Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CHS Murray Field Drainage Ditch Rehab C502
CMP END SECTION DETAIL DEWATERING BAG DETAIL COPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT PROJECT NUMBER: TLF-2020-296 MURRAY FIELD DRAINAGE DITCH BANK REHABILITATION CARMEL CLAY SCHOOLS 520 STADIUM DRIVE CARMEL, INDIANA PROJECT ISSUE DATE: JULY 20, 2020 DRAWN BY: HHW REV. NO. DESCRIPTION DATE BID SET 07/20/2020 CITY COMMENTS 09/03/20201 SITE DETAILS C502 09/10/20