Loading...
HomeMy WebLinkAboutCHS Murray Field Drainage Ditch Rehab C301STMSTM STMSTM STM STM STM STM STMSTM3 1 2 2 5 5 5 7 8 4 4 4 30 900 30 60 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! GRADING KEYNOTES 1. 4' WIDE BOTTOM DRAINAGE SWALE @ 6.0% SLOPE. 2. PERMANENT SEED ALL DISTURBED AREAS INCLUDING PROPOSED FLEXAMAT AREA. 3. RE-INSTALL PERMANENT ROCK CHECK DAM, SEE DETAIL ON SHEET C501. REMOVE SOIL AND SEDIMENT PRIOR TO AND FOLLOWING FINAL GRADING. 4. FLEXAMAT BANK PROTECTION, SEE DETAILS ON SHEET C502. 5. RESTORE EXISTING RIPRAP AS REQUIRED DURING CONSTRUCTION. 6. RESTORE GRADE TO PROPOSED SUBGRADE ELEVATIONS IN AREAS OF EROSION OF UP TO 6 FEET IN DEPTH. ENSURE 95% COMPACTION WITH BACKFILL MATERIAL. PLACE FLEXAMAT OVER COMPACTED BACKFILL MATERIAL, SEE KEYNOTE 4. 7. CMP METAL END SECTION 8. VIDEO INSPECT 160 LF OF EXISTING 18" CMP FOR ANY DEGRADATION OF PIPE. IF ANY INFILTRATION IS OCCURRING AT BOTTOM OF PIPE, LINE INTERIOR OF CMP OR REPLACE DAMAGED PORTION IF POSSIBLE. GRADING PLAN LEGEND APPROXIMATE LIMITS OF FLEXAMAT EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB EDGE OF PAVEMENT FLOWLINE EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION MEG TC BC EP TC BC 750.65 FL 1. SEE DRAWING C002 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. GENERAL NOTES COPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT PROJECT NUMBER: TLF-2020-296 MURRAY FIELD DRAINAGE DITCH BANK REHABILITATION CARMEL CLAY SCHOOLS 520 STADIUM DRIVE CARMEL, INDIANA PROJECT ISSUE DATE: JULY 20, 2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE BID SET 07/20/2020 GRADING PLAN C301 09/10/20