Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A101 - FIRST FLOOR PLAN
REF.F.E.C.F.E.C.UPUPG1A301_______________1A301_______________2A301_______________2A301_______________1A302_______________A2011A2013A2012A2014A4011CLR5' - 0"23456789101112131415161718192021FEDCBAUNIT AG131LEFTKINGUNIT AG129LEFTKINGUNIT AG127RIGHTKINGUNIT BG125LEFTQUEEN/QUEENUNIT BG123RIGHTQUEEN/QUEENUNIT AG130RIGHTKINGUNIT BG128LEFTQUEEN/QUEENUNIT BG126RIGHTQUEEN/QUEENUNIT BG124LEFTQUEEN/QUEENUNIT C1G122RIGHTKINGMECH/ELEC119PBX120CORRIDOR118STAIR #2117DRYERS122LAUNDRY121LINEN STORAGE123ELEV.EQUIP.124EMPLOYEEBREAKROOM116RESTROOM115RESTROOM114FITNESS112GM'S OFFICE111OFFICE110PANTRY126MECH127VESTIBULE101STAIR #1102WORK AREA104ELEV. LOBBY125WATER/ICE113CORRIDOR109FRONT DESK106BREAKFAST107DINING105LOUNGE103GAME AREA108A5039A40212A302_______________9' - 6 1/2"11' - 8"11' - 8"11' - 8"11' - 8"11' - 8"11' - 8"11' - 8"11' - 8"11' - 8"11' - 8"11' - 8"15' - 2"11' - 8"11' - 8"11' - 8"11' - 8"8' - 11 3/8"2' - 8 5/8"3 3/8"4' - 5"21' - 6 3/4"5' - 7 3/4"21' - 6 3/4"4' - 5"2' - 1"3 3/8"W5A2A125DDA2AA119AW1A2W1W1A2118A1117AA2A2W1W1AAW9W9A2W9W8W4W4102AA2101AA2W7A2A120119B117B109116114115121123124122112101B102B127126A4A302_______________3A304_______________3A304_______________2A305_______________2A305_______________A3081A30713A303_______________1A304_______________4A301_______________3A301_______________3A305_______________3A305_______________A2AAA2W1W1W1W1W1W8A2211' - 11 1/4"60' - 3"4' - 5"3' - 0"4' - 5"2' - 1"A3051A2A2A2A2A221' - 2 1/2"23' - 10 3/4"46' - 8"11' - 0 3/4"11' - 8 1/2"23' - 4"15' - 8 3/4"23' - 4"35' - 0"4' - 5"21' - 6 3/4"27' - 9 1/4"4' - 5"2' - 1"4' - 5"53' - 9"21' - 2 1/2"23' - 10 3/4"69' - 5 1/4"74' - 0 3/4"20' - 8"A23A302_______________BIKESTORAGE1004A303_______________PLAN NORTHTRUE NORTHNOTES:-ROOMS FOR HEARING IMPAIRED TO BE PROVIDED WITH VISIBLE & AUDIBLE ALARM PER THE ELECTRICAL DESIGN DRAWINGS. DEVICES SHALL BE ACTIVATED BY BOTH THE IN-ROOM SMOKE DETECTOR AND THE BUILDING FIRE PROTECTION SYSTEM.-SEE ROOM FINISH SCHEDULE FOR SHELVING REQUIREMENTS.-WALL, FLOOR, & ROOF ASSEMBLIES ARE INDICATED WITH . SEE VERTICAL & HORIZONTAL ASSEMBLY SHEETS FOR MORE INFO.1. THIS PLAN SHOWS THE LOCATIONS OF ITEMS THAT ARE ARCHITECTURALLY SIGNIFICANT ONLY. PLUMBING, MECHANICAL, AND ELECTRICAL ITEMS INDICATED ARE REFERENCE ONLY.2. SEE MEP PLANS FOR EXACT LOCATIONS AND DETAILS. SEE THE A500 SHEETS FOR THE GUESTROOM CEILING PLANS.3. CONTRACTOR HAS OPTION TO USE GYP BD SUSP SYSTEM OR LIGHT GAGE METAL FRAMING AT DROPPED GYP BD CEILING LOCATIONS.4. SUSP CLG TO BE CENTERED W/ BALANCE GRID DESIGN W/ EDGE UNITS NO LESS THAN 50% OF TILE SIZE5. SEE SHEET G002 FOR GENERAL ARCHITECTURE NOTES & G003/G004 FOR RATED AREAS6. AT STUCCO -DISTANCE BETWEEN CONTROL JOINTS SHOULD NOT EXCEED 18 FEET IN EITHER DIRECTION WITH A LENGTH TO WIDTH RATIO OF 2.5 TO 1.7. SOFFITS (AND ANY ENCLOSED SPACE AREA) TO BE FRAMED WITH STL STUDS.1. GYP BD W/ PAINTED FINISH (NO TEXTURE)2. GYP BD @ WET AREAS W/ PAINTED FINISH3. EXPOSED STRUCTURE ABOVE -PAINTED4. 2X2 PREMIUM TEGULAR (REVEAL) EDGE ACOUSTICAL CEILING TILE WITH 9/16" NARROW SPLINE GRID SYSTEM5. 2X2 ACOUSTICAL CEILING TILE -1/2" VINYL FACE WITH STANDARD 15/16" GRID SYSTEM6.EIFS -COLOR TO MATCH ADJACENT WALL7.DECORATIVE WOOD BEAM MILLWORKRCP GENERAL NOTESRCP PLAN KEY NOTESLEGEND0'-0"CEILING HEIGHT TAGGYP BD CEILING -DO NOT EXCEED 200 SF BETWEEN CONTROL JOINTS 2' x 2' SUSPENDED ACOUSTICAL CEILING TILE2' x 4' CLEANABLE VINYL FACED SUSPENDED ACOUSTICAL CEILING TILE2' x 4' SUSPENDED ACOUSTICAL CEILING TILEEIFS FINISH CEILING -DO NOT EXCEED 100 SF BETWEEN CONTROL JOINTS (HORIZONTAL APPLICATION)METAL PANEL -COLOR: PANTONE PMS 4525METAL PANEL -COLOR: PANTONE PMS 5405UNIT AG131LEFTKINGUNIT AG129LEFTKINGUNIT AG127RIGHTKINGUNIT BG125LEFTQUEEN/QUEENUNIT BG123RIGHTQUEEN/QUEENUNIT AG130RIGHTKINGUNIT BG128LEFTQUEEN/QUEENUNIT BG126RIGHTQUEEN/QUEENUNIT BG124LEFTQUEEN/QUEENUNIT C1G122RIGHTKINGMECH/ELEC119PBX120CORRIDOR118STAIR #2117DRYERS122LAUNDRY121LINEN STORAGE123ELEV. EQUIP.124EMPLOYEEBREAKROOM116RESTROOM115RESTROOM114FITNESS112GM'S OFFICE111OFFICE110PANTRY126MECH127VESTIBULE101STAIR #1102WORK AREA104ELEV. LOBBY125WATER/ICE113CORRIDOR109FRONT DESK106BREAKFAST107DINING105LOUNGE103GAME AREA108A5032SimA4031A4022BIKE STORAGE100DRAWN BY:CHECKED BY:© Copyright 2021 - Cities Edge, LLC. - All rights reservedSHEETNUMBERThis document contains confidential or proprietary information of Cities Edge, LLC. Neither this document nor the information herein is to be reproduced, distributed, used or disclosed either in whole or in part except as authorized by Cities Edge, LLC. PROJECTNUMBERSHEET TITLE:PROJECT TITLE:ISSUEPHASEDATEISSUEDPROJECT OWNER:PROJECT LOCATION:Certification & Seal:5-29-2024C:\Users\sbents\OneDrive - Cities Edge Architects,LLC\Documents\20-033_ARCH_Tru_Carmel_IN_Central_R23_sbentsUU5H6.rvt5/29/2024 10:21:49 AM20-033AuthorCheckerA101FIRST FLOOR PLAN3/20/2023Dora Hospitality50% SUBMITTALCARMEL, INTRUSCALE: 1/8" = 1'-0"1FIRST FLOORSCALE: 1/8" = 1'-0"2FIRST FLOOR REFLECTED CEILING PLANRevision Date7/16/2024