Loading...
HomeMy WebLinkAboutC201 - ENTRANCE PLAN25'W SAN SWR ESMTPROPOSED ROW 130'107.4'90'100'110'10'10.2'R30 .0 'R30.0'37'9'10.0'R3 0 . 0 'R30.0'10'END WALK CLAY CENTER ROAD 25.0' SEE LANDSCAPE SITE PLAN SHEETS 10'3.0'3.0'3.0'3.0'107.9'DRAINAGE ESMT858.0 858.7 855.6 855.1 20'W BMP ACCESS ESMT 20'W BMP ACC E S S E S M T 25'W SAN S W R E S M T 25'W SAN SWR ESMT 25'W SAN SWR ESMT 25'W SAN SWR E S M T 30'W DRAINAGE ESMTPROPO SE D ROWPROPOS ED R OW OUTDOORMECHANICAL YARD 20' BMP ACCESSEASEMENT SFINV = 863.2 (6"SSD)INV = 864.2 (6"SSD) 165 LF OF 8" HDPE 170 LF OF 8" HDPE 107 LF OF 8" HDPE INV = 860.8 107 LF OF 8" HDPE 107 LF OF 8" HDPE 107 LF OF 8" HDPE 92 LF OF 8" HDPE 136 LF OF 8" HDPE 119 LF OF 8" HDPE 119 LF OF 8" HDPE 246 LF OF8" HDPE 151 LF OF 8" HDPE 85 LF OF 8" HDPE 133 LF OF 8" HDPE SILVAR A C O U R T DOMINO DRIV E CLAY CENTER ROADNO PARKING NO PARKING NO PARKING NO PAR K I N G 1.ALL DIMENSIONS ARE MEASURED TO THE FACE OF CURB, EDGE OF PAVEMENT OR THE FACE OF BUILDING UNLESS OTHERWISE SHOWN. 2.BEARINGS, DIMENSIONS AND EASEMENTS ARE SHOWN FOR REFERENCE. REFER TO RECORDED PLATS AND SURVEYS FOR ADDITIONAL PROPERTY INFORMATION. 3.REFER TO ARCHITECTURAL PLANS FOR BUILDING DIMENSIONS AND DETAILS. 4.TRANSVERSE EXPANSION JOINTS ARE TO BE PROVIDED IN CONCRETE SIDEWALKS AND COMBINED WALKS/CURBS WHERE SHOWN AND AT INTERVALS NOT TO EXCEED 12 x THE WIDTH OF THE WALK. 5.EXPANSION JOINTS SHALL BE INSTALLED IN CONCRETE PAVEMENTS AND WALKS AT ALL LOCATIONS WHERE PAVEMENTS AND WALKS ABUT A VERTICAL SURFACE SUCH AS A CURB, WALL, COLUMN, ETC. 6.CONTRACTION JOINTS SHALL BE PROVIDED AT EQUAL INTERVALS BETWEEN EXPANSION JOINTS IN CONCRETE WALKS. INSTALL CONTRACTION JOINTS AS SHOWN BUT IN NO CASE AT INTERVALS GREATER THAN 1.5 x THE WIDTH OF THE WALK. 1.THE CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS AND APPROVALS HAVE BEEN OBTAINED FROM AGENCIES HAVING JURISDICTION OVER THE WORK PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL OBTAIN AND PAY THE COST OF ALL PERMITS THAT HAVE NOT BEEN SECURED BY THE OWNER. 2.THE CONTRACTOR SHALL COMPLY WITH THE CONSTRUCTION SAFETY STANDARDS AS ISSUED BY THE U.S. DEPARTMENT OF LABOR OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION AS SET FORTH IN FINAL RULE 29, PART 1926, WHERE SUCH REGULATIONS APPLY TO THE WORK. 3.LOCATIONS OF UTILITIES SHOWN WITHIN THESE PLANS ARE BASED UPON INFORMATION OBTAINED FROM UTILITY COMPANIES OR THEIR REPRESENTATIVES AND FIELD EVIDENCE OF IMPROVEMENTS VISIBLE ON THE GROUND SURFACE. EXACT LOCATIONS OF UNDERGROUND UTILITIES HAVE NOT BEEN VERIFIED. THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES AND REQUEST FIELD LOCATIONS OF SUCH WITHIN THE WORK AREA PRIOR TO COMMENCING EXCAVATION ACTIVITIES. THE CONTRACTOR SHALL REPORT ANY VARIATIONS FROM THE LOCATIONS SHOWN THAT MAY PRESENT A CONFLICT WITH EXECUTION OF THE WORK TO THE ENGINEER IN ADVANCE OF CONSTRUCTION. 4.THE CONTRACTOR SHALL COORDINATE WITH THE RESPECTIVE UTILITY COMPANIES AND SHALL PAY THE COST OF PROTECTION, RELOCATION, REMOVAL, CONNECTION, AND/OR RECONNECTION OF UTILITIES AS NECESSARY FOR EXECUTION OF THE WORK. 5.MATERIALS AND WORKMANSHIP SHALL COMPLY WITH ALL APPLICABLE CODES, SPECIFICATIONS, LOCAL ORDINANCES, INDUSTRY STANDARDS AND UTILITY COMPANY REGULATIONS. 6.IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSED RIGHT-OF-WAY. 7.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 8.ALL DIMENSIONS ARE TO FACE OF CURB, EDGE OF PAVEMENT OR FACE OF BUILDING GENERAL SITE NOTES SITE DEVELOPMENT PLAN NOTES R.O.W. ASPHALT PAVEMENT (PER CARMEL STANDARDS - SEE DETAILS) 10' WIDE & ASPHALT PATH (PER CARMEL STANDARDS - SEE DETAILS) 1 R.O.W. ASPHALT PAVEMENT (PER CARMEL STANDARDS - SEE DETAILS) CONCRETE CURB & GUTTER (SEE DETAILS) 10' WIDE & ASPHALT PATH (PER CARMEL STANDARDS - SEE DETAILS) ADA RAMP (SEE SITE & DETAILS) STOP SIGN (R3-2, 36" X 36") (SEE DETAILS) THERMOPLASTIC PEDESTRIAN CROSSWALK ( SEE SITE DETAILS) CONCRETE CURB TRANSITION (SEE DETAIL SHEET) STOP BAR (SEE DETAIL SHEET) 3', COMPACTED AGGREGATE #73 GRAVEL SHOULDER 6" DEPTH 4" THERMOPLASTIC SOLID WHITE 4" THERMOPLASTIC, DOTTED, WHITE, 2' STRIPE - 2' GAP MILL 1.5" EXISTING & RESURFACE W/ 1.5" HMA SURFACE, 9.5 MM 4" THERMOPLASTIC DOUBLE YELLOW FDR ENTIRE RESURFACING AREA. SITE PLAN KEY NOTE LEGEND 2 3 4 5 6 7 8 RIGHT OF WAY RIGHT OF WAY PAVEMENT 9 10 11 12 13 18095 Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANANEWFORCARMEL CLAY SCHOOLSCARMEL ELEMENTARY SCHOOLSDrawing Title: 06-21-19 SO MK Rev. #Revision Description Issue Date 1 ADDENDUM 7/9/2019 3 ASI #1 8/28/2019 SCALE: 1" = 30' KEYMAP C201 1 12 1 3 3 4 4 44 3 5 6 C 202 MATCH LINESAWCUT EXISTING EDGE OF PAVEMENT TO CREATE CLEAN, STRAIGHT EDGE PRIOR TO WIDENING ROADWAY 6 5 7 2 2 1 17 7217 8 C201 ENTRANCE PLAN 9 9 1213 10 9 12 13 10 11 10 9 13 12 10 2 TAC COMMENTS 8/12/2019 3 3 3 3