Loading...
HomeMy WebLinkAboutC401 - SWPP PLAN (INITIAL)TOPSOIL STOCKPILE SILVARA COURTDOMIN O D R I V E CLAY CENTER ROADOHUOHUWWWWWE E E E E E E E EOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUGGGGGGGGGGGGGGGGWWWWWWWWWWWWWWWWWNPDES POSTING BOARD PORTABLE TOILETS STAGING SFSFSFSFS F SF SF SF SF SF SFSF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFS F S FSF SFSFSFSFSFSFSFSFSFROCK CHECK SILT FENCE OUTLET ROCK CHECK SILT FENCE OUTLET ROCK CHECK SILT FENCE OUTLET ROCK CHECK SILT FENCE OUTLETSFSFSFSFSFSFSFSF COIR FIBER LOG INLET PROTECTION (TYPICAL) CONSTRUCTION ENTRANCE WITH STONE DIVERSION BERM AS REQUIRED TO PREVENT SEDIMENT FROM LEAVING SITE. COIR FIBER LOG DIVERSION CHECK DAMS. ENTRENCH 4" INTO GROUND AT SILT FENCE TO PREVENT RUNOFF FROM UNDERMINING SILT FENCH AND DAM. CONCRETE WASHOUT PROTECT EXISTING WOODS PROTECT EXISTING WOODS SF S F S FSFSF SF SF COVERED TRASH ENCLOSURE COIR FIBER LOG INLET PROTECTION (TYPICAL) COIR FIBER LOG CHECK DAM TEMP ROCK CHECK DAM TEMP. SEDIMENT BASIN: EXCAVATE TO 841.0 & ALLOW FOR 2.0' OF SEDIMENT DEPOSITS FINAL BASIN BOTTOM = 843.0 SF SF SF SFWETLANDS (PROTECT) FAIRCLOTH SKIMMER ATTACHED TO OUTLET STRUCTURE (SEE SHEET C602)SF SFSFSFSF SF SF SFSF SF SF SF SF S F 18095 Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANANEWFORCARMEL CLAY SCHOOLSCARMEL ELEMENTARY SCHOOLSDrawing Title: 06-21-19 SO MK Rev. #Revision Description Issue Date 1 ADDENDUM 7/9/2019 3 ASI #1 8/28/2019 EROSION CONTROL NOTES 1.THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THE DRAWINGS ARE CONSIDERED THE MINIMUM PRACTICES NECESSARY FOR COMPLIANCE WITH THE NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY AS IDENTIFIED UNDER SECTION 327-IAC-15-5 OF THE INDIANA ADMINISTRATIVE CODE. HOWEVER, SITE CONDITIONS, CONSTRUCTION METHODS, SEQUENCING OF WORK AND GENERAL PRACTICE MAY WARRANT VARIATION AND/OR ADDITIONS TO THE QUANTITIES, TYPES, AND LOCATIONS OF BMP MEASURES AS SHOWN. 2.UNLESS OTHERWISE SHOWN, TEMPORARY CONTROL MEASURES SHALL BE REMOVED UPON SATISFACTORY ESTABLISHMENT OF PERMANENT VEGETATION. 3.SEE SHEET C404-C405 FOR DETAILS AND SPECIFICATIONS REFERENCED ON THIS SHEET. 4.PERIMETER CONTROL MEASURES (I.E. SILT FENCE, DIVERSION DITCHES AND BERMS, TREE PROTECTION FENCING) SHALL BE INSTALLED PRIOR TO COMMENCING EARTHWORK ACTIVITIES. 5.IN ADDITION TO THE MAINTENANCE REQUIREMENTS IDENTIFIED FOR INDIVIDUAL MEASURES, ALL EROSION CONTROL MEASURES INSTALLED UNDER THIS PROJECT SHALL BE INSPECTED WEEKLY TO ENSURE THEY ARE FUNCTIONING PROPERLY. MEASURES FOUND TO BE DEFICIENT SHALL BE REPAIRED OR REPLACED IMMEDIATELY THEREAFTER. 6.THE CONTRACTOR SHALL MAINTAIN A STABLE CONSTRUCTION ENTRANCE AT ALL TIMES AND SHALL MAKE EFFORTS TO MINIMIZE THE ACCUMULATION OF SOIL, MUD AND DEBRIS ON ADJOINING ROADWAYS. 7.SYMBOLS FOR INLET PROTECTION MEASURES AND DITCH CHECKS ARE SHOWN LARGER THAN ACTUAL SIZE. 8.DISTURBED AREAS AND STOCKPILES THAT ARE TO REMAIN IDLE FOR MORE THAN 14 DAYS SHALL BE STABILIZED WITH TEMPORARY SEEDING. 9.ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE INSPECTOR. 10.PORTABLE TOILETS SHALL BE ANCHORED TO THE GROUND TO PREVENT TIPPING AND SPILLS. 1.EARTH MOVING ACTIVITIES MAY NOT BEGIN UNTIL AFTER ITEMS 2-5 HAVE BEEN COMPLETED. 2.DESIGNATE THE PERSON RESPONSIBLE FOR COMPLYING WITH THE ON-SITE SWPPP. COORDINATE RESPONSIBILITY FOR COMPLETING THE SITE REVIEW AFTER EACH 12" RAINFALL AND A MINIMUM OF ONE TIME A WEEK. 3.POST THE NPDES CONTACT INFORMATION AT THE CONSTRUCTION ENTRANCE AS SHOWN ON THE PLANS. INCLUDE A COPY OF THE CARMEL STORM DRAINAGE APPROVAL AND THE CONTACT INFORMATION FOR THE PERSON RESPONSIBLE FOR IMPLEMENTING THE SWPPP. 4.INSTALL SILT FENCE,CONSTRUCTION ENTRANCE, INLET/CULVERT PROTECTION AND CONCRETE WASHOUT AS SHOWN ON THE PLANS. CONSTRUCT ROCK CHECK DAM SILT FENCE OPENINGS IMMEDIATELY AFTER INSTALLING SILT FENCING. INSTALL DIVERSION CHECKS ALONG NORTH SILT FENCE LINE AS SHOWN ON THE PLANS. INSTALL ALL TREE PROTECTION MEASURES AS SHOWN ON THE PLANS. 5.CONTACT CARMEL ENGINEERING DEPARTMENT AT (317) 571-2441 FOR A PRE-CONSTRUCTION CONFERENCE MEETING BEFORE BEGINNING ANY EARTHMOVING ACTIVITIES. 6.INSTALL PORT-A-LET, AND COVERED CONSTRUCTION DUMPSTER. 7.PERFORM REQUIRED SITE DEMOLITION AND CLEARING. 8.STRIP TOPSOIL AND STORE IN DESIGNATED AND PROTECTED TOPSOIL STOCKPILE AREA. PERFORM MASS GRADING FOLLOWED BY UTILITY INSTALLATION. MAINTAIN STORM INLET PROTECTION UNTIL SITE IS STABILIZED AND EROSION WILL NOT LIKELY OCCUR. 9.CONTRACTOR SHALL EXCAVATE WET DETENTION BASIN TO ACT AS TEMPORARY SEDIMENT BASIN BEFORE PRECEDING WITH ANY OTHER EARTHMOVING ACTIVITIES. OVER-EXCAVATE BASIN FOR SEDIMENT STORAGE AS INDICATED ON PLAN. MAINTAIN A STONE CHECK DAM IN FRONT OF THE BASIN OUTLET UNTIL ENTIRE SITE HAS REACHED 70% VEGETATIVE COVER DENSITY. 10.MAINTAIN ALL INLET PROTECTION, CHECK DAMS AND SILT FENCING IN THE SITE PROJECT BY CLEANING OUT EVERY WEEK AND AFTER EVERY RAIN EVENT OF 1/2" OR GREATER DEPTH. 11.IF WORK ON SITE WILL STOP FOR 2 WEEKS OR MORE AFTER COMPLETION OF MASS GRADING, INSTALL TEMPORARY SEED AS INDICATED ON THIS SHEET AND SHEET C403. 12.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE REQUIRED BY THE INSPECTOR. PRE-CONSTRUCTION SEQUENCING NOTES THERE SHALL BE NO DIRT, DEBRIS, OR STORAGE OF MATERIAL IN THE STREET ADJACENT ROADS MUST BE SWEPT DAILY SCALE: 1" = 100' LINE TYPE / SYMBOL TEMPORARY SEEDING WITH MULCH COARSE AGGREGATE 6 INCHES OF 2"-3" TEMPORARY CONSTRUCTION ENTRANCE (20'W x 150'L) Minimum TREE PROTECTION FENCE SILT FENCE (SEDIMENT FENCE) EROSION CONTROL LEGEND LINE TYPE / SYMBOLDESCRIPTION DESCRIPTION CONCRETE WASHOUT SF STOCKPILE/STAGING LIMITS SF SF ROCK DAM SILT FENCE OUTLET (SEE DETAIL, SHEET C404) COIR FIBER LOG CHECK DAM (OVERLAP ENDS) C401 SWPP PLAN (INITIAL) NPDES POSTING BOARD 2 TAC COMMENTS 8/12/2019 4 ASI #2 9/20/2019 4 4 PROVIDE 8" FAIRCLOTH SKIMMER WITH 6.5" ORIFICE OPENING. J.W. FAIRCLOTH & SON INC. P.O. BOX 757 HILLSBOROUGH, NORTH CAROLINA 27278 i919) 732-1244 8" FAIRCLOTH SKIMMER W/ 6.5" ORIFICE SCALE: NONE TEMPORARY SEDIMENT BASIN SKIMMER TYPE OUTLET STRUCTURE 5 L.F. OF 8" PVC 1 4 BLOCK 8" ORIFICE WHILE SKIMMER IS IN USE 6" SC4 40 PVC