pdf Responded by: Mark Leach - 5/30/24 3:54 PM The unit will remain under current ownership. The maintenance of the unit is part of the overall partnership agreement and covenants with the property to the north. Resolved 18 1 Engineering Alex Jordan 5/1/24 2:20 PM Changemark Please hatch the native vegetation on this sheet and clearly call the basin as a BMP Tru Hotel O&M Manual.pdf Responded by: Mark Leach - 5/30/24 3:54 PM The native vegetation has been hatched and noted on the exhibit Resolved 19 1 Engineering Alex Jordan 5/1/24 2:20 PM Changemark Please show the native planting protective signage on the site map "No mow, no spray" signage should be shown around the basin if they are not already installed. Tru Hotel O&M Manual.pdf Responded by: Mark Leach - 5/30/24 3:54 PM These signs have already been installed and are noted in the O&M Exhibit. Resolved 20 1 Engineering Alex Jordan 5/1/24 2:20 PM Changemark Please provide a detail for the protective signage in the O&M Tru Hotel O&M Manual.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Signs were installed with construction of dry pond. No new signage is necessary Resolved 21 1 CrossRoad Engineers Willie Hall 5/1/24 4:42 PM Changemark Horizontal Datum Per Section 102.02.v.a of the STSM, please revise to include a note indicating the horizontal datum. Please note that the horizontal datum shall be based on Indiana State Plane Coordinates, NAD83. C100 EXISTING TOPOGRAPHY PLAN.pdf Responded by: Mark Leach - 7/1/24 9:54 AM Sheet C100 has been updated to reference ISPE NAD 83 horizontal datum. ---------------------------------------------------------- Reviewer Response: Willie Hall - 6/5/24 2:59 PM Please revise the Existing Topography Plan (C100) to include a note indicating the horizontal datum. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Topographic data is based on IN State Plane East (NAD 83) Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 22 1 CrossRoad Engineers Willie Hall 5/1/24 4:51 PM Changemark Ex. Dry Pond Info Per Section 102.02.v.b of the STSM, please revise to include the pond information including, at a minimum, pond bottom, 10-year elevation, 100- year elevation, emergency spillway elevation, emergency high water elevation, and top of bank elevation. C100 EXISTING TOPOGRAPHY PLAN.pdf Reviewer Response: Willie Hall - 6/5/24 3:03 PM ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Dry Pond info added. Spillway information shown on Grading plan Resolved 23 1 CrossRoad Engineers Willie Hall 5/6/24 4:12 PM Changemark Site Acreage Per inspection of Carmel GIS, the site appears to have an acreage of 1.13 ac. Please review and revise accordingly. Tru Hotel Drainage Report.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Legal description and site acreage have been updated on the construction plans to reflect Lot 1 (1.13 acres). The drainage report references the overall 2.95 acres, which was designed and master planned from a drainage perspective as a single entity with shared infrastructure and ponds Resolved 24 1 CrossRoad Engineers Willie Hall 5/6/24 4:49 PM Changemark Proposed Building Area It appears that roof drains from the proposed building is collected and conveyed to Str. 104; however, it does not appear that the area for the proposed building is included in the storm sewer calculations for Str. 104 and all downstream structures. Please review and revise all maps and calculations to clearly show that the runoff generated by the proposed structure is captured and facilities are designed to accommodate this building runoff. Tru Hotel Drainage Report.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Roof area added in the direct to inlet column of the rational method spreadhsheet for structure 104 and the north building area for structure 105 Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 25 1 CrossRoad Engineers Willie Hall 5/6/24 4:52 PM Changemark Curve Number Calculation Comparison Please revise to include proposed curve number calculations for the overall watershed. The only proposed curve number calculations found were included here with the sub-basins but there were no curve number calculations included with the sub-basins in the master drainage report to confirm compliance. Tru Hotel Drainage Report.pdf Reviewer Response: Willie Hall - 7/9/24 9:31 AM ---------------------------------------------------------- Responded by: Mark Leach - 7/1/24 9:54 AM The developed conditions have been revised in the drainage report. ---------------------------------------------------------- Reviewer Response: Willie Hall - 6/5/24 4:26 PM The curve number of 89 shown on the "Runoff Curve Number Calculation" sheet does not include the area of the proposed building as impervious area. Summing up the pavement area shown on the "Runoff Coefficient and Runoff Curve Number Calculation" sheet totals 1.33 ac. and the amount of impervious area accounted for in the Developed Site CN calculations shown on the "Runoff Curve Number Calculation" sheet is 1.33 ac. Please update the Developed Site CN calculations to include the roof as impervious area. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Curve Numbers for the overall basins shown in the master-plan have been re-calculated with the current site layout and are lower than the original CN's assumed. Calculations have been included in appendix D Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 26 1 CrossRoad Engineers Willie Hall 5/7/24 8:33 AM Changemark Existing Roof Drain It appears that there is an existing roof drain stub that is connected to Str. 104 but no connection / elevation information on that existing connection is shown. Please revise to include that information. C400 UTILITY PLAN.pdf Responded by: Mark Leach - 7/1/24 9:54 AM A measure down was performed on 6/28, confirming the existing stub is an 18" roof drain line with an invert of of 857.36. Additional information as been added to indicate the proposed inverts. ---------------------------------------------------------- Reviewer Response: Willie Hall - 6/5/24 3:21 PM Please obtain measure down information on the existing roof drain connection to Str. 104 if this connection was not confirmed via the as-built drawings. Additionally, keynote D2 indicates the 18" roof drain is to be installed at a slope of 1.25%. Please add the roof drain connection information to verify that this slope can be achieved. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Roof drain connection is existing and already installed. We have a note for contractor to field verify, no elevations were given in the original plan set and none found on as-builts Resolved 27 1 CrossRoad Engineers Willie Hall 5/7/24 9:06 AM Changemark Ex. Pond Info Per Section 102.02.xi.j of the STSM, please revise to include the existing pond information including, at a minimum, pond bottom, 10-year elevation, 100- year elevation, spillway elevation, emergency high water elevation through the spillway, and top of bank. C300 GRADING PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Pond information has been added to the plans. Spillway width and elevation is shown on the grading plan Resolved 28 1 CrossRoad Engineers Willie Hall 5/7/24 9:06 AM Changemark Str. 104 Ponding The ponding hatching shown does not match the ponding elevation of 864.00. What is shown appears to extend to an elevation of +/-864.80. Additionally, the ponding depth is incorrect. The low point appears to be the rim elevation of Str. 104 of 863.09 and if the ponding elevation is 864.00, that would equate to a ponding depth of 0.91 feet. Please review and revise the ponding hatching, elevation information and depth information to accurately reflect the ponding conditions. C300 GRADING PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Ponding elevation, depth and extents has been corrected Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 29 1 CrossRoad Engineers Willie Hall 5/7/24 9:06 AM Changemark Str. 105 Ponding The ponding hatching shown does not match the ponding elevation of 863.91. What is shown appears to extend to an elevation of +/-863.54. Additionally, the ponding depth is incorrect. The low point appears to be the rim elevation of Str. 105 of 863.09 and if the ponding elevation is 863.91, that would equate to a ponding depth of 0.82 feet. Please review and revise the ponding hatching, elevation information and depth information to accurately reflect the ponding conditions. C300 GRADING PLAN.pdf Reviewer Response: Willie Hall - 7/8/24 3:22 PM ---------------------------------------------------------- Responded by: Mark Leach - 7/1/24 9:54 AM Additional information has been included and the routing adjusted to reflect the direction of overflow, which has been corrected to be towards Frontage Road. This is consistent with the original design plans for the building to the north, which constructed the ponds, storm infrastructure and flood routing. ---------------------------------------------------------- Reviewer Response: Willie Hall - 6/5/24 3:44 PM The ponding elevation of 863.21 appears to be incorrect. The overflow routing arrow shows, when this structure is completely clogged, it will spill over the curb to the south to the existing dry basin. The closest elevation along this curb line is at the ramp SW of Str. 105 which has a BC elevation of 863.52 and a TC elevation of 864.02. It appears that, at a minimum, this structure would pond up to those elevations before being able to drain to the dry pond to the south. Please review and revise accordingly. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Ponding elevation, depth and extents has been corrected Resolved 30 1 CrossRoad Engineers Willie Hall 5/7/24 9:17 AM Changemark MFPG, MLAG, and FF Please revise to add the MLAG and FF of the proposed building. C300 GRADING PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM The MFPG, MLAG and FFE have been added for the proposed building Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 31 1 CrossRoad Engineers Willie Hall 5/7/24 9:22 AM Changemark MFPG, MLAG, and FF Elevation Check Per Section 104.02 of the STSM, it does not appear that the proposed building provides the required freeboard above the local ponding elevation nor meet the finish floor requirements of being six inches above the MLAG. Currently, the finish floor elevation is not one foot above the local ponding elevation shown for Str. 104. Additionally, no pond information is included for the existing dry pond to the east to confirm compliance with MFPG, MLAG, and FF requirements. Please revise to include all of this information and confirm that all freeboard requirements are met. C300 GRADING PLAN.pdf Reviewer Response: Willie Hall - 7/8/24 3:33 PM ---------------------------------------------------------- Responded by: Mark Leach - 7/1/24 9:54 AM The MFPG, MLAG and MFFE have been updated based on the respone to comment #29. We respectfully request a variance from these requirements. A separate variance request letter will be provided. ---------------------------------------------------------- Reviewer Response: Willie Hall - 6/5/24 3:51 PM The FFE of the building does not provide the minimum 6-inches above the MLAG. Please review and revise accordingly. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Pond information has been added to the plans for the existing pond to the east. The MFPG, MLAG and FFE elevations have been added to teh plans and the design is in compliance Resolved 32 1 Planning & Zoning Rachel Keesling 5/8/24 1:29 PM Changemark Yellow color? What does the yellow color signify on the balcony areas? A101 - FIRST FLOOR PLAN.pdf Reviewer Response: Rachel Keesling - 6/5/24 9:29 AM Thank you for the explanation and revising the color to accurately reflect the new color scheme. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM These are not balconies. The color being referenced is on the reflected ceiling plan and signifies the ceiling finish color on the underside of the outdoor canopies. It is the same color as EIFS color #2 - PMS 4525. Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 33 1 Transportation Systems David Littlejohn 5/8/24 1:57 PM Changemark Label the bike parking Please label the bike parking on the site plan. C200 SITE PLAN.pdf Responded by: Mark Leach - 7/1/24 9:54 AM The site plan has been revised to specifically denote bicycle parking and long term (exterior) bike parking. There will be a combination of interior and exterior long term parking to satisfy the total of 9 spaces that are required. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 6/13/24 3:17 PM Revise the site plan to label the bicycle parking to ensure consistency with the site plan enlargement. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Keynote 13 on the site plan enlargement calls out bike parking. Resolved 34 1 Transportation Systems David Littlejohn 5/8/24 1:57 PM Changemark Bike parking installation Bike parking installation standards specified in Section 5.29 of the City's UDO require a minimum of 72" (6') for the length of a bike parking space. Revise the plans so that the concrete pad for the bicycle parking will be at least 72" deep to allow for enough space for bikes to be parked on the bike racks appropriately. C200 SITE PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Bike Parking revised to be 6' deep. Resolved 35 1 Transportation Systems David Littlejohn 5/8/24 1:57 PM Changemark Bike rack installation spacing Bike parking installation standards specified in Section 5.29 of the City's UDO requires bike racks to be spaced at a minimum of 30" from each other. The racks shown on this plan are too close together. Revise the plan so that there is a minimum spacing of 30" between the racks. C200 SITE PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Bike racks are spaced at 30" from each other. Resolved 36 1 Transportation Systems David Littlejohn 5/8/24 1:57 PM Changemark Bike parking area Section 5.29 of the UDO requires short term bicycle parking for hotels to be provided at a rate of 1 space for every 30 guest rooms. With 126 guest rooms this hotel is required to have a minimum of 5 bicycle parking spaces (3 inverted-U racks). To comply with the City's bicycle parking installation standards the concrete pad should be at least 9'x6'. C200 SITE PLAN.pdf Responded by: Mark Leach - 5/30/24 3:54 PM 3 U-racks are shown on a 9'x6' pad. Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 37 1 Transportation Systems David Littlejohn 5/9/24 8:44 AM Changemark bike rack spacing Bike parking installation standards specified in Section 5.29 of the City's UDO requires bike racks to be spaced at a minimum of 30" from each other. The racks shown on this plan are too close together. Revise the plan so that there is a minimum spacing of 30" between the racks. A002 - ARCHITECTURAL SITE DETAILS.pdf Responded by: Mark Leach - 5/30/24 3:54 PM Requied number of bike parking stalls have been included. Site base has been updated to reflect necessary spacing. Resolved 38 1 Transportation Systems David Littlejohn 5/9/24 8:44 AM Changemark Bike rack type Section 5.29 of the City's UDO requires an A-frame or inverted-U bike rack style as shown on the C600 Site Details page. Revise the detail to comply with the City's bike rack standards. Please refer to section 5.29 of the UDO for more information/details on the City's bicycle parking requirements. A002 - ARCHITECTURAL SITE DETAILS.pdf Responded by: Mark Leach - 5/30/24 3:54 PM References to the bike rack specifications have been removed from the architectural plans and point to the civil/site plans to avoid conflict. Standard U racks will be used per the City's UDO Resolved 39 1 Transportation Systems David Littlejohn 5/9/24 8:47 AM Changemark Bike storage detail Provide a detail showing how many bikes will be able to be stored in the bike storage room and how the bikes will be stored in the room. A101 - FIRST FLOOR PLAN.pdf Responded by: Mark Leach - 7/1/24 9:54 AM In addition to the 4 long term bike storage spaces within the building an additional 5 long term individually lockable storage lockers have been added on the exterior of the building between the main and secondary entry. Refer to amended sheet C200 for the exact location and locker details. ---------------------------------------------------------- Reviewer Response: David Littlejohn - 6/13/24 3:15 PM Section 5.29 of the UDO requires hotels to provide 1 long term bicycle parking space for every 15 guest rooms. Since this hotel will include 126 guest rooms a minimum of 9 long term bicycle parking spaces is required. The current plan for the bike storage room only shows 4 long term bicycle parking spaces. Revise the plans to provide at least 9 long term bicycle parking spaces. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM The bike storage area has been revised to show the bike storage configuration with the standard U racks space 30" apart. Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 40 1 Sign Permits Aliza Shalit 5/10/24 3:28 PM Changemark Blade sign height Per UDO sign standards a blade sign may be up to 70% of the spandrel height. Please reduce. A201 - EXTERIOR ELEVATIONS.pdf Responded by: Mark Leach - 5/30/24 3:54 PM The blade height is 69.1% of the spandrel height. In discussions with staff, the spandrel height is defined as distance between grade and the bottom of the horzontal shade feature at the top of the building. Resolved 41 1 Sign Permits Aliza Shalit 5/10/24 3:28 PM Changemark Blade sign Per UDO Sign standards a blade sign may not extend more than 5' from the face of the building. Please update. A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Aliza Shalit - 6/13/24 2:24 PM Thank you for working on the size of the sign. Although we value your perspective regarding the depth of the blade, a variance will still be required. The UDO Standard is not dependent on where the blade extends more than 5' from the face of the building, but that it actually does. That said, we can be supportive of the blade sign as is. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM The angular shape of the sign extends 9'9-1/2' from the building face at its furthest point and 6" from the building face at its narrowest point resulting in an average distance from the building face of 5.2". The shape of the sign is both an artistic feature as well as functional to accomodate the shape of the hotel brand logo. The ordinance is written in anticipation of a traditional vertical letter blade sign. If held to this standard, the owner will not be able to accomodate the required brand logo. Due to the height of the sign and blade, the additional extension in length of the building does not pose any type of danger or hazard to the public. Info Only 42 1 Sign Permits Aliza Shalit 5/10/24 3:28 PM Changemark Wall Sign Per UDO sign standards a one sign per street frontage is allowed. This sign will require a Variance. A201 - EXTERIOR ELEVATIONS.pdf Responded by: Mark Leach - 5/30/24 3:54 PM This secondary sign on the North side has been removed from the documents and will not be installed. Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 43 1 Sign Permits Aliza Shalit 5/10/24 3:28 PM Changemark Sign Size This sign will have to be reduced since the blade sign may not extend more than 5' off the face of the wall. There won't be enough room to fit a 7" wide sign. Also, the tag line "by Hilton" should be included in the overall sign dimensions as the sign area is calculated by drawing a square that surrounds all the sign elements and calculating the resulting area. A201 - EXTERIOR ELEVATIONS.pdf Responded by: Mark Leach - 5/30/24 3:54 PM The size of the sign has been slightly reduced and the overall sign dimensions now include the "By Hilton" tag line below the logo. Resolved 44 1 Sign Permits Aliza Shalit 5/10/24 3:31 PM Changemark 3rd sign location What is the 3rd sign location for this 7' wide sign? I only see it on both sides of the blade. Signage Tru Hotel 1.pdf Responded by: Mark Leach - 7/1/24 9:54 AM This note has been corrected to indicate 2 locations. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM The note has been corrected to indicate 2 locations. Question 45 1 Sign Permits Aliza Shalit 5/10/24 3:33 PM Changemark Monument sign Face Change Monument sign face changes or sign additions requires sign permits. Please apply through our online permit portal when ready. Signage Plan.pdf Info Only 46 1 Sign Permits Aliza Shalit 5/10/24 3:36 PM Changemark Ground sign There are no existing monument signs now. Incidental directional signs must be no taller than 3ft from ground to top of sign and carry no more than 3sf of signage. Please update. Signage Tru Hotel 3.pdf Responded by: Mark Leach - 5/30/24 3:54 PM This page has been removed from the documents. There will not be any new monument or directional signs associated with this project. Resolved 47 1 Sign Permits Aliza Shalit 5/10/24 3:37 PM Comment All signs require a separate sign permit application and review process. Please apply through our online permitting site after project has been approved and it is time to work on signage. Info Only 48 1 Sign Permits Aliza Shalit 5/10/24 3:41 PM Changemark Sign locations Please provide location of proposed incidental directional signs on site plan. Signage Tru Hotel 3.pdf Responded by: Mark Leach - 5/30/24 3:54 PM This page has been removed from the documents. There will not be any new monument or directional signs associated with this project. Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 49 1 Planning & Zoning Rachel Keesling 5/16/24 12:28 PM Changemark Docket number Please add Docket No. 2024-00070 ADLS to the title page. C001 TITLE SHEET.pdf Reviewer Response: Rachel Keesling - 6/5/24 9:19 AM Thank you. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Docket number has been added. Resolved 50 1 Planning & Zoning Rachel Keesling 5/16/24 3:55 PM Changemark Backside of higher parapet I believe it was stated that the back side of the tower element/larger parapet would be completely finished to look like the front. Please provide these details. A901 - 3D EXTERIOR VIEWS.pdf Reviewer Response: Rachel Keesling - 6/5/24 9:31 AM Thank you for revising the parapets and finishing the backside. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Drawings have been amended to show back side of parapet finishes and flashing. Resolved 51 1 Planning & Zoning Rachel Keesling 5/16/24 3:55 PM Changemark Parapet cap returns Please extend parapet caps to provide a complete return. A901 - 3D EXTERIOR VIEWS.pdf Reviewer Response: Rachel Keesling - 6/5/24 9:31 AM Thank you for extending the parapet caps. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Drawings have been amended to show back side of parapet finishes and flashing. Resolved 52 1 Planning & Zoning Rachel Keesling 5/16/24 3:56 PM Changemark HVAC covers Please update the drawing to show color coordinating HVAC covers with the building materials adjacent as discussed via email. A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 6/5/24 9:20 AM Ok, thank you for the explanation. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM When components are included in the building modeling program, the louvers make the element appear dark even though they are painted to match the adjacent finish color. We have circumvented this program feature for the purpose of illustrating that the PTAC louvers will match the adjacent wall finish. Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 53 1 Planning & Zoning Rachel Keesling 5/16/24 3:56 PM Changemark Pergola Is this a Smart Pergola? Will it be enclosed at all? A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 6/5/24 9:21 AM Ok, thank you for clarifying. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM This is not a smart pergoal and is not intended to be enclosed. Resolved 54 1 Planning & Zoning Rachel Keesling 5/16/24 3:56 PM Changemark Roof cross section Please provide a cross section that shows the roof parapets and HVAC units. A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 6/5/24 12:30 PM Thank you for directing me to that sheet. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM Refer to the building cross sections on sheet A301. Although the mechanical systems have not yet been designed, we have shown typical roof top HVAC units based on past experience in other hotel projects. Resolved 55 1 Planning & Zoning Rachel Keesling 5/16/24 3:56 PM Changemark Windows Please confirm that the windows will not have any mullions as is shown in these elevations. A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 6/5/24 9:21 AM Thank you. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM The windows will not have any mullions and will appear as shown on the elevations. Resolved 56 1 Planning & Zoning Rachel Keesling 5/16/24 3:56 PM Changemark How many hotel rooms? The chart says 126 rooms, but there are other locations on the drawings that say 127 rooms. Which is correct? C200 SITE PLAN.pdf Reviewer Response: Rachel Keesling - 6/5/24 9:22 AM Thank you. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM There are 126 guest rooms. Resolved Plan Review - Review Comments Report Project Name: PZ-2024-00070 ADLS - Tru Hotel Carmel Workflow Started: 4/18/2024 3:22:07 PM Report Generated: 07/18/2024 11:02 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 57 1 Planning & Zoning Rachel Keesling 5/16/24 3:56 PM Changemark Flag pole Where will the flag pole be located on site? I ask because there is a detail for it on page A0002. C200 SITE PLAN.pdf Reviewer Response: Rachel Keesling - 6/5/24 9:23 AM Thank you. ---------------------------------------------------------- Responded by: Mark Leach - 5/30/24 3:54 PM There will be no flagpole. The detail has been eliminated. Resolved 58 2 Engineering Alex Jordan 6/3/24 1:17 PM Comment We have no further comments on the plans. Before a stormwater management permit can be issued, the following items will need to be provided: 1. A signed and recorded O&M manual 2. A stormwater engineers estimate breaking down the cost of all temporary and permanent erosion control measures 3. A non-expiring stormwater performance bond for 100% of the approved estimate 4. A right-of-way permit application and $5,000 license and permit bond Responded by: Mark Leach - 7/1/24 9:54 AM Required documents will be provided upon approval of plans. Info Only 59 2 TriCo Regional Sewer Utility Ryan Hartman 6/6/24 3:57 PM Comment We are processing the permit and will relay when ready for pickup and payment. As a reminder there shall not be any elevator sump pits tied in the sanitary sewer. Info Only