Loading...
HomeMy WebLinkAboutC104 - DEMO PLAN (POND)SILVA R A C O U R T DOMINO DR I V E CLAY CENTER ROAD80' LAST FENCE POST TO REMAIN. SO THAT REMAINING OFF SITE FENCE HAS A TIE IN. WETLANDS(PROTECT)SILVARA COURTDOMIN O D R I V E WWWWWWWWWWWE E E E E E E E E E E3 3 16 6 7 16 14 15 WETLANDS (PROTECT) 1.CONTROLS ON C401 MUST BE INSTALLED PRIOR TO ANY DISTURBANCE. 2.THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES TO BE REMOVED, RELOCATED OR ABANDONED PRIOR TO COMMENCING DEMOLITION ACTIVITIES. 3.THE CONTRACTOR SHALL COORDINATE WORK ASSOCIATED WITH THE REMOVAL, RELOCATION OR ABANDONMENT OF UTILITIES WITH THE UTILITY COMPANY OR ENTITY HAVING OWNERSHIP OF EACH RESPECTIVE UTILITY. COSTS FOR DISCONNECTION, REMOVAL, AND/OR RELOCATION OF EXISTING UTILITIES AS SHOWN ON THE DRAWINGS OR AS NECESSARY TO ALLOW FOR EXECUTION OF THE WORK SHALL BE PAID BY THE CONTRACTOR. 4.NO OPEN BURNING SHALL BE PERMITTED ON THE SITE. 5.THE OWNER HAS FIRST SALVAGE RIGHTS ON ALL ITEMS REMOVED. IF OWNER FORFEITS RIGHTS, ALL DEMOLISHED MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE LEGALLY DISPOSED OF OFF-SITE UNLESS OTHERWISE SHOWN. 6.UNLESS SCHEDULED FOR DEMOLITION ON THE DRAWINGS, ALL TREES AND VEGETATION SHALL BE PROTECTED THROUGHOUT THE DURATION OF THE PROJECT. PROTECTIVE MEASURES SHALL INCLUDE INSTALLATION AND MAINTENANCE OF TREE PROTECTION FENCING TO BE LOCATED WHERE SHOWN AND AT THE DRIPLINE OF ALL TREES LOCATED WITHIN CLOSE PROXIMITY OF AREAS WHERE HEAVY EQUIPMENT WILL OPERATE. 7.A CLEAN, STRAIGHT EDGE SHALL BE SAWCUT BETWEEN ALL CONCRETE AND ASPHALT SURFACES SCHEDULED FOR DEMOLITION AND CONCRETE AND ASPHALT SURFACES TO REMAIN IN-PLACE. DEMOLITION PLAN NOTES 8.TERMINAL ENDS OF UNDERGROUND UTILITIES ABANDONED IN-PLACE SHALL BE CUT, CAPPED AND PLUGGED. THE ENDS OF DISCONNECTED UNDERGROUND UTILITIES SHALL BE MARKED FOR FUTURE IDENTIFICATION WITH DETECTABLE LOCATOR TAPE OR A METAL ROD. 9.COORDINATE DEMOLITION WORK WITH NEW CONSTRUCTION ELSEWHERE ON THE PROJECT SITE. 10.ALL FOUNDATIONS, SLABS, STRUCTURAL STEEL, MASONRY, SIDEWALKS, RETAINING WALLS, CURBS, APPARATUSES, ETC., WITHIN DESIGNATED FOR REMOVAL SHALL BE DEMOLISHED ACCORDING TO SPECIFICATIONS. ALL DEMOLITION WITHIN PROPOSED FOOTPRINT SHALL BE COORDINATED WITH THE BUILDING DRAWINGS. 11.THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN SAFE ACCESS FOR PEDESTRIANS AND VEHICLE TRAFFIC. THE CONTRACTOR WILL MAINTAIN ALL UTILITY SERVICES TO ALL ADJACENT PROPERTY. IF UTILITY SERVICES MUST BE INTERRUPTED, THE CONTRACTOR SHALL COORDINATE THAT SHUTDOWN TO MINIMIZE IMPACT TO THE ADJACENT PROPERTY. COORDINATE SHUTDOWN AT LEAST ONE WEEK IN ADVANCE WITH THE ADJACENT PROPERTY OWNER. 12.ALL EXISTING ON-SITE UTILITIES SHALL REMAIN UNLESS DESIGNATED FOR REMOVAL, OR UNLESS THEY INTERFERE WITH PROJECT CONSTRUCTION. CONTACT ENGINEER BEFORE REMOVING. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES TO REMAIN. 13.EXISTING MANHOLES, CATCH BASINS, CLEANOUTS, VALVE BOXES, FRAMES COVERS AND GRATES REMAINING IN USE SHALL BE PROTECTED AND ADJUSTED TO FINAL GRADES. 14.REMOVE EXISTING UTILITIES ONLY AFTER CRITICAL NEW SYSTEMS ARE IN PLACE AND OPERATIONAL (I.E. STORM DRAINAGE, SERVICES TO EXISTING STRUCTURES). IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE PROPER REMOVAL, INCLUDING SAFE SEQUENCING OF UTILITY REMOVAL. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AT ALL TIMES. 15.FOR ALL UTILITY LINES AND STRUCTURES DESIGNATED TO BE REMOVED, PLACE AND COMPACT STRUCTURAL BACKFILL WITHIN TRENCH/EXCAVATION. 16.SEE SHEET LD100 THROUGH LD101 FOR TREE PROTECTION & REMOVAL PLAN. 17.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED / REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO START OF CONSTRUCTION TO DOCUMENT EXISTING CONDITION OF THE RIGHT-OF-WAY. 18.ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES & BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES & BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TO ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, & ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR ROADAY. COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES OR BRIDGES SHALL BE BORNE BY THE DEVELOPER. 1 EXISTING ASPHALT PAVEMENT OFFSITE PATH EXISTING CREEK LINE REMOVE OR RELOCATE EXISTING ELECTRIC . COORDINATE WITH UTILITY COMPANY. REMOVE TREE REMOVE FENCE (SALVAGE EXISTING PORTION OF WROUGHT IRON FENCE) REMOVE LIGHT POLE & BASE. SALVAGE & STORE REMOVE IRRIGATION LINE HEADS & COMPLETE CONFIRM ON SITE REMOVE BRICK COLUMNS & FOUNDATION COMPLETE. SALVAGE LIGHT ON COLUMN. REMOVE ALL BOX ASSOCIATED ENTRY WITH ENTRY GATE. REMOVE EGRESS BOX SALVAGE ENTRY GATE & ASSOCIATED GATE OPENING MECHANISMS PROTECT EMERGENCY SYSTEM POLE & SIREN DURING CONSTRUCTION REMOVE EXISTING SCRUB BUSH EXISTING ASPHALT DRIVE TO BE REMOVED COMPLETE SAW CUT PAVEMENT STRAIGHT REMOVE EXISTING STORM PIPE 2 3 4 CONSTRUCTION LIMITS INDICATES TREE REMOVAL R/W LINE WATER LINE FROM CITY MAPPING DEMOLITION PLAN LEGEND 5 6 7 8 9 10 11 12 13 14 15 16 19.ALL PAVING WITHIN EXISTING OR PROPOSED CITY R-O-W SHALL CONFORM TO REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. CONTRACTOR SHALL CONTACT DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK& TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING & PROPOSED R-O-W. 18095 Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANANEWFORCARMEL CLAY SCHOOLSCARMEL ELEMENTARY SCHOOLSDrawing Title: 06-21-19 SO MK Rev. #Revision Description Issue Date 1 ADDENDUM 7/9/2019 3 ASI #1 8/28/2019 SCALE: 1" = 50'KEYMAP C104 C104 DEMO PLAN (POND) 2 TAC COMMENTS 8/12/2019 4 ASI #2 9/20/2019 7 ASI #6 12/03/2019 WETLANDS (PROTECT) 9 ASI #9 01/09/2020 8 8 8